4Rules not to apply to operational construction of the Government:-
(1) Nothing in these rules shall apply to-
(i) lands to which sub-section (4) of Section 1 of the Act applies; and
(ii) operational constructions.
392 (170)
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
Existing Building:-Nothing in these rules shall require the demolition, alteration or abandonment of a building existing on the date on which the relevant provisions of these rules come into force nor prevent continuance of the use or occupancy of an existing building unless in the opinion of the authority, such building or portion thereof constitute a hazard to the safety of the adjacent property or to the safety of the occupants of the building itself.
7Department of building permission and inspection-
(1) The Authority shall have a department of building permission and Inspection which shall be in the charge of an officer, having minimum qualifications prescribed in rule 26 for an Engineer or Architect or Town
मध्यप्रदेश राजपत्र, दिनांक 13 अगैल 2012
392 (171)
Planner and shall, for the purpose of these rules, be designated as Building Officer. The appointment of the Building Officer shall be subject to the approval of the Director, Town and Country Planning Department of the State Government or such other officer as the Director may specify for this purpose:
Provided that two or more local authorities may be permitted by the Director to have a common Building Officer on terms and conditions mutually acceptable to such local authorities:
Provided further that no officer below the rank of Assistant Director, Town and Country Planning may be appointed as Building Officer for the areas between Municipal Area and Planning Area limits:
Provided also that in the Towns classified as Class III and Class IV in the census and where these rules are in force, any Official with technical background may be appointed as Building Officer with the approval of Director, Town and Country Planning.
(2) The Authority shall appoint suitable number of Building Inspectors and other technical officers, having qualifications not less than those prescribed for supervisors in rule 26 to assist the Building Officer.
Power and duties of the Building Officer -
(1) The Building Officer shall enforce the provisions of these rules and all lawful orders or instructions issued pursuant thereto and shall act in any matter related to the mode or manner of construction, addition, alteration, repair, removal or demolition.
(2) The Building Officer shall -
(i) receive all applications for permission under rule 15 and may issue permission;
(ii) inspect the premises for which permissions have been issued and ensure compliance with these rules;
(3) The Building Officer may as and when necessary issue all necessary notices or orders to
(a) remove illegal or unsafe construction,
(b) require necessary safeguards during development or construction,
(c) require adequate exit facilities in existing buildings and
(d) ensure compliance with all the requirements of safety, health and general welfare of the public as contained in these rule.
392 (172)
Right of entry -The Building Officer or his duly authorized representative may, after giving previous notice, enter at any reasonable time in any building or premises to perform any duty imposed upon him by these rules:
Provided that in the case of any building used as a dwelling house, or upon any enclosed part of garden attached to such building, no such entry shall be made except between the hours of sunrise and sunset and without giving its occupiers at least 24 hours notice in writing of the intention to enter.
Inspection:- The Building Officer may make or cause to be made all the required inspections or he may accept inspection reports of persons authorized to prepare the same. All reports of inspections shall be in writing and duly certified by a responsible officer. The Building Officer may, after obtaining the approval of the authority engage any such person as he may deems appropriate to advise and report upon any unusual technical issues that may arise.
Constructions not according to plan - (1) if at any stage the Building Officer is of the opinion that construction is not proceeding according to the sanctioned plan or is in violation of any of the provisions of these rules or any other law for the time being in force, he shall notify the owner / applicant / occupier and thereupon all further construction not in conformity with these rules or any other law shall be stopped until correction has been effected and approved.
(2) If the owner / applicant / occupier fails to comply with the requirements at any stage of construction, the Authority may cancel the permission for building and shall cause notice of such cancellation to be served. If the owner / applicant is not traceable at his known address and there is no agent to receive the notice on behalf of the owner/ applicant the notice may be securely posted upon the said construction. Posting of such a notice shall be considered sufficient notification of cancellation to the owner/ applicant / occupier thereof.
Occupancy Violations:- Whenever any building is being used by any person contrary to provisions of these rules, the Building Officer may by order require discontinuance of such use of such building or portion thereof. Such person shall discontinue the use within ten days of the receipt of such notice or make the building or portion thereof comply with requirements of the rules.
392 (173)
Section 1.05 Part III- Permission and Inspection
6Alternative materials, methods of design and construction and tests-
(1) The provision of these rules are not intended to prevent the use of any material or method of design or construction which have not been specifically prescribed by these rules or the Code, but any such alternative must be approved by the Authority.
(2) The Authority may approve any such alternative provided it is of the opinion that the proposed alternative is satisfactory and that material, method or work offered is, for the purpose intended, at least equivalent to that prescribed in these rules or the Code as regards quality, strength, compatibility, effectiveness, fire and water resistance, durability and safety.
(3) Whenever there is insufficient evidence before the Authority of compliance with the provisions of these rules or the Code or evidence that any material or method of design or construction does not conform to the requirements of these rule or the Code or in order to substantiate claims for alternative materials, design or methods of construction, the Authority may require tests sufficiently in advance as proof of compliance. These tests shall be made by an approved agency at the expense of the owner or applicant.
(4) If there are no appropriate test methods specified in these rules or the Code, the Authority shall determine the test procedure.
(5) Copies of the results of all such tests shall be retained by the Authority for a period of not less than two years after the acceptance of the alternative material.
Section 1.03
Section 1.04 Part Ii-organisation and Enforcement
13Permission for Development or for Construction.
(1) Development or construction not to be without permission: No person shall carry out any development or erect, re-erect or make alterations or demolish any building or cause the same to be done without obtaining a prior permission in writing in this regard from the Authority.
Provided that no permission shall be required for :-
(a) opening and closing of a window or door or ventilator;
(b) providing inter-communication doors;
(c) providing partitions;
(d) providing false ceilings;
(e) gardening;
(f) white washing;
(g) painting;
(h) re-tiling and repairing of roof;
(i) plastering and patch work;
(j) re-flooring;
(k) constructions of sun shades on one's own land;
(I) re-erection of portions of buildings damaged by earthquake or other natural calamities, to the same extent and specifications as existed prior to such damage;
(m) re-erection of portion of buildings damaged by any other calamity, notified by the District Collector with the previous approval of the State Government, to the same extent and specification as existed prior to damage.
(ii) carrying out works in compliance with any order or directions made by any authority under any law for the time being in force;
(iii) carrying out works by any authority in exercise of its powers under any law for the time being in force;
392 (174)
मध्यप्रदेश राजपत्र, दिनांक 13 अग्रैल 2012
(iv) Any work carried out by the Central or the State Government or any local authority :-
(a) required for the maintenance or improvement of a highway, road or public street, being works carried out on land within the boundaries of such highway, road or public street;
(b) for the purpose of inspecting, repairing or renewing any drains, sewers, mains, pipes, cables, telephone or other apparatus including the breaking open of any street or other land for that purpose:
Provided that no work which would entail breaking open any street shall be undertaken without prior intimation to the Authority :
(v) The erection (including wells) made in the ordinary course of agricultural operation.
(vi)The construction of a road intended to give access to land solely for agricultural purpose;
(vii) The normal use of land which has been used temporarily for other purpose like marriage pandals or for festive occasions; and
(viii) In case of land, normally used for no purpose or occasionally used, for any purpose, the use of land for the other purpose or occasions, not involving permanent diversion or diversion for substantial period;
(2) In the case of a high rise building no permission shall be granted unless express clearance is given by the following site clearance committee :-
(A) Within Municipal Corporation area, the Site clearance committee shall consist of the Followings :
(1) Divisional Commissioner Chairman
(2) District Collector Member
(3). Superintendent of Police Member
(4) Municipal Commissioner Member
(5) Superintending Engineer Member
PWD (B&R)
(6) Divisional Engineer of the concerning Electricity Member Distribution Company.
