- Essentiality of permit. — (1) No person shall develop or redevelop any parcel of land by subdividing into plots or cause the same to be done without first obtaining a permit for each such development or redevelopment from the Secretary.
(2) No person shall construct or reconstruct or make addition or extension or alteration to any building or cause the same to be done without first obtaining a building permit for each such work from the Secretary.
(3) No person shall change the occupancy of an existing building from one group to another, without first obtaining the permit from the Secretary.
- Application for development/building permit. — (1) Every person other than a Central or State Government Department who intends to:—
(a) develop or redevelop any parcel of land by subdividing into plots shall apply in writing to the Secretary in the form in Appendix A3 and/or
(b) construct or reconstruct a building or make alteration or addition or extension or change in occupancy to a building shall apply in writing to the Secretary in the form in Appendix A1; and
such application shall be accompanied by plans and statements in duplicate as per these rules along with documents to prove the ownership of the land concerned such as title deed proving the ownership of the applicant, land tax receipt issued by the village office and the possession certificate issued by the village office and payment of application fee as specified in Schedule I, along with a copy of certificate of registration of the Institution, Architect, Building Designer, Engineer, Town Planner or Supervisor, as the case may be, who has prepared and signed the plans, drawings and statements. The applicant shall submit the details of Court cases, if any, pertaining to the land. In case of a Joint Venture development, the agreement between the land owner and the developer shall also be produced.
(2) Applications may also be submitted through e-filing system, as may be prescribed, if such system is in force in the Local Self Government institution concerned and, the Secretary may receive, process and issue necessary orders on the application through e-filing system.
(3) In the case of any development or redevelopment of land and/or construction or reconstruction of a building or alteration or addition or extension or change in occupancy to a building by Central or State Government Department, the officer authorized shall,
before thirty days of commencement of the work, submit to the Secretary a set of layout plan or plans of the proposed plot subdivisions and/or, a set of plans of the proposed building, as the case may be, together with all other details with a certificate duly signed by the Chief Architect or the Engineer-in-charge of the works to the effect that the plans are in conformity with the provisions of these rules in all respects including conformity to any Master Plan / Detailed Town Planning Scheme / Interim Development Order in force under the Kerala Town and Country Planning Act, 2016 (9 of 2016), prepared for the area. In such cases approvals from Chief Town Planner or District Town Planner, as the case may be, and permit from the Secretary as per these rules are not required.
(4) In the following cases the Secretary shall obtain, if not produced by the applicant, after receiving the application for permit / written information from the applicant, whether it is Central Government, State Government, autonomous bodies, Quasi-governmental agencies, local self-government institutions, Co-operative Societies, Devaswom boards, private parties etc.,a written consent/ concurrence/ NOC from the officer/ authority concerned before issuing the permit. The applicant may directly obtain NOC/Permission, if any required, from organizations and submit along with the application for permit.
| Sl. No. | Location/ Use of the site and or building | Officer/authority |
|---|---|---|
| 1 | Proposed building is within 10m from Defence Establishment or Proposed high rise buildings within 500m from Defence Establishment or Telecommunication towers within 200m from Defence establishment or as per notification issued by Defence establishment from time to time | Officer in charge of the Defence establishment |
| 2 | Proposed buildings within 30m from Railway track boundary or Telecommunication towers within 100m from Railway track boundary. | Railway Authority concerned |
| 3 | Proposed site/buildings in areas declared, identified or advised by the Kerala Urban Arts Commission as possessing heritage value. | The Kerala Urban Arts Commission |
| 4 | Proposed buildings within any Security Zone | District Collector |
| 5 | Proposed buildings/places for religious purpose or worship | District Collector |
| 6 | Proposed fuel filling stations | District Collector |
| 7 | Proposed crematoria or burning and burial grounds including cemetery and vaults | District Collector |
| 8 | Proposed site/buildings in any area notified by the Government of India as a coastal regulation zone under the Environment Protection Act, 1986 (Central Act 29 of 1986) and rules made there under. | Kerala Coastal Zone Management Authority (KCZMA) |
| 9 | Any activity as specified in the schedule to the Notification No. S.O. 1533(E) dated the 14<sup>th</sup> September, 2006 and as amended from time to time, issued by the Ministry of Environment and Forests, Government of India | State Level Environment Impact Assessment Authority (SEIAA) / Ministry of Environment and Forests |
