41.INTRODUCTION
(i) Scope: This part deals with the development control rules and general building requirements to ensure health and safety of the public.
(ii) Savings: Not withstanding such modifications and revision, anything done or any action taken under the regulations in force prior to such modification shall be deemed to be valid and continue to be so valid, unless otherwise specified.
42 Additional Definitions
(i) “Unsafe Building”: Definition of building shall also include "Unsafe Building" i.e. a building which
- is structurally unsafe,
- is insanitary,
- is not provided with adequate means of egress,
- constitutes a fire hazard,
in relation to its existing use constitutes a hazard to safety or health or public welfare by reasons of inadequate maintenance, dilapidation or abandonment.
(ii) “Natural Hazard”: The probability of occurrence, within a specific period of time in a given area, of a potentially damaging natural phenomenon.
(iii) “Natural Hazard Prone Areas”: Areas likely to have moderate to high intensity of earthquake, or cyclonic storm, or significant flood flow or inundation, or landslides/mud flows/avalanches, or one or more of these hazards.
Note:
Moderate to very high damage risk zones of earthquakes are as shown in Seismic Zones III, IV and V specified in IS:1893; moderate to very high damage risk zones of cyclones are those areas along the sea coast of India prone to having wind velocities of 39 m/s or more as specified in IS:875(Part 3;) and flood prone areas in river plains (unprotected and protected) are indicated in the Flood Atlas of India prepared by the Central Water Commission, besides, other areas can be flooded under conditions of heavy intensity rains, inundation
in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the development plan of the area and landslide prone areas as identified by State Government \ Land surveys
(iv) “Special Building”: Those buildings housing large gathering at a time such as cinemas, theatres, meeting halls, assembly halls, lecture halls, town halls and the like.
(v) “Lifeline Building” shall mean those buildings which are of post earthquake importance such as hospital building, power house building, telephone exchange building and the like.
i) “Retrofitting” shall mean upgrading the strength of an unsafe building by using suitable engineering techniques.
ii) “Quality Control” is related to construction quality and to control of variation in the material properties and structural adequacy. In case of concrete, it is the control of accuracy of all operations which affect the consistency and strength of concrete, batching, mixing, transporting, placing, curing and testing.
iii) “Quality Audit” by a third party is a requirement for an independent assessment of the quality and seismic or cyclone resistant features of all the high-rise buildings in earthquake zone IV and V and coastal areas of the country. The quality audit report shall consist of conformance or non-conformance of structures with the technical specifications for earthquake and cyclone resistance and to suggest remedies/ rectification if any.
iv) “Quality Assurance” shall mean all planned and systematic actions necessary to ensure that the final product i.e. structure or structural elements will perform satisfactorily in service life.
v) “Compliance” shall mean the verification of the properties of construction materials based on test data and verification of the strength and structural adequacy for various components of buildings and structures.
(vi) “Non-Structural Component” shall mean those components of buildings which do not contribute to the structural stability such as infill walls in R.C. frame buildings, glass panes, claddings, parapet walls, chimneys etc.