(7) Fire Authority / Assistant Fire Officer Member
392 (175)
(8) Joint Director or Deputy Director or Assistant Member Director of the Town and Country Planning Secretary. Department having jurisdiction over the area
(B) Outside Municipal Corporation Area the Site clearance committee shall consist of the followings members :-
(1) Collector of District Chairman
(2) Chief Executive Officer of Zila Panchayat / Chief Municipal Officer of urban local body as the case may be, of the authority concern. Member
(3) Superintendent of Police or his nominee not below the rank of Deputy Superintendent of Police or city Superintendent of Police as the case may be. Member
(4) Concerning Executive Engineer of PWD (B&R) Member having jurisdiction
(5). Divisional Engineer of the concerning Electricity Member Distribution Company
(6) A representative of the Fire Authority or an officer not below the rank of Assistant fire Officer, Member
(7) Joint Director or Deputy Director or Assistant Member Director of the Town and Country Planning Secretary. Department having jurisdiction over the area.
(3) Both the permission for development and also the permission for building shall be necessary for commencement of building activities involving development of land as a composite building scheme.
Development / Building permission issued prior to these Rules: Any permission, sanction or approval given or order passed or any action taken or anything done in respect of the matters covered by these rules under any law or rule in force immediately before the commencement of these rules shall be governed in accordance with the provisions of law or rules under which such sanction or approval was given, order was passed or any action was taken or anything was done, as if these rules have not come into force:
392 (176)
Provided that at the time of application for renewal of such building permission fresh sanction under these rules shall be required for that part of the work which had not started and the same may be granted.
15Application for Development or Building permission:-
(1). Every person who intends to develop, erect, re-erect or make alterations in any land or building shall make an application in writing to the Authority in the form given in APPENDIX A-1 (where it is a case of Development Permission) or in APPENDIX A-2 (where it is a case of Building Permission). Such notice shall be accompanied by the documents, plans and statements in quadruplicate. The plans shall be in Ammonia print. In addition an electronic copy shall also be submitted. The electronic copy shall be prepared in such software as may be directed by the authority. One set of ammonia prints shall be cloth mounted which may be retained in the office of the Authority for record. The application shall be accompanied by documents, as prescribed along with copy of receipt of application fee.
(2) In case of building permission, the application shall also be accompanied by a certificate duly signed by Structural Engineer / Architect / Engineer / Supervisor of the building stating that all the provisions of Rule 88 (for Earthquake prone areas) has been complied with.
(3) Application for modification of permission
(a). The application for modifying a permission already granted under section 30 shall be submitted in form-M given in appendix-K along with the detailed information mentioned therein.
(b) The application shall be accompanied by the copy of receipt of fee prescribed in rule 21(2).
(c) The director shall examine the application so received and if satisfied, that the modification applied for, is not prima facie contrary to the provisions of the Act and the rules made therein, a public notice in form N given in appendix-K shall be issued. The director shall cause the said notice to be published in two prominent hindi news papers which are in wide circulation in the area in which the land is situated.
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (177)
(d). The public notice shall also be displayed on the notice board of the office of the concerned district collector, tehsildar, the local authority and also on the site.
(e) A copy of the notice shall also be sent by speed post to the persons who have been mentioned in the application as the interested persons.
(f) A copy of the notice shall also be sent by speed post to the persons who may have been mentioned in the application as ones who have encumbered any portion of the land.
(g) The director after the expiry of the period for receiving objections, suggestion and claims through the notice mentioned in sub-rule (c), (d), (e) and (f) herein above shall proceed to consider them in details
(h) The director in the process of considering the claims and objections, received if any, may call for any additional information from the applicant or the objector or any public authority as considered appropriate.
(i) After examining the objections and claims received and also the encumbrances the director may either
(1) accept it or
(2) reject the application for modification or
(3) accept it with such changes and with such conditions as considered necessary.
Provided that any modification which affects a plot or any built up area in respect of which the developer has executed a registered sale deed in favor of a particular person shall not be permitted.
However a modification which affects a plot or any built up area, in respect of which an agreement to sell or an advance booking has been made, may be allowed provided that the person with whom such agreement was entered into or in whose favor such advance booking was made gives his consent for said modification in writing to the director.
392 (178)
Provided also that any portion of the land or building which may have been mortgaged or on which any lien exist shall not be subject to any modification of any kind.
(j). In case the director decides to modify the plan under sub rule (3) (i)(1) or (3)(i)(3) herein above the applicant shall have to pay a permission fee equal to 50% of the amount payable under rule 21(3)(a). However, no permission fee shall be payable if the modification does not involve any change in the approved layout.
(4) Application for development permission under section 16(1)
An application under section 16(1) shall be submitted in the form appendix A-1 prescribed under rule 15 and shall contain all the documents mentioned therein.
(a) Every application referred to in sub rule (1) shall be accompanied by the application fees as prescribed under rule 21(2) and a copy of receipt of such payment shall be attached with the application. An application received without such receipt shall be deemed invalid and hence rejected.
(b) The applicant shall pay a permission fee as prescribed in rule 21(3) (a) before the permission is issued.
The director after examining the application may either
(a) accept the application or
(b) reject the application or
(c) accept the application with such changes and with such conditions as considered appropriate.
(1) Development permission under section16(1) shall not be granted if the land is situated in such area where:
(a) sufficient means of access have not yet been developed or proposed
(b) the activity proposed in the application is not
(1) proposed in the published draft development plan or
392 (179)
(2) compatible with the structural plan or a broad outline of the draft plan under consideration.
(3) Conducive to the environmental requirements of the area
(4) compatible with those prevalent around it.
(5) violates any specific instruction issued by the Director in this regard.
16 Earthquake proofing
In addition to the provisions contained in rule 15, the certificates as indicated in APPENDIX A-3, A-4, A-5, A-6, A-7 and A-8 shall be submitted duly signed by the Builder, Architect and Structural Engineer where the land is situated in earthquake prone areas. In case of larger buildings having more than 500 sq. m. built up area or incase of more than 3 storied buildings, the certificates as per APPENDIX A-9, A-10 and A-11 shall be filled in and signed separately by Builder, Architect and Structural Engineer respectively and submitted on its completion.
17Information accompanying Application –
(a) The Application in Appendix A-1 shall be accompanied with application fee, Key Plan, Site Plans, Sub Division / Layout Plan, Service Plans, Project Report out lining the proposed Development, Documents showing proof of ownership or of any legal right in relation to the site, Nazul NOC, proof of the applicant having been authorized by the owner to submit this application (if applicant is not the owner), demarcation report of revenue official, Parking Plans along with parking calculations and certificate of supervision as prescribed in sub-rule (2) to (12).
(b) The Application in Appendix A-2 shall be accompanied with application fee, Key Plan ; Site Plans, Sub Division/Layout Plan approved under section 30 of Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam 1973, Building Plans, Service Plans, Project Report out lining the proposed Development, Documents showing proof of ownership or of any legal right in relation to the site, Nazul NOC, Proof of the applicant having been authorized by the owner to submit this application (if applicant is not the owner), Parking Plans along with parking calculations and certificate of supervision as prescribed in sub-rule (2) to (12).
