Secretary (TCP) to the Government of Himachal Pradesh
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla for publication of this Notice in one or more newspapers in circulation in the Planning / Special Area.
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Notice Board.
Secretary (TCP) to the
Government of Himachal Pradesh
Government of Himachal Pradesh Town and Country Planning Department
FORM-10 (See rule -12(2))
Notification for Approval and Notice of Publication of Development Plan or Sectoral Plan
Dated……….
Whereas, the draft Development Plan for (Planning/Special Area) or draft Sectoral Plan for Sector…………of Development Plan for …(Planning/Special Area) was published by the Director, Town and Country Planning Department, Himachal Pradesh, Shimla under Rule 11 of the Himachal Pradesh Town and Country Planning Rules, 2014 vide Notice No… …dated…………for inviting objection(s) and suggestion(s), which were duly considered and the modifications were made, wherever required /no objection or suggestion was received on the modifications and the Development Plan or Sectoral Plan was submitted to the Government for approval.
Or
Whereas, objections and suggestions were invited on modifications by the undersigned under Rule 12(1) of the Himachal Pradesh Town and Country Planning Rules, 2014 vide Notice No dated…………with respect to the draft Development Plan for… …(Planning/Special Area) or draft Sectoral Plan for Sector…………of Development Plan for ….(Planning/Special Area); and whereas no objection or suggestions has been received.
Or
Whereas, objections and suggestions were received which were considered and rejected.
Or
Whereas, objections and suggestions were received and the modifications have been made in the said draft Development Plan or draft Sectoral Plan.
Now, in exercise of the powers vested under sub-section (1) of section 20 or section 23 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977), the Governor, Himachal Pradesh is pleased to approve the Development Plan for…………..(Planning/Special Area) or Sectoral Plan for Sector… …of Development Plan for …………(Planning/Special Area), with modifications/ without modifications and the same is hereby published in the Official Gazette of Himachal Pradesh as required under subsection (4) of section 20 or section 23 of the Act ibid. A Notice is hereby given that a copy of the said Development Plan or Sectoral Plan is available for inspection during office hours in the following offices:-
1………………………
3………………………
The said Development Plan or Sectoral Plan shall come into operation from the date of the publication of this Notification in the Official Gazette of Himachal Pradesh.
Place
Date…
Secretary (TCP) to the
Government of Himachal Pradesh
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla for publication of this Notification in one or more newspapers in circulation in the Planning / Special Area.
The Controller, Printing and Stationeries Department, Himachal Pradesh, Shimla for publication of this Notification in the Official Gazette of Himachal Pradesh. A copy of Gazette publication may be sent to this office.
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Notice Board.
Secretary (TCP) to the
Government of Himachal Pradesh
FORM-11
(See rule 16(1))
FORM OF APPLICATION FOR PERMISSION UNDER SUB-SECTION (2) OF SECTION 15-A OR CLAUSE (a) OF SECTION 16 OR SUB-SECTION (1) OF SECTION 30 OR SECTION 30-A (BEYOND THE LIMITS AS SPECIFIED UNDER SECTION 30-A) OF THE HIMACHAL PRADESH TOWN AND COUNTRY PLANNING ACT, 1977 (ACT NO. 12 OF 1977) FOR SUB-DIVISION /DEVELOPMENT OF LAND
No……………………
Dated……………
To
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Sir,
*“I/we hereby apply for permission to undertake / carry out the sub-division/ development of land in Khata No… …Khatauni No Hadbast No… .Mauja/ Mohal No… .Khasra No.… …measuring……….. square Meter, over which I/We possess the necessary ownership rights, situated at Street/ Road/ Ward No. Block No… Plot No of Scheme (Name of the Scheme, if any) Village ..Post Office Tehsil District Himachal Pradesh”.
I/We hereby submit the following documents:-
(i) a copy of title/ownership documents i.e. latest jamabandi in original.
(ii) a copy of latest original tatima showing Khasra number(s), description and area of land in question, abutting path with its width as well as adjoining Khasra number(s) falling on all the outer limits/ boundaries of the land in question. The land applied for is shown in red, in the tatima.
(iii) three sets of Location Plan in the scale of 1:1000 showing North direction, indicating the land in question, showing main approach road(s), name of road(s) on which the property and boundaries abuts, important public buildings like hospital, school, cinema, petrol pump, existing land uses / building uses surrounding the land.
*As amended vide Himachal Pradesh Town and Country Planning (Amendment), Rules 2016
(iv)
three sets of Site Plan in the scale of 1:200 showing North direction and all the boundaries of land in question, abutting path with its width, natural features like nullahs, ponds, tress, slopes, contours at an interval of 5.00 Metres if the land is undulated, high tension lines passing through or adjoining the land, existing roads, highways showing the right of way, railway lines, airports with their specification(s) and boundaries, showing details of utilities and services like water supply, drainage, sullage, sewage, sewerage alongwith disposal of drainage, sullage, sewage, position of septic tank, soak pit, rain harvesting tank, electric and telephone poles, showing manner and site for muck disposal and all such other matters which need to be co-ordinated with the adjoining area.
(v) for sub-division of land into plots, three sets of Drawings in the scale of 1:100 showing North direction, dimensions and area of plots, internal roads, set backs, parks and open spaces, community buildings such as schools, dispensary, post office, bank etc. and all development proposals including a general report and mode so as to make scheme self explanatory.
(vi) a note indicating the type of development proposed i.e. land use or building use, namely residential or commercial or industrial or public and semi-public etc.
FORM-12
(See rule 16(1))
FORM OF APPLICATION FOR PERMISSION UNDER SUB-SECTION (2) OF SECTION 15-A OR CLAUSE (a) OF SECTION 16 OR SUB-SECTION (1) OF SECTION 30 OR SECTION 30-A (BEYOND THE LIMITS AS SPECIFIED UNDER SECTION 30-A) OF THE HIMACHAL PRADESH TOWN AND COUNTRY PLANNING ACT, 1977 (ACT NO. 12 OF 1977) FOR DEVELOPMENT OF LAND / CONSTRUCTION OF BUILDING
No…………
Dated…………
To The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Sir,
*“I/we hereby apply for permission to erect/ re-erect, to make addition or alteration, to undertake repairs to a building on a piece of land in Khata No……………Khatauni No…… ………. Hadbast No…… …….. Mauja/ Mohal No..Khasra No.…… …measuring……….. square Meter, over which I/We possess the necessary ownership rights, situated at Street/ Road/ Ward No. Block No… Plot No… of Scheme (Name of the Scheme, if any) Village… …..Post Office… . Tehsil… …… District……………. Himachal Pradesh”.
I/We hereby submit the following documents:-
(i) a copy of title/ownership documents i.e. latest jamabandi in original.
(ii) a copy of latest original tatima showing Khasra number(s), description and area of land in question, abutting path with its width as well as adjoining Khasra number(s) falling on all the outer limits/ boundaries of the land in question. The land applied for is shown in red, in the tatima.
(iii) three sets of Location Plan in the scale of 1:1000 showing North direction, indicating the land in question, showing main approach road(s), name of road(s) on which the property and boundaries abuts, important public buildings like hospital, school, cinema, petrol pump, existing land uses / building uses surrounding the land.
(iv) three sets of Site Plan in the scale of 1:200 showing North direction and all the boundaries of land in question, abutting path with its width, natural features like nullahs, ponds, tress, slopes, contours at an interval of 5.00 Metres if the land is undulated, high tension lines passing through or adjoining the land, existing roads, highways showing the right of way, railway lines, airports with their specification(s) and boundaries, showing details of utilities and services like water supply, drainage, sullage, sewage, sewerage alongwith disposal of drainage, sullage, sewage, position of septic tank, soak pit, rain harvesting tank, electric and telephone poles, showing manner and site for muck disposal and all such other matters which need to be co-ordinated with the adjoining area.
