- Design
| COMMENTS | |
|---|---|
| 1.1. Design/Drawings available? | Y/N |
| Design category Type design? Specific design? | Y/N Design to be collected to refer to Design Consultant/H.O. |
| Drawings prepared / checked by competent Authority? | Y/N |
| Design drawings / details Structural detailed included Earthquake/cyclone resistant features included? | Y/NY/N |
| Design verified/vetted by Dept./Govt. approved agency/competent authority? | Y/N |
| Design changes approved by Dept./Govt. approved agency/competent authority? | Y/N |
- Foundation
2.1. Foundation used Existing/New
2.2.1 If existing foundation used
2.2.1. Depth of foundation below ground <50cm/50-70/>70cm
2.2.2. Type of masonry Stone/brick/PCC blocks
2.2.3. Thickness of masonry (above ground): 23cm/35/>35
2.2.4. Mortar used Cement-sand/Lime/Mud
2.2.5. Mix of cement mortar 1:4/1:6/Leaner
2.2.6. Height upto plinth cm
2.2.7.If stone mason
2.2.7.1 Through stones Yes/No, if Yes Adequate/inadequate
2.2.7.2 Corner stones Yes/No, if Yes Adequate/Inadequate
2.3. If new foundation used
2.3.1. Depth of foundation below ground <50/50-70/>70cm
2.3.2. Type of masonry blocks stone/bricks/PCC
2.3.3. Thickness of masonry above plinth 23cm/35/>35cm
2.3.4. Mortar used Cement-sand/lime/mud
2.3.5. Mix cement mortar (1:4) Yes/No
2.3.6. Height up to plinth <60/>60cm
2.3.7.1 Through Stones Yes/No, if yes Adequate/Inadequate
2.3.7.2 Corner Stones Yes/No, if yes Adequate/Inadequate
2.4. Vertical reinforcement in foundation : Yes/No
3 Walling
3.1 Type of masonry Stone/Brick/PCC Blocks
3.2 Mortar used Cement-Sand/Lime/Mud
3.3 Mix of cement mortar 1;4/1;6/Leaner
3.4 Thickness of wall >23cm/23cm/23cm
3.5 Mixing of mortar OK/Not OK
3.6 Joint Property filled OK/Not OK
3.7 Wetting of bricks Good/Medium/Poor
3.8 If stone masonry
3.8.1 Through Stones Yes/No 3.8.2 Corner Stones Yes/No 3.9 Overall workmanship Good/Medium/Poor
4 Roofing
4.1 Type of roof Flat/Sloping
-
4.2 If sloped : Morbid tiles/A.C. sheet/G.I. sheet
-
4.3 Purlins : Angle-Iron/Timber/NA
-
4.4 Truss type : _
-
4.5 Anchorage with wall : Adequate/Inadequate/NA
-
5 Materials
-
5.1 Cement
-
5.1.1 Source : Authorised Dealer/Market
-
5.1.2 Type of cement : OPC/PPC/PSC
-
5.1.3 If OPC : Grade (33/43/53)
-
5.2 Sand
-
5.2.1 Type of sand : River sand/Stone dust
-
5.2.2 Presence of deleterious material : Mild/Moderate/high
-
5.3 Coarse Aggregates
-
5.3.1 Type coarse Aggregates : Gravel/Crushed Stone
-
5.3.2 Presence of deleterious material : Mild/Moderate/High
-
5.4 P.C.C. Blocks (Applicable for onsite production)
-
5.4.1 Type of P.C.C. Blocks : Solid blocks/Hollow blocks
-
5.4.2 Ratio of concrete in blocks : _
-
5.4.3 Interlocking feature : Yes/No
-
5.4.4 Coarse aggregates used : Natural/Crushed stone
-
5.5 Bricks Blocks, Stone etc.
-
5.5.1 Strength (field assessment) : Low/Medium/High
-
5.5.2 Dimensional accuracy : Yes/No
-
5.6 Concrete
-
5.6.1 Mix of concrete : (1:1 ½:3)/(1:2:4)/Design Mix
-
5.6.2 Batching : Weigh batching/Volume batching
-
5.6.3 Compaction : Vibrators/Thappies and rods
-
5.6.4 Workability : Low/Medium/High
-
5.6.5 Availability of water : Sufficient/Insufficient
-
5.6.6 Curing : Satisfactory/Unsatisfactory
-
5.7 Reinforcing Steel
-
5.7.1 Type of Steel : Plain mild steel/HYSD bars
-
5.7.2 Source : Authorised Dealer/Market
-
5.7.3 Whether IS marked : Yes/No
-
5.7.4 Conditions of bars : Clean/Corroded
-
5.7.5 Fixing of reinforcement as per drawings : Yes/No
-
5.7.6 Suitable cover : Yes/No
-
5.7.7 Spacing of bars : Regular/Irregular
-
5.7.8 Overlaps as per specifications: Yes/No
-
5.8 Form Work
-
5.8.1 Type of Form Work : Timber/Ply board/Steel
-
5.8.2 Use of mould oil : Yes/No
-
5.8.3 Leakage of cement slurry : Observed/Not observed
| 6.1.1.2 Skill level | Yes/No | Yes/No |
|---|---|---|
| 6.1.1.3 Lintel level | Yes/No | Yes/No |
| 6.1.1.4 Roof level (if applicable) | Yes/No | Yes/No |
If sloped Roof, whether seismic bands are provide at
| 6.1.2.1 | Gable wall top | Yes/No | Yes/No |
|---|---|---|---|
| 6.1.2.2 | Eaves level | Yes/No | Yes/No |
Provision of vertical steel in masonry at
| Provided Adequate | ||
| 6.1.3.1 Each corner | Yes/No | Yes/No |
| 6.1.3.2 Each T-junction | Yes/No | Yes/No |
| 6.1.3.3 Each door joint | Yes/No | Yes/No |
| 6.1.3.4 Around each window | Yes/No | Yes/No |
Openings
| 6.1.4.1 Total width of openings(*-42% for double storey) | : | <50% / 50*-60% / >60% |
|---|---|---|
| 6.1.4.2 Clearance from corner | : | OK / Not OK |
| 6.1.4.3 Pier width between two openings | : | OK / Not OK |
| Framed Structures | ||
| Ductile detailing | ||
| 6.2.1.1 Spacing of stirrup | : | OK /Not OK |
| 6.2.1.2 Sizes of members | : | OK / Not OK |
| 6.2.1.3 End anchorage | : | OK / Not OK |
| 6.2.1.4 Lapping (length, location etc.) | : | OK / Not OK |
| 6.2.1.5 Angle of stirrup hook | : | 90 / 135 degrees |
Any testing carried out by Owner / Engg. Supervisor on
| Testing done | Testing results | ||
|---|---|---|---|
| 6.3.1 | Water | Yes/No | OK / Not OK |
| 6.3.2 | Cement | Yes/No | OK / Not OK |
| 6.3.3 | Bricks / PCC blocks / Stones | Yes/No | OK / Not OK |
| 6.3.4 Aggregate | Yes/No | OK / Not OK | |
| 6.3.5 Mortar | Yes/NO | OK / Not OK | |
| 6.3.6 Concrete | Yes/No | OK / Not OK | |
| 6.3.7 Reinforcement | Yes/No | OK / Not OK |