(2) Drawing Sheet Sizes. :-
392 (180)
(a) the size of drawing sheets shall be any of those specified in Table- k
TABLE- I
Drawing Sheet Sizes
[Rule 17 (2) (a)]
S.No.
Designation
Trimmed sizeIn mm.
Untrimmed SizeIn mm.
(1)
(2)
(3)
(4)
1.
A0
841X1,189
980X1,230
2.
A1
594X841
625X880
3.
A2
420X594
450X625
4.
A3
297X420
330X450
5.
A4
210X297
240X330
6.
A5
148X210
165X240
(b) Recommended Notation for Colouring Plans:- The plans shall be coloured as specified in Table-2.
392 (181)
TABLE-2
a) Colouring of Plans
[Rule 17(2)(b)]
S.No.
Item
Article II.
Site Plan
(a) Building Plan
White Plan
Ammonia Print
White Plan
Ammonia Print
1
2
3
4
5
6
1.
Plot Lines
Thick black
Thick black
Thick black
Thick black
2.
Existing street
Green
Green
-
-
3.
Future street, (if any)
Green Dotted
Green Dotted
-
-
4.
Permissible building lines
Thick dotted black
Thick dotted black
Thick
-
Open spaces
No colour
No colour
No colour
No colour
1
2
3
4
5
6
6.
Existing work
Black (out line)
Blue
Black
Blue
392 (182)
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
7.
Work proposed to be demolished
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
8.
Proposed work (see Note-1)
Red filled in
Red
Red
Red
9.
Drainage and Sewerage Work.
Red Dotted
Red Dotted
Red Dotted
Red Dotted
10.
Water Supply work
Black Dotted
Black Dotted
Black Dotted
Black Dotted
Thin
Thin
Thin
Thin
Note 1: This need not be done for entirely new construction. However for extension of an existing work this shall apply..
Note 2: For land development, Sub-division, Layout, suitable coloring notations duly indexed shall be used.
(3) Key Plan.- A key plan drawn to a scale of not less than 1 in 10,000 shall be submitted along with the application for permission for a development / building showing the boundary locations of the site with respect to neighborhood landmarks. The minimum dimension of the key plan shall be not less than 75 mm.
(4) Site Plan.- The site plan submitted with an application for permit shall be drawn to a scale of not less than 1 in 1000 for site up to ten hectares and not less than 1 in 2000 for a site more than ten hectares and shall show:-
(a) the boundaries of the site with dimensions and of any contiguous land belonging to the applicant indicating Khasra number or any other equivalent local denominations and in case the contiguous land owned by the applicant had been sub-divided earlier, public facilities provided in it and all streets within it opening out in the site for which the permission is being sought;
(b) the position of the site in relation to neighboring street
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (183)
(c) the name of the street in which the building is proposed to be situated, if any:
(d) all existing buildings on, over or under the site including service lines;
(e) the position of the building, and of all other buildings (if any) which the applicant intends to erect upon his contiguous land referred to in (a) in relation to:-
(i) the boundaries of the site and in case where the site has been partitioned, the boundaries of the portion owned by the applicant and also of the portions owned by others;
(ii) all adjacent streets, buildings (with number of storeys and height) and premises within a distance of 12 m of the site and of the contiguous land (if any) referred to in (a); and
(iii) if there is no street within a distance of 12m of the site, the nearest existing street.
(f) the means of access from the street to the building, and to all other buildings (if any) which the applicant intends to erect upon his contiguous land referred to in (a):
(g) space to be left about the building to secure a free circulation of air, admission of light;
(h) the width of the street (if any) in front and of the street (if any) at the side or rear side of the buildings;
(i) the direction of north point relative to the plan of the buildings;
(j) the position of all existing features like high.tension line, telegraph and electrical poles / lines , underground pipe lines, trees, grave yards, religious buildings, railway lines, etc. within a distance of 30 meters from the nearest edge of the site, all major physical features of land proposed to be developed which include the approximate location and size of any water body, flood affected areas and contours at an interval of 0.3 meters in case of the site which has a slope more than 1 in 20;
(k) present and proposed use of the land; and
(I) such other particulars as may be prescribed by the Authority;
(5) Sub-Division / Layout Plan:- In case of development work, the application shall be accompanied by the sub-division / layout plan which shall be drawn on a scale of not less than 1:500 containing the following :-
392 (184)
मध्यप्रदेश राजपत्र, दिनांक 13 अर्गैल 2012
(a) scale used and north point;
(b) the location of all proposed and existing roads with their existing proposed / prescribed width within the land;
(c) dimensions of plot along with building lines showing the setbacks with dimensions within each plot;
(d) the location of drains; sewers, public facilities and services, and electrical lines, etc.
(e) table indicating size, area and use of all the plots in the sub-division / layout plan, along with MOS, FAR, Ground Coverage, Building Height, Occupant load;
(f) a statement indicating the total area of the site, area utilised under roads, open spaces for parks, playgrounds, recreation spaces and proposed layout-plan including reservations such as schools, shopping and other public places (if provided for) along with their percentage with reference to the total area of the site proposed to be sub-divided; and
(g) in case of plots which are sub-divided in built-up areas in addition to the above, the means of access to the sub-division from existing streets;
(h) in all layouts of any kind of development having area of 2 hectares or more, rainwater harvesting measures shall be compulsory.
(6) Building Plan:-
(i) The Plan, elevation and section of the building shall preferably be drawn to a scale of 1 :100. The plan shall :-
(a) include floor plans of all floors together with the covered area clearly indicating the size and spacing of all framing members and sizes of rooms and the position of staircases, ramps and lift wells
(b) show the use of occupancy of all parts of the building;
(c) show exact location of essential services, for example, water closet, sink, bath including the water supply and drainage line;
(d) include sectional drawing showing clearly the size of footings, thickness of basement wall, wall construction, size and spacing of framing members, floor slabs and roof slabs with their materials and size and locations of doors, windows and
392 (185)
other openings. The section shall indicate the height of building and rooms and also the height of the parapets and the drainage and the slope of the roof. At least one section should be taken through the staircase;
(e) schedule showing calculations and designs in respect of RCC work, if any, involving structural engineering such as roof, slabs, columns, frame etc.
(f) . show elevation of front and sides;
(g) indicate details of served privy, if any;
(h) give dimensions of the projected portions beyond the permissible building line;
(i) include terrace plan indicating the drainage and the slope of the roof;
(j) give indications of the north point relative to the plan, and the scale used;
(k) schedule of built-up area floor-wise, F.A.R, proposed schedule of setbacks and coverage; and
(I) for commercial building, indicate the placement and size of display boards;
(ii)
Building Plan for High rise / Special buildings :- For high rise buildings and for special buildings like educational, assembly institutional, industrial, storage and hazardous and mixed occupancies with any of the aforesaid occupancies having area more than 500 square meters the following additional information shall be furnished or indicated in the Building Plan in addition to the items given in item (i) above as applicable:
(a) access to fire appliances/vehicles with details of vehicular turning circle and clear motorable access way around the building;
(b) size (width) of main and alternate staircase along with balcony approach, corridor, ventilated lobby approach;
(c) location and details of lift enclosures ;
(d) location and size of fire lift;
(e) smoke stop lobby/door, if provided;
392 (186)
(f) refuse chutes, refuse chamber, service duct;
(g) vehicular parking space;
(h) refuse area, if any;
(i) details of building services, like : Air-conditioning system with position of fire dampers, mechanical ventilation system, electrical services, boilers, gas pipes, water/ sewage treatment plants ;
(j) details of exits including provision of ramps, etc. for hospitals and special risks;
(k) location of generator; transformer and switch gear room;
(I) smoke exhauster system, if any;
(m) details of fire alarm system and net work;
(n) location of centralized control, connecting all fire alarm system, built-in-fire protection arrangements and public address system, etc
(o) location and dimensions of static water storage tank and pump room along with fire service inlets for mobile pumps and water storage tank;
(p) location and details of fixed fire protection installations such as sprinklers, wet risers hose-reels, drenchers, carbon-di-oxide installations, and
(q) location and details of first aid fire fighting equipment or installations.
