3.1 Compliance Requirements:
3.1.1 Mandatory Requirements:
A. Compliance of this code shall be mandatory for buildings specified in clause 2.
B. All Government notifications related to energy conservation or mandatory use of any product/process or equipment shall be complied with.
3.1.2 New Buildings:
New buildings shall comply with either the provisions of clause 4 to 8 of this code or the Whole Building Performance Method of Appendix B. In case of mixed use buildings if the builtup area of the commercial part qualifies for the applicability of this code then the commercial part of the building need to comply with this code.
3.1.3 Additions to existing Buildings:
Where the addition plus the existing building exceeds the builtup area threshold of clause 2, additions shall comply with the provisions of clause 4 to 8. Compliance may be demonstrated in either of the following ways:-
(a) The addition alone shall comply with the applicable requirements, or
(b) The addition, together with the entire existing building shall comply with the requirements of this code that would apply to the entire building, as if it were a new building:
Exception to clause 3.1.3: When space conditioning is through the existing systems and equipment, the existing system and equipment need not comply with this code. However, any new equipment installed must comply with specific requirements applicable to that equipment.
3.1.4 Alterations to existing Buildings:
Where the existing building exceeds the builtup area threshold as specified in clause 2, the portions of a building and its systems that are being altered shall meet the provisions of clause 4 to 8. The specific requirements for alterations are described in the following subsections.
Exception to clause 3.1.4: When the entire building complies with all of the provisions of clause 4 to 8 as if it were a new building.
3.1.4.1 Building Envelope:
Alterations to the building envelope shall comply with the requirements of clause 4 for fenestration, insulation, and air leakage applicable to the portions of the buildings and its systems being altered.
Exception to clause 3.1.4.1 the following alterations need not comply with these requirements provided such alterations do not increase the energy usage of the building.
(a) Replacement of glass in an existing sash and frame, provided the U-factor and SHGC of the replacement glazing are equal to or lower than the existing glazing;
(b) Modifications to roof/ceiling , wall or floor cavities which are insulated to full depth with insulation; and
(c) Modifications to walls and floor without cavities and where no new cavities are created.
3.1.4.2 Heating, Ventilation and Air Conditioning:
Alterations to building heating, ventilating, and air conditioning equipment or systems shall comply with the requirements of clause 5 applicable to the portions of the building and its systems being altered. Any new equipment or control devices installed in conjunction with the alteration shall comply with the specific requirements applicable to that equipment or control device.
3.1.4.3 Service Water Heating:
Alterations to building service water heating equipment or systems shall comply with the requirements of clause 6 applicable to the portions of the building and its systems being altered. Any new equipment or control devices installed in conjunction with the alteration shall comply with the specific requirements applicable to that equipment or control device.
3.1.4.4 Lighting:
Alterations to building lighting equipment or system shall comply with the requirements of clause 7 applicable to the portions of the building and its systems being altered. New lighting systems, including controls, installed in an
existing building and any change of building area type as listed in Table 7.1 shall be considered an alteration. Any new equipment or control devices installed in conjunction with the alteration shall comply with the specific requirements applicable to that equipment or control device:
Exception to clause 3.1.4.4: Alterations that replace less than 50% of the luminaries in a space need not comply with these requirements provided such alterations do not increase the connected lighting load.
3.1.4.5 Electric Power and Motors:
Alteration to building electric power systems and motor shall comply with the requirements of clause 8 applicable to the portions of the building and its systems being altered. Any new equipment or control devices installed in conjunction with the alteration shall comply with the specific requirements applicable to that equipment or control device.
3.2 Compliance Approaches:
The building shall comply with the mandatory provisions of clause 4.2, 5.2, 6.2, 7.2, and 8.2 and either of the following:
(a) Prescriptive Method ( 4.3, 5.3, and 7.3)
Exception to clause 3.2 (a): The envelope trade-off option of clause 4.4 may be alternatively used in place of the prescriptive criteria of clause 4.3
(b) Whole Building Performance Method of Appendix B clause 1.
