a. Central Ground Water Board has assessed that potential annual rainwater runoff of 24.39 MCM (5,372 MG) out of the total of 175 MCM (38,546 MG) is available for recharge areas in Delhi. This is proposed to be realised through construction of check dams and artificial recharge structures in rainwater drains.
b. Low water consumption plumbing fixtures as prescribed under UBBL shall be installed in new developments.
c. Revival of water bodies with an aim to recharge ground water shall be taken up. DJB has identified/proposed various recharging schemes/projects in NCT of Delhi such as Check dams/Nala bunds in Ridge area, Roof-top rainwater harvesting schemes in institutional and commercial buildings, percolation ponds, lake basins, aquifer storage and recovery wells, parks and gardens recharge regions, flyovers and city roads, Yamuna flood basin areas, etc. to be carried out by respective agencies.
(b) Waste Water: Following strategies may be adopted to manage waste water:
i. Treated wastewater for non-potable uses: 100% treatment and maximum reuse of treated wastewater shall be encouraged in following ways:
a. Development within land pooling sectors and LDA shall ensure Zero Liquid Waste Discharge.
b. Decentralised wastewater treatment systems with dual piping shall be mandatory for approval of any new development/regeneration project with discharge of more than 10,000 litres per day or having plot area more than 2000 sqm.
c. Decentralised treatment units may be installed as a shared facility for single or multiple buildings/plots or for scheme/sector/layout.
ii. Waste water Management: DJB shall prepare a phasing plan for the bulk usage of treated wastewater for the following:
a. Management of Decentralised Sewage Treatment Plants: The capacity of the sewage treatment plants/recycling plants would be equal to or more than the water inflow requirements. As per the Sewerage Master Plan (SMP)-2031 prepared by DJB, 14 STPs, 42 DSTPs and, 02 STP and interceptor sewerage project are to be constructed as per requirement.
b. Discharge of treated waste water into the river as per the requirements of environmental flow.
c. Rejuvenation and maintenance of lakes and water bodies.
d. Groundwater recharge through development of aquifer recharge ponds and lakes.
e. Horticulture, irrigation, bus/metro/railway carriage and cleaning of vehicles, road cleaning, firefighting, construction purposes, etc.
f. Non-potable uses in industries as per feasibility.
(c) Drainage and storm water management: To ensure proper drainage and use of rain water, following strategies may be adopted:
i. The Drainage Master Plan of the I&FC Department shall be implemented through multi-agency coordination and monitored on regular basis.
ii. Water sensitive urban design can be adopted in new layout plans and area improvement projects for enhancing availability of pervious surfaces throughout the city. Elements such as bio swales, vegetated filters, pervious storm water drains, raingardens, semi-pervious paving, etc. may be adopted as per feasibility.
iii. The design of drainage networks in new developments shall ensure that storm water is directed/discharged into identified groundwater recharge sites.
iv. Appropriate vegetation may be planted in buffers of rivers, natural drains and lakes to create natural sponges for the city.
v. Strategies for groundwater recharge shall be complemented by strict regulation for groundwater extraction. Extraction from bore wells other than those registered with DJB and/or other competent authorities shall be considered illegal.
vi. Drainage to be integral part of Road Development Plans/flyovers/Grade Separators.
vii. GIS based mapping and database for drainage shall by the concerned agency.
viii. Rejuvenation of selected drains may also be required considering the upstream flow in the region.