(iii) Additional Information in case of High Rise Buildings:
In respect of high rise buildings, the following additional information shall be given;
(a) (i) Urban Planning;
- Land use as per Development Plan
- Land use as per Zonal Plan (if any)
- Land use as per Layout Plan (if any)
- Proposed density;
392 (187)
(b) Traffic Planning;
- Width of existing road
- Width of proposed road
- Provision of entry and exist.
- Provision of service road.
- A comprehensive circulation plan of the plot and of its adjoining areas.
- Arrangements for parking vehicles;
(c) Fire prevention, fighting and protection Planning ;
- Details of fire detection and fire fighting arrangement.
(d) Planning of Services:
- Internal Water, sewerage, drainage, power, telecommunication, garbage disposal and cleaning of common spaces.
- Peripheral water, sewerage, drainage, power.
- Trunk water, sewerage, drainage, power, telecommunication and garbage disposal.
(e) Architecture:
- Plans of each floor
- Necessary number of cross sections.
- Elevation of each sides.
- Details of toilet blocks and kitchen
- Details of landscaping and tree plantation ;
- System of power connections from Electric poles, Telephone poles, Dust bins numbering, parking of different vehicles, covering of drains, over-head tanks, underground water tank.
(7) Service Plan. - Plans, elevations and sections of water supply and sewerage disposal system, if any, shall also be indicated. In case of
392 (188)
building having more than three stories, elevation and scheme of the services shall also be included.
(8) Specification.
(i) Specifications both general and detailed, giving type and grade of materials to be used, duly signed by the licensed architect, structural engineer, engineer, supervisor or town planner, as the case may be, shall accompany the application.
(ii) Every application for permission for sub-division of land shall also be accompanied by the following statements:-
(a) a statement contained general specifications of all improvements proposed to be made within the area e.g. grading and paving of roads and lanes, provision of gutters, side drains, provisions for sufficient, safe and assured water supply, arrangement of sewage disposal, street lighting and development of parks and Play-fields and public utility;
(b) the purpose for which land is to be used and particulars of proposed distribution of land under different purposes;
(c) general specifications of the material to be used, estimated cost of the proposed development of the area; and
(d) any other statement required by the Authority.
(9) Supervision: - The application shall be further accompanied by a certificate in form given in APPENDIX-B by the licensed architect, structural engineer, engineer, supervisor or town planner, as the case may be undertaking the supervision.
(10) Certificate of structural design:- In high rise buildings, a certificate about structural stability duly signed by a structural engineer, along with all relevant calculations shall accompany the application.
(11) Proof of title etc.- Every application shall be accompanied by the following as evidence of applicant's right, title or interest in the land or plot, namely :-
(a) attested copy of the sale deed, lease deed, or any other document under which right, title or interest in land or plot is claimed;
(b) attested copy of the khasra plan and khatauni record, if any;
(c) attested copy of No Objection Certificate from Nazul
Provided that in case the No Objection Certificate for the entire approved layout has been taken from the concerned Nazul Authority; Individual plot owners in the layout shall not be required to submit Individual No Objection Certificates from the Nazul authority,
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (189)
Provided also that No Objection Certificate from the concerned Nazul authority shall be required only for the first application to erect, re-erect or construct a building. In no case shall a No Objection Certificate from the concerned Nazul authority for construction of the upper floors be required if the Ground floor has already been approved earlier by the Authority.
(d) other document that may be considered necessary by the Authority. In case of lease hold plots, the lessee shall have to prove that he is entitled to construct on the lease hold plot.
(e) Authorisation of owner, if applicant is not the owner.
(12) For buildings which need the approval of the Art Commission, if constituted under rule rule 35, such approval shall accompany the application.
(13) In any area designated for agricultural use, Farm houses shall be permissible subject to the following conditions and such other conditions as may be imposed by the authority :-
(i) Minimum size of the plot shall be 0.40 hectare
(ii) Maximum F.A.R. shall be 0.10
(iii) The maximum height of structure shall be 7.5 meters with sloping roof.
(iv) The Farm House shall have a @ 250 live trees per hectare to be planted before the application for building constructions is made to the Authority for approval.
(v) The Farm House shall only be permitted on that land which is accessible by road having width not less than 7.5 meters.
(vi) The Farm House shall have minimum 10 meters set back from all side.
Preparation and signing of plans:- The licensed architect, structural engineer, engineer, supervisor or town planner as the case may be, shall prepare and duly sign any plans and shall indicate his name, address, qualifications and license number and it's validity. The plans shall also be duly signed by the owner/ applicant indicating his address. The type of plans / buildings that can be undertaken by the licensed professionals shall be as given in rule 26.
Application for alteration:- When the application is for an alteration of the building, only such plans and statements, as may be necessary, shall accompany the application.
Application for construction of building where land adjoins the Government Property:- In case of an application for erection, re-erection or alteration in
392 (190)
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
a building or any structure abutting on property maintained by Public Works Department, Military or other Government Departments, the application and plan shall be in sufficient numbers to enable the Authority to forward one set each to the appropriate department for report before the permission is granted. The Government Department shall report to the authority within two weeks from the date of the receipt of the notice and plans whether or not they have any objection to the proposed construction, and give brief reasons for objection, if any. If no reply is received within two weeks or within such further period as may be extended by the Authority, from the Government Department, the authority shall be free to consider the question of sanctioning the plan.
Part IGeneral
Madhya Pradesh Bhoomi Vikas Niyam (Land Development Rules) - statewide DC framework (Bhopal, no city-specific DCR)
2012 · PDF page 159
Hover any section to copy its link or text, ask Copilot about it, or bookmark it.
Short Title – (1) These rules, may be called the Madhya Pradesh Bhumi Vikas Niyam, 2012.
(2) These rules shall come into force from their publication in the Official Gazette.
Definitions – In these rules, unless the context otherwise requires-
(1) "accessory use" means any use of the premises subordinate to the principal use and customarily incidental to the principal use;
(2) "Act" means the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (No. 23 of 1973);
(3) "alteration" means a change from one occupancy to another or a structural change, such as an addition to the area or height or the removal of part of a building or any change to the structure such as the construction of or cutting into or removal of any wall, partition, column, beam, joist, floor or other support or a change in or closing of any means of ingress or egress or a change of the fixtures or equipment;
(4) “approved” means approved by the Authority having jurisdiction or power;
(5) "Authority having jurisdiction" (hereinafter referred to in these rules as "Authority") in relation to development and building activities means,
392 (158)
(a) the Director of Town & Country Planning or any other officer authorized by him in this behalf for granting permission for development of land in Planning and non-planning area. The development of land includes,-
(i) making material change in land including its sub division and change in its use in terms of occupancy;
(ii) construction of any type of building.
