4.2.3.3 New Housing for Urban Poor
New housing should be in the form of one or two room units, which would be developed through public and private agencies and through Cooperative societies. As this category constitutes bulk of the housing stock that has to be catered at an affordable price to the lowest income bracket as housing for Economically Weaker Sections (EWS), this is often done by cross-subsidization.
For this purpose, adequate land would be earmarked for EWS housing. The developers of group housing shall ensure that minimum ¹ [15% of proposed FAR to be] constructed for Community-Service Personnel / EWS and lower income category. ² [Employer Housing of Central Government, State Government and other Government Agencies are not required to follow the requirement of FAR or Dwelling Units for Community Service Personnel / EWS and lower income category.] In old built up areas, this may be as redevelopment schemes or industrial housing, etc., whereas, in urban extensions, the acquisition and development cost of this land should be borne by rest of the project. Such reserved lands should be handed over to a designated agency for promoting housing for low income and weaker sections.
The pattern of EWS housing shall be such as to ensure optimal utilization of land in a sustainable manner. For that purpose, multi-storied housing will be the preferred option. Apart from mandatory provision for EWS housing in all group housing projects/ schemes, the primary responsibility for creating adequate stock of housing for urban poor shall be borne by public agencies.
4.2.3.4 Slum & JJ Redevelopment Regulations and Guidelines for Collective Community Rehabilitation / Relocation - In-situ Upgradation / Rehabilitation of Slum & JJ Clusters, Resettlement Colonies, ³[schemes for rehabilitation of project-affected persons# and Unsafe Buildings*#] ⁴[and EWS public housing schemes]
¹ Modified vide S.O. 1215 (E) dated 13-05-2013
² Added vide S.O. 1277(E) dated 19-05-2009
³ Added vide S.O. 2894(E) dated 23-09-2013 and modified vide S.O. 2895(E) dated 23-09-2013
⁴ Added vide S.O. 2895(E) dated 23-09-2013
The ¹[implementing agency / corporate body concerned] should work out schemes for collective community rehabilitation/relocation and explore the possibility of involving private sector/slum cooperatives. In existing resettlement colonies, redevelopment, regular servicing and maintenance, which are overdue, are to be based on the guidelines and incentives as applicable for the Slum& JJ Rehabilitation Scheme ¹[schemes for rehabilitation of project-affected persons# and for Unsafe Buildings*#] ²[and EWS public housing schemes.]
The following guidelines with site-specific relaxations may be adopted as required. Regular monitoring of executed schemes and revision of these guidelines at the time of preparation of new schemes is essential. Group housing norms shall be applicable with the following conditions:
(i) ¹ [Minimum plot size 2000 sqm (on a min. ROW of 9m).] ¹ [In case of Public Housing, the Technical Committee of DDA may relax minimum plot size by 10 %.]
(ii) Maximum ¹ [900 DUs/ha] on residential component of the land.
(iii) The scheme should be designed in a composite manner with an overall maximum FAR of 400 on the residential component of the land ¹[(including facilities i.e., Facility for the level as indicated in Table.3.3 of Chapter 3 based on the population accommodated under the project/scheme)]
³ [The maximum FAR of 300 on the remunerative component of the land shall be applicable irrespective of the landuse.
Any use/ mix of uses shall be permitted as proposed by the developer entity within the overall FAR of 300, in the remunerative component as per MPD provisions.
In case the developer entity proposes mix of uses, the parking and other development control norms will be applicable on pro-rata basis, on the FAR utilized for the particular use.]
(iv) Mixed land use / commercial component ⁴ [(including all commercial activities as permitted under Table 5.1 of Chapter 5)] up to 10% of permissible FAR in the residential component of the land. ¹ [In addition ⁴ {to the above}, 10% of the permissible FAR ⁴ {may} be permitted for home based economic activities (i.e., Group-A Household Industries as given in Annexure I of Chapter 7) to the beneficiaries of the
¹ Modified vide S.O. 2894(E) dated 23-09-2013
² Added vide S.O. 2895 (E) dated 23-09-2013
³ Modified vide S.O. 4674(E) dated 23-12-2020
⁴ Added vide S.O. 475 (E) dated 28-01-2019
project/ scheme.] 1[All the commercial activities shall be permissible irrespective of the land use subject to all statutory clearances and shall in no case compromise with the basic community needs and infrastructure facilities required to be provided as per MPD-2021.]
(v) Specific situations may require clubbing of scattered squatters with JJ sites in the neighbourhood to work out an overall comprehensive scheme.
(vi) The minimum residential component of the land area for rehabilitation of squatters has to be 60% and maximum area for remunerative use has to be 40%.
(vii) Area of dwelling unit for ²[EWS or rehabilitation shall be minimum 25 sqm and max. 40 sq. mt. and room sizes as per IS: 8888.]
(viii) 3[Common parking is to be provided for residential component at 0.5 ECS per 100 sqm of floor area which can be relaxed wherever required. Parking for remunerative purposes shall be as applicable for the relevant land use.]
(ix) No restriction on ground coverage (except set backs)
(x) Schemes shall be approved by concerned local body.
(xi) Schemes / designs should be compatible for ⁴ [differently-abled persons].
(xii) Norms for Social Infrastructure shall be as per 5[4.2.2.3 A. sub para (xix).]
(xiii) Norms for Physical Infrastructure shall be as per note (iv) of Table 4.2.
6 [Note:
* Unsafe buildings are to be determined by the statutory competent authority.
# In case of Schemes for Rehabilitation of Project-affected Persons & Unsafe Buildings, this will only be applicable for those schemes wherein these guidelines are adopted. Disposal and eligibility for allotment of the built flats/plots for Schemes for Rehabilitation of Project-affected Persons & Unsafe Buildings shall be governed by the separate policy already formulated or yet to be framed by the Housing & Lands Departments of DDA.]
³ [Slum & JJ Clusters on plots smaller than 2000 sqm be relocated instead of taking up in-situ rehabilitation as per the above-cited guidelines.]
¹ Added vide S.O. 475 (E) dated 28-01-2019
² Modified vide S.O. 2894(E) dated 23-09-2013
³ Added vide S.O. 2895 (E) dated 23-09-2013
⁴ Modified vide S.O. 3173 (E) dated 12-12-2014
⁵ Modified vide S.O. 1014 (E) dated 08-03-2022
⁶ Added vide S.O.2894(E) dated 23-09-2013