The telecom operators may share the towers for fixing their respective antennas. The same are required to adhere to the prescribed technical requirements, so as to curtail multiplicity of towers as well as to optimize the use of the existing ones.
78. SIZES OF SEPTIC TANKS
Table XI
| No of user | Length in Meter | Width in Meter Domestic tank | Liquid depth in Meter |
| 5 | 1.50 | 0.75 | 1.00 |
| 10 | 2.00 | 0.90 | 1.00 |
| 15 | 2.00 | 0.90 | 1.30 |
| 20 | 2.30 | 1.10 | 1.30 |
| 50 | 4.00 | 1.40 | 1.30 |
| For Housing colonies | |||
| 100 | 8.00 | 2.60 | 1.00 |
| 150 | 10.60 | 2.70 | 1.00 |
| 200 | 12.40 | 3.10 | 1.00 |
| 300 | 14.60 | 3.90 | 1.00 |
| Hostels, Boarding Schools | |||
| 50 | 5.00 | 1.60 | 1.30 |
| 100 | 5.70 | 2.10 | 1.40 |
| 150 | 7.70 | 2.40 | 1.40 |
| 200 | 8.90 | 2.70 | 1.40 |
| 300 | 10.70 | 3.30 | 1.40 |
79. ACQUISITION OF LAND
The Authority may refuse to grant permission for any construction or addition or alteration of building if any site is intended to be acquired by the Government for any public purpose for which a Notification under section 4 of land acquisition Act has been published. In the case of plots, proposed to be sub-divided the sanction of the Authority for such Sub-division shall be obtained under section 27 of Meghalaya Town country Planning Act, 1973.
80. New Plot
80.1. Addition to existing Plot: When one or more new plots of land are added to one or more premises by way of amalgamation or otherwise, the existing
buildings on any such plots may be considered to be in accordance with these byelaws at the material time when the building/buildings was/were sanctioned are satisfied considering amalgamated plot to be one parcel of land. Addition and alteration to the sanctioned building or addition of a new building or new block or newly added land/lands may be permitted as per prevailing byelaws considering amalgamated land to be one parcel of land.
(b). Sub-Division of Plots
When a plot has fully utilised its coverage & F.A.R., further sub division is not permissible. However if some percentage of coverage & F.A.R.is left after sub-division, the sub-divided plots are entitle only the balance coverage & F.A.R.
81. Linking of two blocks
If there are two adjacent plots or adjacent buildings belonging to the same owner, gangways between these two buildings may be permitted at any level, subject to the condition that it does not obstruct movement of vehicles or fire vehicles, as the case may be, the minimum width of the gangway being not less than that of a stairway.
82. Rain Water Harvesting
82.1. Water Harvesting: Water harvesting through storing of water runoff including rainwater in all existing and new buildings on plots of 100 sq.mt. and above will be mandatory. The plans submitted shall indicate the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells.
82.2. Soft Cover: Provision for soft cover should be included in the plan for building sites-
82.2.1. For any building having a minimum covered area of 500 sq. m, the applicant should provide soft cover of at least 15% of the plot area.
82.2.2. For any other building, having lesser covered area, the soft cover should be atleast 10% of the plot area.
-
Recycling of waste water All buildings having a covered area of 500 Sq.mts or minimum discharge of 10,000 lt. and above per day shall incorporate waste water recycling system. The recycled water should be used for non drinking purposes.
-
INCENTIVES FOR OWNERS LEAVING MORE SETBACKS / RAIN WATER HARVESTING / RECYCLING OF WASTE WATER:
84.1. The following incentives in terms of rebate in building permission fees will be given by the Authority for owners or their successors-in-interest who:
84.1.1. Construct the building /blocks by leaving more setbacks than the minimal stipulated in these byelaws: Leaving 1.5 times or more the minimum setbacks in all sides: 10 % rebate on building permission fees will be allowed provided the setbacks has to be on all sides to qualify for the rebate. Leaving more on one side and the minimum on other sides would not qualify for such rebate.
84.1.2. Undertake both recycling of waste water and rain water harvesting structures: 10 % rebate on building permission fees will be allowed.
84.1. 3. Where owners provide at least 25% additional parking space over and above the minimum they would be allowed for a rebate of 10 % in building permission fees.
-
Energy Conservation Building: Building or building complexes having a connected load of 100 KW will be regulated as per the Energy Conservation Code 2007 as amended. Generally buildings or complexes having air conditioned area of 1,000 sq m or more will also fall under this category.