(v) for construction of building, apartment, colony etc., three sets of Drawings in the scale of 1:100 showing North direction, dimensions and area of building, etc. and other architectural details and Specifications (enclosed herewith) of proposed building, apartment, colony etc alongwith Schedule of Area (enclosed herewith) including built up and open area, set backs.
*As amended vide Himachal Pradesh Town and Country Planning (Amendment), Rules 2016
Specifications
1.
Total plot area
=
M²
2.
Total built up area of each floor:-
(i) Ground floor
=
M²
(ii) First floor
=
M²
(i) Second floor
=
M²
(ii) Third floor
=
M²
(iii) Fourth floor
=
M²
(iv) ......
=
M²
The purpose for which it is intended to use the building
Specification to be used in the construction of:-
(i) Foundation…
(ii) Walls……
(iii) Floors…
(iv) Roofs…
*As amended vide Himachal Pradesh Town and Country Planning (Amendment), Rules 2016
Number of storeys of which the building will consist = Nos.
Approximate number of persons proposed to be accommodated = Nos.
The number of toilets proposed to be provided = Nos.
Whether the site has been built upon before or not, if so, when did the previous building cease to be fit for occupation…
Source of water to be used for purposed building
Signature of Applicant(s)
Schedule of Area
(i) Built up area. = M2
(ii) Open area = M2
(iii) Total plot area = M2
(i) Front Set Back = M
(ii) Left Side Set Back = M
(iii) Right Side Set Back = M
(iv) Rear Set Back = M
Signature of Applicant(s)
Registered (AD) /Speed Post
Town and Country Planning Department Himachal Pradesh Form- 13 (See rule-18 and 19)
FORM OF PERMISSION FOR DEVELOPMENT/ SUB-DIVISION OF LAND/ CONSTRUCTION OF BUILDING No… Dated …………...
Order
To
Sh./Smt./M/s……………………… ……………………. ……………………………………..
Subject:- Permission for development/Sub-division of land/ construction of building.
Reference:- Your Application No……… …….Dated…
You are hereby granted permission under section 31 as applied by you under section 28 or section 29 or section-30 or section 30-A (beyond the limits as specified under section 30-A) of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977)to carry out the development/sub-division of land/ construction of building as mentioned in your Application under reference, subject to the following conditions, namely:-
Building permission shall be obtained from the local authorities concerned before the commencement of the development.
The building operations shall be carried on strictly in accordance with the approved building plan.
The permission is valid for a period of three years. After lapse of permission you shall have to apply for extension of permission.
One copy of the approved plan is enclosed herewith.
Please acknowledge the receipt of this order.
Enclosers: As above.
Director Town and Country Planning Department, Himachal Pradesh, Shimla
Copy to:-
The Commissioner, Municipal Corporation/ Executive Officer, Municipal Council / Secretary, Nagar Panchayat…………alongwith a copy of the approved plan for information and further necessary action.
The Chairman, Town and Country Development Authority…… alongwith a copy of the approved plan for information and further necessary action.
The Registrar/ Sub-Registrar, Sub-Tehsil/ Tehsil………District………Himachal Pradesh alongwith a copy of the approved plan for information and making necessary entries in the Revenue record.
Enclosers: As above.
Director Town and Country Planning Department, Himachal Pradesh, Shimla
32Town and Country Planning Department Himachal Pradesh FORM-13-A (See Rule 19-A) NO Objection Certificate for Releasing Service Connections or Completion Certificate No… Dated……
To
Shri/Smt./M/s…
Subject: No Objection Certificate for Releasing Service Connections or Completion Certificate.
Reference: Your Application No…………………. dated ………………
This is in reply to your application under reference for issuance of No Objection Certificate for Releasing Service Connections or Completion Certificate. This No Objection Certificate for Releasing Service Connectionsor Completion Certificate is hereby granted in your favour for storey building for use on the land bearing Khasra No… Hadbast No. Mohal / Mauza Tehsil.. District... Himachal Pradesh, measuring as the development works have been completed by you in all respects, as per approved plan/revised sanction granted to you, vide letter No… …dated… …………as per the provisions of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977).
Further, this Department has no objection, if following service connection(s) with reference to section-83-A of the Himachal Pradesh Town and Country Planning Act, 1977 are released in your favour:-
Floor
Use
Number of service Connections (In Words)
Electricity
Water
Sewerage
This No Objection Certificate for Releasing Service Connections or Completion Certificate is issued subject to following condition(s):-
*As amended vide Himachal Pradesh Town and Country Planning (Fifth Amendment), Rules 2020
(i) That the said building is constructed as per the provisions of the Himachal Pradesh Town and Country Planning Act, 1977, the Himachal Pradesh Town and Country Planning Rules, 2014 and the Regulations contained in the respective Interim Development Plan/ Development Plan of the concerned Planning Area/Special Area.
(ii) This No Objection Certificate for Releasing Service Connections or Completion Certificate is subject to withdrawal, in case, if above named person carries out any un-authorized construction or any addition/alteration in old building or in case any documents produced by him/her are found fake.
(iii) The service connection(s) is/ are issued for the above referred buildings constructed over the Khasra number as mentioned above. If the service connections are installed in other building (s) or other Khasra numbers, the same shall stand withdrawn.
*Note: - Strike out which is not applicable
Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Copy to:-
The Executive Engineer, Division No. …, Himachal Pradesh State Electricity Board Ltd… .... for information and further necessary action.
The Executive Engineer, Division No.….….…, Himachal Pradesh Irrigation and Public Health Department for information and further necessary action.
Director,
Town and Country Planning Department,
Himachal Pradesh, Shimla.
Registered (AD) /Speed Post
No…………………
Dated …………...
To
Order
Sh./Smt./M/s…
Subject:- Refusal for development /Sub-division of land/ construction of building.
Reference:- Your Application No………… …….. Dated………………..
You are hereby informed that the permission to carry out the development works as mentioned in your Application under reference, is refused under clause (c) of subsection (1) of section 31 of the Himachal Pradesh, Town and Country Planning Act 1977, (Act No. 12of 1977) on the following grounds:-
…………………
One copyof refused plan is enclosed herewith.
Please acknowledge the receipt of this order.
Enclosers: As above.
Director Town and Country Planning Department, Himachal Pradesh, Shimla
FORM 15
(See rule-21)
Form of Structural Stability Certificate and Soil Investigation Report
To
The Director,
Town and Country Planning Department,
Himachal Pradesh, Shimla.
Subject:- Structural Stability Certificate.
I/We hereby certify that the building of Sh./ Smt./ M/s… ……. proposed over Khasra No ………… Mauja /Ward No……… Tehsil… ………. District … ………… Himachal Pradesh has been designed by me / us, as per the Indian Standards Codes for general structural safety against natural hazards including earthquake protections and after soil investigations. The building is structurally safe.
Name
(Civil Engineer)
Registration No dated
Address…………
I/We hereby certify that the soil and strata of the land over which building of Sh./ Smt./ M/s .has been proposed to be constructed on Khasra No.. Mauja /Ward No………. Tehsil District Himachal Pradesh falling in sliding and sinking zones as defined in respective Interim Development Plan or Development Plan or in re-claimed piece of land has been geologically investigated by me / us, as per the Indian Standards Codes. The bearing capacity of soil and strata can sustain the load of the proposed building and it is safe.
