Form for Obtaining Proposals of Development or Zoning Plan
To,
The Authority
Madhya Pradesh.
Sir,
I hereby intend to develop/redevelop the land/Khasra No....on/in plot No....in Colony/ Street....in Mohalla/Bazar....in City.... The proposals of the Development Plan/Zonal Development Plan pertaining to the area may be made available for the preparation of sub-division plan for the land referred to in above. The necessary payment for procuring the proposals of Development Plan/Zonal Development Plan has been made and the attested copy of receipt is enclosed.
Signature of Applicant or Owner
Name of Applicant or Owner
(in block letters)
Address of Applicant or Owner
Dated:
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (289)
*APPENDIX- H-1
(See rule 81(4))
RAIN WATER HARVESTING THROUGH PERCOLATION PITS (Individual House)
15 CM. DEPTH SAND.

Dig a number of 3 mtr. deep and 30 cm dia percolation pits at an interval of 3 mtrs. around the plinth fill them up with broken bricks and pack the top 15 cm. with river sand. Erect 7.5 c.m. high dwarf walls entrance to facilitate recharge.
392 (290)
APPENDIX- H-2
(See rule 81(4))
(Building Complexes)

WITH 5CM.TO 7.5
On the three sides along the inner periphery adjoining the compound wall, dig 1m. wide pit to a depth of 1.5 m. and fill it with 5 to 7.5 cm. sized pebbles let the rain water falling on the terrace flow into this pebble bed.
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (291)
(See rule 81(4))
RAIN WATER HARVESTING THROUGH SERVICE WELL CUM RECHARGE WELL

Provide well of 1.2 m dia for a depth of 10.0 m and divert the rainwater from the terrace into the well through rainwater down take pipes. Divert the rain water falling around the open space surrounding the building to the frontage where in a gutter is provided for a depth of 1.0 M and a width of 0.6 M with perforated slabs. The rain water collected in the gutter in front of the entrance is discharged into another recharge well of 1.2 M dia with 10.0 m. deep provided hereby through necessary piping arrangements.