(b) the Municipal Corporation or Municipal Council or Nagar Panchayat, as the case may be, or an officer authorized by or under the relevant Municipal Law or the Gram Panchayat or such other authority or officer so authorized under the Madhya Pradesh Panchayati Raj Adhiniyam, 1993 (No. 10 of 1994) for granting permission for construction/ alteration, demolition of building in planning area and non-planning area falling within their respective jurisdictions.
Explanation - (1). The expressions "Municipal Corporation" or "Municipal Council" or Nagar Panchayat whenever the context so requires shall include the Administrator referred under section 423 of the Madhya Pradesh Municipal Corporation Act, 1956 (No. 23 of 1956) or "the person or committee of persons" appointed by the State Government under section 328 or Section 337 of the Madhya Pradesh Municipalities Act, 1961 (No. 37 of 1961);
(2) The expressions "Gram Panchayat" whenever the context so requires shall include the "the person or committee of persons" appointed by the State Government or the prescribed authority under clause (b) of sub-section (3) of section 87 of The Madhya Pradesh Pachayati Raj Evam Gram Swaraj Adhiniyam, 1993 (No. 1 of 1994);
(6) "balcony" means a horizontal projection, including a handrail or balustrade, to serve as passage or a sitting out place;
(7) “basement” means that part of the building which has been constructed below the plinth level. However, in certain cases, where the topography of the site permits, the part of the building below the ground or reference level could also be called the basement;
(8) “building activities” means,—
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (159)
(a). erection, re-erection, making material alteration and demolition of any building;
(b) development of land as a composite building scheme and corporate development;
(c) development and redevelopment of any tract of land which includes division and sub-division into plots or various land uses within a colony;
Note - (1) In all the above three cases, the development permission shall be granted or refused, as the case may be, by the Director of Town and Country Planning;
(2) The building permission shall be granted or refused by Municipal Corporation or Municipal Council or Nagar Panchayat or Gram Panchayat as the case may be, within their respective jurisdictions;
(9) "building height or height of a building" means the vertical length of the building which shall be measured from a ground or reference level. Such ground or reference level would be at the centre point of frontage of the plot or land from which the access is being taken. If the site is sloping, the reference level will be taken at the centre line of the existing or proposed approach road or street in front of the plot or land from which the access is being taken or the average level of the plot, whichever is higher. The part of the building below ground or reference level shall be considered as basement. The height of the Machine rooms, mumptee, stilt floors, podiums, service floors, parking floors shall not be included in the calculation of building height.
The following appurtenant structures shall not be included the calculation of the height of a building if the aggregate area of such structures do not exceeds one-third of the area of roof of the building upon which they are erected,—
(a) tanks and their supports;
(b) chimneys, ventilating, air-conditioning, lift rooms and similar service equipment;
(c) temporary shade for plants; and
(d) parapet walls and architectural features not exceeding 1.5 meter in height;
(10) “building line” means the line up to which the plinth of a building may lawfully extend on the side, which abuts the street or an extension of a street or a strip of land ear-marked or reserved for future construction of street and such line has been so prescribed in the
392 (160)
मध्यप्रदेश राजपत्र, दिनांक 13 अर्गैल 2012
approved plan or co-ordination plan or the scheme by the Authority. The building line may be changed from time to time by the Authority;
(11) “chhajja” means a sloping or horizontal structural overhang usually provided over opening on external walls to provide protection from sun and rain and includes architectural extension;
(12) “chimney” means an upright shaft containing and encasing one or more flues provided for the conveyance to the outer air of any product of combustion resulting from the operation of any heat producing appliances or equipment, employing solid or liquid or gaseous fuel;
(13) “chowk or courtyard” means a space permanently open to sky, enclosed fully or partially by building and may be at ground level or any other level within or adjacent to a building;
(14) “chowk inner” means a chowk enclosed on all sides;
(15) "chowk outer" means a chowk where at least one of its sides is not enclosed;
(16) "clear height" means the vertical distance measured from the finished floor surface to the underside of the beam that support the ceiling;
(17) "Code" means the National Building Code of India (NBC) as published by the Bureau of Indian Standards (BIS);
(18) “conversion” means the change of occupancy of premises to any occupancy or use requiring additional occupancy permit;
(19) "corner site" means the change of occupancy of premises to any occupancy or use requiring additional occupancy permit;
(20) “covered area or ground coverage” means the area of the land covered by the plinth of the building at the ground floor level. This shall exclude the area of the plinth not covered by roof at top. Cantilevered projection equal to floor height, but restricted to the extent of 4.5 meters at the slab level with clear height for vehicular / pedestrian movement shall not be included in the covered area. The areas covered by the porch, service ducts, private garage not exceeding 25 sq. meters on ground floor, podium, stilt, staircase, fire escapes, ramps, mechanized parking areas, refuse chutes, two watchmen huts and one pump room each not exceeding 6 sq meters, atrium if not used for commercial activities and lift wells shall not be included in the covered area;
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (161)
(21) "Cul de Sac" means a lane, one end of which terminates as a dead end providing no further access;
(22) “density” means the residential density as expressed in terms of number of dwelling units per hectare.-
Explanation,- (1) Where such densities are expressed as exclusive of community facilities and provision for open spaces and major roads (excluding incidental open spaces), these shall signify net residential densities. Where these densities are expressed after taking into consideration the required open provision for space and community facilities and major roads, these shall signify gross residential, as the case may be, densities on neighborhood level, sector level or town level. The provision of open spaces and community facilities shall depend on the size of the residential community;
(2) Incidental open spaces are mainly open spaces required by these rules to be left around and in between two buildings to provide lighting and ventilation;
(23) “Development Authority” means a Town and Country Development Authority established under section 38 of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 (No. 23 of 1973) or a Special Area Development Authority constituted under section 65 of the said Act;
(24) “drain” means a line of pipes including all fittings and equipments, such as manholes, inspection chambers, traps, gullies and floor traps, used for the drainage of a building or a number of buildings or yards appurtenant to building, within the same cartilage and shall include open channels used for carrying surface water;
(25) “drainage” means the removal of any liquid by a system constructed for this purpose;
(26) “dwelling unit (tenement)” means an independent dwelling unit with separate facilities for living, cooking and sanitary requirement;
(27) "exit" means a passage, channel or means of egress from any building stories or floors area to a street or other open space of safety;
(28) "Farm House" means a house in such areas and built subject to such conditions as specified in sub-rule (13) of rule 17;
392 (162)
मध्यादेश राजपत्र, दिनांक 13 अपैल 2012
(29) "floor" means the lower surface in a storey on which one normally walks in a building. The general term, "floor" unless otherwise specially mentioned shall not refer to a "Mezzanine Floor";
Note: - The sequential number of floor shall be determined by its relation to the determining entrance level. For floors at or wholly above ground level with lowest floor in the building with direct entrance from the road or street shall be termed as ground floor. The other floors above floor 1 shall be numbered in sequence as floor 2, floor 3 and so on, with numbers increasing upwards.