| 10 | As per prevailing statutes of the Kerala State Pollution Control Board. | Kerala State Pollution Control Board |
| 11 | Proposed traffic terminal stations like mobility hubs, bus stands or inter-state bus terminals | Chief Town Planner |
| 12 | i. All buildings under Group A1, A2, B, C,E,F,G1,G2and H occupancy exceeding 1000 sq.m of built-up area or exceeding 15 m of height ii. All buildings under Group D, I and J occupancy irrespective of the number of storeys. | Director of Department of Fire and Rescue Services or an officer authorized by him in this regard to the effect that the construction of the building conforms to the fire and safety norms specified in part 4 Fire and Life Safety of National Building Code of India, 2016 and subsequent amendments. |
Provided that the required permission/No Objection Certificate of any other Departments/Agencies as required under law may also be obtained for any land developments or constructions:
Provided that the Secretary shall issue permit for Single family residential buildings up to 300 m2 of buildup area coming under Coastal Regulation Zone, in accordance with the provisions of the relevant Coastal Regulation Zone notification in force:
Provided further that, such officer/authority concerned shall furnish his reply within fifteen days from the date of receipt of the consultation letter, if such establishment has any objection to the proposed work. The objection, if any, raised by the officer within the said fifteen days shall be duly considered by the Secretary before issuing permit. All these are subjected to amendments of the relevant Acts from time to time.
In cases where final remarks are not received within the said fifteen days from the Officer or Railway Authority as in sub-rule(4), the Secretary may delay final decision in the application for permit, if any interim reply is received from the Railway Authority concerned. Provided that provisions regarding the height of the building as specified in the National Building Code of India 2016 shall not apply to multiplexes.
Note: —
i. In the case of all livestock and poultry farms under group G1 or G2occupancies, and vaults and burial grounds under Group I occupancy, certificate of approval from the Director of Department of Fire and Rescue Services is not necessary.
ii. Applications for renovation without involving additional built-up area or structural alterations of existing buildings for religious purpose or places of worship can be considered by the Secretary after informing the District Collector in Form in Appendix-I duly filled by the applicant and verified by the Secretary.
(5) (1) Any new building under any of the following occupancies as provided under rule 25 of these rules, having a connected load of 100kW or greater, or a contract demand of 120kVA or greater,or having air-conditioned area of 500 sq.m. or greater, require the compliance of the provisions of Kerala State Energy Conservation Building Code:-
Group A2 : Lodging houses & Special Residential
Group B : Educational,
Group C : Medical / Hospital
Group D : Assembly,
Group E : Offices/Business
Group F : Mercantile/Commercial and
Group H : Storage
(2) Along with the application for building permit submitted to the Local Self Government Institution concerned for issuing building permit, the applicant shall submit the forms mentioned in the Kerala State Energy Conservation Building Code Rules, notified by Kerala Government.
Provided that a copy of the above said documents, with certification from a certified Energy Auditor (Building) shall be submitted simultaneously to the State Designated Agency, who shall scrutinize the same and intimate any non-compliance to the applicant and to the Local Self Government Institution concerned within thirty days of receipt.
If any noncompliance has been pointed out by the State Designated Agency, the Local Self Government Institution shall get a further certificate of rectification from the applicant through the certified Energy Auditor (Building) before issuing the building completion certificate as per schedule, section 3 of Kerala State Energy Conservation Building Code (KSECBC).
(6) Layout of buildings and/or usage of plots/ concurrence,—
(1) While issuing approval for plot sub division lay outs or usage of plot and/or layout of buildings, the District Town Planner or Chief Town Planner as the case may be, shall consider the following aspects.
(a) Usage of Plot: Usage of plot shall be governed by the provisions of the Master Plan / Detailed Town Planning Scheme / Interim Development Order in force under the Kerala Town and Country Planning Act 2016 (9 of 2016) prevailing in the area. In the absence of such a plan / scheme / order,approval for usage of the plot is determined in consideration of the following:
(i) The surrounding developments
(ii) Availability of infrastructure facilities
(iii) Physical aspects of the plot
(iv) Impact on the surrounding area
(b) Layout of Building: Approval for layout of building(s) is determined in consideration of the following:
(i) Access to the plot and building
(ii) Alignment of the internal roads
(iii) General setting of the building
(iv) Parking arrangements and maneuverability
(v) Aspects related to FAR and Coverage
(vi) Different uses within building
(vii) Provisions of the Master Plan / Detailed Town Planning Scheme/ Interim Development Order,if any, in force under the Kerala Town and Country Planning Act, (9 of 2016) 2016.
