91Application for approval of sites and for permission to construct or reconstruct building other than huts.-
(1) Before submission of the building plan, approval of the building site has to be obtained.
However, the applicant may simultaneously submit the site plan and building plan to the ULB for approval at his own risk and cost. But the ULB shall consider the building plan submitted for approval only after the site plan is approved. In case the site is not approved, the submitted building plan shall also be treated as not approved.
(2) Every application, specified in sub-rule(1) submitted in Form A, shall state inter alias the proposed use of the land as per use group provided in this rules.
(3) Every application, specified sub-rule(1) shall be accompanied by a site plan in triplicate and the reports/ recommendations of tests for soil and stability of slopes, as and where applicable under Rule 90 and a fee as may be determined by the ULB. The site plan shall be drawn to scale of not less than 1(one) centimeter to 6.0(six) meters and shall be signed by the applicant and by the licensed Building Planner or Architect as required under Rule 94 with a certificate to the effect that the site has been inspected personally by the Licensed Building Planner or the Architect, as the case may be.
(4) Every site plan specified in sub-rule(3) shall show or state on the body of the sheet showing the site plan the following:
(a) the boundaries of the site and of the owner thereof with number assigned to plot / premises;
(b) the position of the site in relation to neighboring streets with dimensions;
(c) the name of the street on which the site abuts;
(d) the position of the building and of all other buildings including existing buildings (if any) which the applicant intends to erect upon his contiguous and referred to in clause (a) in relation to-
(i) the boundaries of the site and, in case where the site has been sub-divided, the boundaries of the portion owned by the applicant and also the portions owned by other owners, and
(ii) all adjacent streets, buildings and premises within a distance of 12.00 meters of the site and of the continuous land (if any) referred to in clause(a);
(e) the use or occupancy of all the buildings;
(f) the direction of North point;
(g) the means of access from the street to the building and to all other buildings( if any) which the applicant intends to erect upon his contiguous land referred to in clause (a)
(h) the schematic position and approximate height and the number of the storeys of all other buildings within 12.0 meters from each side of the site;
(i) the free passage or way in front of the building;
(j) the width of the street (if any) in front and at the rear of the building ;
(k) the means of drainage of the proposed building leading to existing public drains or drainage channels with their location in relation to the site;
(1) the means of drinking water supply to the proposed building indicating the source and the distance from the site including the route through which the pipeline will be laid, if piped water supply will be achieved;
(m) the means of power supply to the proposed building on the site, indicating the route through which power supply will be achieved;
(n) areas of distress;
(o) such other particulars as may be specified by the ULB;
(p) the location of power line, water line, sewer line, natural drainage channel / jhora, road side drain, protective works;
(q) location of land slides, if any on or near the site in hill areas detected during reconnaissance. The ULB shall come to ensure that the site is away from the slide zone or area of distress;
(r) on a sloping site in hill areas, proposals, for diversion of the natural flow of water coming from uphill side of the building away from the foundation.
Part XSpecial Provision for ULBs in the Hill Areas
88 Special provision. –
(1) Notwithstanding anything contained elsewhere in these rules, the special provisions of this part shall apply only to the ULB in the hill areas or to supplementing, the other provisions elsewhere in this rule in there application to those ULBs in the hill areas. Anything not covered under the special provisions shall be guided by the provision made elsewhere in this rule or the Act.
(2) For provisions not specifically covered in this part related provisions of other parts will apply.
89 Power to relax rules. -
Notwithstanding anything contained in these rules, a ULB or other concerned authorities may for reasons to be recorded in writing and with the previous approval of the State Government relax any provision of these rules for dealing with a case in a just and equitable manner.
92Sub-division of plots. -
(1) No sub-division of any plot within the ULB area shall be undertaken without prior approval of the respective ULB.