Name
(Geologist)
Registration No… dated
Address…
(Strike out which is not applicable)
FORM-16 (See rule-22) Form of Application for Appeal
No. ………………..
Dated…………
To
The Secretary (TCP) to the, Government of Himachal Pradesh, Shimla.
Subject: Appeal against the Orders of refusal of permission/ licence.
Reference: Order No.…… ……..dated……… against which the appeal is filed.
Sir,
My /our application for grant of permission for development/ sub-division of land/ construction of building/ grant of licence has been refused by the Director vide Order No...dated……….. A certified copy of the Order is attached herewith. Against this Order, I am making this appeal. The clear statement of facts of the case and the grounds on which this appeal is made, is as under:-
1………………………
In view of above stated grounds, precisely the relief prayed for is as under:-
1………………………
………………………
I/ we have deposited a sum of Rs… …….only (Rupees … only) through Treasury Challan (original copy attached herewith) or through e-payment, as the prescribed fee for making this appeal.
I/ we… ….do hereby declare that the facts and contents stated above are true to the best of my/our knowledge and belief.
Place…
Date…
Yours faithfully,
Enclosers: As above.
(Signature of the Applicant(s))
Address…
Phone No……
Form- 17
Notice to the Government to Purchase Interest in the Land
The Secretary (TCP) to the, Government of Himachal Pradesh, Shimla.
Sir,
*“I/we hereby apply for permission to undertake / carry out the sub-division/ development of land in Khata No… ……Khatauni No Hadbast No… Mauja/ Mohal No. .Khasra No. measuring……….. square Meter, over which I/We possess the necessary ownership rights, situated at Street/ Road/ Ward No. Block No… Plot No of Scheme (Name of the Scheme, if any) Village ..Post Office Tehsil District… Himachal Pradesh.”
It is further submitted that:-
The land has become incapable of reasonably beneficial use in its existing state; or
The land cannot be rendered capable of reasonably beneficial by carrying out the permitted development in accordance with the permission; or
The sale value has been diminished due to the reasons given below:-
In view of the above mentioned reasons, I/we pray the Government to acquire the necessary interest in land, in accordance with the provisions of sub-section (5) of Section 35 of the Himachal Pradesh Town and Country Planning Act, 1977 ( Act No. 12 of 1977).
I/ we/am/are enclosing herewith following documents for taking further action in the matter:-
Proof of ownership
Location Plan…………………
Site Plan……………………
…………………………………………………………………………………………
Enclosers: As above.
Yours faithfully,
(Signature of the Applicant(s)) Address
Phone No… *e-mail address
*As amended vide Himachal Pradesh Town and Country Planning (Amendment), Rules 2016
Registered (AD) /Speed Post
Town and Country Development Authority/special Area Development Authority Himachal Pradesh
FORM -18
(See rule-25)
Order of Revocation/ Modification of Development Permission
No…………………
Dated …………..
Whereas, permission under sub-section (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) to develop land was granted in favour of Shri/Smt./M/s ..vide Office Order No. dated
And, whereas it appears to the undersigned that it is expedient, having regard to the Development Plan prepared or under preparation for………. Planning/ Special Area and to other material considerations, that the permission for development should be revoked or modified;
Now, therefore, the undersigned in exercise of the powers vested under subsection (1) of section 37 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977), hereby revoke or modify the development permission granted vide Office Order referred to above, to the extent as given below:-
1………………………
Chairman
Town and Country Development Authority/
Special Area Development Authority…
Shri/ Smt./ M/s
Registered (AD)/Speed Post
Town and Country Development Authority/special Area Development Authority Himachal Pradesh
FORM-19 (See rule 26(3))
Town and Country Planning Department Himachal Pradesh Form- 21 (See Rule -28)
Order
No………………
Dated……………
Whereas, a claim under sub-section (1) of section 37 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) for revocation or modification of permission for development was filed before the undersigned by Shri/Smt./M/s… …..on dated…
And, whereas the said claim was sent to the Town Planning Officer for adjudication and giving his report after affording the owner(s) reasonable opportunity of being heard qua the claim;
And, whereas the report of the Town Planning Officer has been received and duly considered;
Now, therefore, the undersigned in exercise of the powers vested under subsection (2) of section 37 of the Act ibid, hereby assess and award an amount of Rs… ……only(Rs… ….only) in favour of Shri/Smt./M/s… in respect of his/her/their aforesaid claim.
Chairman Town and Country Development Authority Special Area Development Authority…
Shri Smt./M/s
Registered (AD)/Speed Post
FORM- 20 (See rule -27)
Notice under Section 38 of the Himachal Pradesh Town and Country Planning Act, 1977
(act NO. 12 of 1977)
No………………
Dated, ……………
To
Shri /Smt./M/s
(Owner/Occupier)
Subject:- Show Cause Notice under the provisions of section 38 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act 12 of 1977).
Whereas you have commenced/ carried on/ completed development of land or errection of building consisting of ………storeys and situated on Khasra No………Ward/Mohal/Village……Tehsil………District…….Himachal Pradesh:-
(a) without the permission as required under sub-section (2) of section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or sub-section (1) of section 30 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977). OR
(b) in contravention of the permission granted under sub-section (2) of section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or subsection (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) vide Order No… .dated
OR
(c) in contravention of the permission duly modified under sub-section (2) of section 15- A or clause (a) of section 16 or sub-section (1) of section 28 or Section 29 or subsections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or sub-section (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) vide Order No… …dated
OR
(d) after the permission for development has been duly revoked under sub-section (1) of section 37 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), vide Order No… .dated
OR
(e) in contravention to the provisions specified under sections 39, 39-A, 39-B and 39-C of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977).
As such, you are hereby required to show cause either personally or through your duly authorized agent within thirty days from the receipt of this Notice, as to why action under section 38 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) be not initiated against you.
Director
Town and Country Planning Department Himachal Pradesh, Shimla
(Strike out which is not applicable).
Registered (AD)/Speed Post
Notice under Sub-section (1) of Section 39 of the Himachal Pradesh Town and Country Planning Act, 1977
(act NO. 12 of 1977)
No… To Shri /Smt./M/s (Owner/Occupier)
Dated, ……………
Subject:- Notice under sub-section (1) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977).
Whereas, it has been observed that you have commenced / carried out/carrying out the development on the land or you have changed or are changing the use of land i.e… …(Description of Land) situated on Khasra No………Ward/Mohal/Village………Tehsil…………District………….Himachal Pradesh:-
(a) without the permission as required under sub-section (2) of section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or sub-section (1) of section 30 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977).
FORM 24 (See rule 32)
OR
(b) in contravention of the permission granted under sub-section (2) of section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or subsection (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) vide Order No… .dated
OR
(c) in contravention of the permission duly granted under sub-section (2) of Section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or subsections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or sub-section (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) vide Order No… …dated
OR
(d) after the permission for development has been duly revoked under sub-section (1) of section 37 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), vide Order No …dated…
OR
(e) in contravention to the provisions specified under sections 39, 39-A, 39-B and 39-C of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977). Now, therefore, you are directed:-
(a) to restore the land to the condition existing before the development took place.
OR
(b) to comply with the conditions of the permission granted or modified and conveyed to you vide Order No… .dated…
OR
(c) to alter the development in conformity with the condition(s) subject to which permission has been granted to you as under:-
(i)………………
(ii)…
(iii)…
OR
(d) to stop and discontinue the development operations as under:-
(iii)…
Within a period of fifteen days from the date of service of this Notice. If within the period as specified in this Notice, you fail to comply with the above direction(s), subject to the provisions to sub-sections (3), (4) or (5) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), you shall be liable for action under subsection (6) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977).