(30) "Floor Area Ratio" means the ratio of total built up area in a building on all floors to the total plot area of the land in question. The built up area shall mean the total built up area on all floors excluding the area under lift wells, service ducts, machine room for lifts, water tanks, escalator, lift lobby, fire escapes, ramps, refuse chutes and service ducts, pump room, mezzanine floor, parking areas, parking floors, mechanized parking areas, porch, service floors, podiums, private garage (not exceeding 25 sq. mtrs.), servant quarter(not exceeding 25 sq. mtrs.), basement subject to the provision of rule 76, corridors, arcades, lobbies, mumptee, staircases, one entrance lobby or foyer on ground floor (provided that in commercial use premises, the area of such foyer or entrance lobby which exceeds 20% of permissible ground coverage shall be counted in the FAR), atrium which is not used for commercial activity, pump room and two watchmen hut each not exceeding 6 sq meters, but shall include covered projections exceeding the limits prescribed under rule 58. If the built form below the ground or reference level is used as habitable accommodation because of the existing topography such area may be permitted as habitable area and shall be counted in the Floor Area Ratio;
(31) "Fire Separation" means the distance in meters measured from any other building on the site or form other site, or form the opposite side of a street or other public space to the building;
(32) "Foundation" means a part of structure which is in direct contact with and transmits loads to the ground;
(33) "front open space" or front marginal open space (FMOS) means an open space across the front of a plot;
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (163)
(34) "ground level" means the level at the centre line of the existing or proposed approach road or street in front of plot or land. If the site is sloping, this will be taken at the centre point of frontage of plot or land or at the centre line of approach road or street from which the access is being taken or the average level of the plot whichever is higher;
(35) "group housing" means housing of a number of dwelling units on an undivided plot of land, built compositely and integrally where land and building (excluding individual units) are held jointly, buildings and services are maintained jointly and the construction is undertaken by one Agency/ Authority/ Individual;
(36) "habitable purpose" means a built space being occupied or designed for occupancy by one or more persons for study, living, sleeping, eating, cooking purpose but shall not include bath-rooms, water closet compartments, laundries, serving and storage pantries, corridors, sellers, attics and spaces that are not used frequently or during extended periods;
(37) "habitable room" means a room occupied or designed for habitable purpose;
(38) "high rise building" means a building,-
(a) which consists of more than ten stories; or
(b) which has a height of more than 30 meters"
Note: The height of the building means the height defined and calculated in accordance with sub-rule (9) of rule 2.
(39) "ledge or tand" means a shelf like projection, supported in any manner whatsoever, except by means of vertical supports within a room itself but not having projection wider than one meter;
(40) "Licensed Architect/ Structural Engineer/Engineer/ Town Planner/ Supervisor Group" means respectively a qualified Architect/ Structural Engineer/ Engineer/ Town Planner/ Supervisor Group who, where necessary, has been licensed as such by the Authority;
(41) "lift or escalator" means an appliance designed to transport persons or materials between two or more levels in a vertical or substantially vertical direction by means of a guided platform;
(42) "loft" means an intermediary floor between two floors which is constructed for storage purposes;
392 (164)
(43) "mezzanine floor" means an intermediate floor, between ground floor and first floor;
(44) "multiplex" means such building in which separately two or more cinema halls are installed separately with or without shopping area which shall be called multiplex cum-shopping;
(46) "occupancy or use group" means the principal occupancy for which a building or a part of a building is used or intended to be used for the purpose of classification of a building according to occupancy, an occupancy shall be deemed to be included as subsidiary occupancies which are contingent upon it.
Explanation.- The occupancy classification shall be as under:-
(i) "residential buildings" include any, building in which sleeping accommodation is provided for normal residential purposes with or without cooking or dining or both facilities. It includes single or multi-family dwellings, lodging or boarding houses, dormitories, apartment houses and flats;
(ii) “educational buildings” include any building used for school, college or day-care purposes involving assembly for instruction, education or recreation incidental to educational buildings;
(ii) "institutional building" include any building or part thereof which is used as hospitals; sanatoria, custodial institution, penal institutions like jails, prisons, Legislative Assembly Building, Governor House, Universities, Embassy Buildings, Stock Exchange, Insurance Building, Banks, Society, Non Governmental Organisation, Financial Institutions, Social Institutions, Religious Institutions, Office Buildings (Government /Semi-Government/ Private) and such other purposes;
(iv) "assembly building" include any building or part of a building where groups of people congregate or gather for amusement, recreation, political, social, religious, civil, travel and similar purposes for example theatres, motion picture houses, assembly hall, auditoria, exhibition halls, museums, skating rinks, gymnasium, restaurants, place of worship, dance halls, club room, passengers stations and terminals of air, surface and other public transportation services, recreation piers and stadium;
मध्यप्रदेश राजपत्र, दिनांक 13 अगैल 2012
392 (165)
(v) "mercantile Building" means any land or building or part thereof which is used for the purpose of carrying on any trade, business or profession or sale or exchange of goods or services of any type whatsoever with a view to making profit and also includes the use of any land or buildings for storage of goods or as an office or as hotel and includes any building or part of a building which is used as multiplex, shops, stores, markets, for display and sale of merchandise either wholesale or retail. Storage and service facilities incidental to the sale of merchandise and located in the same building shall be included under this group.
(vii) "industrial building" means any building or part of a building or structure, in which products or materials of all kinds and properties are fabricated, assembles or processed and include assembly plants, laboratories, power plants, smoke houses, refineries, gas plants, mills, dairies, factories.
(viii) "Storage Building" means any building or part of a building used primarily for the storage or sheltering of goods, wares or merchandise and includes warehouses, cold storages; freight depots transit shade, store houses, public garages, hangers, truck terminals, grain elevators,
(ix). "Hazardous building" means any building or part of a building which is used for the storage, handling, manufacture or processing of hazardous substances as defined under the applicable law.
(46) "Occupier" includes any person who for the time being is paying or is liable to pay rent or compensation or premium on account of the occupation of such building or any portion of the building and also includes a rent-free tenant, but does not include a lodger, and the words "occupy" and "occupation" shall be construed accordingly;
(47) "Open space" means an area forming an integral part of the plot left open to sky.
(49) "Rear open space" or Rear Marginal open space (R MOS) means an open space across the rear of a plot between the rear of the building and the rear boundary of the plot;
392 (166)
(50) "Side open space" or Side Marginal open space (S MOS) means an open space across the side of the plot between the side of the building and the side boundary of the plot;
(51) "Operational Construction" means a construction put up by Government Department for operational purposes;
(52) "Owner" means the owner as defined under section 2(n) of the Act
(53) "Parapet" means a low wall or railing built along the edge of a roof or a floor;
(54) "Parking Floor" means a floor designed for the use as a parking space.
(55) "Parking space" means an area enclosed or unenclosed, covered or open, sufficient in size to park vehicles together with a driveway connecting the parking space with a street or an alley and permitting ingress and egress of the vehicle;
(56) "Permission" means an authorization in writing by the authority to carry out work of development or building and regulated by these rules, which otherwise would be unlawful;
(57) "Plinth" means the portion of the structure between the surface of the surrounding ground and surface of the floor immediately above the ground;
(58) "Plinth area" means a built up covered area measured at the plinth level;
(59) "Podium" means the over-ground covered parking space which is necessarily built over the ground coverage but does not extend into the prescribed minimum open spaces of the plot.
Explanation: Such parking space shall be called a stilt if it is within the limits of ground coverage.
(33) "Porch" means a space that may be covered by cantilevered projection or simply supported structure at lintel level or slab level or podium level which is open from three sides and is intended to be used for parking of vehicles, picking / dropping of passengers. Such area shall not be counted in ground coverage and FAR.