(2) Generally –
(a) a plot to be sub-divided shall be treated as mother plot;
(b) sub-division shall not be allowed if the mother plot abuts an all weather means of access having a width of less than 2.00 meters for plots having area less than 500 sq. meters and width not less than 3.0 meters for plot having area more than 500 sq. meters, provided that an emergency vehicular access (min. 3 m wide) shall be available within a distance of 50 meter from the mother plot;
(c) every individual plot obtained by sub-division of the mother plot shall abut a means of access having width of not less than 2.00 meters;
(d) these rules shall not apply to a scheme for Economically Weaker Section and Low Income Group Housing approved by the Government;
(e) sub-division may be allowed on the condition that the following facilities shall be provided by the owner at his own cost to the satisfaction of the ULB;
(i) complete drainage facilities in accordance with provisions made elsewhere for the hill areas, ensuring drainage of such individual plot and of the means of access and passages leading to existing public drains or natural drains or natural drainage channels,
(ii) all weather means of access with related protective works, if necessary along with street lighting,
(iii) sanitary facilities including sewage and garbage disposal facilities,
(iv) water supply facilities,
(v) electricity and electrification facilities,
(vi) all individual plots as well as the means of access and infrastructure provided shall be accompanied by complete protective measures in accordance with provisions made elsewhere for hill areas in these rules.
(f) no permission for sub-division of a plot of land shall be granted unless each sub-divided plot is at least 100 sq. meters in area in residential buildings and 40.0 sq. m for other than residential building;
(g) no sub-division of plot shall be granted unless a detailed layout plan or the area proposal to be sub-divided is submitted before the ULB duly integrating the site layout plan with the general use of the land in the adjoining areas. The existing street pattern as also other physical infrastructural 'facilities' like drainage, sewerage, water supply, electric supply with location of high tension or low tension electric line with poles are also required to be shown.
(3) The mother plot shall abut an all weather means of access conforming to the conditions specifies below:
(a) the means of access shall have a width of not less than 2.0 meters, for plots having an area less than 500 sq. meters and a width not less than 3.0 meters for plots having area more than 500 sq. meters :
provided than an emergency vehicular access (min. 3 m wide) shall be available within a distance of 100 m from the mother plot;
(b) the minimum permissible width for any given length of means of access for sub-divided plots shall be as given in the following table:
Length of internal road
Minimum width of means of access
Up to 25.00 meters
1.5 meters (pedestrian pathways only)
Above 25.00 meters but below 50.00 meters
3.0 meters
Above 50.00 meters but below 100.00 meters
4.5 meters
Above 100.00 meters
6.00 meters
(c) sub-division of a mother plot measuring more than 500 sq. meters in area shall only be allowed if a proportion of the total area of the mother plot is developed as public amenities or open space, as specified in the table below. This shall be in addition to the land required for providing the means of access to the individual plots obtained by sub-division of the mother plot as specified in this rule.
Size of plot to be sub-divided
% of area to be reserved for community purpose (excluding roads)
Above 2000 sq. meters and below 5000 sq. meters
7.5
5000 sq. meters and above
10.0
Moreover, each such space in a single parcel shall have minimum area of 150 square meters and a minimum width of not less than 3.00 meters; and each such open space shall abut a means of access as specified in sub-rule (3) of this rule.
(4) For mother plots measuring more than 5000.00 sq. meters in area, sub-division may be allowed if an additional 5(five) percent of the total area of mother plot is reserved for use for facilities like school, health centre, market, police outpost, milk booth, post office, power sub-station, transport terminal, water tank for fire fighting/ water treatment plant and the like, such land abut a means of access as specified in this rules. This is in addition to land necessary for means of access as specified in sub-rule (3) and for public amenities and open spaces specified in this rules.
90Criteria of using a piece of land as building site. –
(1) No piece of land shall be used as a building site unless the ULB is satisfied that -
(a) land record is in conformity with the proposed construction keeping in view specified land use, if any;
(b) the site of such building abuts an all weather public street, a projected public street or a private street/ footpath, passage and is not less than 1.50 meters wide at any part, duly sanctioned and constructed and recorded in the Books of ULB in accordance with the provisions of the Act or any other law in force immediately before the commencement of the Act:
Provided that, no building shall be erected so as to deprive any other building or buildings site of the means of access as specified above;
(c) the site is at least 100 sq. meters in area for residential purposes and 40.0 sq.m in area for other than residential purposes.