(c) Concurrence : Concurrence shall be governed by the provisions of the Master Plan / Detailed Town Planning Scheme / Interim Development Order in force under the Kerala Town and Country Planning Act, 2016 (9 of 2016) prevailing in the area considering the following aspects and suggest conditions with respect to the following.
(i) The surrounding developments
(ii) Availability of infrastructure facilities
(iii) Physical aspects of the plot
(iv) Impact on the surrounding area
(2) Application for Layout approval and Usage of plot/Concurrence shall be submitted in the form in Appendix-A4 along with scrutiny fee as per Schedule III
(3) Such approval from District Town Planner or Chief Town Planner, as the case may be, may specify conditions with due consideration to various planning aspects pertaining to the particular development/construction and local developments and there may also be additional conditions not specified in these rules:
Provided that these conditions so specified shall not in any form be interpreted to relax the provisions of these rules:
Provided further that, before the approval of the site and plans and issue of permit, the Secretary shall ensure that the application, drawings and specifications conform to the provisions of these rules and other applicable statutes and the conditions, if any, stipulated by Chief Town Planner or District Town Planner, as the case may be.
(4) For any deviation without change in occupancy and upto 5% of the total built up area in the plan approved by the District Town Planner / Chief Town Planner for layout of buildings and usage of plot as per these rules, but limited to 500 sqm. without change in occupancy, revised approval from the District Town Planner/ Chief Town Planner is not necessary. However, if there are serious deviations from such approved plan, fresh approvals shall be obtained from the Chief Town Planner or District Town Planner as the case may be.
(5) Approval/ Rejection/ any other communication of layout and/or usage of plot shall be intimated to the applicant in writing within one month in case of District Town Planner and within two months in case of Chief Town Planner.
- Plans to be submitted.—(1) An application for a development permit shall be accompanied by atleast 3 copies of site plan, service plan and key map together with details and specifications as prescribed in these rules.
(2) An application for building permit shall be accompanied by atleast 3 copies of site plan, service plan, key map, building plan, safety plan in case of high rise buildings, parking plan wherever the building requires parking space as per these rules, together with details and specifications as prescribed in these rules.
(3) All plans submitted shall include the name, address and signature of the land owner, applicant and registered Institution/Architect/ Engineer/ Town Planner/ Supervisor. Also, the plans have to be certified by the registered Architect/ Engineer/ Town Planner/ Supervisor as given in Appendix J1.
(4) Site Plan.—
(a) The site plan shall be drawn to a scale of not less than 1:400, fully dimensioned and shall show:
(i) boundaries of the plot intended for the proposed construction and any contiguous land belonging to the same owner including the revenue details like survey number with sub division, block, village, taluk, extent of plot etc.;
(ii) the number of the nearest building and electric post and the position of the site in relation to the neighboring street and its main access;
(iii) the name of such street, if any; street levels and its width, which shall be the width in between the plot boundaries on the opposite sides;
(iv) shall clearly show the setbacks of all existing and proposed buildings within the plot and also show all existing and proposed buildings above or below the ground level with their uses, appurtenant structures, proposed finished ground levels and authorised building numbers of the existing buildings within the plot issued by the Municipality;
(v) consolidated statement of the plot area, covered area and floor wise and use wise built-up area of both existing and proposed buildings including that of accessory buildings, Floor Space index and Coverage;
(vi) all existing and proposed streets or foot - paths within the plot with its width to scale;
(vii) the area and location of any land within the plot that is undevelopable such as rocky outcrops, steep terrains, marshes, water bodies, puramboke land etc.;
(viii) the area and location of any land within the plot that is not proposed to be developed or redeveloped and any land that is proposed to be reclaimed;
(ix) the area and location of any paddy fields and/or other agricultural land that are proposed to be reclaimed and /or converted for the said development or redevelopment;
(x) the position of external toilets, cattle sheds, stables, wells and other appurtenant structures; and
(xi) the north direction, predominant wind direction in relation to the site and any other relevant information of the plot not specifically mentioned, but may be required by the Secretary;
(xii) topographic contours (with contour intervals not greater than 1.5 metre to show the features of the plot clearly) of the site if required by the Secretary / District Town Planning Office.
