(6) Glass Facade/ Service Ducts/Shafts/ Refuge Area/ Vents
(i) An Opening to the glass facade of min. width 1.5 meters and height 1.5 meters shall be provided at every floor at a level of 1.2 meters from the flooring facing compulsory open space as well as on road side. Construction that complies with the fire rating of the horizontal segregation and has any gap packed with a non-combustible material to withstand thermal expansion and structural movement of the walling without the loss of seal against fire and smoke.
(ii) Mechanism of Opening: The openable glass panel shall be either left or right shall have manual opening mechanism from inside as well as outside. Such openable panels shall be marked conspicuously so as to easily identify the openable panel from outside.
(iii) Fire seal to be provided at every floor level between the external glazing and building structure.
(iv) The glazing used for the facade shall be of toughened (tempered) safety glass as per I.S. 2553.
(v) To avoid fire propagation vertically from one floor to another floor, a continuous glass must be separated internally by a smoke/ fire seal which is of non-combustible material having a fire resistance rating of not less than 2 hours.
(vi) Service ducts and shafts shall be enclosed by walls and doors with fire resistance rating. All such ducts or shafts shall be properly sealed and stopped fire ingress at all floor levels.
(vii) A vent opening at the top of the service shaft shall be provided having an area between one- fourth and one-half of the area of the shaft.
(viii) Glass quality and Practice of use of Glass in buildings shall have to be in conformity with the BIS codes as given in Table 3 herein contained.
Table No. 3: Glass quality and Use of glass in buildings
Sl. No.
IS Code
Specifications
(a)
(b)
(c)
1
2553 (Part 1): 1990
Specification for safety glass: Part 1 General purpose (third revision)
2
2835:1987
Specification for flat transparent sheet glass (third revision)
3
438:1994
Specification for silvered glass mirrors for general purposes (second revision)
4
5437:1994
Specification for figured rolled and wired glass (first revision).
5
14900:2000
Specification for transparent float glass.
6
16231 Part 1
General methodology for selection
7
16231 Part 2
Energy and Light
8
16231 Part 3
Fire and Loading
9
16231 Part 4
Safety related to Human Impact
Annexure IXGeneral Building Requirements (See clause (vii) and (viii) of Rule 43)
(1) Doorways:
(i) Every doorway shall open into an enclosed stairway, a horizontal exit, on a corridor or passageway providing continuous and protected means of egress.
(ii) No exit doorway shall be less than 1 meter in width. Doorways shall be not less than 2 meter in height. Doorways for bathrooms, water closet and stores shall be not less than 0.75 meter wide.
(iii) Exit doorways shall open outwards, that is, away from the room but shall not obstruct the travel along any exit. No door, when opened, shall reduce the require width of stairway or landing to less than 0.9 meter, overhead or sliding doors shall not be installed.
(iv) Exit door shall not open immediately upon a flight or stairs, a landing equal to at least the width of the door shall be provided in the stairway at each doorway, level of landing shall be the same as that of the floor which it serves.
(v) Exit doorways shall be openable from the side which they serve without the use of a key.
(vi) Mirrors shall not be placed in exit ways or exit doors to avoid confusion regarding the direction of exit.
(vii) Revolving doors shall not be provided as a means of fire exit
(7) Building Services
(i) Staircase and Corridor Lighting
(a) The staircase and corridor lighting shall be on separate service and shall be independently connected so as it could be operated by one switch installation on the ground floor, easily accessible to firefighting staff at any time irrespective of the position of the individuate control of the light points, if any.
(b) Staircase and corridor lighting shall also be connected to alternate supply from parallel high-tension supply or to the supply from the stand-by generator.
(c) Emergency lights shall be provided in staircase and corridor or passageway, horizontal exits, refuge area; and all wires and other accessories used for emergency light shall have fire retardant property.
(viii) Gas supply:
(a) Town Gas / L.P. Gas Supply Pipes - Where gas pipes are run in buildings, the same shall be run in separate shafts exclusively for this purpose and these shall be on external walls away from the staircases. There shall be no interconnection of this shaft with the rest of the floors.
