- Relaxation of rules : -(1) The Chief Inspector may by order in writing, and subject to such conditions as he may think fit to impose, relax the provisions of any of these rules to such extent as , in his opinion, may not be applicable to such lift or escalator;
(2) In case of lift or escalator operated by power other than electricity, the Chief Inspector may, by order in writing, relax the provision of these rules to such extent as, in his opinion are inconsistent or are not applicable to such lift or escalator. Such lift or escalator must, however, comply with such instructions as may be issued in this behalf by the Inspector with the approval of the Chief Inspector;
(3) Every relaxation so directed shall be reported forthwith to, and shall be subjected to disallowance or revision by the State Government;
-
Responsibility of the owner of lift or escalator, agent and authorized person.-Where any person is responsible for the observance of any of these rules, every agent and the person authorized under section 13 shall also be responsible for such observance in respect of matters under their respective controls.
-
Mode of entry.-All persons entering in pursuance of the Act or these rules, any building which is used as a human dwelling or a place of worship ,shall in making such entry have due regards so far as may be compatible with the exigencies of purpose for which such entry is made, to the social and religious usage of the occupants of the building entered.
73.Repeal and Saving:-On the commencement of these rules, the Bombay Lifts Rules, 1958 in its application to the State of Gujarat shall stand repealed.
Provided that such repeal shall not affect the previous operation of the said rules and any thing done or action taken by or under the provisions of the said rules, in so far as it is not inconsistent with the provisions of these rules be deemed to have been done or taken under the corresponding provisions of these rules and shall continue in force unless and until superseded by anything done or any action taken under these rules.
ANNEXURE I (see rule 3)
Application for permission to install lift or for making additions or alterations to the installed lift.
-
Full name and permanent address of the owner/ applicant.
-
Name and address of the local agent
of owner, if any. (appointed under section 14)
-
Address of the premises where the lift is to be Installed * or additions or alterations are proposed.
-
Whether a lift has been previously erected and a licence has been granted. (Details to be given)
-
Name and address of the person (authorised under section 13) who will install the lift or make additions or alterations
-
Type and make of lift proposed to be erected
-
Number of lift required
-
Rated Load : number of persons ----Kilograms ----
-
Rated speed ..... meter per second.
-
Travel in meters
-
Serving.... floors .... entrances .
-
Method of control
-
Position and details of machine room with distance of machine from the walls of machine room.
-
Position and details of counter weight.
-
Construction, design and finish of car body work
16.Bottom car run by (in milli- meters )
17.Bottom counter weight run by (in millimeters)
18.Details of Buffer
-
Details of call Indicator
-
Details of car frame, platform, internal size of car.
-
Details of bottom and top counter weight clearance.
-
Details of car and counter weight guide rails, brackets with its fastenings and shoe.
-
Details of car and landing doors with its opening device and locking arrangements.
24.Details of emergency stop switch, floor leveling switch, floor selectors and car gate switch
-
Details of lift pit, lift well enclosure and lifting beam.
-
Type of lift operation with its devices.
27.Details of over speed governor.
-
Details of retiring cam/ retiring ram
-
Details of safety gear.
-
Details of sheave and diverter pulley.
-
Details of slack rope switch.
-
Details of terminal slow down switch.
-
Details of terminal stopping device normal.
-
Details of terminal stopping device final.
-
Distance of total head room.
-
Details of gear machine
-
Travel distance
-
Details of fire man switch when required.
-
Details of main switch and wiring in machine room, lift well and lift pit with position and controlling switches.
-
Details of over current protection
-
Details of bottom and top car clearance.
-
Details of alarm system
-
Details of earthing
-
Details of emergency signal or telephone.
-
System of roping. The number and description, weight and size of the supporting cables.
-
Details of lift well dimensions.
-
Details of power and lighting cables to half way points in lift well.
48.Details of main switch(es) and fuse (s) or circuit breaker(s) in machine room and main switches and fuses for isolating main cables to machine rooms(s)
-
Details of the construction of the overhead arrangement with the weight and sizes of the beams.
-
Proposed date for commencement of work
-
Proposed date for completion of work.
Signature of the person referred to at Serial Number. 5 of above
Signature of the Applicant
Authorization Number.
Date :
Application for permission to install escalator or
as or alterations to the installed escalator.
(To be submitted to the Inspector of Lifts and Escalators)
-
Full name and permanent address of the owner/ applicant.
-
Name and address of the local agent of the owner, if any (appointed under section 14.)
-
Address of the premises where the escalator is to be installed or additions or alternations are proposed.
-
Whether an escalator has been previously erected and a licence has been granted (Details to be given).
-
Name and address of the person (authorized under section 13) who will install the escalator or make additions or alterations:-
-
Maker's name and address
-
The rated speed of the escalator
-
The rated load of the escalator in Kilograms
-
The maximum number of persons which the escalator can carry
-
The angle of inclination of the escalator with the horizontal
-
The width of the escalator.
-
The vertical rise of the escalator.
-
The number, description, weight and size main drive chain, handrail drive chain and governor drive claim.
-
Details of construction of the stresses and step treads together with the weight and size of all structural members and supporting beams in connection therewith.
-
Proposed date of commencement of work
-
Proposed date of completion of work
Date :
Signature of the person referred to at Serial number 5 above
Authorization Number.
Signature of the applicant