8.1 General
Electric equipment and systems shall comply with the mandatory requirements of clause 8.2.
8.2 Mandatory Requirements
8.2.1 Transformers
8.2.1.1 Maximum Allowable Power Transformer Losses
Power transformers of the proper ratings and design must be selected to satisfy the minimum acceptable efficiency at 50% and full load rating. In addition, the transformer must be selected such that it minimizes the total of its initial cost in addition to the present value of the cost of its total lost energy while serving its estimated loads during its respective life span. All distribution transformers shall comply with the provisions of clause 3.1.4.6.
| Rating KVA | Max. Losses at 50% loading KW* | Max. Losses at 100% loading KW* | Total losses at 50% loading KW* | Total losses at rated load KW* |
| Up to 22 KV class | 33KV class | |||
| 100 | 0.94 | 2.4 | 1.12 | 2.4 |
| 160 | 1.29 | 3.3 | 1.42 | 3.3 |
| 200 | 1.5 | 3.8 | 1.75 | 4 |
| 250 | 1.7 | 4.32 | 1.97 | 4.6 |
| 315 | 2 | 5.04 | 2.4 | 5.4 |
| 400 | 2.38 | 6.04 | 2.9 | 6.8 |
| 500 | 2.8 | 7.25 | 3.3 | 7.8 |
| 630 | 3.34 | 8.82 | 3.95 | 9.2 |
| 800 | 3.88 | 10.24 | 4.65 | 11.4 |
| 1000 | 4.5 | 12 | 5.3 | 12.8 |
| 1250 | 5.19 | 13.87 | 6.25 | 14.5 |
| 1600 | 6.32 | 16.8 | 7.5 | 18 |
| 2000 | 7.5 | 20 | 8.88 | 21.4 |
| 2500 | 9.25 | 24.75 | 10.75 | 26.5 |
Electrical Power
| Rating VA | Max. Losses at 50% loading W* | Max. Losses at 100% loading W* | Total losses at 50% loading W* | Total losses at rated load W* |
| Up to 11 KV class | 33KV class | |||
| 100 | 520 | 1800 | 560 | 1820 |
| 160 | 770 | 2200 | 780 | 2580 |
| 200 | 890 | 2700 | 900 | 3000 |
| 250 | 1050 | 3320 | - | - |
| 315 | 1100 | 3630 | 1300 | 4300 |
| 400 | 1450 | 4630 | 1520 | 5100 |
| 500 | 1600 | 5500 | 1950 | 6450 |
| 630 | 2000 | 6640 | 2300 | 7600 |
| 1000 | 3000 | 9800 | 3450 | 11350 |
| 1250 | 3600 | 12000 | 4000 | 13250 |
| 1600 | 4500 | 15000 | 4850 | 16000 |
| 2000 | 5400 | 18400 | 5700 | 18500 |
| 2500 | 6500 | 22500 | 7050 | 23000 |
For Tables 8.1,8.2:* Total loss values given in above table are applicable for thermal classes E,B&F and have component of the load loss at reference temperature according to clause 17 to IS 2026: Part 11, i.e., average winding temperature rise as given in column 2 of Table 8.2 plus 30ºC. An increase of 7%on total for thermal class H is allowed.
8.1.1.1 Measurement and Reporting of Transformer Losses
All measurement of losses shall be carried out by using calibrated digital meters of class 0.5 or better accuracy and certified by the manufacturer. All transformers of capacity of 500kVA and above would be equipped with additional metering class current transformers (CTs) and potential transformers (PTs) additional to requirements of utilities so that periodic loss monitoring study may be carried out.
8.1.2 Energy Efficient Motors
Motors shall comply with the following:
(a) All permanently wired motors of 0.375kW or more serving the building and -
Electrical Power
expected to operate more than 1,500 hours per year and all permanently wired polyphase motors of 50kW or more serving the building and expected to operate more than 500 hours per year shall have a minimum acceptable nominal full load motor efficiency not less than IS 12615 for energy efficient motors;
(b) Motors of horsepower differing from those listed in the table shall have efficiency greater than that of the next listed kW motor;
(c) Motor horsepower ratings shall not exceed 20% of the calculated maximum load being served;
(d) Motor nameplates shall list the nominal full- load motor efficiencies and the fullload power factor;
(e) Motor users should insist on proper rewinding practices for any rewound motors. If the proper rewinding practices cannot be assured, the damaged motor should be replaced with a new, efficient one rather than suffer the significant efficiency penalty associated with typical rewind practices;
(f) Certificates shall be obtained and kept on record indicating the motor efficiency. Whenever a motor is rewound, appropriate measures shall be taken so that the core characteristics of the motor is not lost due to thermal and mechanical stress during removal of damaged parts. After rewinding, a new efficiency test shall be performed and a similar record shall be maintained;
(g) All motors and pump sets shall comply with the provisions of clause 3.1.4.6.
8.2.3 Power Factor Correction
All electricity supplies exceeding 100 A, 3 phases shall maintain their power factor between 0.95 lag and unity at the point of connection.
8.2.4 Check – Metering and Monitoring
(a) Services exceeding 120 kVA shall have permanently installed electrical metering to record demand (kVA), energy (Kwh), and total power factor. The metering shall also display current (in each phase and the neutral), voltage (between phases and between each phase and neutral), and total harmonic distortion (THD) as a percentage of the current
(b) Service not exceeding 120 kVA but over 65 kVA shall have permanently installed electric metering to record demand (Kw), energy (Kwh), and total power factor (or kVARh)
(c) Services not exceeding 65 kVA shall have permanently installed electrical metering to record energy (Kwh)
Electrical Power
8.2.5 Power Distribution Systems
8.2.5.1 Power Distribution System Losses
The power cabling shall be adequately sized as to maintain the distribution losses not to exceed 1% of the total power usage. Record of design calculation for the losses shall be maintained.