(Strike out which is not applicable).
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla / District Public Relation Officer, District .Himachal Pradesh for information and circulation of this news item so that public may not go for purchase of illegal plot / flat / apartment /building as referred to above.
The Executive Engineer, Division No. …, Himachal Pradesh State Electricity Board Ltd……….. with the request that service connection may not be released or to disconnect the service connection of the above said owner/ occupier immediately.
The Executive Engineer, Division No..… , Himachal Pradesh Irrigation and Public Health Department, ……… with the request that service connection may not be released or to disconnect the service connection of the above said owner/ occupier immediately.
Notice Board.
Registered (AD)/Speed Post
FORM - 22 (See rule -29)
NOTICE UNDER SUB-SECTION (2) OF SECTION 39 OF THE HIMACHAL PRADESH TOWN AND COUNTRY PLANNING ACT, 1977 (ACT NO. 12 OF 1977) Dated… …………..
Subject:- Notice under sub-section (2) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977)
Whereas, a Notice was issued under rule 28 of the Himachal Pradesh Town and Country Planning Rules, 2014 to Shri/Smt./M/s …; and
Whereas, the directions issued vide aforesaid Notice have not complied with…
Now, therefore, a Notice is served under sub-section (2) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) to Shri/ Smt./M/s… and he / she/ them is /are directed to stop or to seal the un-authorized development on the land situated on Khasra No………..Ward/Mohal/Village .Tehsil …… ..District……………Himachal Pradesh in the following manner:-
2………………………
Shri/Smt./M/s
(Owner/Occupier)
Copy to:-
Form for Police Assistance
No……………………
Dated…………
Whereas it has been noticed that Shri/Smt./M/s……………S/o/W/o Shri/Smt. ………resident of ………. is/ are carrying out/had carried out un-authorized development on the land situated on Khasra No Ward/Mohal/Village… ….Tehsil… …District… Himachal Pradesh, in contravention of the Interim Development Plan/ Development Plan / Sectoral Plan/ Himachal Pradesh Town and Country Planning Rules, 2014 or without permission or approval or sanction as required under sub-section (2) of section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or sub-section (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) or in contravention of any conditions subject to which such permission, approval or sanction has been granted vide Order No .dated…
And, whereas the undersigned in pursuant to the powers vested under subsection (1) of section 39-A of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) had ordered the discontinuance/stoppage of the said development vide this Office Order No dated
And, whereas the said development has not been discontinued /stopped by the said person, in pursuance of the orders issued under sub-section (1) of section 39-A of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977);
Now, therefore, the undersigned, being the authorized Officer in this behalf, in pursuance of the provisions contained in sub-section (2) of section 39-A of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977) requires you to deploy adequate Police force to remove, within days, the said person by whom the development has been commenced and all his/her/their assistants and workmen from the place of development and to seize all construction material, tools, machinery, scaffolding or other things used in such development.
..(Signature)
.(Designation)
for on behalf of the State Government of Himachal Pradesh
Station House Officer,
Registered (AD)/Speed Post
FORM- 25 (See rule 34)
Notice to Seal Un-authorised Development under Section 39-B of the Himachal Pradesh Town and Country Planning Act, 1977 (act NO. 12 of 1977) No Dated
No…………………..
To
Sh./Smt./M/s
………………………………...
Whereas, it has been brought to the notice of the undersigned, pursuant to the inspection conducted on dated that un-authorized development is being or has been carried out by you on the land situated on Khasra No……… ……Ward/Mohal/Village ……Tehsil………….District………….Himachal Pradesh, in contravention of the Interim Development Plan/ Development Plan / Sectoral Plan/ Himachal Pradesh Town and Country Planning Rules, 2014 or without permission or approval or sanction as required under sub-section (2) of section 15-A or clause (a) of section 16 or subsection (1) of section 28 or section 29 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or sub-section (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) or in violation of the conditions of the permission/approval/sanction given to you vide Order No dated; and
In order to prevent any dispute as to the nature and extent of the un-authorized development and for the purpose of carrying out the provisions of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977), it is proposed to make an order sealing the said un-authorized development under section 39-B of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977); and
Therefore, you are hereby called upon to show cause within a period of… days from the service of this Notice to the satisfaction of the undersigned, as to why the said un-authorized development be got directed to be sealed under section 39 (B) ofthe Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977); and
Take further notice that on… …(date) between… ………(time) you and /or your authorized representative shall appear for hearing in my below referred office in support of your contentions, failing which you shall be proceeded against ex-parte; and
At the time of hearing you may also, in addition to the above, produce such evidence, as you may desire to produce in support of your contentions.
.(Signature)
.(Designation)
for on behalf of the State Government of Himachal Pradesh.
Town and Country Planning Department Himachal Pradesh Form- 25-A [See Rule 34(2)]
FORM 26 (See rule 35(1))
Undertaking
That I, Sh./Smt./Miss s/o/w/o/d/o... Resident of have undertaken un-authorized construction/development comprising of on land bearing Khasra No .,. Hadbast No. Mohal / Mauza Tehsil. District. Himachal Pradesh, on my own land.
That I have been served with a Notice under provisions of the Himachal Pradesh Town and Country Planning Act, 1977 by… …… vide letter No. dated
That in view of the opportunity of hearing afforded to me by the Competent Authority namely ..., I hereby agree to remove the un-authorized construction/development, within a period of….……days / months from the date of issue of orders by the Competent Authority vide its Order No. dated
That I may be allowed to use the remaining authorized portion of the building temporarily during this period.
That I shall remain entitled to the service connection(s) issued to me for the aforesaid building during the period mentioned above, after which the connections shall be liable to be disconnected and the Competent Authority shall be at liberty to initiate any action as per the provisions of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) and Rules framed there under.
That I shall seal the un-authorized portion of the building on my own as per directions of the Competent Authority and the entire expenditure involved in sealing of the unauthorized portion of the building shall be borne by me, be it related to material or labour. In case sealing is done by the Competent Authority, the entire expenditure shall be paid by me to the Competent Authority, failing which the same shall be recovered from me as arrears of land revenue.
Signature of applicant(s)
Address…
Phone No……
* As amended vide Himachal Pradesh Town and Country Planning (Second Amendment), Rules 2018
Form of Application for Composition of Offences under Section 39-C Read with Sub-section (3) of Section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (act NO. 12 of 1977)
No……… To
Dated:……………
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Subject:-
Reference:- Your Notice No… .dated
Sir,
With reference to your Notice referred to above, I/we beg to submit that I/we may kindly be granted permission under section 39-C read with sub-section (3) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12, of 1977) for composition of offences i.e. deviations / un-authorized constructions/ developments having carried out on land bearing Khasra No……Khata /Khatauni No.………measuring…………square Metre situated at Mauza.... Pargana....... ....Tehsil………District………Himachal Pradesh. My /our original map was approved vide order No… .........dated………… (strike out if no map was approved).
The reasons for composition of offences i.e. deviations / un-authorized constructions/developments are as under:-
1………………………
The details of offences i.e. deviations / un-authorized constructions/ developments are as under:-
In case of building where plan was approved and deviations have been carried out from the approved plan, beyond the prescribed limits, as specified under Rules and Regulations. Details of deviations /developments carried out are as under:-
(I) Schedule of Area: (i) Built up Area M2 (ii) Open area = M2 (iii) Total Plot Area = M2
(II) Schedule of Open Spaces: (i) Front Set Back M (ii) Left Side Set Back M (iii) Right Side Set Back M (iv) Rear Set Back = M
(III) Number of storeys of the building = Nos.