3.2.1 Consistent with Section 22 of AP Building Rules, 2012 and to encourage compliance, the ULB shall adopt the following compliance rating methodology as described in the table below. Compliance by prescriptive method to get A P ∗ is mandatory for all the new buildings as per definition given in section 2(aa). However, builder/owner/developer can adopt A P ∗ ∗ and above on voluntary basis.
APECBC Compliance Rating Methodology:
| Category | Compliance Requirement |
|---|---|
| AP* | compliance by prescriptive method as per APECBC or compliance by whole building performance method with energy savings up to 5% above standard design |
| AP ** | compliance by whole building performance method with energy savings of ≥6 and ≤10% above standard design |
| AP *** | compliance by whole building performance method with energy savings of ≥11 and ≤15% standard design |
| AP **** | compliance by whole building performance method with energy savings of ≥16 and ≤20% above standard design |
| AP ***** | compliance by whole building performance method with energy savings of ≥21 and ≤30% above standard design |
| AP ****** | compliance by whole building performance method with energy savings above 30% of standard design |
3.3 Administrative Requirements:
Administrative requirements relating to permit requirements, enforcement, interpretations, claims of exemption, approved calculation methods, and rights of appeal are specified by the Authority having Jurisdiction.
3.3.1 Professional statement for energy analysis shall be prepared to identify the compliance format and to demonstrate how the project design and the construction complies with APECBC
3.3.2 Professional responsibility for energy analysis and compliance for any method adopted by builder/owner/developer/ shall be fixed on respective AP Empanelled architect or BEE empanelled architect who submits the professional statement
3.4 Compliance Documents:
3.4.1 General:
Plans and specifications shall show all pertinent data and features of the building, equipment, and systems in sufficient detail to permit authority having jurisdiction to verify that the building complies with the requirements of this code. Details shall include, but are not limited to:
(a) Building Envelope: insulation materials and their R- values; fenestration U- factors, solar heat gain coefficients (SHGC), visible light transmittance (if the trade-off procedure is used), and air leakage, overhangs and side fins, building envelope sealing details;
(b) Heating, Ventilation, and Air Conditioning : system and equipment types, sizes, efficiencies and controls , economizers, variable speed drives, piping insulation, duct sealing, insulation and location, requirement for balance report;
(c) Service Hot Water and Pumping : solar water heating system;
(d) Lighting: lighting schedule showing type, number, and wattage of lamps and ballasts, automatic lighting shut off, occupancy sensors, and other lighting controls, lamp efficacy of exterior lamps; and
(e) Electrical Power: electric schedule showing transformer losses, motor efficiencies, and power factor correction devices, electric check metering and monitoring system.
3.4.2 Supplemental information:
The authority having jurisdiction may require supplemental information necessary to verify compliance with this code, such as calculations, worksheets, compliance forms, manufacturer’s literature, or other data.
3.4.3 Inspection by Urban Local Bodies
3.4.3.1 ULB Authority. The ULB has full authority to implement the APECBC including but not limited to:
a. APECBC Compliance Application Fees. The applicant shall pay the APECBC compliance application fee to the ULB, as determined by MAUD and the ULB, for every APECBC compliance application that is submitted to the ULB for approval. The ULB has the authority to develop a fee payment schedule and periodically modify fee amounts.
b. Progress Inspections. The ULBs have the authority to determine the required inspection documentation to verify APECBC compliance for the envelope, heating, ventilation and air conditioning, service hot water and pumping, lighting and electrical power of the building, during the construction and occupancy phases.
c. Incentive Structures. The ULB and MAUD have the authority to provide incentives for compliance with AP*** or higher categories of the APECBC Compliance Rating, consistent with this code. The incentives may be in the form of expedited processing of the certificate of construction and occupancy certificate filed by the applicant.
d. Energy Analysis Disclosure. The ULB has the authority to disclose the energy analysis results at any time.
e. APECBC Trainings and Education. The ULB is authorized to develop training for ULB staff and inspectors; education and outreach programs to design professionals; and programs for licensing professionals and inspectors on APECBC compliance.