(xiii) All existing natural streams/drains within the plot, if any
(xiv) World Geodetic System (WGS-84) coordinates (latitude and longitude) of the site and elevation of the top most point of the building with respect to mean sea level, if the plot falls within the Colour Coded Zone Map(CCZM) prepared by the Airport Authority of India and/or for buildings with elevation more than 150m as per Aircraft Act, 1994 (Central Act XXII of 1934):
Provided that when circumstances are such as to make a smaller plan necessary or sufficient, the plan may be drawn to a scale of 1:800 if acceptable by the Secretary.
(b) In the case of site plan for plot sub division layouts, in addition to items in (a) above, the following details shall also be furnished:—
(i) the layout of cul-de-sac, streets or foot-paths within, adjoining or terminating at the site, existing and/or proposed to be widened or newly aligned;
(ii) the proposed plot subdivision, and the area and use of each sub division thereof;
(iii) the access to each plot subdivision;
(iv) the layout of any service road or foot path and public parking spaces proposed or existing, if any.
(5) Key map:—The site plan shall be accompanied by a key map giving full details of the location of the site with reference to north direction, all adjacent streets, junctions, premises and landmarks.
(6) Service Plan:—The service plan shall be drawn to a scale not less than that of the site plan, and shall show:—
(i) the proposed plot sub-division, if any, and the uses of such sub- division;
(ii) the layout of existing and proposed water supply, electricity, drainage and sewerage main lines from or to which connections are proposed to be given with dimensions and specifications;
(iii) the layout of existing and proposed water supply, electricity, drainage and sewerage lines within the plot, with dimensions, specifications and description of installation;
(iv) any other relevant information not specifically mentioned but may be required by the Secretary; and
(v) the north direction and predominant wind direction in relation to the site.
(7) Building Plan:— The plans, elevations and sectional elevations in the building plan accompanying the application shall be accurately drawn to a scale of not less than 1:100, fully dimensioned and shall,-
(i) include floor plans of all floors together with consolidated statement on the plot area, covered area and floor wise and use wise built-up area, including that of accessory buildings, if any, and such drawings shall clearly indicate the sizes and spacing of all framing members, size of rooms, levels of each floor, position of staircases, travel distance between staircases, ramps and lift wells;
(ii) show the use or occupancy of all parts of the buildings;
(iii) show the exact location of essential services like water closets, sink and bath;
(iv) include sectional drawings showing the lowest ground level contiguous to the building, highest ground level contiguous to the building, levels of each floor, abutting road level, the height of rooms, building and parapet, thickness and spacing of structural members, floor slabs and roof and details of staircase.
(v) show all street elevations;
(vi) give dimensions of the projections, if any;
(vii) include a terrace plan indicating the drainage and the slope of the roof;
(viii) show the direction of north line relative to the plan of the building; and
(ix) specify total and floor wise built up area of the building
(x) specify, in the case of Group G1 or G2 industrial occupancy and Group I hazardous occupancy, wherever applicable;
(a) power used in H.P.
(b) number of workers
(c) raw materials used
(a) flow chart indicating the process
(d) details of waste generated
(f) details and methods of disposal of waste
(8) Parking Plan:—Parking plan shall be drawn to a scale not less than that of the site plan, in cases where parking is to be provided as per these rules, and shall show clearly parking spaces, width and slope of drive-ways/ ramps and maneuvering spaces, parking space for differently abled persons, visitors parking, loading and unloading spaces etc. along with consolidated statement on calculation of parking requirements, as per these rules.
(9) Safety Plan:—In the case of high rise buildings, every application for approval shall be accompanied by a safety plan suitable for the proposed construction duly certified by the architect / licensee / engineer that it is in accordance with the Health and Safety Manual published by the Labour Department.
(10) In case of high-rise buildings the suggestions in the guidelines on use of Glass in buildings-Human safety, 2015 shall be adhered to wherever glass is extensively used in building.