(IV)
Deviations in the Set Backs (Storey wise)
(i) Ground Storey =
M²
(ii) First Storey
=
M²
FORM 30 (See rule 36(2))
NOTICE OF PUBLICATION OF FINAL TOWN DEVELOPMENT SCHEME
No……………..
FORM-31 (See rule 38(1))
Dated………………
Whereas, objections and suggestions were invited vide Notice No… ……dated………. with respect to the draft Town Development Scheme for………………(Planning/ Special Area) under sub-section (3) of section 52 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977);and whereas, no objection or suggestion has been received.
Or
rejected.
Whereas, objections and suggestions were received which were considered and
Or
Whereas, objections and suggestions were received and the amendments have been made in the said draft Scheme.
And, whereas the Town Development Scheme for the (Planning/Special Area), has been approved under sub-section (4) of section 52 of the Himachal Pradesh, Town and Country Planning Act, 1977 ( Act No. 12 of 1977) by the Committee constituted under sub-section (5) of section 52 of the Act ibid;
Now, the Town Development Scheme for the (Planning/Special Area), is hereby published for the information of the general public and copies of the said Scheme are available for inspection during office hours in the following offices:-
1………………………
The said Town Development Scheme shall come in operation with effect from the date of publication of this Notice in the Official Gazette of Himachal Pradesh.
Place… Date…
Chairman Town and Country Development Authority Himachal Pradesh
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla for publication of this Notice in one or more newspapers in circulation in the Planning / Special Area.
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Notice Board.
Chairman Town and Country Development Authority, Himachal Pradesh.
Notice of Intention to Levy Development Charges under Sub-section (1) of Section 62 of the Himahcal Pradesh Town and Country Planning Act, 1977 ( Act NO 12 of 1977)
No……………..
Dated………………
It is hereby notified and declared for the information of general public that the Town Development Scheme for (Planning/Special Area) has been completed. The Town and Country Development Authority intends to levy Development Charges, as per Schedule given below, in the (Planning/Special Area) affected by the Scheme adjacent to it.
The owner(s) of land falling within the aforesaid area are liable to pay the aforesaid development charges.
The objections, if any, in this behalf are invited, by the undersigned by date (not later than thirty days from the date of publication of this Notice) in the Official Gazette of Himachal Pradesh.
Sr.No.
Name of Owner
Original Plot
Incremental value effected due to implementation of Scheme
Incremental difference in value (Col. 4&5).
Amount payable by plot owner as Developmental Charges
Remarks
Area
Value
1
2
3
4
5
6
7
8
Place………… Date…
Chairman
Town and Country Development Authority Himachal Pradesh
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla for publication of this Notice in one or more newspapers in circulation in the Planning / Special Area.
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Notice Board.
Chairman Town and Country Development Authority Himachal Pradesh
Town and Country Development Authority Himachal Pradesh Form 32 (See Rule 38 (2))
Notice for Assessment of Development Charges
No……………..
Dated………………
To
Sh./Smt./M/s…
Your landed property bearing Khasra No… …Mauja Village/Town… …….Tehsil… …District… Himachal Pradesh, is affected by the Town Development Scheme for ( Planning /Special Area) of this Authority.
You are hereby given Notice under sub-section (4) of section 62 of the Himachal Pradesh Town and Country Planning Act, 1977 ( Act No. 12 of 1977) that the development charges of Rs………only (Rs… … only) have been assessed to be due from you.
You are hereby called upon to deposit the Development Charges as mentioned above with the Town and Country Development Authority within a period of thirty days from the date of receipt of this Notice.
Chairman Town and Country Development Authority Himachal Pradesh
FORM-33 (See rule 39)
Application For………………percent Debenture(s) Issued by the Town and Country Development Authority
To
(Broker's Stamp to be affixed here).
The Chairman, Town and Country Development Authority, Himachal Pradesh.
Sir,
I/We…… hereby apply for the debentures of the face value of Rs………only (Rs. only) of the above issue and tender Cash/Cheque/Draft for Rs………only (Rs. only) for the purchase of …………percent debentures of the Town and Country Development Authority, of the nominal value of Rs only (Rs. only). The debentures may kindly be issued to me/us in the denomination stated below:-
*Debenture of Rs………….only (Rs… only)
*Debenture of Rs………… only (Rs… only)
*Debenture of Rs………… only (Rs… … only)
*Debenture of Rs …………only (Rs… … only)
Yours faithfully,
Dated
Name of Applicant(s) (in Block letters) Address (in Block letters)
*To be given in the figures and words.
Note:- 1 The debentures will be issued in the denominations of Rs 100, Rs.500, Rs. 1000, Rs.5000, Rs.10,000, Rs. 25,000, Rs.50,000, Rs.1,00,000 and Rs.5,00,000.
2 If the Applicant(s)’s signature is by thumb marks, it should be witnessed by two persons. The full name(s), occupation(s) and address (es) of the witness (es) should be appended to their signatures.
Town and Country Planning Department Himachal Pradesh Form -34 (See Rules 13, 14 and 16) Application for Grant of Planning Permission for Real Estate Project
Sir,
I/we hereby wish to apply for the grant of planning permission to set up a Real Estate Project having name and style of project in Khata No… Khatauni No… Hadbast No… …Mauja/Mohal No. Khasra No. …measuring………square Metres, Tehsil District……… Himachal Pradesh.
The requisite particulars are as under:-
(i) Status of the Applicant, whether individual or Company or Firm or Association of Persons or Co-operative Society or joint family
(ii) In case of Individual or Association of Persons or joint family:-
(a) Name
(b) Father’s Name
(c) Occupation
(d) Permanent Address
(iii) In case of Firm or Co-operative Society or Company:-
(a) Name
(b)Address
(c) Copy of Registration Certificate
(d) Major activities
(e) Name and Address of Partners/ Chief Executive/ Full time Directors…
* As amended vide Himachal Pradesh Town and Country Planning (Eighth Amendment), Rules 2022
(i) Whether applicant is Income Tax payee/ assesses, if so, give Permanent Account Number (PAN) No.… alongwith Aadhar No
(ii) Whether the applicant had ever been granted permission to set up a Real Estate Project or Building or Apartment under any other law, if yes, details thereof
(iii)Whether the applicant has ever established a Real Estate Project or is establishing a Real Estate Project, if, yes details thereof…
The following Plans, Drawings and other documents are submitted online, namely:-
The following Plans, Drawings and other documents are submitted online, namely:-
(i) a copy of latest Jamabandi (not being more than six month old), in original showing the title/ownership of the land under the Real Estate Project;
(ii) a copy of latest original Tatima(not being more than six month old), showing Khasra number(s), description and area of land in question, abutting Road/path with its width as well as adjoining Khasra numbers falling on all the outer limits/ boundaries of the land in question with their revenue classification.
Certified that the plans have been prepared, designed and signed by Sh./Smt./M/s… .(Name and address of the registered Town Planner/ Architect/ Engineer/ Draughtsman/ Surveyor) having Registration No… ….dated…
I/We have deposited a fee of Rs……..only (Rupees…………only) in accordance with the scale as specified under sub-rule (2) of Rule 16 of the Himachal Pradesh Town and Country Planning Rules, 2014.
Enclosers: As above.
Yours faithfully,
(Signature of the Applicant(s))
Address…
Phone No…
*e-mail address…
*As amended vide Himachal Pradesh Town and Country Planning (Amendment), Rules 2016
(vi) A copy of Structural Stability Certificate and a copy of Soil Investigation Report (for the areas falling in sliding and sinking zones as defined in respective Interim Development Plans or Development Plans or for any re-claimed piece of land). (Strike out which is not applicable).