(b) LPG distribution pipes shall always be below the false ceiling. The length of these pipes shall be as short as possible. In the case of kitchen cooking range area, apart from providing hood, covering the entire cooking range, the exhaust system shall have to be designed to take care of 30 cu.m per minute per square meter of hood protected area. It must have grease filters using metallic grill to trip oil vapours escaping into the fume hood.
(c) For large/commercial kitchens all wiring in fume hoods shall be of fiberglass insulation. Thermal detectors shall be installed into fume hoods of large kitchens for hotels, hospitals and similar areas located in high rise buildings. Arrangements shall be made for automatic tripping of the exhaust fan in case of fire.
(d) When LPG is used, the same shall be shut off. The voltage shall be of 24 V or 100 V DC operated with the external rectifier. The valve shall be of the hand re-set type and shall be located in an area segregated from cooking ranges. Valves shall be easily accessible. The hood shall have manual facility for steam or carbon dioxide gas injection, depending on duty condition; and Gas meters shall be housed in a suitably constructed metal cupboard located in a well-ventilated space, keeping in view the fact that LPG is heavier than air and town gas is lighter than air.
(ix) Boiler Room: Further, the following additional aspects may be taken into account in the location of Boiler/Boiler Room:
(a) The boiler shall not be allowed in sub-basement but be allowed in the first basements away from the escape routes.
(b) The boilers shall be installed in a fire resisting room of 4 hours fire resistance rating, and this room shall be situated on the periphery of the basement. Catch pit shall be provided at the low level. Entry to this room may be provided with a composite door of two hour fire resistance.
(c) The boiler room shall be provided with fresh air inlets and smoke exhausts directly to the atmosphere.
(d) Foam inlets shall be provided on the external walls of the building at the ground floor level to enable the fire services to use foam in case of fire.
(e) The furnace oil tank for the boiler, if located in the adjoining room shall be separated by fire resisting wall of 4 hour rating. Entry to this room shall be provided with a composite door of 2 hour fire resistance. A curb of suitable height shall be provided at the entrance in order to prevent the flow of oil into the boiler room in case of tank rupture.
(ii) Electrical Services
(a) The electric distribution cables or wiring shall be laid in separate duct which shall be sealed at every floor with non-combustible materials having the same fire resistance as that of the duct. Low and medium voltage wiring running in shaft and in false ceiling shall run in separate conduits.
(b) Water mains, telephone cables, intercom cables, gas pipes or any other service line shall not be laid in the duct for electric cables. Use of bus ducts/solid rising mains instead of cables is preferred.
(c) The provision of dedicated telecommunication ducts for all new building proposals is mandatory for conveyance of telecommunication and other data cables.
(d) Separate circuits for water pumps lifts, staircases and corridor lighting and blowers for pressurizing system shall be provided directly from the main switchgear panel.
(iii) Alternate Source of Electric Supply: A stand-by electric generator shall be installed to supply power to staircase and corridor lighting circuits, fire lifts, the stand-by fire pumps, pressurization fans and blowers, smoke extraction and damper system in case of failure of normal electric supply. The generator shall be capable of taking starting current of all the machines and circuits stated above simultaneously. If the stand-by pump is driven by diesel engine, the generator supply need not be connected to the stand-by pump.
(iv) Air-conditioning: Air-conditioning shall conform to the following:
(a) Escape routes like staircases, common corridors, lift lobbies. shall not be used as return air passage.
(b) The ducting shall be constructed of substantial gauge metal in accordance with good practice.
(c) Wherever the ducts pass through fire walls or floors, the opening around the ducts shall be sealed with materials having fire resistance rating of the compartment.
(d) Where duct crosses a compartment which is fire rated, the ducts shall be fire rated for same fire rating. Further depending on services passing around the duct work, which may get affected in case of fire temperature rising, the ducts shall be insulated.
(e) Metallic ducts shall be used even for the return air instead of space above the false ceiling.
(f) Where plenum is used for return air passage, ceiling and its fixtures shall be of non-combustible material.
(g) The materials used for insulating the duct system (inside or outside) shall be of non-combustible material; glass wool shall not be wrapped or secured by any material of combustible nature.
