75 Wells
1 Essentially of permit.—
(i) No new well shall be dug without the permission of the Secretary.
(ii) Where any person intends to dig an open well/tube well/bore well, he shall submit an application in the form in Appendix A1 to the Secretary, together with site plan and documents to prove the ownership.
(iii) The site plan shall show the position and dimension of the well and all existing and proposed buildings and structures in the site and within 7.5 metres radius from that well.
2 Setback.—
(i) The set back from any street shall be as that required for a building.
(i) There shall be minimum 1.20 metres set back from other boundaries.
(iii) The well may be located within or abutting or away from the building in the plot.
(iv) No leech pit, sock pit, refuse pit, earth closet or septic tank shall be allowed or made within a distance of 7.5 metres radius from any existing well used for supply of water for human consumption or domestic purpose or within 1.2 m distance from the plot boundaries.
-
Wall and surrounding.— The well shall be protected with brick wall with minimum 1 metre height.
-
Fees.— The application fee and permit fee shall be as in Schedule I and Schedule II respectively.
-
Approval of plan and issue of permit.— The Secretary shall, if convinced of the boundaries and plan and bonafides of the ownership approve the plan with or without modification and issue permit. In the case of tube wells, once the clearance from Ground Water Department is obtained by the applicant and furnished, the Secretary shall issue the permit on the same day of receipt of application along with prescribed fee.
-
Validity and extension.— The permit once issued shall be valid for three years and cannot be extended.
-
Completion report.— The applicant shall submit a completion report to the Secretary, in white paper typed or written in ink, specifying the date of completion.
76 Rainwater harvesting.—
(1) Groundwater recharging arrangements:—
(i) Unless otherwise stipulated specifically in a Master Plan / Detailed Town Planning Scheme / Interim Development Order in force under the Kerala Town and Country Planning Act, 2016 (9 of 2016), workable ground water recharging arrangements shall be provided as an integral part of all new building constructions through collection of roof top rainwater.
(ii) The components of workable groundwater recharging arrangements, as stipulated in sub rule (1) above, shall include:
(i) Roof gutters
(ii) Down pipe
(iii) Filter unit
(iv) Recharge well or recharge pond or percolation pit
Provided that open well or pond within the plot can be used as recharge components as mentioned in item (iv) above.
Provided further that filter unit as mentioned in item (iii) shall be mandatory only in situations where rainwater is recharged directly to the groundwater through open wells, pond and the like.
(iii) In exceptional cases such as water logging or impermeable subsoil conditions to considerable depths, the ground water recharging arrangements for building constructions need not be made mandatory.
(iv) The owner(s)/occupier(s) shall maintain the roof tops and the groundwater recharging arrangements in healthy/working conditions.
(2) Rainwater storage arrangements:—
(1) Unless otherwise stipulated specifically in a Master Plan / Detailed Town Planning Scheme / Interim Development Order in force under the Kerala Town and Country Planning Act, 2016 (9 of 2016), workable rainwater storage arrangements shall be provided as an integral part of all new building constructions through the collection of roof top rain water for all occupancies, except hazardous occupancy buildings and huts.
(2) The components of a workable rainwater storage arrangement, as stipulated in subrule (1) above, shall include: -
(i) Roof gutters
(ii) Down pipe and first flush pipe arrangement
(iii) Filter unit and
(iv) Storage tank with provisions for drawing water and spill over.
(3) The minimum capacity of the storage tank, as stipulated in sub-rule(2)(iv) of the rain water storage arrangement shall be at the rate given below:
Group A1 25 litres/sq.metre of Covered area
Group A2 25 litres/sq.metre of Covered area
Group B 50 litres/sq.metre of Covered area
Group C 50 litres/sq.metre of Covered area
Group D 50 litres/sq.metre of Covered area
Group E 50 litres/sq.metre of Covered area
Group F 25 litres/sq.metre of Covered area
Group G1 & Group G2 50 litres/sq.metre of Covered area
Group J 25 litres/sq.metre of Covered area
Note:— Covered area means the area mentioned in item (aa) of sub-rule (1) of rule 2.
(4) The owner(s)/occupier(s) shall maintain the roof tops and the rain water storage arrangements in healthy working conditions.
(5) If both ground water recharging arrangements and rain water storage arrangements are required to be provided as laid out in this chapter, in addition to rain water storage arrangements, arrangements for carrying the spill over water from storage tank to recharge well or recharge pond or percolation pit need only be provided.
(3) Urban Forestry:— As per section 4 of The Kerala Promotion of Tree Growth in Non– Forest Areas Act, 2005 (46 of 2005);
(1) Every owner or occupant of a land other than single family residential building shall, within a period of one year from the date of issue of occupancy certificate, plant trees so as to conform to the standards prescribed by Secretary from time to time.
(2) Planting of trees shall be made at the rate of minimum of one tree per 450 sq.m of plot area for plots exceeding 450 sq. metres of area. Total number of trees would include the existing trees in the plot also.
(3) A space of minimum 1 m X 1.5 m has to be provided for planting trees.
(4) It shall be the duty of the owner or occupier of the land who is required to plant a tree or trees to ensure that they grow properly.