(d) the land is capable of being well drained by means of drainage facilities leading to the existing Public drainage, channel or natural jhora;
(e) the site is reasonably secured from danger from hillside slips from above, below, or the sides;
(f) the soil of the site is likely to sustain the construction of a building thereon; and for sites with inclinations of 30° and above or proposed building above 6.5 meters in height or 500 sq. meters in coverage, such sustainability shall be justified, at the cost of applicant, by prior testing of soil and certification of stability of slopes and buildings conforming to the latest relevant codes of Bureau of Indian Standards including
IS 12070: IS Code of practice for design and construction of shallow foundation on rock.
IS 13063: IS Code of practice for structural safety of building on shallow foundation on rock.
IS 14243 (Part I & II): Selection and development of site in hill areas guidelines; in addition to other relevant Indian Standards.
A competent geo-technical engineering organization or firm, recognized by the ULB, shall carry out detailed geo-technical investigations, testing and certification in such cases.
(1)
(m)
(i)
Explanation: Soil will also include rocks, boulders laterite etc.
(g) the site does not contain any portion which forms a component of the open spaces prescribed under the regulation for any other building site thereof.
93Preparation of plan and supervision of execution of work.-
(1) Every owner who intends to erect, re-erect, add to or alter any building shall get its plan prepared and structural work designed and supervised by an Architect/Structural Engineer/Licensed Building Planner as required under Rule 94, while submitting the plan the Architect/Licensed Building Planner/Structural Engineer should certify to the effect that site has been personally inspected while planning for building and/or designing the structural members, as well as has taken into account the findings and/or recommendations of stability analysis as well as soil tests performed as and when necessary under this rule.
(2) In all such cases, the Licensed Building Planner/ structural Engineer or Geotechnical Engineer shall have to be empanelled with the ULB.
(3) The name, address and license or empanelment number of the persons so employed and serial number in the case of Architect shall be stated in the application in respect of such building.
(4) In case of building plans/site plan submitted by Central or State Government or by organization controlled by Central or State Government, if the plans are prepared and submitted under the signature of the Government Engineer or architect, who are employees of the applicant organization, the rule 93(1) shall be applicable.
94Engagement of technical personnel: -
(1) Every person who intends to erect, re-erect, add to or alter any building shall, subject to the provisions of the Act and these rules, engage –
(a) for all buildings up to 4.50 meters in height, a technical person having a diploma in Civil Engineering/Architect with at least 2 years experiences and having the rank of a licensed Building Planner for planning, design and construction of the building foundation and superstructure and for all buildings above 4.50 meters but below 8.00 meters in height and /or erection involving piling works, deep foundation or construction of basement or any other underground structure thereto, a licensed Building Planner having a degree in Civil Engineering/Architect with at least 2 years experiences and / or an Architect and a Structural Engineer and a Geo-technical Engineer for conducting soil and other tests as required under rule 93(1), planning, design and construction of the building foundation and superstructure for all other buildings above the height of 8.00 mts. but below 14.00 mts. in height.
(b) A licensed Building Planner shall have –
(i) a degree in Civil Engineering or Architecture from a recognized university or its equivalent qualification recognized by the Government and shall not have less than 2(two) years experience in planning, design and execution of building works including sanitary and plumbing works related to building under similar geo-technical conditions, or
(ii) a diploma in Civil Engineering or Architecture from a recognized university or its equivalent qualification recognized by the Government and shall not have less than 5(five) years experience in planning, design and execution of building works including sanitation and plumbing works related to buildings under similar Geo-technical conditions;
(c) a Structural Engineer must have a Degree in Civil Engineering from a recognized university or its equivalent with at least 5(five) years experience (including two years in hill areas) in structural design;
(d) a Geo-technical Engineer must have a degree in civil engineering from a recognized university or its equivalent with at least 2(two) year experience in soil and foundation engineering under identical soil/slope/geo-technical conditions.