(11) Plan showing surrounding developments:- In the case of applications which need approval of usage of plot and/or layout of building(s) from the District Town Planner/ Chief Town Planner as per these rules and/or as per the provisions of any Town Planning Schemes, a sketch shall also be provided showing surrounding developments approximately within 50metres from the boundary of the plot indicating:
(i) distance from plot boundary,use and number of storeys of buildings and details of other developments, if any;
(ii) vacant land, agricultural land, water bodies and other features;
(iii) any other relevant information not specifically mentioned, but may be required by the Secretary/ District Town Planner/ Chief Town Planner.
(12) The minimum size of the paper on which all plans are drawn shall not be less than 297 mm X 420 mmor A3.
(13) The plans accompanying the application shall have the colour scheme as specified in Table 1 and shall be indicated in the legend in the plans.
| Sl.No. | Item | Notational colouring |
|---|---|---|
| 1 | Plot line | Thick black line |
| 2 | Street (existing) | Brown line |
| 3 | Street (proposed) | Brown dotted line |
| 4 | Permissible building line | Thick black dotted line |
| 5 | Building(Existing) | Black outline |
| 6 | Building (proposed to be demolished) | Yellow hatching |
| 7 | Building (proposed) | Red outline |
| 8 | Drainage sewerage work | Red dotted line |
| 9 | Water supply works | Black dot and dash line |
| 10 | Electric line | Green line |
(14) All plans, drawings and specifications shall be certified and signed by a registered Institution or Architect or Engineer or Town Planner or Supervisor or Building Designer,registered as provided for in these rules, as well as the applicant.
(15) If the plot is owned by more than one person, the application shall be submitted jointly and signed by all the persons or by legally authorized representatives of such persons, if any.
(16) If the application is for construction or reconstruction of a single building or block of buildings in more than one adjoining plots owned by different persons, or to make addition or extension or alteration to such building, the application shall be submitted jointly and signed by all the persons or by legally authorized representatives of such persons, if any.
(17) The Secretary shall, after considering the application, plans and drawings and other documents, issue development permit in the form in AppendixB1or building permit in the form in Appendix B2, as the case may be.
- Certain operational constructions by Government to be exempted from these rules.—The operational constructions of the Central or State Government, whether temporary or permanent
which is necessary for the operation, maintenance, development or execution of any of the following services shall be exempted from these rules, namely:—
(a) Railway;
(b) National Highway;
(c) National Waterways;
(d) Major Ports;
(e) Airways and Aerodromes;
(f) Posts and telegraph, telephones, wireless, broadcasting and other like forms of communications;
(g) Roads, bridges, street furniture, toll plazas and wayside amenities by the Central Government, State Government and/or Local Self Government;
(h) Waterway amenities like boat jetties and other waterside facilities for transportation by the Central Government, State Government and/or Local Self Government;
(i) Regional grid for electricity;
(j) Any other service which the State Government may, if it is of opinion that the operation, maintenance, development or execution of such service is essential to the life of the community, by notification, declare to be a service for the purpose of this clause:
Provided that the following constructions by the services do not come under the purview of operational constructions, namely: -
(i) New residential colonies, new residential buildings (other than temporary shelters which are used for essential operational quarters for limited essential operational staff and the like) roads and drains in railway colonies, community halls, hospitals, clubs, all type of educational institutions and offices, shopping complexes, railway mail service offices, parcel offices; and
(ii) Post offices, other type of office of Posts and Telegraphs Department, residential colonies.
- Permit not necessary for certain works.—Notwithstanding anything contained in these rules, no building permit shall be necessary for executing the following works which do not otherwise violate any provisions regarding general building requirements, structural stability and fire safety requirements of these rules, namely:-
(i) Providing or removing of windows or doors or ventilators;
(ii) Providing inter-communication doors;
(iii) Providing or removing of partitions without any structural alteration;
(iv) Gardening excluding any permanent structures;
(v) White or color washing;
(vi) Painting;
(vii) Petty repairs to the building and pitched roof;
(viii) Plastering and patch work;
(ix) Interior decoration without any structural alterations; and
(x) Changing of the location of the building or construction within the plot:
(xi) Compound wall not abutting a public street:
Provided that the changing of the location under item (x) shall be incorporated in the completion plan:
Provided that except in cases as specified in rule 5(6)(3), if the change in location under item (x)above, is in deviation from any approvals, concurrences etc. obtained from any of the agencies/authorities concerned, other than that obtained from the Municipality, as per these rules or bye laws made under the Act and any other law, such approval, concurrences etc. shall be obtained afresh.