i. Local bodies shall implement Solid Waste Management Rules, (amended from time to time) in addition to the recommendations of this Plan.
ii. To promote waste segregation & management at source/locality, integration of informal waste workers, engagement of local communities, RWAs, MTAs, etc. and circular economy, following measures are to be adopted:
a. Local bodies shall facilitate decentralised waste management by involving RWAs, MTAs, informal waste workers and other stakeholders. Local bodies shall ensure that waste is collected, managed and treated in proximity to its generation in unplanned settlements (including JJ clusters).
b. Localities (residential areas, housing societies, colonies, apartments, markets, etc.) shall manage wet MSW within their plot boundaries through eco-friendly solutions such as composting, bio-methanation, etc.
c. The dry recyclable MSW shall be sent to Material Recovery Facilities or processing plants. Existing dhalaos with sufficient capacity and space may be repurposed by local bodies to serve as Material Recovery Facilities at local level, providing area for segregation of wastes and recovery of recyclables. Existing dhalaos may be gradually phased out and repurposed.
d. Wet waste from bulk waste generators (hotels, restaurants, etc.) shall be segregated and processed at source within the premises or transported to authorised composting plants.
e. To target long-term behavioural change and raise awareness, local bodies may incentivise societies/RWAs/MTAs for adoption of good practices and technologies of sustainable waste management in collaboration with NGOs, CBOs, etc. Local bodies shall ensure mandatory disposal of local waste management by the Societies/RWAs/MTAs. Local bodies shall levy higher tax slab in case the Societies/RWAs/MTAs do not undertake local waste management.
f. All non-municipal waste i.e. e-waste, biomedical waste, hazardous waste, etc., shall be processed at government authorised processing centres. Only inert waste, if any, shall be permitted to be disposed at centralised landfill facilities.
(b) Minimising environmental impact of MSW: The following measures shall be implemented to minimise the environmental impact of MSW:
i. Reliance on landfills for waste disposal to be reduced and existing landfill sites are to be incrementally reclaimed as green/recreational areas. Legacy waste at these sites namely Okhla, Bhalaswa and Ghazipur, to be salvaged in a phased manner as per the CPCB Guidelines for Disposal of Legacy Waste (and any amendments thereafter).
ii. New landfill sites shall be discouraged. Any new landfill (if proposed) shall only be utilised for disposal of inert waste and mandatorily adopt sanitary landfilling techniques.
iii. Local bodies and other concerned (government and private) agencies shall adopt innovative environment friendly techniques for processing, post-processing and recycling of municipal, non-municipal waste (including inert wastes as per feasibility).
iv. Littering in public areas and dumping of waste in water bodies, parks, green areas and open land shall be strictly prohibited.
v. The capacity of authorised C&D waste processing plants shall be enhanced and new processing plants may be provided wherever feasible.
vi. Landfill site cleared from the waste shall be utilised and developed in consonance with the existing/extant rules.
(c) Non-Municipal Waste: Non-municipal waste such as e-waste (electrical, electronic waste, etc.), biomedical waste and hazardous waste shall be managed with strict compliance to the rules notified by the Ministry of Environment, Forests and Climate Change. Additional facilities for processing shall be as follows:
i. Medical waste and Common Bio-Medical Waste Treatment Facilities shall be provided as per requirement.
ii. Suitable provisions for recycling, processing and disposal of e-waste shall be made by concerned agencies.
(d) Waste as a Resource: The Agencies involved in waste management shall adopt the principles of reduce, reuse and recycle (circular economy).
i. Processing of plastic waste as per Plastic Waste Management Rules (amended from time to time) through innovative means such as conversion to fuel oils, utilising in road construction, co-processing in energy plants, etc.
ii. Recycled waste products and composting shall be promoted for a waste to wealth eco-system.
iii. Waste to energy plants shall be promoted.
iv. Recycling industry and eco-parks shall facilitate dedicated space for repair, reuse and recycling of waste material.
v. Provisions of Construction and Demolition Waste Management Rules, 2016 of CPCB shall be mandated in construction related projects.
(iii) Power: The following strategies are suggested for additional power capacity enhancement.
(a) Renewable Energy Plan shall be prepared by GNCTD to identify potential renewable energy generation areas and projects.
(b) Delhi has a high potential for generation of solar energy, therefore, the following strategies to be adopted for scaling up the production of solar energy in Delhi:
i. Solar farms shall be encouraged in the green field areas in line with “The Agriculture-cum-Solar Farm Scheme” of Delhi.
ii. Delhi has a number of canals and drains that can be utilised for harnessing solar/hydro energy as per feasibility. The concerned agencies to leverage this potential for generation of solar/hydro energy as per feasibility.
iii. Government buildings and institutional campuses with a roof-top area above 500 sqm to install solar PV as per Delhi Solar Policy.
iv. Public facilities such as Airports, Metro Stations, Railway Stations, Inter-state and City-level Bus Stations/Depots, Stadiums, etc., may progressively meet their power requirements through solar and other renewable energy sources as per feasibility.
(c) The following strategies may be adopted to enhance the usage of solar energy in buildings and public spaces:
i. Solar-based LED lighting to be used for roads, parks and public places.
ii. The installation of solar PV and solar-assisted water heating provisions shall be as per UBBL.
iii. The DISCOM shall undertake installation of smart meters in a phased manner.
(d) Practice of differential pricing for power supply may be adopted by DERC.
(e) Power supply infrastructure shall be improved as per feasibility in the following ways:
i. The transmission network shall be planned within the ROW of proposed Master Plan/Zonal Plan roads as per feasibility.
ii. New sub-stations to be developed and upgraded based on modern technologies.
iii. Power lines to be laid underground within the road cross sections in the whole city in a phased manner as per technical and financial feasibility with land pooling areas as priority phase.
iv. Exposed overhanging wires and cables in dense areas to be laid underground as per the feasibility. Registered RWAs, societies, market traders’ associations, etc. would be encouraged for full/part funding required for the decluttering of exposed over hanging wires, and in such cases, appropriate tax incentives maybe granted by the concerned agencies.
(iv) Gas network: The strategies are suggested for shifting towards using natural gas:
(a) The gas pipeline shall be planned and integrated within the road ROW of 12m and above.
(b) The provision of piped gas connections at household level to be promoted for new developments.
(c) Piped gas connections may also be extended to unauthorised colonies that are undergoing planned regeneration.
(v) Telecommunication and digital infrastructure: Improvement is envisaged as follows:
(a) Infrastructure provisions to support higher service levels such as 5G network and above, optical fibre coverage and integration of the city’s services with digital systems, artificial intelligence (AI), big data, etc.
(b) A unified command and control centres may be set up by the local bodies for effective urban management, traffic, emergency response, etc.
(c) Provision for cyber-security, maintaining global standards of wireless & broadband networks and connectivity shall be ensured by concerned agencies.
(d) In order to support IT, ITES and cyber economies, data centres have been permitted in industrial areas. Space/duct for optical fibre shall be provided in street sections of 12m ROW and above as per feasibility.
(e) Smart poles may be installed in public areas, comprising of CCTV cameras, sensors, public information systems, etc.