(2) The Licensed Building Planner, the Architect, the Structural Engineer and the Geo-technical Engineer will work in association with one another and will be individually and/or collectively responsible for ensuring the safety of the building structure and its foundation.
(h) (i) no part of the land is located within 200 meters from the boundary of a sinking or probable slip zone, designated in a meeting by the ULB.
(ii) within an area of distress or possible unequal settlements with wide fissures, regular cracks, faults, voids, rock, debris or landslides caused by subsidence or crosion, filling and disposal or organic materials, or;
(iii) it is located within an area showing high water table and fully saturated soil with a possibility of liquefaction and settlement on exposure to earthquakes or of water seepage in the foundations and crosion, or,
(iv) any other vulnerable area identified by the ULB as unsafe for environmental, geological, wind, drainage or any other reasons;
no piece of land is located within five meters in any direction of the outside edge of such water courses;
adequate drainage measurement and protection work as specified in rules shall be taken by the applicant at his own cost if it is located on the permanent shadow zones of ridges and spurs, at the bottom of the valleys or gorges or located by nature of its orientation in a zone as identified by the ULB to be inadequately sunlit so as to make it unfit human habitation, if any;
the side has not been subject to repeated blasting or, was a former quarry;
where the side is within 5.0 (five) meters of any side of a tank, the owner will take such measures as well prevent any risk of the drainage from such building passing into the tank;
where the site is within 5.0(five) meters of any side of a tank, water reservoir, jhora/ natural spring, water source or natural drain or within 2.0(two) meters from either side of water pipe, sewer line and / or other such underground utilities, the owner shall take such measures at his own cost, which shall prevent any risk of damage and / or landslide thereto by construction of such buildings. The distance shall be measured from outside edge of the jhora/drain / pipeline etc. as the case may be taken by the owner, at his own cost if the side is within 30 meters of jhora;
no piece of land shall be used as building site if it is located on the permanent shadow zones of ridges and spurs at the bottom of the valleys or gorges or located by the natural or its orientation in a zone as identified by ULB to be inadequately sunlit so as to make it unfit for human habitation.
(2) No piece of land located in central business area as determined by the ULB or in sinking zone or areas of distress with cracks caused by subsidence and /or slides or any other areas identified by ULB with reasons to be recorded in writing, shall be used as a building site without prior approval of the State Government.
(3) No piece of land where a closed, sick or other industry was located or is in operation, shall be used as site for construction of any building, other than an industrial building, without the prior approval of the competent authority.
(3) The Licensed Building Planner, Structural Engineer or a Geo-technical Engineer is also required to be empanelled with the ULB.
(4) In case of death, resignation removal of Licensed Building Planner, Architect, Structural Engineer, Geo-technical Engineer or, as the case may be a fresh engagement shall he made forthwith and shall be notified to the Mayor/Chairman of the ULB. No work shall be carried out in the intervening period, if any.
(5) The validity of any engagement made under this rule shall lapse, in the case of an Architect with lapse of validity of registration granted under the Architect's Act, 1972(20 a 1972) or in case of a Structural Engineer and a Geo-technical Engineer with the lapse of empanelment, or in the case of a Licensed Building Planner, with lapse of the validity of license.
97Open spaces for building.-
(1) Generally-
(a) every room intended for human habitation shall abut an interior or exterior open space or an open verandah open to such interior or exterior open space. Open
spaces shall be areas forming integral parts of the plot at ground level and shall be open to sky without any projection or overhang excepting cornices, chajja or weather-shades of not more than 0.50 meter width;
(b) every building shall have exterior open sprees comprising front open space, and side open spaces. The minimum width prescribed for front open space, rear open space and side spaces shall be provided along the entire front, rear and side faces of the building respectively. For this purpose the front of the building shall be that face of the building which faces the means of access of the building and the rear of the building is that face of the building which is farthest from the means of access. These provisions shall also be applicable to each individual building separately when a plot contains more than one building. In the case of a corner plot located at the crossing of more than one street or passage, the rear of the building shall be deemed to be that face of the building, which is farthest from the widest of all such streets and/or passages;
(c) open spaces prescribing to one site cannot be taken for another site. No building shall at any time be erected on any open space prescribed in these rules for a building and from part of the site thereof, nor shall such open space be taken into account in determining the area of any open space required under these rules for any other building.