(2) Stairways:
(i) A staircase shall not be arranged round a lift shaft.
(ii) The natural ventilation requirement of the staircase shall be, achieved through opening at each landing, of an area 0.5 square meters in the external wall. A cross ventilated staircase shall have 2 (two) such openings in opposite/adjacent walls or the same shall be cross-ventilated through the corridor. The National Building Code of India, Chapter 4 Fire and Life Safety, Clause 4.4.2.5 Smoke Control of exits shall be followed for requirement of Pressurized staircase in various building components.
(iii) The minimum width of staircase shall be as in Table 1 herein contained—
Table No. 1: Type of Building and Staircase Width
Sl.No.
Type of Building
Width (m)
(a)
(b)
(c)
1
Residential buildings (dwellings)
1.0
2
Residential Hotel Buildings
1.5
3
Assembly buildings e.g. auditorium, theatres and cinemas
2.0
4
Educational buildings up to 30 meter in height
1.5
5
Institutional buildings like hospitals
2.0
6
All other buildings
1.5
(iv) The minimum width of treads without nosing shall be 0.25 meter for staircase of residential buildings. In the case of other buildings the minimum tread shall be 0.3 meter. The treads shall be constructed and maintained in a manner to prevent
slipping. The maximum height of riser shall be 0.19 meter in the case of residential buildings and 0.15 meter in the case of other buildings and the number of riser shall be limited to 12 per flight.
(v) Handrails shall be provided with a minimum height of 0.9 meter from the center of the tread.
(vi) Handrail shall be provided on both sides of the staircase, if the width of staircase is 1.5 meter or more.
(vii) The minimum headroom in a passage under the landing of a staircase and under the staircase shall be 2.2 meter.
(viii) Access to exit staircase shall be through a fire door of a minimum 120 min fire resistance rating. It shall be a swing type door opening in the direction of the escape.
(4) Ramps:
(i) In the case of parking spaces provided in basement(s) and upper storey of parking floors, at least two ramps of width and slope as per Table 2 shall be provided, located preferably at opposite ends.
Table No. 2 - Requirements for ramp for vehicles
Sl No.
Type of Vehicle
One way ramp width (in meters)
Two way ramp width (in meters)
Maximum continuous ramp length (in meters)
Minimum width of ramp landing (in meters)
Maximum slope of ramp (in meters)
(a)
(b)
(c)
(d)
(e)
(f)
(g)
1
LMV
3.0
6.0
40
6
1:8
2
LCV
4.5
9.0
3
HMV
6.0
12.0
4
fire tender
7.5
40
6
1:10
Note.- (1) Such ramps may be permitted in the side and rear setbacks after leaving 6 meters space for movement of fire-fighting vehicles; (2) The parking of vehicles at different level may also be mechanized. (3) In case of underground/multi-storeyed parking, special measures with regard to fire safety shall be taken in compliance to Part 4-Fire and Life Safety of NBCI.
(ii) Ramp may also be provided in setback area which can be sloped considering unhindered movement of fire Engine and in no case the gradient shall be less than 1:10.
(iii) All structural design/safety aspects shall be complied per latest BIS Codes and National Building Code of India along with consideration of weight of Fire Engine and its maneuverings.
(iv) The minimum width of the ramps in hospitals shall be 2.4 meters for stretcher and not for vehicular movement
(v) In this case Handrails shall be provided on both sides of the ramp.
(vi) Ramps shall lead directly to outside open space at ground level or courtyards or safe place.
(vii) Requirement of accessibility for elders and persons with disabilities shall be ensured in compliance with the provisions of Annexure-VIII which may require providing ramps with specified gradient or accessible lifts for access to different levels.
(h) Air ducts serving main floor areas, corridors, shall not pass through the staircase enclosure.
(i) The air-handling units shall be separate for each floor and air ducts for every floor shall be separated and in no way inter-connected with the ducting of any other floor.
(v) If the air-handling unit serves more than one floor, the recommendations given in clause (iv) shall be compiled with, in addition to the conditions given below:
(a) Proper arrangements by way of automatic fire dampers working on smoke detector / or fusible link for isolating all ducting at every floor from the main riser shall be made.
