Literature review on the planning systems in India and abroad indicates that each country/territory has evolved its own system suiting specific needs, traditions and legal arrangements. The recommended urban development planning systems in the guidelines have, therefore, taken into account such variations.
The recommended planning system is to consider various plans, both statutory and non-statutory, to be a part of the system. These various plans such as urban revitalisation plan, city development plan, comprehensive mobility plan, city sanitation plan, coastal zone management plan etc. have emerged due to the planning needs and/or funding schemes/programmes. Similarly, regional plan, which is to cover a larger land area, is included in the system across the scale of planning.
The Table- 1.3 below, which has been designed based on stakeholder consultations, suggests the planning system framework on the basis of -
■ Hierarchy
■ Spatial extent
■ Scale of planning
■ Details provided in the plan
■ Function and their speciality
Table- 1.1: Planning System Framework
| Planning system | Scope and purpose of the plan | Time frame* | Various plans; indicative list | |||||||
| Core area of planning | ||||||||||
| Perspective Plan | To develop vision and provide a policy framework for urban & regional development and further detailing | 20years | Vision document | Concept plan | Mission statement | -- | -- | -- | -- | -- |
| Regional Plan | To identify the region and regional resources for development within which settlement (urban and rural) plan to be prepared and regulated by DPC. | 20years | Regional plan (Mobility 1) | Sub-regional plan | -- | -- | -- | -- | -- | -- |
| Development Plan | To prepare a comprehensive Development Plan for urban areas, Peri-urban areas under control of Development authority/Metropolitan Planning Committee. | 20-30 years (Review every 5 years) | District Development Plan (Mobility 1) | City/Metropolitan Development Plan (Mobility 2) | Master Plan City Utility (30 years) | Revised Development Plan | -- | -- | -- | -- |
| Local Area Plan | To detail the sub-city landuse plan and integration with urban infrastructure, mobility and services. | 5-20 year (Review every 5 yrs) | Town Planning Schemes | Zonal Plan / Sub-city plan | Ward Committee Plan | Coastal Zone Mgmt Plan | Urban Redevelopment Plan | -- | -- | -- |
| Specific and investment planning | ||||||||||
| Special Purpose Plan | To identify the needs of the special areas which require special plan within the framework of the development plan. | 5-20 year (within city utilities 30 year plan) | City Development Plan (as per JnNURM) | Comprehensive Mobility Plan (as per JnNURM) | City Sanitation Plan (as per JnNURM) | Disaster Management Plan (as per NDMA) | Slum Redevelopment Plan (as per RAY) | Tourism Master Plan | Environmental Conservation Plan | Heritage Conservatio n Plan |
| Annual plan | To translate Development Plan in the context of annual physical & fiscal resource requirement. To monitor plan implementation with performance milestones. | 1 year | Investment plan | Audit and monitoring plan | -- | -- | -- | -- | -- | -- |
| Project/Research | To focus on project related investments, costing and returns & for the studies required prior to or post plan formulation. This should be a continuous process to support planning and implementation at all stages and promotes innovation in practice. | 5-20 year | Pre-feasibility & feasibility study | Detailed Project Report | Schemes & Sub-projects | Surveys & studies | Project such as: Riverfront development projects | -- | -- | -- |
Note: Consultative meetings and the regional workshops during URDFI formulation have pointed out the need to review the plan period of 20 years and extend the same to 30 years. However general consensus was in the favour of 20 years. Intermittent review in 5 year gap would be required.