(d) If the front open space is 3.00 meters or more in width a Gate Gomti for security purpose may be allowed in the said open space. The covered area of such Gomti shall not in any case exceed 3.00 sq. m. and the height of such Gomti shall not exceed 3.00 meters. The covered area of the Gate Gomti shall not be included in calculation of ground coverage.
(2) The minimum front, rear and side open spaces shall be provided along the entire faces /sites of the building as given in the table below:
Minimum width of open space in meters
Front
Rear
Side
Residential and Educational uses
1.5 m.
1.5 m.
1.5 m.
Commercial, Public and other uses
2.5 m.
2.5 m.
2.5 m.
Provided that the minimum clearance, on all the sides between a building wall and the toe of a retaining or other protective wall shall be 1.50 meters, except on the side where the septic tank shall be installed, in which case, the minimum clear distance of 2.1 meters shall be provided:
provided further that for mixed use buildings, the minimum front open space shall be the one applicable for that particular occupancy which gives the provision of the minimum front open space in these rules, provided that for a building more than 11.00 meters in height the Minimum open spaces provided in sub-rule(2) above shall be increased by 0.3 meter in all cases.
(3) Notwithstanding anything contained elsewhere in this rule in the case of a building with a septic tank, a side open space of 2.1 meters shall be provided on any one side of the building for the provision of the said septic tank.
(4) In the case of a building more than 25.0 meters in depth, a passage of width not less than 3.5 meters shall be provided along the entire depth of the building.
(5) For plots of size not more than 65(sixty five) sq. meters minimum side space of 0.90 meter may be allowed on each side provided the building height does not exceed 6.5 meters -
(a) notwithstanding anything contained in this rule, the minimum distance across the side open space from every new building to an existing building with a door or window opening shall be 1.80 meters;
(b) notwithstanding anything contained in this rule the minimum width of side open space for an industrial or storage or mercantile (wholesale) building shall be
(6)
3.50 meters;
(c) in the case of a building more than 24.00 meters in depth on a plot abutting any street a passage along the side depth of the building shall be provided and the minimum width of such passage shall be 4.0 meters.
The interior open space shall be as follows: -
(a) For inner courtyard -
in case the whole of 1(one) side or part of at least 2(two) sides of every room excepting bath, water closets and store-room is not abutting either the front, rear or side open spaces, it shall abut an inner courtyard whose minimum width shall be 30% of the height of the building or 3.00 meters whichever is more.
(b) for ventilation shaft, that is to say -
for ventilating water closet bath room and kitchen such water closet or bath room or kitchen if not opening to front side, rear or interior open space, shall open on to a ventilation shaft, the size of which shall not be less than the values given below :-
Height of building ( meters)
Minimum Area of ventilation shaft Sq. Mts.
up to 11.00
10.50
1.00
Above 11.00 but not more than 12.50
3.00
1.20
Note: No chajja shall be allowed in the ventilation shaft unless the width of shaft is 2.40 meters or more.
(c) the minimum width shall not be less than 20% of the height of the building or 2.50 meters, which ever is more.
(7) The service rooms shall have access by means of 2(two) passages of staircases, providing access and exit from higher and lower level floors, the width of which shall not be less than 1.2 meters and the slope shall not be steeper than one 1:1 and so located that the travel distance on any floor up to any such access or exit is not more than 15.0 meters.
