Where any building permit which has been issued by the Competent Authority before the commencement of the this Code and where construction is in progress and has not been completed within the specified period from the date of such approval, the said permission shall be deemed to be sanctioned under this Code and shall only be eligible for revalidation thereunder. Accordingly, where the validity of sanction has expired and construction has not commenced, construction shall be governed by the provisions of this Building Code.
13.2Power of relaxation
The Government may relax any restrictions or conditions or norms stated in the Code or may issue direction to revise the Code, if the relaxation or revision is in public interest at large.
[101]
53
[Appendix A: Qualification and Competence of Architect/ Engineer/ Supervising Engineer/ Structural Engineer/ Proof Consultant/ Supervisor/ Geotechnical Engineer.
Sr.No.
Professional
Qualification
Competency/ Functions
1
Architect
Registered with valid membership of the Council of Architecture, India as prescribed under the Architect's Act 1972.
Prepare, sign all plans and submissions of building plans under Code 4 Further supervise construction of all buildings and issue certificate of supervision and completion of all buildings pertaining to Architectural aspects, as stated in this code.
2
Engineer
Graduate in Civil Engineering from recognized Indian or foreign university, having Associate membership of The Institution of Engineers (India).
Supervise all building construction including preparation of service plans, structural drawings, details and calculations of buildings upto 1000 square metres plot area and 15.0 metres height referred in Form BRV(A1).
3
Supervising Engineer
Graduate in Civil Engineering from recognized Indian or foreign university, having Associate membership of The Institution of Engineers (India), with minimum three years of experience.
Supervise all building construction and issue certificate of supervision and completion of all buildings pertaining to structural aspects, as stated in this code.
4
Structural Engineer
Post-Graduate in Structural engineering from recognized Indian or
The Structural Engineer shall be competent to prepare the structural
53 Substituted vide memo no. Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated 27.06.2022
[102]
Foreign University, having Associate membership of Institute of Engineer, India with minimum three years experience in structural engineering practice with designing and field work.
design, make calculations and design details for all buildings and undertake their supervision referred in Form BR-V(A2).
5
Proof Consultant i i
i. Structural Engineer or a group/ firm of Structural Engineers having post-graduate qualification in structural engineering, having Associate membership of Institute of Engineer, Indiawith ten years experience in structural design and evaluation thereof, for multistoreyed and specialized structure, and/ or an institute of the following type: ii. Institute of Structural Engineers (India). ii. Central Building Research Institute, Roorkee. v. Various engineering institutes, like: a) Indian Institute of Technology; b) Punjab Engineering College, Chandigarh; c) National Institute of Technology; d) Any other institute of repute;
Evaluation/ checking of the structural design of the buildings referred in relevant Form BR-V(A2).
6
Supervisor
i. Two years diploma in Draftsman Civil with
To prepare, sign and submit building plans and
[103]
seven years experience under a qualified Architect/Civil Engineer for building design, construction and supervision; or ii)ii. Three years diploma in Civil Engineering/Architectural Assistantship with five years experience under a qualified Architect/Civil Engineer for building design, construction and supervision; or iii)iii. B.Tech Civil, B.Tech (Building Engineering Management or equivalent);
supervise construction of building upto 200 Sqm (8 marla) and 15 mtr. Height, under Code 4.The Supervisor shall get his/her empanelment renewed annually for the first 2 years and it shall be renewed for a period of 3 years thereafter.
7
Geotechnical Engineer
Post graduate in geotechnical engineering with minimum 10 year experience in geotechnical engineering practice in designing and field work. or Doctorate in civil engineering or geotechnical engineering with minimum 5 year experience in geotechnical engineering practice in designing and field work.
Evaluation/checking of the design of the buildings above 70 m height as mentioned in BR-V (A2)
Annexure “B” – Standard AffidavitI ...... son/daughter/wife of........, applied for building plan approval/ DPC Level/ occupation certificate vide application dated...... on Form BR........, and resident of ...., hereby solemnly state & affirm as under:
[104]
That I shall not use basement as habitable space, as the same has not been included in the FAR and has not been shown as habitable space in the approved plans.
That I shall use the building only for the purpose for which approval and occupation certificate has been obtained.
That I shall comply with all the condition(s) implied by the competent authority at the time of approval of building Plan and Occupation certificate.
That ……… .(condition/ indemnity/ affirmity required by the Competent Authority)-I.
That … ….(condition/ indemnity/ affirmity required by the Competent Authority)-II.
That ……… …….(condition/ indemnity/ affirmity required by the Competent Authority)-III.
Place: Date:
DEPONENT
Verification
I son/daughter/wife of applied for building plan approval/ DPC Level/ occupation certificate vide application dated on Form BR… and resident of hereby verify and affirm that the contents of this affidavit are true and correct to the best of my knowledge, belief and information in witness whereof I have signed hereunder on day of
Place: Date:
DEPONENT
Annexure “C” – Standard report format for Single Joint Inspection.
