The planning, design and installation of air-conditioning and heating installations of the building shall be in accordance with Part VIII, Building Services, Section 2-Electrical Installations and Section 3- Air-conditioning and Heating of the National Building Code of India, as amended from time to time.
49[Plumbing Services]
45 Substituted vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
46 Substituted vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
47 Renumbered vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
48 Renumbered vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
49 Renumbered vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
[81]
10.1.4
10.1.5
The planning design and installation of water supply systems, drainage, sanitary installations and gas supply installations in buildings, shall be in accordance with Part IX- Plumbing Services, Section 1- Water Supply, Section 2- Drainage and Sanitation and Section 3- Gas supply of the National Building Code of India, as amended from time to time.
50[Construction Practices]
(1) The various construction activities like: demolition, excavation, blasting, actual construction from foundation level upto completion shall be in accordance with Part VII – Construction Practices and Safety of the National Building Code of India, as amended from time to time.
(2) The Safety Measures to be adopted during the various construction operations, including storage of materials on the construction site and Corporation/ public land shall be in accordance with Part VII- Construction Practices and Safety of the National Building Code of India, as amended from time to time.
51[Damp Proof Course]
(1) Wall of a building including a pier forming a part of the wall or a compound wall shall be provided with a damp proof course, except when built up of materials such as cement concrete known as 1:2:4 cement concrete with or without the addition of any damp proofing material.
(2) The materials specified as Damp Proof Course shall be as indicated in the Haryana Public Works Department or as per the Indian Standard Institution specifications, specified for this purpose and as amended from time to time.
(3) In external wall, the horizontal Damp Proof Course shall be laid immediately above the plinth protection and a vertical damp proof course shall be provided on the interior face of the wall extending between the horizontal Damp Proof Course and the level of the upper surface of the concrete in finished floor.
(4) In an internal wall, the horizontal Damp Proof Course shall be laid in level with the upper surface of the concrete in the
50 Renumbered vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
51 Renumbered vide Misc-2339-(HBC)-Loose-II/7/9/2022-2TCP dated: 27.06.2022
[82]
finished floor. The section continuity of damp proof course between the internal and external wall shall be secured by the insertion any damp proof material.