(8) Mezzanines are to be used strictly for purposes other than habitation or kitchens and eating places and may be provided between any 2(two) floor shall be permitted with a minimum clear height at every part of at least 2.0 meters measured from the floor to the lower most point on the underside of the roof, slab, beam or false ceiling. The area of such mezzanines shall be included in floor area in all calculations.
Access, circulation and parking. -
(1) Every plot shall abut a means of access which may be a public street or private street or passage, the minimum width of which shall be as specified in this rule.
(2) Any building which in full or part is put to assembly occupancy for the purpose of theatre, motion picture house, city hall, skating-rink, auditorium, exhibition hall or for similar other purposes shall not be allowed on a plot located within 50 meters of the junction of 2(two) streets, the width of each of which shall be a minimum of 8.0 meters.
(3) Every building on a plot having more than one building shall abut an internal
road connecting the means of access of the plot and such roads shall conform to the requirements of internal roads specified in rule 52(1).
Number of car parking Spaces as per Covered Area of plot and Use Group
Residential and Educational uses
1 Car Space per 300 sq. meters.
Commercial, Public and other uses
1 Car Space per 200 sq. meters.
In case of a plot having more than one building or use, parking requirements shall be calculated according to the proportionate floor area of each building or use group, as the case may be.
(4) For plots abutting non-vehicular means of access less than 3.0 meters in width, car parking space need not be provided within the plot area but space with vehicular access has to be identified and owned by applicant for the required parking /garage space, as per this rule.
(5) The parking space for each vehicle shall be accessible from the means of access, either directly or through a driveway or internal circulation, aisle, the width of which shall not be less than 3.5 meters for cars and 5.0 meters for trucks and the gradient of which shall not be more than 1:6.
(6) The minimum size of a car parking space shall be 2.50 meters x 5.00 meters and that for a truck or bus parking space shall be 3.75 metre x 10.00 meters. These spaces do not include the area of circulation, internal roads, aisles and driveways, and standards for those shall be guided by provisions in the National Building Code.
(7) No garage for car shall be less than 2.5 meters x 5.00 meters (clear size) with a minimum head room of 2.0 meters and no garage for truck shall be less than 3.75 meters x 10.00 meters (clear size) with a minimum head room of 3.50 meters.
(8) (a) An internal road must be so constructed as to have a slope inwards/ towards the hillside. Such slope must be not less than the gradient of the road;
(b) where required, the inner and outer edges of an internal road must be protected by protective walls of such number and placed in such positions as the ULB may direct and constructed in accordance with the specifications in this rule.
99Drainage measures. -
(1) (a) An open drain must be provided on the inner side of an internal road constructed in accordance with the specifications in rule 98.
(b) an effective slope and drainage system shall be maintained at all times on the developed ground after slope cutting or filling, during and after development as per this rules on any side;
(c) the drainage system shall efficiently collect and carry away from the site, the water collected within the premises or the building complex or from the hillside above, fix suitable disposal as quickly an possible to water courses such) as main drains or natural streams/jhoras without stagnation, avoiding any possibility or erosion, slope failure, damage to the building or other property in the vicinity.
(2) (a) proper slops not less than 1 : 60 shall be maintained all around a building for quick drainage of the entire plot as provided in Rules 90(1) (d) and 98.
The possibilities of erosion or ground failure through ingress and percolation of water into soft ground or through joints and fissures in the soil crust shall be prevented by suitable surface protection measures such as surface grouting, stone pitching, planting of small plant and grass, so as to protect and make the surface impervious in accordance with the provisions of the BIS Code, specially the minimum distance from provision required to be maintained for planting trees;
(b) the flow of water, particularly on the upper side of the building, shall be diverted away from the foundations through suitable lined or unlined drains;
(c) drains for sullage/rain water must be constructed with round or half-round tiles embedded in concrete, or with U-shaped stone masonry set in lime mortar and plastered over the inner surface with Portland cement or with U-shaped stone concrete and the sectional area of every drain shall be subject to the approval of the ULB.
