The approved plan should consist of a report, supplemented by the existing and proposed land use plans. The Report should include list of tables, list of illustrations and annexures, which should be appropriately referenced. More
importantly, the aims and objectives, scope of work, limitations and methodological framework should be highlighted.
The contents of various plans could be as follows:
2.2.1 Perspective Plan
The Perspective Plan should be driven by the vision and mission of the exercise being undertaken. Whereas the vision may refer to the end state, the mission should clearly focus on the steps to be undertaken to achieve the end state. At the same time, the perspective plan must take into cognizance the relevant policies and statues of the Central and State Governments and projects/ schemes being implemented at National, State, District, Region and Town levels. Based on the foregoing analysis, clear strategies should be worked out for urban and regional planning and development including for the peri-urban areas, environmental protection, heritage conservation and the linkages between these aspects.
Surveys and analysis form the core issue both in terms of spatial and attribute data sets. Based on this analysis, alternative strategies for development may be worked out and the most appropriate strategy for development indicated for detailing out further. Accordingly, the contents of a perspective plan shall broadly encompass the following:
■ Existing Scenario in overall terms.
■ Projected requirements for the horizon year based on the total quantum of land available and that can actually be used for development.
- Specific planning studies related to setting, linkages both socio-economic and physical, and likely challenges. In addition climatological studies, identification of areas prone to hazards, environmentally sensitive zones.
■ Population projection for the horizon year based on past trends and other statistical methods to arrive at assigned population for the horizon year.
■ Economy and employment levels, both existing and projected.
- Shelter-including shortfalls in various categories of housing stock and the total requirement
■ Transportation-analysis of the existing network, projected requirement based on detailed OD surveys.
- Institutional uses both existing and required for the horizon year in terms of education, health, socio-cultural, religious, and distributive services like police, fire, telecom etc.
■ Infrastructure in terms of water, underground sewerage, drainage, and solid waste management.
■ Resource base- monetary resources required to implement plan proposals vis-a-vis financial health of the local body/implementing agencies.
- Manpower resources both existing and proposed as per requirement.
Given the extent of the planning area and the assigned population to be accommodated, physical proposals may be drawn up driven by transportation and activity nodes.
It is important to ensure that projects/schemes are identified at this level itself including their costing and modalities for implementation.