(vii) a note indicating the type of development proposed i.e. land use or building use, namely residential or commercial or industrial or public and semi-public etc.
Certified that the plans have been prepared, designed and signed by Sh./Smt./M/s ……(Name and address of the registered Town Planner/ Architect/ Engineer/ Draughtsman/ Surveyor) having Registration No… .dated………and the Structural Stability Certificate has been issued by Sh./ Smt./ M/s (Name and address of the registered Civil Engineer) having Registration No… …dated……and the Soil Investigation Report has been issued by Sh./Smt./M/s (Name and address of the registered Geologist) having Registration No ..dated…………(Strike out which is not applicable).
I/We have deposited a fee of Rs……..only (Rupees …only) in accordance with the scale as specified under sub-rule (2)of Rule 16 of the Himachal Pradesh Town and Country Planning Rules, 2014.
Enclosers: As above. Yours faithfully,
(Signature of the Applicant(s))
Address…
Phone No…
*e-mail address
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla / District Public Relation Officer, District .Himachal Pradesh for information and circulation of this news item so that public may not go for purchase of illegal plot / flat / apartment /building as referred to above.
The Executive Engineer, Division No. …, Himachal Pradesh State Electricity Board Ltd……….. with the request that service connection may not be released or to disconnect the service connection of the above said owner/ occupier immediately.
The Executive Engineer, Division No..…, Himachal Pradesh Irrigation and Public Health Department,.………… with the request that service connection may not be released or to disconnect the service connection of the above said owner/ occupier immediately.
Notice Board.
Registered (AD)/Speed Post
*FORM- 23 (See rule 31) ORDER UNDER SUB-SECTION (1) SECTION 39-A OF THE HIMACHAL PRADESH TOWN AND COUNTRY PLANNING ACT, 1977 (ACT NO. 12 OF 1977)
No…………………..
Dated……………
Subject:- Order under sub-section (1) of section 39-A of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) to discontinue or to stop the development on land bearing KhasraNo……………Ward/Mohal/Village……………….Tehsil………… …District……………….. Himachal Pradesh, situated in the… Planning /Special Area.
Whereas, it has been brought to the Notice of the undersigned, pursuant to the inspection conducted on dated ….,that un-authorized development is being or has been carried out by Shri/Smt./M/s ..on the above referred land, as detailed in Annexure-A to this order;
And, whereas the said un-authorized development falls within …..Planning /Special Area and is being or has been carried out, in contravention of the Interim Development Plan/ Development Plan / Sectoral Plan/ Himachal Pradesh Town and Country Planning Rules, 2014 or without permission or approval or sanction as required under sub-section (2) of section 15-A or clause (a) of section 16 or sub-section (1) of section 28 or section 29 or sub-sections (1) or (2) of section 30-A (beyond the limits as specified under section 30-A) or sub-section (1) of section 31 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) or in contravention of any conditions subject to which such permission, approval or sanction has been granted vide Order No… .dated…
Now, therefore, in exercise of the powers vested under sub-section (1) of section 39-A of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977), it is hereby ordered that the said development be discontinued/stopped forthwith on the above referred land.
.(Signature).(Designation) for on behalf of the State Government of Himachal Pradesh
Shri/Smt./M/s Address…
ANNEXURE-A (Details of un-authorized constructions)
.(Signature).(Designation) for on behalf of the State Government of Himachal Pradesh
*As amended vide Himachal Pradesh Town and Country Planning (Amendment), Rules 2016
(iii) Second Storey
=
M²
(iv) Third Storey
=
M²
(v) Fourth Storey
=
M²
(vi) Fifth Storey
=
M²
(vii) ......
=
M²
In case of building where plan was not approved and construction carried out is as per the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12, of 1977), the Himachal Pradesh Town and Country Planning Rules, 2014 and Regulations of the Interim Development Plan or Development Plan. Details of developments carried out are as under:-
(I)
Schedule of Area:
(i) Built up Area
=
M²
(ii) Open area
=
M²
(iii) Total Plot Area
=
M²
(II)
Schedule of Open Spaces:
(i) Front Set Back
=
M
(ii) Left Side Set Back
=
M
(iii) Right Side Set Back
=
M
(iv) Rear Set Back
=
M
(III)
Number of storeys of the building
=
Nos.
In case of building where plan was not approved and deviations have also been carried out plan, beyond the prescribed limits, as specified under Rules and Regulations. Details of deviations /developments carried out are as under:-
(i) Built up Area = M2
(ii) Open area = M2
(iii) Total Plot Area = M2
(i) Front Set Back = M
(ii) Left Side Set Back = M
(iii) Right Side Set Back = M
(iv) Rear Set Back = M
(III) Number of storeys of the building- = Nos.
(IV) Deviations in the Set Backs (Storey wise)
(i) Ground Storey = M2
(ii) First Storey = M2
(iii) Second Storey = M2
(iv) Third Storey = M2
(v) Fourth Storey = M2
(vi) Fifth Storey = M2
(vii) = M2
In case of building constructed on an under size plot i.e. less than the permissible plot size, as specified under Rules and Regulations. Details of deviations/ development carried out are under:-
(I) Schedule of Area
(i) Plot Area as specified under Rules and Regulations
(ii) Minimum Plot Area over which building has been constructed = M2
(iii) Total area of under size Plot (i)-(ii) = M2
(iv) Percentage of under size Plot Area = %
The following documents are enclosed herewith:
(i) A copy of title/ ownership documents i.e. latest jamabandi in original.
(ii) A copy of latest original tatima showing dimensions of plot and width of access to the plot.
(iii) Two sets of Location Plan in the scale of 1:1000 showing North direction, land/building in question, abutting path, approach road, important buildings.
(iv) Two sets of Site Plan in the scale of 1:200, clearly showing the building within tatima dimensions and also showing all drainage lines, sewerage connection or location of septic tank, soak pit, rain water harvesting tank, solar passive arrangements and house drainage.
(v) Two sets of detailed architectural drawing of the existing building showing each storey with two cross- sections and two elevations of the building in the scale of 1:100. These drawings are in the form of working drawing showing all the dimensions of rooms, openings, thickness of wall, floor and slab etc.
(vi) Two sets of photographs taken from all sides of the building, clearly showing the number of storeys.
(vii) A copy of Affidavit to the effect that building has been constructed on own land and has not encroached upon any Government or other’s land.
(viii) A copy of Structural Stability Certificate as per Section 31-A of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No 12 of 1977).
*(ix) For the plots abutting National Highways: The access permission to properties along National Highways provided in Guidelines for access permission to Fuel Station and Properties along National Highways-amendments vide letter no RW-NH-33032/01/2017 dated 19th July 2018 shall be mandatory. For other State Highways, and Himachal Pradesh Public Works Department’s scheduled roads the applicant shall be required to submit a self-declaration/undertaking to maintain minimum control width/ setback as per provisions of the Himachal Pradesh Road Side Land Control Act, 1968.
Certified that the Plans have been prepared, designed and signed by Sh./Smt./M/s … (Name and address of the registered Town Planner/ Architect/ Engineer /Draughtsman/ Surveyor), having Registration No.……dated..... and the Structural Stability Certificate has been issued by Sh./Smt./M/s……...............(Name and address of the Registered Architect/ Planner/ Engineer /Draughtsman), having Registration No.………..dated...
I/We have deposited a sum of Rs……./- only (Rs. ………only ) towards the Application Fee and a sum of Rs…….. only ( Rs………. only), on account of Composition Fee in accordance with the scale as specified in sub-rule (3) of Rule 35 of the Himachal Pradesh Town and Country Planning Rules, 2014, vide Treasury Challan No , dated…………(Original copy attached)/e-payment.
Enclosers: As above.
Yours faithfully,
Signature of applicant(s) Address…
Phone No…
* As amended vide Himachal Pradesh Town and Country Planning (Fifth Amendment), Rules 2020
Registered (AD)/Speed Post
FORM- 27 (See rule- 35(1))
Form of Permission for Composition of Offences
No……………..
Dated………………
To
Sh./Smt./M/s…
Subject:- Permission for Composition of Offences.
Reference:- Your Application No. ……… …….dated………….
This is in reply to your Application under reference on above cited subject. You are hereby granted permission under sub-section (5) of section 39 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) for Composition of Offences carried out on the land bearing Khasra No. …Mauja…………..Tehsil…………..District… Himachal
Pradesh.
A copy of map duly compounded is enclosed herewith.
Please acknowledge the receipt of this Order.
Enclosers: As above.
Director Town and Country Planning Department, Himachal Pradesh, Shimla
FORM 28 (See rule 36(1))
Notice of Declaration of Intention to Prepare Town Development Scheme
No……………..
Dated………………
It is hereby declared and published for the information of the general public as required under sub-section (2) of section 52 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977), that the Town and Country Development Authority intends to prepare Town Development Scheme for .Planning/Special Area. A copy of the said Scheme is available for inspection in the office of the undersigned.
Place… .Chairman Date
Town and Country Development Authority Himachal Pradesh
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla for publication of this Notice in one or more newspapers in circulation in the Planning / Special Area.
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Notice Board.
Chairman Town and Country Development Authority Himachal Pradesh.
FORM 29 (See rule 36(2))
Notice of Publication of Draft Town Development Scheme No……… Dated………
Notice is hereby given that a draft Town Development Scheme has been prepared for the …(Planning/Special Area) under sub-section (3) of section 52 of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977) and a copy thereof is available for inspection during office hours in the following offices:-
1………………………
3…………………………
4………………………
Any objection or suggestion with respect to the draft Scheme, which is received in writing from any person(s) likely to be affected thereby within thirty days of the publication of this Notice in the Official Gazette of Himachal Pradesh, will be considered, by the Town and Country Development Authority after having been given him/them opportunity of being heard in person, if he/ they so desire.
Place… Date
Chairman Town and Country Development Authority Himachal Pradesh
Copy to:-
The Director, Information and Public Relation Department, Himachal Pradesh, Shimla for publication of this Notice in one or more newspapers in circulation in the Planning / Special Area.
The Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Notice Board.
Chairman Town and Country Development Authority Himachal Pradesh
3 If the Application is made in the name of a Registered Body excepting Trusts, the under noted documents, if not already registered at the Public Debt Office, should be enclosed with the investment application:-
(i) Certificate of Registration Incorporation.
(ii) Memorandum and Articles of Association or a certified copy of the Rules, Regulations and Bye-laws of the Body/Company.
(iii) Certified copy of the Resolution in favour of the person(s) authorized to deal in Government securities on behalf of the Body/Company.
Application Receipt
Received………… percent debentures of the Town and Country Development Authority from Shri/Smt./M/s… for the sum of Rs…… only (Rs… only) by Cash/Cheque/ Draft subject to realization, being Application money for the above mentioned debentures.
(Signature and designation of the Officer receiving money) Town and Country Development Authority, Himachal Pradesh
Note:- This Receipt must be carefully preserved, as it is to be surrendered to the Authority duly discharged at the time of taking delivery of debentures.
(iii) details of encumbrances on the land on which development of project is proposed including details of any rights, title, interest, dues, mortgage, litigation in Revenue Courts and name of party in or over such land or non-encumbrance certificate from an Advocate having experience of atleast ten years or from the revenue authority not below the rank of Tehsildar/ Naib Tehsildar, as the case may be;
(iv) three sets of Location Plan in the scale of 1:1000 showing North direction, indicating the land in question, showing main approach road(s), name of road(s) on which the property and boundaries abuts, important public buildings like hospital, school, cinema, petrol pump, existing land uses / building uses surrounding the land;
(v) The Site Plan to be submitted along with the application for seeking permission shall be drawn to a scale of 1: 200 for plots up to 2500 square metres in size and on a scale of 1:500 for plots more than 2500 square metres in size. The plan shall show the following:-
(a) The boundaries of the site conforming to revenue tatima and any contiguous features;
(b) The position of the site in relation to neighbouring street/ revenue road/rasta;
(c) The names and width of the streets on which the building is proposed to be situated, if any;
(d) All existing buildings standing on, over or under the site;
(e) The means of access from the street to the building, and to all other buildings, if any which the applicant intends to erect upon his contiguous land, referred to above in clause (a);
(f) The width of the street, in front, if any at the sides or rear of building;
(g) The direction of North point relative to the plan of the buildings;
(h) Any existing physical features such as drains, trees, overhead/ underground electric supply lines including its capacity, etc;
(i) The area of land under scheme as per revenue record and as available at site, ground coverage and the covered area on each floor alongwith its percentage to the total area of the site;
(j) The contour plan @ contour interval of 2 mtrs for plots up to 2500 square metres and 5 mtrs for plots above 2500 square metres;
(k) Details of utilities and services like water supply, drainage, sullage, sewage, sewerage along with disposal of drainage, sullage, sewage, position of septic tank, soak pit, Sewerage Treatment Plant, rain harvesting tank, electric and telephone poles, fire hydrants, emergency evacuation signage.
(vi) For Plotted Development projects i.e. sub-division of land into plots, three sets of drawings in the scale of 1:200 for plots of size up to an area of 2500 Sqm and to the scale 1:500 for plots of sizes more than 2500 Sqm showing,
(a) Layout plan/site plan showing boundaries of site conforming to revenue tatima and status of land on all four sides;
(b) Existing road(s) with its width, abutting the plot, as per Revenue Record/ Tatima and/ or as existing at site physically, if not in Revenue Records;
(c) Contours, with contour interval of 2 mtrs for plots of size up to 2500 Sqm and contour interval of 5mtrs for plots of size more than 2500 Sqm;
(d) Existing water bodies like Bauri, Well, Nallah, khud, if any;
(e) Overhead or underground electrical lines with their capacities;
(f) Water or sewerage lines private or government with their capacities;
(g) Trees and Forest Boundary, if within or abutting the land under reference;
(h) Layout plan showing all plots with their dimensions, internal roads/ Driveways, setbacks from the internal roads and boundaries, Green areas comprising of parks and open spaces, community buildings such as school, dispensary, post office, bank etc. and all development
(i) proposals including a general report and mode, so as to make the scheme self-explanatory;
(j) Area Schedule detailing total plot area as per revenue records and as available at site, total area of different land uses i.e. Residential, Commercial, Public/ Semi-Public, if any , area under internal roads/ driveways, footpaths, cycle tracks, Green area (parks and green belts), area under services like sewerage treatment Plants/ septic tanks and soak pits, Electrical Transformer or sub-station, overhead or underground water tanks with their respective capacities, accommodation for watch and ward staff.
A separate ‘area calculation drawing sheet’ showing the calculations of worked out area of each plot and space by sub-dividing the plot / space into geometrical shapes and working out area on the basis of dimensions of the sub-divided geometrical shapes to arrive at absolutely correct area of each plot / each space including open area, green area etc;
(k) North direction; and
(l) Table/ Chart showing details of sub divided/ carved out plots i.e. number of plots in each category, Plot area, Ground Coverage and its percentage , front sides and rear setbacks , FAR etc.