(b) When the automatic fire alarm operates, the respective air-handling units of the air-conditioning system shall automatically be switched off.
(c) The vertical shaft for treated fresh air shall be of masonry construction.
(d) The air filters of the air-handling units shall be of non-combustible materials or fire rated.
(e) The air-handling unit room shall not be used for storage of any combustible materials.
(f) Inspection panels shall be provided in the main trunking to facilitate the cleaning of ducts of accumulated dust and to obtain access for maintenance of fire dampers.
(g) No combustible material shall be fixed nearer than 150 mm to any duct unless such duct is properly enclosed and protected with non-combustible material (glass wool or spyglass with neoprene facing enclosed and wrapped with aluminum sheeting) at least 3.2 mm thick and which would not readily conduct heat.
(ix) No living space, store or other fire risk shall open directly into staircases.
(x) External exit door of staircase enclosure at ground level shall open directly to the open spaces or can be reached without passing through any door other than a door provided to form a draught lobby.
(xi) The exit sign with arrow indicating the way to the escape route shall be provided at a height of 0.5 meter from the floor level on the wall and shall be illuminated by electric light connected to corridor circuits. All exit way marking signs shall be flushed with the wall and so designed that no mechanical damage shall occur to them due to moving of furniture or other heavy equipment's. Further all landings of floor shall have floor indication boards indicating the number of floor. The floor indication board shall be placed on the wall immediately facing the flight of stairs and nearest to the landing. It shall be of size not less than 0.5 meter × 0.5 meter and it shall be prominently on the wall facing the staircase.
(xii) In case of single staircase it shall terminate at the ground floor level and the access to the basement shall be by a separate staircase. The second staircase may lead to basement levels provided the same is separated at ground level by either a ventilated lobby with discharge points at two different ends or through enclosures with fire resistance rating door (Table 1, Part IV of the National Building Code of India revised time to time) or through a fire protected corridor.
(3) Lifts: General requirements of lifts shall be as follows:
(i) All the floors shall be accessible for 24 hours by the lifts. The lifts provided in the buildings shall not be considered as a means of escape in case of emergency. In a dual line arrangement (lifts opposite to each other) the lobby may be between 1.5 times to 2.5 times the depth of one car. For in-line (single line) arrangements the lobby may be typically half of the above recommendations.
(ii) Grounding switch, at ground floor level, to enable the fire service to ground the lift shall also be provided.
(iii) The lift machine room shall be separate and no other machinery shall be installed there in.
(iv) Walls of lift enclosures and lift lobby shall have fire rating of 2 hour; (National Building Code of India); lifts shall have a vent at the top of area not less than 0.2 square meter.
(v) Lift car door shall have a fire resistance rating of 1 hour.
(vi) Lift lobby doors in lift enclosures shall have fire resistance as per relevant provision of the National Building Code of India.
(vii) Collapsible gates shall not be permitted for lifts and shall have solid doors with fire resistance of at least 1 hour.
(viii) Lifts if communicating with the basement, the lift lobby of the basements shall be pressurized as suggested in Annexure-III (Fire Protection and Fire Safety Requirements) with self-closing door with fire resistance rating. Telephone or other communication facilities shall be provided in lift cars and to be connected to fire control room for the building.
(ix) Suitable arrangements such as providing slope in the floor of lift lobby shall be made to prevent water used during firefighting etc., at any landing from entering the lift shafts.
(x) A sign shall be posted and maintained on every floor at or near the lift indicating that in case of fire, occupants shall use the stairs unless instructed otherwise. The sign shall also contain a plan for each floor showing the locations of the stairways. Alternate source of power supply shall be provided for all the lifts through a manually operated changeover switch.
(xi) The National Building Code of India, Chapter 4 Fire and Life Safety, Clause 4.4.2.5 Smoke Control of exits may be followed for requirement of Pressurized lifts in various building components.
(5) Corridors:
(i) Exit corridors and passageways shall be of width not less than the aggregate required width of exit doorways leading from them in the direction of travel to the exterior.
