(see rule -23)
Initial / Periodical Inspection Report of Lift.
Fee paid vide challan No: Dated:
Number of floors:
| Sr.No. | DESCRIPTION | REQUIREMENT | ACTUALLY PREVAILENT AT THE TIME OF INSPECTION | ACTUALLY PREVAILENT AT THE TIME OF INSPECTION | Remarks |
| 1 | Dimensions | As per approved plan or as per relevant IS _cms _cms _cms | ____cms ____cms ____cms | ____cms ____cms ____cms | |
| 2 | Clean and dry | Shall be in clean and dry condition | a. | Clean and dry | |
| 2 | Clean and dry | Shall be in clean and dry condition | b. | Clean but not dry | |
| 2 | Clean and dry | Shall be in clean and dry condition | c. | Dry but not clean | |
| 2 | Clean and dry | Shall be in clean and dry condition | d. | Neither dry nor clean | |
| 3 | Provision of ladder | A ladder shall be provided if height exceeds two meters | a. | Height does not exceed two meters | |
| 3 | Provision of ladder | A ladder shall be provided if height exceeds two meters | b. | Height exceeds two meters and a ladder is provided | |
| 3 | Provision of ladder | A ladder shall be provided if height exceeds two meters | c. | Height exceeds two meters but a ladder is not provided | |
| 4 | No. of buffers for car | Mention actual numbers and also mention whether it is spring buffer or oil buffer. Oil buffers are required when rated speed of the car is more than 1.5 meters per second. | a. | One/two buffer(s) is/are provided. | |
| 4 | No. of buffers for car | Mention actual numbers and also mention whether it is spring buffer or oil buffer. Oil buffers are required when rated speed of the car is more than 1.5 meters per second. | b. | Spring/oil buffer(s) is/are provided. | |
| 4 | No. of buffers for car | Mention actual numbers and also mention whether it is spring buffer or oil buffer. Oil buffers are required when rated speed of the car is more than 1.5 meters per second. | c. | Oil buffers are not provided even though the speed exceeds 1.5 meters per second. | |
| 5 | Number of buffers for counterweight. | Mention actual numbers and also mention whether it is spring or oil buffer. Oil buffers are required when rated speed for the car is more than 1.5 metres per second. | a. | One/two buffer(s) is/are provided. | |
| 5 | Number of buffers for counterweight. | Mention actual numbers and also mention whether it is spring or oil buffer. Oil buffers are required when rated speed for the car is more than 1.5 metres per second. | b. | Spring/oil buffer(s) is/are provided. | |
| 5 | Number of buffers for counterweight. | Mention actual numbers and also mention whether it is spring or oil buffer. Oil buffers are required when rated speed for the car is more than 1.5 metres per second. | c. | Oil buffers are not provided even though the speed exceeds 1.5 meters per second. | |
| 6 | Condition of car buffers | Buffers shall not be in bent condition. In case of oil buffers a device for determining the quantum of oil shall be provided. | a. | Normal/Bent/Missing | |
| 6 | Condition of car buffers | Buffers shall not be in bent condition. In case of oil buffers a device for determining the quantum of oil shall be provided. | b. | Device for determining the quantum of oil is provided. (applicable only for oil buffers) | |
| 6 | Condition of car buffers | Buffers shall not be in bent condition. In case of oil buffers a device for determining the quantum of oil shall be provided. | c. | Device for determining the quantum of oil is not provided. (applicable only for oil buffers) | |
| 7 | Condition of Counterweight buffer. | Buffers shall not be in bent condition. In case of oil buffers a device for determining the quantum of oil shall be provided. | a. | Normal/Bent/Missing | |
| 7 | Condition of Counterweight buffer. | Buffers shall not be in bent condition. In case of oil buffers a device for determining the quantum of oil shall be provided. | b. | Device for determining the quantum of oil is provided. (applicable only for oil buffers). | |
| 7 | Condition of Counterweight buffer. | Buffers shall not be in bent condition. In case of oil buffers a device for determining the quantum of oil shall be provided. | c. | Device for determining the quantum of oil is provided. (applicable only for oil buffers). | |
| 8 | Clearance between car and buffer | measure clearance when the car is leveled at bottom most landing ......cms. | ......cms. | ||
| 9 | Clearance between counter-weight and buffer. | Measure clearance when the car is leveled at top most landing......cms. | ......cms. | ||
| 10 | Counterweight guard screen. | shall be provided upto a height of two metres from the floor of the pit except when rope comp-ensation sheave is provided. | a. | Guard screen is provided. | |
| 10 | Counterweight guard screen. | shall be provided upto a height of two metres from the floor of the pit except when rope comp-ensation sheave is provided. | b. | Guard screen is not provided. | |
| 10 | Counterweight guard screen. | shall be provided upto a height of two metres from the floor of the pit except when rope comp-ensation sheave is provided. | c. | provided but not upto a height of two metres. | |
| 11 | Provision of light point under the car. | Shall be provided. | a. | Light point provided. | |
| 11 | Provision of light point under the car. | Shall be provided. | b. | Light point not provided. | |
| 11 | Provision of light point under the car. | Shall be provided. | c. | Light point provided but not in working condition. | |
| 12 | Provision of pit switch / provision of pit switch unit with arrangement for lighting the pit. | shall be provided and should be accessible from the lowest landing. When pit depth is more than 2m there should be two pit switches, one accessible from the lowest landing and other from the pit. | a.b. | Pit switch unit is provided not provided. | |
| 13 | Operation of Pit Switch | The lift shall stop on opening of pit switch. | a.b. | Pit switch is tested & found OK not found OK. | |
| 14 | Condition of pulley of safety governor rope | It shall have free movement | a.b. | Pulley is having free movement jammed. | |
| 15 | Condition of pulley of limit switch roller of limit switch. | It shall have free movement | a.b. | Pulley is having free movement not having free movement | |
| 16 | earthing of metal parts of lift car. | The metal parts shall be efficiently earthed. | a.b. | Metal part are efficiently earthed are not efficiently earthed. | |