I. Inspection report Format for Pre-Construction Stage (to be conducted within 1-2 week of submission of building plan application/ self certification:
Name of applicant:.........................
Address of site/ building Plot no. .......... Khasra no............... Sector/ area........... Colony..............
Application no.:.............
Geo-coordinates of site: Lat/ Long points: (as many required to survey the site)
Area of site:....................... (in square metres)
Building use type: Residential Commercial Industrial Institutional Any other.
Name of Department
Appointed Nodal Officer for joint
Inspection details
Inspection parameters
Sign of Nodal officer
[105]
inspection
Urban Local Bodies
District Town Planner/Building Inspector/Engineer
Site inspection w.r.t site dimension, area, etc.
■ Area of site■ Site dimensions along with Geo-coordinates.■ Physical features.■ Applicability of Acts on site/ HT line/Gas line, etc.
HSIIDC
To be appointed by the Corporation.
Temporary Water Connection
Water Connection inspection
Town and Country Planning Dept.
District Town Planner
Site inspection w.r.t site dimension, area, etc.
■ Area of site■ Site dimensions along with Geo-coordinates.■ Physical features.■ Applicability of Acts on site/ HT line/Gas line, etc.
Forest Department
To be appointed by the Department.
Inspection for any acquisition or grabbing of forest land or any cutting of marked trees.
As per Department requirement.
Inspection report Format for During-Construction Stage (to be conducted within 1 week of submission of self certified DPC level certificate:
Name of applicant:......
Address of site/building Plot no. ......Khasra no......Sector/ area......Colony......
Application no.:......
Area of site:...... (in square metres)
Building use type:■ Residential■ Commercial■ Industrial■ Institutional■ Any other.
Name of Department
Appointed Nodal Officer for
Inspection details
Inspection parameters
Sign of Nodal officer
[106]
joint inspection
Labour Department
Joint Director/ Deputy Director/ Assistant Director
Cess Assessment inspection
▪ As per Department requirement
Urban Local Bodies
District Town Planner/ Building Inspector/ Engineer
DPC level inspection
▪ Inspection at DPC level of building w.r.t approved building plan.
Town and Country Planning Dept.
District Town Planner
DPC level inspection
▪ Inspection at DPC level of building w.r.t approved building plan.
HUDA
Junior Engineer
▪ Inspection for temporary Water connection (only new construction)▪ DPC level inspection (only new construction).
As per Authority requirement.
UHBVN
Concerned SDO/ OP
Inspection for Temporary Electricity Connection
As per Department requirement.
III. Inspection report Format for Pre-Construction Stage (to be conducted within 1-2 weeks of submission of building plan application/ self certification:
Name of applicant:.........................
Address of site/ building Plot no. .......... Khasra no............... Sector/ area........... Colony..............
Application no.:.............
Area of site:....................... (in square metres)
Building use type: Residential Commercial Industrial Institutional Any other.
Name of Department
Appointed Nodal Officer for joint
Inspection details
Inspection parameters
Sign of Nodal officer
[107]
inspection
Labour Department
Joint Director/ Deputy Director/ Assistant Director
Inspection at time of completion of construction.In case of start of manufacturing in factory (Manufacturing)
As per Department requirement
Fire Department
Fire Officer
Site inspection for Fire Safety norms and fixtures after completion of building
As per Department requirement
Urban Local Bodies
District Town Planner/ Building Inspector/ Engineer
Inspection for Occupation certificate to check that the building has been constructed as per approved plan or notSite inspection for public health services.
Site inspection for OC.Site inspection of health services
HSIIDC
To be appointed by the Corporation
Inspection for Occupation certificate to check that the building has been constructed as per approved plan or notSewerage Connection
As per Corporation requirement.
Town and Country Planning Dept.
District Town Planner/ Engineer
Inspection for Occupation certificate to check that the building has been constructed as per approved plan or notSite inspection for public health services.
Site inspection for OC.Site inspection of health services
Public Health Engineering Department
To be appointed by the Dept.
Inspection for potable water connection
As per Department requirement.
PWD (B & R)
To be appointed by the Dept.
Inspection at the time of road cutting for laying of services like water, sewerage line, etc.
As per Department requirement.
Pollution Control Board
To be appointed by the
Inspection at the time manufacturing of products
As per Board requirement
[108]
HUDA
Board. Junior Engineer
Inspection for Permanent Water connection (only new construction) Inspection for Occupation certificate to check that the building has been constructed as per approved plan or not.
t. As per Authority requiremen t.
UHBVN
Concerned SDO/ OP
Inspection for Permanent Electricity Connection
As per Department requiremen t.
Chief
Concerned
Inspection for granting
As per
Electrical
District
NOC for installation
Department
Inspector,
Electrical
of electrical
requiremen
Power
Inspection
connection and
t.
Department
fixtures
HAREDA
To be appointed by the Dept.
Inspection for ECBC compliance. Inspection for solar related installation.