(ii) The minimum width of a corridor in a residential building shall be 1.0 meter for single loaded and 1.8 meters for double loaded and in all other buildings shall be 1.5 meters.
(iii) In Hospitals, the corridors through which patients are moved, shall have a minimum width of 2.4 m throughout and corridors in other areas of hospital not intended for the housing, treatment, or use of inpatients shall be not less than 1.5 m in width.
(iv) Where stairways discharge through corridors and passageways, the height of corridors and passageways shall be not less than 2.4 meters.
(v) All means of exit including staircases lifts lobbies and corridors shall be ventilated.
FORM -I APPLICATION FOR DRAWING OF ATTENTION (See sub-rule (6) of rule 10)
From:
.
To The Vice-Chairman Development Authority
Subject: Statutory notice under sub-section (8) of section 16 of ODA Act, 1982
Madam/Sir,
I/We do bring to your kind notice that I/We had submitted the application in prescribed Form for Approval of Building Plan to Development Authority on Dt. with respect of Plot No. Khata No. Village/Mouza:, of Municipal Corporation / Municipality / NAC within Development Area for issue of Permission under section 16.
Two months have elapsed since the submission of application and I/We have not received any communication with respect to the said application. Please take notice that if within a further period of one month from the date of receipt of this notice by you, no communication either granting or refusing permission, is received by me/us, I/we shall presume that issue of permission as applied for has been granted in my/our favour.
I/We understand that in computing the period of two months and one month as mentioned in para-2 above, the period in between the date of requisitioning any further information or documents from me/us and the date of receipt of such information or document from me/us shall be excluded.
Yours faithfully,
Signature of the applicant(s)
FORM -II REGISTER (See rule 11)
Sl. No.
Name and address of Applicant
Date of receipt
Date of permission with Letter No.
Date of refusal with Letter No.
Date of endorsement to Enforcement Branch
Date of return from Enforcement Branch
Date of sending to record room
Signature of the Dealing Assistant
Signature of the S.O.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
1
2
3
4
5
FORM -III INDEMNITY BOND FOR BASEMENT (See sub-rule (6) of rule 41)
This Indemnity Bond is executed by Shri/Smt S/O, D/O, W/O Shri/Smt R/O in favour of Development Authority.
Whereas the executant has submitted to the concerned Authority the plans for, sanction of basement over Plot No. Mouza/Village under the provisions of the Act and Rules and Regulations made there under:—
And whereas the concerned Authority has agreed to sanction the aforesaid construction subject to the conditions that the owner shall indemnify the concerned Authority in the event of any loss or damage being cause to the adjoining building on account of the construction of the said basement either at the time of digging of its foundations or in the course of its construction or even thereafter and also against any claim of any concern thereto.
And whereas the executant has agreed to execute an indemnity bond to the above affect and also to abide by the terms imposed by the concerned Authority to the grant of sanction for construction of the basement.
Now this deed witnesses:
1.That in consideration of the sanction of the plans by Development Authority for construction of the basement the executant undertakes that he/she shall at all times keep Development Authority free from any liability, loss or damages/flowing from any injury or damage caused to the adjoining built-up properties or to any person as a consequence of the construction of at the time of digging of its foundations or during the course of its construction or at any time thereafter.
2.The owner agreed and undertakes that in the event of any claim being made by any person or persons against the concerned Authority either in respect of the sanction granted by the concerned Authority to the owner for the construction of basement or in respect of the construction or manner of construct ion of the basement by the owner of the consequences flowing from the said sanction the executant shall be responsible and liable and not Development Authority.
3.The executant agrees and undertake to indemnify the concerned Authority fully in respect of any amount which the concerned Authority may be required to pay to any person either by way of compensation or on any other account as a result of any claim or suit or any other proceedings concerning the sanctioning of the construction of the basement of the making thereof and also in respect of the costs and expenses which the concerned Authority may incur on defending any action.
4.Without prejudice to the above undertaking the executant hereby binds itself to pay to Development Authority to the full extent any amount which Development Authority may be required to pay to any person in connection with, relating to or concerning the sanctioning of the basement or the making thereof.