(d) drains for surface water only may be constructed either of dry rubble masonry or of any other material approved by the ULB and may be either rectangular or U-shaped in section. Such drains shall not be connected with any drain carrying sullage water or sewage;
(e) except with the written permission of the ULB no covered drain shall be constructed and no existing open drain shall be covered in;
(f) no building shall be placed cover any drain;
(g) where a small drain is crossed by a private road, a removable,
R.C.C. slab cover or wooden or iron grating, if the ULB so direct, must be laid over the drain, instead of covered culvert;
(h) drains must discharge into the nearest water channel or public drain, unless in any case the ULB otherwise direct, The outfall of a drain into a water channel or public drain must be protected and guided in such manner as ULB may direct. Where the drain of a private road joins the drain of a public road, the former drain must be so directed or so protected by strike boards as to minimize the risk of damage to the public drain or road.
Filters may also be provided where necessary;
(i) every building must be constructed so as not to project over, or admit of water from the roof falling upon or damaging, any open space, road or passage it abuts, whether public or private;
(j) every building shall have rain water gutters and pipes connected to a drain, along the periphery of a building;
(k) a masonry drain must be placed round the periphery of every building or block of buildings, sufficient in section and slope to the satisfaction of the ULB for the effectual of the building and placed as to admit of the drainage being led into some drain at the time existing or projected;
(I) the surrounding round adjacent to the building must be sloped from all sides towards the perimeter drain and an impervious apron, not less than 0.75 m. wide shall be provided all around the building to prevent the entry of water into the foundations.
(3) (a) Septic tank and soak pits shall also be so located so as to be easily accessible from the means of access to the plot.
(b) Soak pits shall be constructed on the side of buildings as far as possible, at right angles to the slope of the land and as far as possible from the building foundations. There shall be a minimum clearance of 2.1 meters between the foundation and the soak pit to minimize the chances of dampness and slope failures due to seepage from the soak pit.
(4)(a) A private bridge must be constructed as and where necessary to the satisfaction of the ULB so as to leave sufficient waterway to pass the maximum discharge of the channel spanned by the bridge.
(b) The invert of the channel under a private bridge must, as far as practicable, be laid to the same slope as that of the channel.
(c) When a pocket for the deposit of debris is cut in the hillside above a private bridge, it must be lined with masonry walls unless, if constructed on solid rock.
95Permissible height of building,-
(1) (a) The following appurtenant structures shall not be included in the height of the building :
i. stair cover not exceeding 2.40 meters in height;
ii. lift machine rooms as per the latest edition of the National Building Code;
iii. roof tanks and their supports, the height of support not exceeding 1.50 meters;
iv. chimneys;
v. parapet walls not exceeding 1.50 meters in height;
vi. ventilating, air-conditioning and other service equipments;
vii. height above mid-point between eaves level and ridge level.
(b) The aggregate area of the structures mentioned in clause (a) (except (vi) shall not exceed one-third of the area of the roof upon which these are erected.
(2) The maximum permissible height of a building as well as its permissible floor area shall be regulated by the width of the surrounding open space in the same holding plus the width of its means of access, depending on the type of building use as per the table below:
Width of means Of access plus
width of front open space
Upton
3.0 -
5.0 -
Above
3.0 -
5.0 m
7.0 m
7.5 m
Floor Area Ratio (F.A.R.)
Residential
1.0
2.0
2.5
2.75
Commercial, Public & other Uses
1.0
2.0
2.5
2.5
Maximum permissible height
4.5 m
6.5 m
11.5 m
13.5 m
Provided that in case a building is more than 14.00 meters in height prior approval of the State Government is required to be obtained.
For building of residential (excluding a height of 4.5 meters), commercial, public and other uses the means of access of at least 3 meter wide should be available within a distance of 100 meters of foot-path length from the proposed plot.
(3) The ULB may, if necessary, restrict the height of building in any area within the municipal limits, below that provided above for reasons to be recorded in writing.
96 Ground coverage:-
The maximum permissible ground coverage for buildings when a single building is proposed for a plot shall be regulated by the plot size, depending on the type of building use as given in the table below: