Criteria of using a piece of land as a building site.
(1) No piece of land shall be used as a building site in ULB areas unless the ULB is satisfied that –
(a) land record is in conformity with the proposed construction and the plot of land is at least 100 sq. mt. in area for residential purposes and minimum 40 sq. mt. for the purposes other than residential purposes.
Provided that for plot size from 50 sqmt to less than 100 sqmt for Residential purpose and plot size less than 40 sqmt for other then residential purpose, construction upto single storied may be permitted subject to fulfillment of other provisions of these rules.
(b) the level of the land is not lower than the level of the approach road or the means of access on which the site abuts.
(c) the land is capable of being well-drained by means of drainage facilities leading to existing public drains of drainage channels;
(d) “the soil of the site should be capable of sustaining the construction and the building thereon under all conditions”;
(e) where the site is within 5.00 meters of any side of a tank, the owner will take such measures as shall prevent any risk of drainage from such building passing into the tank;
Explanation: - Soil will also include rocks, boulders, laterite, etc.
(2) No piece of land in the concern ULB area located in a sinking zone or central business area, as determined by the local bodies, shall be used as a building site without prior approval of the State Government;
provided that for construction of any building on any piece of land in the ULB of the hill areas, prior investigation and testing of soil by a Government recognized investigating and testing organization, in respect of land shall be made;
(3) No piece of land where a closed, sick or other industry is located or is in operation, shall be used as a site for construction of any building other than Industrial purpose.
(4) No separate Non Agricultural (NA) permission shall be required in case land falls in the residential zone earmarked in the Master / Development Plan of the city/town, if exists.
5Applications for approval of Buildings sites.-
(1) Every site plan, shall show or state on the body of the drawing of the site plan the following:
(a) the boundaries of the site and of any contiguous land belonging to the owner thereof with number assigned to plot/premises;
(b) the position of site in relation to neighboring streets with dimensions;
(c) the name of the street on which the site abuts;
(d) the position of the building and of all other buildings including existing buildings(if any) which the applicant intends to erect upon his contiguous land referred to in clause (a) in relation to (i) the boundaries of the site and, in case where the site has been subdivided, the boundaries of the portion owned by the applicant and also the portions owned by the other owners, and
(ii) all adjacent streets, buildings and premises within a distance of 12.0 meters of the site and of the contiguous land (if any) referred to in clause (a);
(e) the use or occupancy of all the other existing buildings;
(f) the direction of North point;
(g) the means of access as per rules 46 and sub-rules thereon from the street to the building(s) and to all other buildings(if any) which the applicant intends to erect upon his contiguous land referred to in clause(a);
(h) the schematic position and approximate height and the number of stories of all other buildings within 12.0 meters of the site;
(i) the free passage or way in front of the building;
(j) the width of the street(if any) in front and at the rear of the building;
(k) the means of drainage of the proposed building leading to existing public drains or drainage channels with their location in relation to the site;
(I) the means of drinking water supply to the proposed building indicating the source and the distance from the site including the route through which the pipe line will be laid, if piped water supply is envisaged;
(m) the means of power supply to the proposed building on the site, indicating the route through which power supply will be achieved;
(n) "areas of distress";
(o) such other particulars as may be prescribed by the local bodies;
(p) the location of power-line, water line, sewer line, natural drainage channel/jhora road side drains, protective works;
(2) in case of a promoter submitting site plan/ building plan for approval, all provisions made in the updated version of Tripura Building Rules shall apply;
(3) Every application made under Rule 5 shall be written on printed Form-A to be supplied by the ULB on payment of an amount not less than Rs. 10/- only.
6 Further information required to be submitted by applicant.-
Within 15(fifteen) working days from the date of receipt of an application for approval of building site, the competent authority may required the applicant –
(a) to furnish him with any information on matters referred to in these rules which has not already been given in the documents there under; or
(b) to satisfy him that there are, no objections which may lawfully be taken to the approval of the site.
7 Incomplete or defective information. –
(1) If any information or document required under these rules is, in the opinion of the Local Body, incomplete or defective, it may within 15 (fifteen) working days from the date of receipt of the same, require further information or documents to be furnished.
(2) If any requisition made under these rules is not complied with within 1(one) month, the application for approval of the building-site may be refused.
8Signature on approved site plan.-
When the competent authority has approved any site plan, the approved plan/plans shall be signed by such officer as may be authorized in its behalf and in such manner as may be directed and two copies of approved site plan will be returned to the applicant.
Control of development of parks, public open space, ponds, wetlands, canals, river and other water front and brick fields –
(1) For the purpose of these rules, public open space shall mean any open space which is open to the use of enjoyment of the public, whether it is actually used or enjoyed by the public or not and whether the entry is regulated by any charge or not.
(2)(a). Generally, parks and public open spaces shall classified for the purpose of these rules into three following groups:-
(i) the parks and public open spaces with area to 1500 Sq.m. shall be termed as small park and public open space;
(ii) the parks and public open spaces with area more than 1500 Sq.m. but up to 7000 Sq.m. shall be termed as medium parks and public open spaces;
(iii) the parks and public open spaces with area more than 7000 Sq.m. shall be treated as large parks and public open spaces.
(b) The structure above ground level shall be subject to the following provisions:
No structure other than the following shall be permitted in parks and public open spaces;
(i) statue of public interest;
(ii) structure related to play equipments and fixtures;
(iii) structure related to public amenities provided that the height of such building shall not exceed 4.00 meters and that total area covered by such building shall not exceed 10% of the total of the small parks and public open spaces, 5% in the case of medium parks and public open spaces and 3% in the case of large parks and public open spaces.
(iv) Boundary wall with maximum height of 1.50 mt.
For the purpose of calculation of total area of parks and public open spaces, as aforesaid, the area of water body, if any, shall be excluded.
(c) The underground structure shall be subject to the following Provisions:
(i) no underground structure shall be allowed in small and medium park and public open spaces;
(ii) In large parks and public open spaces underground structure for amenities or parking facilities may be allowed, provided such structure shall not affect the environment or create traffic problem.
(3) No canal, pond, water body, wetland, river lets, jhora, water source, natural spring, streams, drains, culverts shall be filled up provided that after taking due consideration of the existing relevant Acts, the drainage slope, slip, landslide, ecology, culture, environment, pisciculture, fire fighting or any other material consideration and for reasons to be recorded in writing the Local Body with the prior approval of the State Government may allow any canal pond, rivulets, streams, rivers, flood plain area to be filled up.
(4) In the case of a building in the zone of river (within 15 metres from river bank) or other water fronts of large water bodies (more than 1000 acres), -
(a) the maximum permissible height of a building in such zone shall be 5.00 metres. In the case of a building on stilts, the maximum permissible height of the building shall be 6.50 metres including the stilts, the maximum height of which shall be 3.00 metres - In such building the stilted portion shall not be allowed to be walled up or covered along the sides- in such situations the stilted portion should be suitably stiffened as per provision of IS 1893:2000 to resist code based earthquake forces"
(b) no building shall be more than 20.00 metres long alongside the river or other water fronts. There shall be a clear linear gap of 50.00 metres between the two buildings alongside the river or other water front;
(c) the maximum permissible covered area of such buildings shall be 200.00 Sq.metres;
(d) the structures for recreational purpose conforming to this sub-rule may be permitted within the adjoining land.
(5) Existing bricks fields shall be allowed to be continued as brickfields within their own boundaries. After being declared as abandoned, the excavated portions shall have to be maintained by the owner at his cost as water bodies where pisciculture or any type of recreational activity may be allowed.
10Sub-division of plots.
(1) No sub-division of any plot within the ULB area shall be undertaken without the prior approval of the Local Bodies.
(2) Generally –
(a) plot to be subdivided shall be termed as mother plot;
(b) Sub-division shall not be allowed if the mother plot abuts a means of access having a width of less than 3.50 metres for plains;
(c) every individual plot obtained by sub-division of the mother plot shall abut a means of access having width of not less than 3.50 metres;
(d) the junctions of means of access within the mother plot shall be provided with splayed corners measuring not less than 2.50 metres on each side;
(e) these rules shall not apply to a scheme for Economically Weaker Section and Low Income Group Housing approved by the Government;
(f) sub-divisions may be allowed on the condition that the following facilities shall be provided by the owner at his own cost to the satisfaction of the Local Bodies;
i. drainage facilities with pucca drain ensuing drainage of each individual plot and of the means of access and passages leading to existing public drain or natural drainage channels;
ii. all weather means of access and related protective works, if necessary along with street lighting;
iii. street and passages along with street lighting;
iv. sanitary facilities including garbage disposal facilities;
v. water supply facilities;
(g) no permission for sub-division of a plot of land shall be granted unless each sub-divided plot is at least 100 Sq. metres in area for residential purposes and 40 sq. meters for other than residential purposes;
(h) no subdivision of a plot shall be granted unless a detailed layout plan of the area proposed to be sub-divided is submitted before the ULB duly integrating the site layout plan with the general use of the land in the adjoining areas.
The existing street pattern as also the other physical infrastructures facilities like drainage, sewerage, water supply, electricity supply with location of high tension or low tension electric line with poles axe also required to be shown.
(3) The maximum permissible length for the means of access shall be as given in the following table;
Maximum length of the means of access
Width of means of access.
For means of access closed at one end.
For means of access open to street at both ends.
(1) 3.50 metres and above but not more than 7.00 metres.
25.00 metres.
75.00 metres
(ii) above 7.00 metres but not more than 10.00 metres.
50.00 metres.
150.00 metres
(iii)above 10.00 metres.
No restriction.
No restriction
(4) For mother plot measuring more than 5000 Sq. metres in area sub-division may be allowed, provided 8%(eight percent) the total area of the mother plot is developed as public open space. The width of each such open space shall not be less than 10.00 metres and each such open space shall abut a street
having a width of not less than 7.00 metres. The minimum area of each such open space is one parcel shall be 400 Square metres. This open space shall be in addition to the land required for providing the means of access to the individual plots obtained by subdivision of mother plot.
(5) For mother plots measuring more than 25,000.00 sq. metres in area, subdivision may be allowed, provided seven percent of the total area of the mother plot reserved for facilities like school, health centre, market, police outpost, milk booth, post office, power sub-station, transport terminal, water treatment plant, sewerage treatment plant and the like. Such land shall abut a street having a width of not less than 10.00 metres in addition to the land necessary for means of access and for open spaces mentioned in sub-rule(3).
10 A. Amalgamation of land
(1) Amalgamation of plots within the ULB area shall be allowed with prior approval of the ULB followed by a Registered Agreement.
(2) Amalgarnated plot(s) should satisfy the criteria in Rule 4(1).
(3) Amalgamated plot should be considered as a unit for application of relevant Rules laid down in this Rule.
(4) Building on amalgamated plot should be constructed at a time for full plinth area otherwise approved building plan will be treated as cancelled.
11Delay in sanction or refusal of site plan. –
(1) Where the sanction of the site plan is not accorded by the Local Bodies and no reason is assigned in this behalf, or where sanction is not refused within a period of 60 days from the date of receipt of the application in this behalf or receipt of necessary particulars, whichever is later, the applicant may make a representation to the Mayor/Chairperson of the ULB.
(2) Upon such representation, the Mayor/Chairperson shall after causing such enquiry as he may think fit and after giving the applicant an opportunity of being heard, convey sanction of the site plan either conditionally or unconditionally or refuse sanction stating reasons and communicate the same to the applicant within a period of 30 days from the date of receipt of the representation under sub-rule (1).
Masonry building not to be erected without special permission in certain cases-
(1) Save with the special permission of the Local Body no building (other than a hut)
shall be erected unless –
(a) the site of such building abuts on a public street or a projected public street or a private street duly sanctioned and constructed In accordance with the provisions of the Act or any other law in force immediately before the commencement of the Act; or
(b) there is access to the building from any such street by a passage or pathway appertaining to such site, and not less than 2.40 metres wide at any part,
(2) No building shall be erected so as to deprive any masonry or framed building of the appropriate means of access,
(3) The following building shall be exempted from the operation of these rules —
(a) any building erected or intended to be erected by or with the sanction of the competent authority for use solely as a temporary hospital for the
reception and treatment of persons suffering from any infectious or contagious disease;
(b) any hoarding or like means of protection (other than a masonry wall) which the owner of any premises certifies to the competent authority, not less than seven days after erection to have been erected for the purpose of preventing threatened acquisition of any casement over his own premises or any portion thereof, provided, the stability of such hoarding or other means of protection is certified by the competent authority.
B. Submission of Building Plan
13Application to the Mayor/Chairperson with a building plan for permission to erect a new building or to make addition or alteration to a building. –
(1) No person shall erect a new building, or re-erect or make addition and / or alteration to any building or cause the same to be done without first obtaining a sanction from the Local Body under these rules.
Provided that no such sanction is required to be obtained from the Local Bodies for –
(a) erection, re-erection, addition to or alteration of -
(i) an internal partition wall which does not violate any of the provisions of Act or these rules, or
(ii) a parapet wall or a cornice or chajja within the boundaries or the site and not overhanging a street, so however, that the total height of the parapet wall shall not be more than 1.50 metres and width of the cornice or chajja shall not be more than 50 centimeters.
(b) repairing of a staircase of lift-shaft.
(c) white washing or painting.
(d) re flooring of the surface of an existing floor,
(e) re-conditioning of the surface of an existing floor, without changing the character and dimension of such roof, re-flooring of the surface of an existing floor, provided that no such work as is referred to in clauses(a) and (c) shall be undertaken without giving the Local Bodies 15(fifteen) days notice in writing giving the nature of work proposed to be undertaken;
(f) erection of a false ceiling in any floor for air-conditioning, lighting or decorative purposes;
(g) plastering and patch work;
(h) providing or closing, an internal door or window or a ventilator, not opening directly opposite a door or a window of another building;
(i) replacing or fallen bricks, stores or repairing of damaged pillars or beams;
(j) repairing or renewing existing plumbing service,
(k) carrying out such other work as is necessary in the opinion of the Local Bodies, for reasons to be recorded in writing, to maintain the building in a condition of good repair or to secure it to present danger to human life.
(2) Every person intending to erect a new building or to make addition and / or alteration to any building, shall apply to sanction giving notice in writing in Form B along with following :-
(a) copies of documents showing that the applicant has exclusive right to undertake such works;
(b) duly authenticated copies of receipts showing payment of tax to the ULB for the quarter previous to the date of application in respect of the land, building or portion thereof upon which the building is proposed to be erected, re-erected, added to or altered and a declaration from the ULB stating that there is no arrear dues payable to the ULB,
(c) a declaration, stating the name, address and other particulars of Architect or Licensed Building, Structural Engineer etc. as the case may be, along with their consent, who are engaged as per rule 17;
(d) requisite number of copies of the drawings as stipulated in Rule 14;
(e) (i) certified copy of the approved site plan;
(ii) certified copy of the reports of tests for stability of slopes and for soil as per requirements in Rule 4 and such test report should also indicate the maximum load that can be transferred to the soil of the particular site safely;
(f) receipt of deposition of fees as specified in sub-rule(9) of Rule 14 of these rules; and
(g) in the case of steel towards, the authenticated copy of the relevant license issued by the Government of India or the State Government.
14Particulars to be furnished in, and with, an application. –
(1) Every application made under Rule 13 shall, be written on a printed form (to be supplied by the ULB on payment of an amount not less than Rupees 10(ten) only or as may be determined by the ULB for each such form) and shall state the location of the site, reference number of approval of the site plan, the number assigned to the premises in the assessment book and its dimensions, and such other particulars as may be specified by the Local Body.
(2) All site plans, building plans, elevations and sections shall be on drawing sheets which shall be in any of the sizes specified in the table below:-
TABLE -1Drawing Sheet Sizes
Serial No.
Designation
Trimmed size mm
1
2
3
1
A0
841 x 1189
2
A1
594 x 841
3
A2
420 x 594
4
A3
297 x 420
5
A4
210 x 297
The plans may be ordinary prints on Ferro-paper or other paper or blue printed, but one set of such plans shall be blue/ammonia printed. Prints of plans shall be on one side of paper only.
The plans shall be coloured as specified in Table 2.
TABLE -2Colouring of Plans
Sl. No.
Item
Size Plan
Size Plan
Size Plan
Building Plan
Building Plan
Building Plan
White Plan
Blue Print
Ammonia Print
White Plan
Blue Print
Ammonia Print
Col. 1
Col. 2
Col. 3
Col. 4
Col. 5
Col. 6
Col. 7
Col. 8
1
Plot lines
Thick Black
Thick Black
Thick Black
Thick Black
Thick Black
Thick Black
2
Existing street
Green wash
Green wash
Green wash
Green wash
Green wash
Green wash
3
Future street if any
Green doted
Green doted
Green doted
Green doted
Green doted
Green doted
4
Permissible building lines
Thick doted black
Thick doted black
Thick doted black
5
Open Spaces
No colour
6
Existing work
Yellow
Yellow
Yellow
Yellow
Yellow
Yellow
7
Work proposed to be demolished
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
8
Proposed work
Red filled in
Red
Red
Red
Red
Red
9
Drainage & sewerage work
Red dotted
Red dotted
Red dotted
Red dotted
Red dotted
Red dotted
10
Water supply work
Block doted thin
Block doted thin
Block doted thin
Block doted thin
Block doted thin
Block doted thin
11
Deviations
Red hatched
Red hatched
Red hatched
Red hatched
Red hatched
Red hatched
(5) The Plan of the building, elevations and sections according to the application shall be accurately drawn to a scale of 1(one) meter to 1(one) centimeter and coloured in the manner as laid down in Table 2 of rule-14.
(6) The Plans, sections (longitudinal and sectional) and elevations of building shall indicate-
(a) the floor plans of all the floors including roof plan together with the covered area;
(b) existing building and the basement plan, if any, the sizes of rooms and spacing of structural members, and their materials;
(c) the location of essential services, that is to say, water closet, sink, baths, septic tank and the like, and arrangement for drainage of sullage and other waste water disposal including sewer connection if any;
(d) the sizes of footings, the thickness of basement walls, other walls, floor and roof slabs, the construction materials, sizes and spacing of framing members, floor to ceiling heights with their materials, taking at least one fully dimensioned section (both longitudinally and crosswise) through staircase, bath and water-closed as well as such other sections as would clearly indicate the details of architectural features, mezzanine floors, and lofts;
(e) the front elevation and all other elevation from the abutting public streets;
(f) the house drainage plan, and site drainage plan up to nearest Nagar Panchayat or Municipality or natural outfall;
(g) the dimensions of all projected portions beyond the permissible building line;
(h) the roof plan indicating the drainage and slope of the terrace;
(i) the plans and details of private water
(j) (i) the details of breast wall, retaining wall or other protective measures, if any, which are required to be undertaken;
(ii) no part of the proposed building shall be permitted to be erected directly over the retaining or other similar protective walls;
are necessary for a building under any provision of these rules, the copy of details or reports and/or recommendations of soil/stability/other tests and/or copy of details of calculating for structural design duly signed by the competent personnel as specified in Rule 17. Details structural drawings including reinforcement detailing should also be submitted.
(7) Doors and windows schedule shall show sizes of doors, windows, and frames.
(8) The plan in its headline shall indicate specifically-
(a) the purpose of construction,
(b) the name of the owner,
(c) the name of the police-station, and
(d) the name and jurisdiction list number of mouza and cadastral survey number of the plot or plots, of the site, if required;
(9) Every application shall be accompanied with an application fee of not less than Rupees 10(ten) only and not more than Rupees 30(thirty) only as may be determined by the ULB.
(10) The nearest road of 3 m width or more with the pathway connecting the road and the site should be shown in case of plot abutting roads less than 3 m.
15Specification and other information to accompany the application with building plan:-
Every such application shall further be accompanied by a brief specification giving the following information:-
(a) the materials and method of construction to be used for external walls, partition walls, foundations, roofs, floors, stairs, fire place and chimneys;
(b) the manner in which roof and house drainage and the surface drainage of the site will be disposed of;
(c) the manner, if any, in which it is proposed to pave the courtyard and open space in the building or premises and the scope to which the surface is to be made in each case;
(d) the means of access that will be available for removal of nuisance;
(e) proposed occupancy or use of the building for ensuring conformity with the provisions of chapter xiv of the Act;
(f) the area of plot, area of the plinth of the proposed and existing buildings if any, and the area of open spaces left;
(g) the number and area of each tenement, the area put to different occupancy or use group in all the floors of the proposed building including the same for existing building, if any;
(h) safety measures proposed to be taken during the construction of the building;
(i) for buildings other than residential and educational buildings, the means of ingress and egress of vehicles shall be indicated;
(j) the position of water tanks with sizes which shall have to be constructed below ground or just above;
(k) the area of garage (if any);
(I) number of flats proposed to be built in each floor and total number of flats (if any);
(m) calculation of F.A.R.
(n) an indemnity bond in Form J in the case of building plans having provisions for deep foundation work, piling work, construction of basement or underground construction;
(o) first aid and other provisions for dealing with fire,
(p) such other particulars as may be determined by the Municipality / Nagar Panchayat having jurisdiction.
(q) A certificate undertaking design for hazard safety in Form B-A;
16Preparation of plan and supervision of execution of work.-
(1) Every person who intends to erect, re-erect or add to or alter any building shall get its plan prepared and structural work designed and supervised by an architect, / structural engineer/licensed building Planner as required under Rule 17. While submitting the plan the architect/ licensed building Planner/ structural engineer should certify to the effect that the site has been personally inspected while planning the building and/or designing the structural members, as well as has taken into account the findings of/or recommendations of stability analysis as well as examined the Soil Tests Reports as and where necessary under this rule.
(2) In all such cases, the licensed building Planner, structural engineer or geo-technical engineer shall have to be empanelled with the ULB.
(3) The name and address and license or empanelment number of person so employed and serial number / registration number in the case of architect shall be stated in the application in respect of such buildings.
(4) In case of building plans /site plans submitted by central or state government or by organization controlled by Central or State Government, if the plans are prepared and submitted under the signature of Government Engineer or Architect who are employees of the applicant organization, the Rule 16 (1) and 16(3) shall not be applicable.
17Engagement of technical personnel. -
(1) Every person who intends to erect, re-erect, add to or alter any building shall subject to the provisions of the Act and these rules, engage, -
(a) for all buildings upto 4.5 M. in height, a technical personnel of at least a diploma holder Licensed Building Planner for planning, designing and construction of the building structure and the foundation;
(b) for all buildings above 4.5 meters and up to 8.0 m. in height and/or for erection involving deep foundation works or construction of basement or any other underground structure thereto, a licensed Degree holder Building Planner and /or an Architect and a Structural Engineer for planning, designing and construction of the buildings including foundation;
(c) for all other buildings above 8.00 meter and upto14.0 m. in height and /or for erection involving piling works, deep foundation works or construction of basement or any other underground structure thereto or separately, a licensed degree holder Building Planner, an Architect, a Structural Engineer and a Geo-technical Engineer for planning, designing and construction of a building; and
(d) for all other buildings above 14.0 meters in height, permission has to be sought from the state government through the ULB. Engagement of technical personnel shall be as per clause (c) above;
provided that licensed Building Planners, the Architect, the Structural Engineer and the Geo-technical Engineer will work in association with one another and they will be individually and/or collectively responsible for ensuring the safety of the building structure and its foundation;
(2) In case of death, resignation, removal of Architect Structural Engineer, Geotechnical Engineer or Licensed Building Planner as the case may be, a fresh engagement shall be made forthwith and shall be notified to the Mayor/Chairperson of the ULB. No work shall be carried out in the intervening period, if any.
(3) The validity of any engagement made under this rules shall lapse, in the case an Architect with lapse of validity of registration granted under the Architect's Act, 1972 (20 of 1972), or in the case of a Structural Engineer and a Geo-technical Engineer with the lapse of empanelment, or in the case of Licensed Building Planner, with lapse the validity of license.
(4) A Structural Engineer or a Geo-technical Engineer is also required to be empanelled with the ULB.
(5) A Licensed Building Planner shall have -
(a) at least a diploma in Civil Engineering or Architecture from a recognized university or an equivalent engineering qualification recognized by the Government and shall not have less than 2 years experience in planning, designing and execution of building work including sanitary and plumbing works related to buildings, or
(b) a degree in Civil Engineering or Architecture from a recognized university or an equivalent Engineering qualification recognized by the Government and shall not have less than 2 years' experience in planning, designing and execution of building works including sanitary and plumbing works related to buildings.
18 Time and manner of disposal of application under rule 13. -
Within 15(fifteen) working days from the date of receipt of an application with building plan, the ULB may require the applicant -
a) to furnish him with any information on matters referred to in these rules which has not already been given in the documents there under;
b) to satisfy, him that there are no objections which may lawfully be taken to the approval of the building plans;
c) if any requisition made under these rules is not complied with within 1(one) month, the application for approval of the building plans shall be treated as cancelled.
19 Action to be taken while a building is under construction. -
1(one) copy of the sanctioned building plan and copy of the documents mentioned in Part II A 14 (6) shall be kept at the site of the building at all times when building operations are in progress and such plans shall be made available at all such times for the inspection of the ULB or of any officer authorized by it in that behalf.
20Sanction of building Plan and permission to execute work.-
(1) within 30 (thirty) days of the receipt of any application with building plan or of any information or documents which the ULB may reasonably require the applicant to furnish before deciding whether permission shall be granted to execute any work, the competent authority shall, by written order -
a) accord sanction, in Form 'C', to the building plan conditionally or unconditionally give permission to execute the work, or
b) refuse in Form ‘D’ on one or more of the grounds mentioned in section 126 of the Act to accord such sanction, or
c) accord sanction but impose conditions for permission to execute the work, or
d) accord provisional sanction under the proviso in section 125 of the Act :
Provided further that in the case of a provisional sanction, the applicant shall furnish a statement to the effect that, if he is unable to produce the license or permission as required, the provisional sanction would be at his own risk and cost and shall not be made final and the
occupancy certificate under Rule 34 of this Rules shall not be issued in respect of the use other than that specified in the Building Plan.
(2) The Building permit shall not be issued till a duly authenticated copy of a receipt showing payment to the ULB of the Building Permit Fees payable under rule 25 of these rules for the sanction of the buildings is produced before the Mayor/Chairperson of the Local Body.
21 Power to cancel permission on the ground of material misrepresentation by applicant.-
If, at any time permission to erect any masonry or framed building has been given and the ULB is satisfied that such sanction, was granted in consequence of any material misrepresentation or fraudulent statement contained in the application or in the plans, elevations, sections or specifications submitted therewith in respect of such building the ULB may cancel such permission, and any work done there under shall be deemed to have been done without sanction.
22 Appeal on refusal of sanction of building plan.-
Where permission has been refused, the applicant may make further appeal to the Local Body for re-consideration.
23Sanction of plan in case of delays. -
If within the period specified in these rules, the Local Body has neither sanctioned nor refused to accord sanction to execute any work, the applicant may represent to the Mayor/Chairperson in writing, in this regard and if the representation is not disposed of within 30(thirty) days from the date of receipt of the representation, such sanction or permission shall be deemed to have been granted and the applicant may proceed to execute the work. So, however that nothing in the sanction shall be deemed to have permitted the applicant to contravene any of the provisions of this rule or any other rules or regulations applicable to such works.
24Duration and expiry of sanction of building plan. -
(1) A sanction to erect a building accorded under these rules shall be valid for 3(three) years from the date on which it is sanctioned and may be renewed thereafter for a further period of 2(two) years on payment, in the form of cash or bank draft, of such fees as may be determined by the Local Body on the basis of rule 25, and on production of the previously sanctioned plan. A building plan may be revalidated for a further period of 5 years only in case a building has been partly completed and occupancy certificate in terms of rule 34 has been issued as well as on production of the previous sanctioned/revalidated building plan, the completion certificate and on receipt of fees required to be paid as to be determined by the ULB from time to time;
provided that, if the application for renewal of a building is made after the expiry of 3(three) years, the same shall be accompanied by a renewal fee with a fine not being less than Rupees 2(two) thousand or as may be determined by the ULB concerned.
(2) Any person who erects a building or continues the work of erection of a building after the permission sanctioned under these rules has expired, shall be deemed to erect such building or to continue such work without sanction;
(3) The erection of a building or work shall be completed within the period specified by the Local Body under section 211 of the Act.
25Fees for sanction of building plans. -
(1) The ULB shall levy a minimum fee for sanction of building plan at such rates, specified in the following on the basis of the sanctioned total covered area in all floors - however maximum fees will not exceed 5 (five) times the minimum specified fees as given hereunder -
(a) for load bearing buildings the minimum rate of fees would be Rs. 20/-(twenty)
per sq.mt. and
(b) for buildings proposed to be constructed by RCC structure, the rate of fees would be Rs. 25/-(Twenty five) per sq. mt.
(2) In the case of steel towers, the ULB shall levy fees at the rate of Rs.3/- (three) per cubic metre of the volume of such towers.
(3) The ULB shall levy a development fee, in addition to the fees specified in sub-rule(1) or sub-rule(2), as the case may be, for passing the building whose Floor Area Ratio has been calculated on the basis of a means of access which is a National Highway, State Highway or any such access having an width of 15 metres or above, at such rates as may be determined by the ULB.
26 Signature of approved plan.-
When the Mayor/Chairperson of Local Body has given permission to execute any work, the approved plans of the work shall be signed by such officer as may be authorized in its behalf and 1(one) set of approved plan and 1(one) set of certified copy of the approved plan shall be handed over to the applicant.
27 Retention of plan and submission of fresh applications.-
When sanction to erect a new building (other than a hut) is refused,
(a) the Mayor/Chairperson of the Local Body will retain two copies of plan and shall without charge, furnish applicant with its reason for such refusal in writing; and
(b) the applicant may, at any time thereafter, send to Mayor/Chairperson of the Local Body a fresh application and fresh or modified documents under these rules with the object of meeting the objections for which such sanction was refused.
C. Commencement of Work
28 Notice to the Mayor/Chairperson of the ULB before Commencement of work.-
Not less than 7(seven) days before any person commences to erect or re-erect a building shall send to the Mayor/Chairperson a notice, in Form 'E', specifying the date on which he proposes to commence the work.
29 Notice for completion of work up to plinth level.-
(1) After the completion of the structural work up to the plinth level or up to 1(one) metre above ground level, whichever is higher, the applicant shall give a notice to the ULB in Form 'F' to enable him to inspect such work.
(2) An officer of the ULB duly authorized in this behalf shall inspect the work at the site within 15(fifteen) days from the date of the receipt of the notice and within 7(seven) days of such inspection issue necessary direction, if any.
30Deviations during construction.-
(1) No deviation from the sanctioned plan shall be made during erection or execution of any work.
(2) Notwithstanding anything contained in sub-rule (1),-
(a) if during erection or execution of work any internal alteration within the sanctioned covered space which does not violate the provisions of the Act or these rules, is intended to be made, the person referred to in sub-rule(1) of rule 13 shall inform the ULB by notice in writing along with a certificate from the Architect or the Licensed Building Planner, as the case may be, together with drawings incorporating the deviations and structural calculation in case of structural deviations, stating the nature and purpose of Plan' under rule 33; of such deviations at east 15(fifteen) days prior to carrying out such erection or execution of work and may proceed with the
execution of such work subject to the condition that such deviations shall be incorporated in the ‘Completion plan’ under rule 33;
(b) if during the erection or execution of work any external deviation beyond sanctioned covered space is intended to be made and which does not violate the provisions of the Act or these rules, the person referred to sub-rule (1) of rule 13 shall, prior to carrying out such erection or execution of works, submit, in accordance, with the provisions of those rules, a revised plan incorporating the deviations intended to be
carried out, for obtaining necessary sanction thereof.
(3) If no notice is served under clause (a) of sub-rule (2) above, or the work of erection or execution is undertaken without the sanction referred to in clause(b) above, such erection or execution of work shall be deemed to be in contravention of the provisions of the Act and these rules and shall be dealt with accordingly.
31Demolition of unauthorized construction. -
(1) The ULB may order for demolition or alteration of any building/buildings, if the competent authority is satisfied -
(a) that the erection of any building -
(i) has been commenced without obtaining the sanction or permission of the competent authority, or
(ii) is being carried on or has been completed otherwise than in accordance with the particulars on which such sanction or permission or order is based or after such sanction or permission has been lawfully withdrawn, or
(iii) is being carried on or has been completed in breach of any provision of the Act or these rules or of any condition, modification, direction or requisition lawfully given or made under the Act or under these rules.
(2) If any material alteration of or addition to, any building has been commenced or is being carried on or has been completed in breach of any provision of the Act or these rules or if any alterations required by any notice issued under these rules have not been duly made, the ULB may, in addition to any prosecution that may be instituted under the Act, they make an order directing that such erection alteration or addition, as the case may be, or so much thereof as has been executed unlawfully or if any structure specified in the application or plan or specification as a structure to be demolished or altered before the erection of the new building has not been demolished or altered or if any material alterations or additions have been made, such alterations or additions shall -
(a) be demolished by the owner thereof or altered by him to the satisfaction of the competent authority, as the case may require; or
(b) be demolished or altered by the competent authority at the expense of the said owner;
provided that prior to carrying out any demolition of any building or part thereof as described in the notice, the owner of the building shall be given a notice stipulating therein the date and time to appear himself or through his authorized representative before the ULB who will hear the circumstances under which such deviation/unauthorized construction work has been carried out and after hearing record the order of the ULB and the said order shall be communicated to the owner officially.
(c) all demolished materials shall be removed by the ULB at the cost of the owner or to the satisfaction of the ULB within a maximum period of 30(thirty) days from the date of demolition.
32Stoppage of erection of new building in certain cases.-
(1) In any case the construction of a new building (s) is sought to be erected on a soil which is recently filled up (known from the records of Settlement or ULB about topography of the soil) pond, lake, marshy and sub-soil, the Mayor/Chairperson of the concerned ULB may seek a Soil Test Report issued by a competent authority along with the proposed building plan. Considering the Soil Report, the Mayor/Chairperson may restrict the maximum height of the building or he/she may advice to change the structural design or reject the construction of the said building.
(2) In any case in which the erection of a new building or any other work has been commenced or is being carried on unlawfully, the Mayor/Chairperson may, by written notice, require the person carrying on such erection or other unlawful work to discontinue the same.
(3) If any notice issued under these rules is not duly complied with, the competent authority may, with the assistance of the police, if necessary, take such steps as it may deem needful in order to stop the continuance of the unlawful work.
(4) If it appears to the competent authority that it is necessary, in order to prevent the continuation of the unlawful work, to depute any public or municipal officer to watch the premises, the cost of providing the same shall be borne by the person to whom the notice was addressed.
33Completion of work. -
After the completion of the erection of a building or the execution of any work, the owner of the building shall submit a notice of completion in Form 'G'. In case of deviation as stated in clause (a) of sub-rule (2) of rule 30, the notice shall be accompanied by 3(three) sets of building plan and marked 'completion plan' with all revisions and modifications including those referred to in sub-rule (2) of rule 30. The applicant shall duly sign the plans and also the concerned technical personnel specified in rule 17;
Provided that for a residential or educational building in any municipal area, not exceeding 8.0 metre in height on a plot of 200 Sq. metre in area, application of this rule may not be insisted upon but the owner will have to intimate in writing to the ULB about the completion of such building.
34Occupancy certificate.-
(1) Within 7 (seven) working days of receipt of the notice of completion of building or work, the ULB or the authorized representative in this behalf, shall inspect the building or work and shall satisfy itself or himself that the erection of the building or the execution of the work has been done in accordance with the sanctioned plan.
(2) Within 10 (ten) working days from inspection, the ULB shall, if it is satisfied that the building or the work has been completed in accordance with the sanctioned plan, issue an occupancy certificate, in Form 'H';
Provided that such certificate shall not be issued in the case of a building or any work for which provisional sanction was given unless the applicant produces before the Mayor/Chairperson the license or permission;
provided further that the occupancy certificate shall be issued only after all the extra materials like sand, boulders, stone chips, cement, steel, bamboo, timber etc. lying on the public road have been removed by owner and the damages to public property, if any, has been made good by the owner with his own cost to the entire satisfaction of the ULB.
(3) After due verification, one set of the building plan shall be returned to the applicant with the endorsement of approved completion plan under the signature of the Mayor/Chairperson or an Officer authorized in this behalf.
(4) The ULB may, upon a written request from an applicant and on his furnishing an Indemnity Bond undertaking to indemnify the ULB against any risk, danger or damage to any person, whether an occupier or not, and or his giving an undertaking to ensure in such manner as the ULB may specify, public safety, issue a partial occupancy certificate, subject to the provisions to sub-rule (1) and the proviso to sub-rule (2); provided that no partial occupancy certificate shall be issued unless the ULB is satisfied that the portion for which such partial occupancy is solicited is in a habitable condition; provided further that when the erection of the building or the execution of the work is completed within the period or the extended period provided for in the Act, the applicant shall apply for conversion of the partial occupancy certificate or issue of an occupancy certificate, and such certificate may be issued in accordance with the provisions of these rules.
(5) In case where the occupancy certificate is refused, the ULB shall communicate the reasons thereof in writing to the applicant within 15 (fifteen) days from the date of receipt of the notice of completion of the work.
(6) In case where, in the opinion of the ULB the building or the work has not been completed in accordance with the sanctioned plan, it may take necessary action in accordance with the provisions of the Act and these rules.
(7) The ULB shall not permit connections to be made to municipal water mains and municipal drains, if any, from any new building in respect of which occupancy certificate has not been issued;
provided that the ULB may order severance of such connections if he is of the opinion that the conditions of the partial occupancy certificate are being violated or if further erection of the building or execution of the work is proceeding contrary to the sanctioned plan.
(8) The ULB shall not permit construction to be made to municipal water mains, if any, from any new building in respect of which water connection fee, as may be specified by the ULB from time to time, has not been paid in advance.
35 Delay in issue of occupancy certificate.-
(1) In case where, within a period of 30(thirty) days from the receipt of the notice of completion, the ULB fails to issue an occupancy certificate or to communicate refusal the applicant may make a representation in writing to the Mayor/ Chairperson.
(2) The Mayor/ Chairperson shall, after such enquiry as he may think fit, and after giving the applicant an opportunity of being heard, issue the occupancy certificate or communicate refusal of the same to the applicant within a period of 30(thirty) days from the date of receipt by the Mayor/ Chairperson of the representation.
36 Prohibition of use of Building without occupancy certificate.-
No person shall occupy or permit to be occupied a building erected or re-erected or altered under the Act in respect of which an occupancy certificate or a partial occupancy certificate under these rules has not been issued by the ULB.
37 Work subsequent to issue of occupancy certificate,-
If any re-erection or addition or alteration of a building in respect of which an occupancy certificate has been issued is intended, a fresh notice under the Act or these rules, as the case may be, shall be necessary.
38 Notice for covering up drains, etc. -
(1) Before proceeding to cover up drains or appliances connected with the drainage the applicant shall give a notice to the ULB in Form 'I' stating that such drains or
appliances are ready for inspection and shall specify the date and hour not being a date earlier than 7(seven) days from the date of the notice on which he will proceed to cover up such drains or appliances.
(2) An officer of the ULB duly authorized by the ULB in this behalf shall inspect the work at the site, within 3(three) days of such inspection, issue necessary direction, if any.
39Power of Mayor/ Chairperson of the ULB, to guard against accidents during construction or repairs. -
(1) The Mayor/ Chairperson of the Local Body, so far as practicable during the construction or repair of any building, street, drain, water-supply line or other premises vested in the ULB or in an owner, cause proper precaution for guarding against accident to be taken by shorting up and protecting the adjoining buildings, and shall cause such bar, char or post as it shall think fit, to be fixed across or in any street to prevent the passage of any carriage, cart or other vehicle, or of cattle, and avert danger while such construction or repair is being carried on, and shall cause such construction or repair work in a street to be sufficiently lighted and guarded during the night.
(2) Whoever takes down, alters or removes any such bar, chain or post or removes or extinguishes any such light without the authority or consent of the Mayor/Chairperson of the ULB shall be published with fine which may extend to Rs. 250/-(two hundred and fifty) only.
40Power of Mayor/ Chairperson of the ULB to cause hoards or fences to be set up during construction, repair, etc.-
A person intending to construct or take down any building or any other structure or to alter or repair any other structure externally shall, if the position or circumstances of the work is or are likely to cause, or may cause obstruction, danger or inconvenience in any street, before beginning such work -
(a) obtain beforehand permission in writing from the Mayor/ Chairperson of the ULB so to do; and
(b) cause sufficient hoards or fences to be put up in order to separate the area where the work is to be carried on, from the street, and shall maintain such hoards or fences standing and in good condition to the satisfaction of the Mayor/ Chairperson of the ULB during such time as the Mayor/ Chairperson of the ULB considers necessary for the public safety or convenience and shall cause the same to be sufficiently lighted during the night and shall remove the same when directed by the Mayor/ Chairperson of the ULB.