5.The owner agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully observes/performs the undertaking herein before contained.
Form -IV Application for Issue of TDR Certificates (See Rule 36)
For Office use only
Receipt Date:
Diary/Regd. No
Signature of Officer receiving
From
(Name in BLOCK Letters and full address for correspondence of person furnishing information)
Mobile No.
Place:
E-Mail:
Date:
To, The Authorised Officer, TDR Development Authority
Sub: Application for issue of Transferable Development Rights (TDR) Certificates Sir,
In response to the provisions of rule 36 of the Odisha Development Authorities (Planning and Building Standards) Rules, 2020, in respect of following lands on which the applicant(s) has/have interest and which the applicant(s) is/are required to surrender to the Development Authority, I /we hereby request that TDR Certificate may be issued to me in lieu of lands being proposed for surrender to the Authority as per rules and regulations of Government of Odisha. Details of such lands along with supporting documents pertaining to legal rights, plot area, details of structures/plantation on it are furnished herewith below:
1. Details of lands (Area in Square meters)
Plot No.
Khata No.
Total area of plot as per RoR
Area proposed for TDR
Kisam
Mouza
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Total
(Please attach self-signed photo copies of the Land ownership documents including copy of ROR, Encumbrance Certificate, RSD, Rent receipts, Holding Tax receipts etc. indicating legal right over the land).
2. Type of structures on the proposed land:
(A) Construction:
(i) Plinth area in Square Meters.
(ii)Type of construction (RCC Roof/Tin/Asbestos/others)
(B) Plantations:
(i) Species of Tree (Photographs to be enclosed):
(ii)Age :
(iii)Numbers :
This is to certify that the above information’s are true and correct to the best of my knowledge and belief and there is no misrepresentation of facts or fraudulent statements with respect to information and documents furnished. I also undertake to abide by all terms and conditions as given in rules and regulations meant for the purpose.
Applicant’s Full Name:
Full Signature:
List of Documents Enclosed:
1.
2.
3.
4.
5.
6.
7.
(vi) Transformers:
(a) When transformers are housed in the building below the ground level it shall be necessarily in the first basement in separate fire resistance room of 4 hours rating. Transformer shall be dry type and shall be kept in an enclosure with walls, doors and cut-outs having fire resistance rating of 4 hour. The room shall necessarily be at the periphery of the basement having separate and direct access from open area at ground floor through a fire escape staircase. The entrance to the room shall be provided with a steel door of 2 hours fire rating. A curb of a suitable height shall be provided at the entrance in order to prevent the flow of oil from ruptured, transformer into other parts of the basement. The switchgears shall be housed in a separate room separated from the transformer bays by a fireresisting wall with fire resistance not less than 4 hours.
(b) The transformer shall be protected by an automatic foam sprinkler system. When housed at ground floor level it/they shall be cut-off from the other portion of premises by Fire Resisting Walls of 4 hours rating.
(c) A tank of RCC construction of adequate capacity shall be provided at lower basement level to collect the oil from the catch pit in case of emergency. The pipe connecting the catch-pit to the tank shall be of non-combustible construction and shall be provided with a flame-arrester.
(d) The electric sub-station shall be located in a separate building in accordance with sub-rule (1) of rule 68 and clause (a) of sub-rule (1) of rule 64 of the Indian Electricity Rules, 1956.
(e) In case this is not practically possible due to site conditions, the substation shall be located on the ground floor. As far as possible sub-station shall not be installed in a basement, for such situations special provisions like mechanical ventilation, wherever required, cable ducting, cable trays, top/bottom entry of HV/LV cable, hooks on Transformer(s) and HV panels, adequate fire detection and fire-fighting arrangement, adequate drainage, effective measures to prevent flooding shall be provided. Adequate precautions shall also be taken for water proofing to prevent seepage of water. A ramp shall also be provided with a slope, not steeper than 1 in 7, for easy movement of equipments to and from sub-station.
(vii) Fire regulations—The installations shall be carried out in conformity with the local regulations and rules made thereunder wherever they are in force. At other places the National Building Code of India shall be followed.
In witness whereof the executant above named has signed this bond on this of at