(34) "Private Garage" means a building not exceeding 25 sq. mtrs. whether permanent or temporary or a portion thereof designed and used for parking of privately owned mechanically propelled motor vehicles (of any description or other vehicles, in either case in private ownership);
मध्यप्रदेश राजपत्र, दिनांक 13 अर्गैल 2012
392 (167)
(35) "Public Garage" means a building or portion thereof, other than a private garage, designed or used for repairing, servicing, hiring, selling or storing or parking of motor vehicles of any description or other vehicles;
(60) "Room height" means a vertical distance measured from the finished floor surface to the finished ceiling surface. Where a finished ceiling is not provided, the underside (bottom) of joists or beams or tie-beams shall determine the upper point of measurement;
(61) "Clear height" means the vertical distance measured from the finished floor surface to the underside of the beam that supports the ceiling;
(62) "Row housing / Row type building" means a row of buildings with only front and rear MOS or interior open spaces;
(63) "Sanctioned Plan" means the set of plans and specifications related to the development of land or construction of buildings which has been duly approved and sanctioned by the authority
(64) "Semi-detached Building" means a building detached on three sides;
(65) "Service Floor" means a covered floor specially provided for diverting / repairing / managing the building services like electric / sewage / water supply / drainage / air conditioning lines and does not extend beyond the limits of the floor immediately below.
(66) "Service lane" means a road / lane provided at the rear or side of a plot for service purpose;
(67). "Set back line" means a line laid down in each case by the authority usually parallel to the plot boundaries beyond which nothing can be constructed towards the site boundaries;
(68) "Site" means a parcel of land enclosed by definite boundaries proposed for definite purpose;
(69) "Corner site" means a site at the junctions of two or more intersecting street;
(70) "Site interior or tandem" means site, access to which is by a passage from a street, whether such passage forms part of site or not;
392 (168)
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
(71) "Storey" means the portion of a building included between the surface of any floor and the surface of the floor next above it or if there be no floor above it, then the space between any floor and the ceiling next above it;
(72) "Street" means any means of access, namely, highway, street, lane pathway, alley, stairway, passageway, carriageway, footway, square place or bridge, whether a thoroughfare or not over which the public have a right of passage or access or have passed and had access uninterruptedly for a specified period whether existing or proposed in any sanctioned plan or co-ordination plan or Development / Zoning Plan and includes all bunds, channels, ditches, storm water drains, culverts, sidewalks, traffic islands roadside trees and hedges retaining walls, fences barriers and railings within the street lines;
(73) "Street level or grade" means the officially established elevation or grade of the central line of the street upon which a plot fronts and if there is no officially established grade, the existing grade of the street at its mid-point:
(74) "Street line" means the line defining the side limits of a street ;
(75) "To erect" or "to erect a building" means-
(a) to erect a new building on any site whether previously built upon or not;
(b) to re-erect any building of which portions above or below the plinth level have been pulled down, burnt or destroyed; and
(c) conversion from one occupancy to another ;
(76) "To abut" a plot or land or building is said "to abut" a road or a street, if a portion of the plot or land or building touches the road or street edge;
(77) "Travel distance" means distance from the remotest point on a floor of a building to a place of safety, whether it is vertical exit, or a horizontal exit to an outside exit measured along the line of travel;
(78) "Verandah" means covered area in residential building with at least one side open
(79) "Water closet (WC)" means a privy with arrangement for flushing the pan with water;
(80) "Window" means an opening other than a door to the outside which provides all or part of the required natural light or ventilation or both to an interior space.
392 (169)
(81) "Subway" means a passage constructed under the ground for the movement of the pedestrians or vehicles or both
(82) "Skyway" means a structure built overground, whether covered or uncovered, which connects two or more buildings and is used for pedestrian movement. The height of the skyway above the ground shall depend upon use of the passage underneath.
(83) "Shopping Mall" means integrated Multi-storied shopping centre where commercial activity is carried out along with sufficient public spaces, amenities, security arrangement and parking as required in these rules.
(84) "Open Mall" means a building or group of buildings where commercial activity is carried out along with storage, godown, logistics, administrative facility, parking (open or covered), & security arrangement..
Applicability of the rules:-(1) Where land is to be developed or redeveloped into sub-divisions, plots or colonies, the rules shall apply to all the modifications to the land layout.
(2) Where a building is erected, the rules shall apply to the design and construction of the building.
(3) Where the whole or any part of the building is demolished, the rules shall apply to all parts of the building whether removed or not.
(4) Where the whole or any part of the building is demolished, the rules shall apply to any remaining part and to the work involved in demolition.
(5) Where a building is altered the rules shall apply to the whole building whether existing or new, except that the rules shall apply only to part if that part is completely self contained with respect to facilities and safety measures.
(6) Where the occupancy of a building is changed, the rules shall apply to all parts of the building affected by the change.
21Fees:
(1) Every application referred to in rule 15 shall be accompanied by application fees as prescribed under sub rule (2) and an attested copy of receipt of such payment shall be attached with the application. An application received without such receipt shall not be deemed valid and hence rejected.
(2) Application Fee: Application shall be accompanied by the fees which shall be as under:-
(i) For the Development Permission Rs 5000 per hectare. The fee payable shall be calculated by rounding off the area to nearest whole number eg 1.499 hectare shall be treated as 1 hectare and 1.5 hectare shall be treated 2 hectare.
(ii) For the Building Permission Rs 1.00 per Square meter of the proposed built-up area.
(iii) Application fee shall not be refunded in any case.
(3) Permission Fee: The applicant shall pay the following permission fee before the permission is issued:
(a) In case of application under section 29 of the Act {excluding application under section 29(3)}, the permission fee for development of any land shall be as under:-
Item
For development in following land use zones
Where population of the planning area is
More than 10
5 to 10 lakhs
Less than 5 lakhs
392 (191)
lakhs
Permission fee payable (Rs/Hectare)
Residential or Public and, semi Public or Industrial or Transportation or other
75,000
50,000
25,000
commercial
1,50,000
1,25,000
1,00,000
Recreational or agriculture
30,000
20,000
10,000
(b) In case of a building permission (other than high rise buildings)
Item No.
Type of construction
Built up area
Fees Rs Chargeable
Sq m.
To Sq m.
1.
2.
3.
4.
5.
1.
A building intended to be used exclusively for residence
0
75
750
76
125
1,250
126
200
2,000
201
300
3,000
301
400
4,000
401
600
6,000
601
750
7,500
751
1,000
10,000
1,001
1,250
12,500
1251
1500
15,000
1501
2000
20,000
392 (192)
Item No.
Type of construction
Built up area
Fees Rs Chargeable
Sq m.
To Sq m.
1.
2.
3.
4.
5.
2001
2500
25,000
above 2500
50,000
2.
A building intended to be used as shops, store, house, factory or carrying on trade of business or any other commercial or industrial purpose.
Fees specified in item No.1 together with additional charge of 50% of such amount of fees,
3.
A building intended to be used as administrative block in a factory
Fees as prescribed in item No.1
4.
A building intended to be used for shops cum residence purpose.
Fees specified in item No.1 together with an additional charge of 50% of such amount of fees.
5.
A building intended to be used as Cinema Theatres.
Up to 800 seating capacity Rs.15,000.00Above 800 seating capacity Rs.25,000.00
6.
A building intended to be used for any Social Charitable, culture, Educational purposes, Dharmshala and similar types of building and for any other purpose not specifically provided for.
Same as in item no 1
392 (193)
Item No.
Type of construction
Built up area
Fees Rs Chargeable
Sq m.
