From ………………………. ……………………….. ………………………..
To The Member Secretary, Chennai Metropolitan Development Authority Thalamuthu Natarajan Building, No.1, Gandhi Irwin Road, Egmore, Chennai-600 008.
Sir, I / We, the undersign, do hereby request to allow to utilise the DRC detailed below for the construction proposed to be put up at the site bearing S.No/T.S.No…… Block No………of ………………..… Village……….……....... Taluk …………………District for which the Planning Permission is applied for by (name)..… (address) and is being dealt in CMDA file No…
Particulars of DRC DRC No. Issued in favour of Name in full
Signatures ……………… ……………………… …….…………………
I / We, the applicants of the PPA for the construction at ………… is / are willing to utilise the DRC issued in favour of the above persons, and request CMDA to permit the eligible floor area to be put up at my premises.
Name in full …………………………. ………………………….. …………………………..
Signatures ……………………… ……………………… …….…………………
Attestation by Notary Public I hereby attest the signatures of the DRC holders and the PPA applicants mentioned above.
Signature Name Address & Seal
Witnesses
1……………………….
2………………
¥Guidelines for Special TDR
The following guidelines shall be followed in the award of special TDR under DR. No. 9-A read with the detailed regulations contained in Annexure XXVII:
i. TNSCB shall identify the slum and workout a scheme for eviction and rehabilitation of the slum availing the special TDR provided for in the Development Regulations (DR). The scheme proposed by TNSCB shall be informed in advance to CMDA with the following details:
a) Revenue address of the site of the slum which is proposed to be evicted (i.e the details of T.S. No. / S.No., Block No., Village Name, Taluk and District) along with the map showing physical boundary of the slum under reference.
b) No. of dwellings to be resettled along with the list of the slum beneficiaries who are eligible for award of special TDR under the DR provisions, who have been enumerated and identified by TNSCB based on the approved standard criteria.
ii. TNSCB shall workout the scheme in such a way that no part of the slum shall be left out from eviction for whatsoever reason. The slum clearance of the encroachments at the slum site by rehabilitating them elsewhere shall be planned in toto ensuing that no part is left as residuary part of the slum and it doesn’t expand later and grow as a full slum in the same site. Compliance of this condition has become essential as otherwise the purpose of award of TDR will not be served. In cases of large slums, TNSCB may propose in consultation with CMDA on the extent to be considered for eviction and resettlement at a time, as it may not be possible for rehabilitating all of them at a time in such large slums.
iii. On receipt of the details stated in (i) above from TNSCB, CMDA shall examine the TNSCB’s proposal and convey its assurance to TNSCB for award of special TDR to the private developers based on the list of slum beneficiaries certified as eligible by the TNSCB.
iv. TNSCB shall enter into final agreement with the developers only after receipt of CMDA’s specific assurance for award of special TDR.
v. The buildings proposed/constructed by the developers under the scheme in agreement with the TNSCB shall conform to DR and the local body regulations and shall be
¥ Approved by the Authority in its Resolution No. 117/2010, dt.17.9.10 and published in TNGG on 8.12.10
constructed only after getting due planning permission and building permission from the competent authorities as prescribed in the DR.
vi. The size of the dwelling unit to be provided by the developer shall not be less than 25 sq.mts. in plinth area (excluding common areas) and shall have atleast two habitable rooms with a place for cooking.
vii. TNSCB shall ensure that the developer gets planning permission and building permission, and that the constructions for rehabilitation are carried out to the specifications prescribed by TNSCB, with quality checks during constructions etc.
viii. The assurance of CMDA for award of special TDR is always subject to the compliance of supply of the dwellings and handing over to the TNSCB on time as agreed upon and execution of registered transfer deed.
ix. TNSCB shall take over the premises only after the developer obtains completion certificate issued by the competent authority for having completed the construction as per the approved plan and the TNSCB shall ensure that the buildings are ready for occupation with all service connections.
After receiving the certificate of the TNSCB for having taken over of the premises with buildings constructed to the specification of the TNSCB and title transfer to TNSCB through a registered deed, Member Secretary, CMDA shall award special TDR as provided in the DR to the developers recommended by the TNSCB.
xi. The cleared site shall be handed over to the Government department / agency by TNSCB immediately after the eviction and certificate by the landowning department shall be obtained for handing over and for its protection against encroachments subsequently.
xii. Any failure on the part of the land owning department to protect its slum cleared land from any encroachment or formation of slum shall not make the slum dweller on such re encroached land entitle for any special TDR under these provisions.
xiii. After clearance of the slum site covered in the scheme for rehabilitation and handing over of the cleared site to the concerned land owning government departments / agencies, the TNSCB shall send the scheme completion report to CMDA for record.
xiv. TNSCB shall ensure that a slum dweller avails himself / herself of the alternative accommodation only once.
xv. Development Rights Certificate (DRC) issued can be cancelled by the Member Secretary, CMDA in the following circumstances:
a) Where special DRC has been obtained by fraudulent means.
b) Where the property is encumbered in any way restricting the ownership or development rights or where there is a dispute on the title of the rehabilitation site.
xvi. In cases where TNSCB constructs directly the rehabilitation tenements and provides alternate accommodations, and proposes to avail the Special TDR as provided in the sub-D.R. No. 23 under the Annexure XXVII, the normal procedures stated above for private developers shall not apply. CMDA may award the Special TDR as may be eligible under the Development Regulations on receipt of details on the rehabilitation scheme and Board’s resolution of TNSCB claiming the Special TDR, and keep the Government informed.
xvii. Format of the special Development Rights Certificate to be issued by the Member Secretary, CMDA shall be as prescribed in Appendix – I
xviii. Register on the award of DRC, the transfer of DRC if any, and the utilization of DRC shall be maintained as prescribed in Appendix – II
xix. Special DRC holders shall submit utilization form as prescribed in Appendix – III.
xx. Disclaimer: CMDA shall be absolved of any dispute or litigation arisen during implementation of the slum clearance scheme and any dispute or litigation shall be defended by the TNSCB, the scheme implementation agency.