(vii) For Residential/ Commercial or Mixed Development Projects:
Three sets of drawings in the scale of 1:100, in the format of working drawing, showing North direction, dimensions and area of building, apartment/flats/Shops etc. and other architectural details and specifications of proposed building, apartment/flat /shop and all development proposals along with Schedule of built up area and open area, setbacks, area calculation sheet showing the calculations of worked out area of each plot or apartment/flat/shop, so as to make the scheme self explanatory.
The plans, elevations and sections of the building shall be drawn to a scale of 1:100 for plots measuring up-to 2500 M2; and 1:200 for plots measuring more than 2500 M2.
A separate area calculation drawing sheet showing the calculations of “carpet area” of each saleable unit like flat/ apartment/ villa cottage/ garage/ covered parking/ commercial unit/ club house/ gym/ community centre/ exclusive balcony or verandah/ exclusive terrace etc, that the promoter intends to sell/ lease to prospective allottees in a real estate project, in accordance with the definition of “carpet area” as per the provisions of Real Estate(Regulation and Development) Act, 2016 and as is required as per serial no 2(XII) FORM ‘A’ specified in Himachal Pradesh Real Estate(Regulation and Development) Rules, 2017.
Similarly, the area calculation drawing sheet showing the calculations of all “common areas” that the promoter intends to sell/ lease to prospective allottees in a real estate project on pro rata share basis, in accordance with the definition of “common areas” as per the provisions of Real Estate(Regulation and Development) Act, 2016.
The carpet area of each saleable unit and common areas in a real estate project should be worked out by sub-dividing the saleable unit / space into geometrical shapes and working out area on the basis of dimensions of the sub-divided geometrical shapes to arrive at absolutely correct area of each saleable unit and common area in a real estate project
These shall show:-
(a) the plans of all the floors including basements and all external elevations and cross sections illustrating distinctly all the different levels and minimum one section through stair case;
(b) the plinth level of the building with reference to the level of the mean level of street from where approach to the site is taken;
(c) the schedule indicating the size of the doors, windows, openings and other methods of ventilation of each room/ area;
(d) the means of access to the buildings and to its various floors as well as the means of escape in case of fire, if required under the specific law/ Code; along with ramps and steps with respect to the building;
(e) in case of proposed additions and alterations in the existing building, all new works shall be shown on the drawings in distinctive colors along with index;
(viii)
(f) the method of disposal of waste water, sewage, storm water and water supply in detail;
(g) provision of rain water harvesting system as per relevant Code in force ; and
(h) provision for photo voltaic solar power plant as per relevant Code in force; and
(i) provision for differently abled person(s) as per Act/rules in force
an explanatory note explaining the salient features of the proposed Real Estate Project in particular, the source of wholesome water supply arrangements and site for disposal and treatment of storm and sullage water. Detailed specifications and designs of water supply schemes, storm water, sullage, sewage, sewerage and provision for muck disposal with estimated costs ;
(ix) three sets of drawings showing the cross-sections of the proposed roads indicating, in particular the width of the proposed drainage ways, cycle tracks and footpaths, green verges, position of electric poles, telephone poles and any of other works connected with such roads. These drawings shall indicate the position of sewers, storm water channel, water supply and any other public health services. The detailed specifications and designs of roads, works thereof;
(x) one set of detailed specifications and structural design of buildings or apartments/flats with estimated cost of buildings or apartments/flats and Structural Stability Certificate and Soil Investigation Report thereof in FORM 15;
(xi) a set of detailed specification and design for electric supply including street lighting, etc ;
(xii) an undertaking in the shape of self-declaration to the effect that while constructing the building or apartment/flat, the owner/promoter shall abide by and conform to the Himachal Pradesh Public Works Department’s specification(s) for the quality of material to be used and quality of constructions;
(xiii) a note indicating the type of development proposed i.e. land Use or building use, namely residential or commercial or industrial or public and semi-public use etc; and
(xiv) the name and address of the registered Town Planner/ Architect/ Engineer.
I/We further hereby enclose the following documents, namely:-
(i) Check List as per Appendix 7.
(ii) Receipt in the shape of e-Challan or Challan or e -payment or Demand Draft drawn in favour of the Competent Authority amounting to Rs…………….only (Rs … ………..only) as application fee.
It is further requested that I /we may be exempted from providing the following amenity or amenities in the proposed Real Estate Project and an explanatory note, in duplicate, alongwith plans marked A.B.C. (so on) as to why the said amenity or amenities are not required to be provided in the Real Estate Project are enclosed herewith:- (i) (ii) (iii)
I/We solemnly affirm and declare that the particulars given in para 1 to 4 above are correct to the best of my/our knowledge and belief.
Enclosures: As above.
Dated:
Place:
Yours faithfully,
Signature of Applicant(s) alongwith full Name(s) and correspondence address Phone
No… E-mail address…
Town and Country Planning Department Himachal Pradesh FORM-35 (See Rule 42) Application for Part Completion/completion Certificate in Respect of Real Estate Projects
To
The Director,
Town and Country Planning Department,
Himachal Pradesh, Shimla.
Sir,
I/We hereby apply for Part/Competition Certificate for Real Estate Project registered under The Real Estate (Regulation and Development) Act, 2016(Act No. 16 of 2016) vide No dated valid upto… .As required, I /we hereby submit the following documents and information as under,-
(i) a copy of development permission granted by the Competent Authority;
(ii) a copy of the detailed Plan of the project showing the works undergoing or completed for which the Part Completion Certificate is required, alongwith detailed list of apartments/plots completed;
(iii) Structure Stability Certificate in accordance within the provision of Section 31-A of the Himachal Pradesh Town and Country Planning Act, 1977.
(iv) an explanatory note clearly indicating the details of external development works which have been completed or are in progress or are yet to be undertaken in conformity with the approved plan;
(v) valid copy of the Consent to Establish the project issued by the Competent Authority;
(vi) No Objection Certificate from Fire Department; and
(vii) any other information,-
Yours faithfully,
Applicant (s)
Address…
Phone No…
E-mail address…
*Note: - Strike out which is not applicable.
** As amended vide Himachal Pradesh Town and Country Planning (Eighth Amendment), Rules 2022
Town and Country Planning Department Himachal Pradesh FORM-36 (See Rule 42) Part Completion/completion Certificate in Respect of Real Estate Projects
No…………………
Dated…………
To
Shri/Smt./M/s…
Subject: Part Completion/Completion Certificate.
Reference: Your Application No…………………. dated ………………
This is in reply to your Application under reference for issuance of Part Completion/Completion Certificate. This Part Completion/Completion Certificate is hereby granted in your favour for the Building/Apartment /Flat/Plot No Block No situated at Village/Town Tehsil District… Himachal Pradesh and to the Real Estate Project registered under the Real Estate Regulation and Development) Act, 2016 vide No… .(Name of Real Estate Project) situated at Village/Town Tehsil . District… Himachal Pradesh, as the development works have been completed by you, in respect above named of Building/Apartment /Flat/Plot No… Block No… ..or in respect of Real Estate Project , as per terms and conditions of the permission granted to you under provisions of the Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977).
Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
Copy to:-
The Chairman, Real Estate Regulatory Authority, Shimla, Himachal Pradesh for information and further necessary action.
Director, Town and Country Planning Department, Himachal Pradesh, Shimla.
*Note: - Strike out which is not applicable.
** As amended vide Himachal Pradesh Town and Country Planning (Eighth Amendment), Rules 2022