To Sq m.
1.
2.
3.
4.
5.
7.
Addition or alteration in built up area or external addition or alteration which does not add to the built up area such as courtyard, compound wall, alteration in elevation or roofing such as tiles to A.C. Sheet of flat surface, additional opening or closing not covered by provision to sub-rule (1) of Rule 14.
Rs. 500.
8.
In case of addition or alteration in the proposed plan
Up to 10% above 10%
Rs.500.00 Fresh application according to the rule shall be necessary
9.
Revalidation of the building permission
10% of the amount of fees charged originally in respect of the building concerned
(c) In case of building permission of high rise buildings :-
A building intended to be used exclusively for residence.
Rs. 10.00 Per Sq.m. floor area space.
392 (194)
मध्यप्रदेश राजपत्र, दिनांक 13 अरैल 2012
Item Type of Construction No.
Fees chargeable in rupees
1.
2.
3.
2.
A building intended to be used as shops; stores, house, factory or for carrying on trade or business or any other commercial or industrial purpose.
Fees as prescribed in item No.1 with additional charges of 100% of amount of fees.
3.
A building intended to be used as administrative block in a factory.
Fees as prescribed in Item No.1
4.
A building intended to be used for shop-cum-residence purposes.
Fees specified in item No.1 together with additional charges of 50% of such amount of fees.
5.
A building intended to be used for any special, charitable / cultural, educational purpose including hospital, School, club Dharmashala and similar type of building and for any other purpose not specifically provided for.
fees specified for item No.1.
(d) The authority may reject the application if the applicant does not deposit the permission fee within 15 days of receiving the intimation to deposit such fees. Such intimation shall be sent by registered post to the applicant.
(4) Standard Plan Permission:-
Each authority shall keep a set of approved standard building plans for plot sizes up to 150 Square meters. In case the owner's/applicant's plot is situated in an approved and authorized layout, and he wishes to construct his residence as per one of the standard approved plans available with the Authority, he may apply to the Authority in the prescribed format and indicating his choice of the standard approved plan along with the requisite fees and his ownership documents. The receipt of payment received from the Authority in such case shall be considered as authorized building
392 (195)
permission, provided that in case a plot is not part of an approved and authorized layout, prior Development Permission under Section 30 of the Act shall be necessary.
(5) In case an application for modifying a permission, already granted under section 30 of the Act, is applied in compliance of an order of the State Government which requires or permits such modification, only the application fee prescribed in sub rule(2) hereinabove shall be charged. No permission fee mentioned in 21(3)(a) shall be payable in such cases.
(6). Withdrawal of application: In case the applicant withdraws his application and plans at any time before sanction then such withdrawal shall terminate all proceedings with respect to such application. In the event of submission of a fresh application within a period of three months from the date of such withdrawal, the application fee paid earlier shall be adjusted towards fee payable for fresh application. In no case the fees once paid shall be refunded.
22Merger and division
(A) Merger of plot
An application for merger of plot with another plot or with land shall be made to the director by the owners or a person authorized by the owner(s) of such plot or land, as the case may be, in form-O given in APPENDIX K. The documents mentioned in the form shall also be submitted along with the application
The application fee shall be Rs 5000/ and a copy of receipt of payment of such fee shall be submitted along with the application. In case the application of merger is allowed the applicant shall have to pay a permission fee equal to Rs 25000/ at the time of the grant of such permission.
In cases where land use premise is residential merger of the plots shall be allowed subject to the following conditions-
a). plots for economical weaker sections and low income groups shall not be merged;
392 (196)
मध्यप्रदेश राजपत्र, दिनांक 13 अरैल 2012
b). only contiguous plots shall be merged and the size of such merged plots shall not exceed 500 sq.m ;
c). the number of dwelling units permissible in the plot formed after merger shall not exceed the sum of the dwelling units permissible in the plots that were merged;
Note: The merger of a residential plot with any land is prohibited.
The contiguous plots with commercial land use premises may be merged.
Note: The merger of a commercial plot with any land is prohibited.
The contiguous plots with PSP land use premises may be merged. Such plot may also be merged with another contiguous land of similar land use.
The contiguous plots with industrial land use premises may be merged. Such plot may also be merged with another contiguous land of similar land use.
(a) On receipt of an application for merger the director shall issue a public notice in form-P given in APPENDIX-K inviting objections and suggestions from persons likely to be affected, if any , regarding such merger. Notice shall also be served through registered post upon owners or occupiers of plots adjacent to those being merged. After the last day fixed for receiving the objections, the director shall proceed to examine the objections received if any. The director may call for additional information from the applicant or the objector or any public authority that he may consider necessary.
After considering the objections and suggestions, if any, the director may either
(a) accept the application or
(b) reject the application or
(c) accept the application with such conditions as considered appropriate..
However an application of merger shall not be accepted if such merger
(i) adversely affect the right of access way of any person.
(ii) in any manner violates the norms prescribed in the applicable Development Plan or the provisions of the Act or these rules.
No application of merger shall be considered in case of plot or land with mixed use.
मध्यप्रदेश राजपत्र, दिनांक 13 अपैल 2012
392 (197)
Where the plot is part of a layout of a scheme developed by any State Government agency like the Housing Board, Special area development authority, Town Development Authority, merger may be permitted only if the applicant furnishes the No Objection Certificate of the concerned agency.
(B) Division of the plot
An application for division of a plot shall be made to the director in form-Q APPENDIX-K. The documents mentioned in the form shall also be submitted along with the application
The application fee shall be Rs 5000/ and a receipt of payment of such fee shall be submitted along with the application. In case the application of division is allowed the applicant shall have to pay a permission fee of Rs 25000 at the time of the grant of such permission.
Division of plots with only PSP or industrial use premises shall be permissible. No application of division shall be considered in case of plot or land with mixed use.
On receipt of an application for division the director shall issue a public notice in form-R given in APPENDIX-K inviting objections / suggestions from persons likely to be affected by the division applied for. Notice shall also be served through registered post upon owners or occupiers of plots adjacent to the plot whose division has been applied for. After the last day fixed for receiving the objections / suggestions, the director shall proceed to examine the objections received if any. The director may call for additional information from the applicant or the objector or any public authority that he may consider necessary.
After considering the objections and suggestions, if any, the director may either
(a) accept the application or
(b) reject the application or
(c) accept the application with such conditions as considered appropriate..
However an application of the division of the plot shall not be accepted if such division
(i) adversely affects the right of access of any person.
392 (198)
(ii) in any manner violates the norms prescribed in the applicable development plan or the provisions of the Act or these rules.
Where the plot is part of a layout of a scheme developed by any State Government agency like the Housing Board, Special Area Development Authority, Town Development Authority, division may be permitted only if the applicant furnishes the No Objection Certificate of the concerned agency.
23Duration of sanction:-
(1) In case of development permission under Section 30 of Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam 1973 the sanction once accorded shall remain valid up to three years.
(2) The permission shall be got revalidated before the expiration of this period. Such revalidation may be permitted for two consecutive terms of one year each, after which proposals shall have to be submitted afresh. In case the application for revalidation is submitted after the expiry of the said period of three years the authority shall charge a permission fee equal to the fee prescribed under rule 21(3)(a) before revalidating the same. However the limitation of five years shall not be relaxed.
(3) In case execution of the project begins during the validity of the permission granted under section 30 of the Act, the permission shall not be deemed to lapse thereafter at any time.