Joint Declaration by the Architect, Structural Engineer / Engineer and Owner for Obtaining Completion Certificate
(On completion of a building and before occupation the Architect and the Structural Engineer along with owner will jointly inspect the building and submit a report of completion of the building to the Local Authority stating that the work is done as per approved plans and design).
Declaration: The following declaration is to be made at the time of obtaining Completion Certificate from the Local Authority by the builder/owner or authorized signatory:-
-
Certified that the building has been constructed according to the Sanctioned Plan and Structural design (one set of building and Structural drawings as executed is enclosed) which incorporates the provisions of structural safety as specified in relevant prevailing IS Codes/Standard.
-
It is also certified that the construction has been done under our supervision and guidelines and adheres to the drawings submitted and the records of supervision have been maintained by us.
-
Any subsequent change in the drawings will be responsibility of the owner.
Signature of Owner/ Builder with date, name and address
Signature of Architect with date, name and address
Signature of Engineer/ Structural Engineer with date, name and address