Part IIBuilding in areas other than municipalities in hill areas
A. Building Sites:
3 Criteria of using a piece of land as a building site.
(1) No piece of land shall be used as a site for the erection, re-erection, addition to, or alteration of, any building except in accordance with the provisions of the Act and these rules.
(2) If any question arises as to what, for the purposes of the Act, shall be deemed to be the site for erection, reerection, addition to or alteration of, any building, the Municipal Authority shall determine the same and his decision shall be final.
(3) No piece of land shall be used as a building site in Municipality unless the Board of Councillors is satisfied that,—
(a) land record is in conformity with the proposed construction;
(b) the level of the land is not lower than the level of the crown of the nearest public street;
(c) the land is capable of being well-drained by means of drainage facilities leading to existing public drains or drainage channels;
(d) the soil of the building site is likely to sustain the construction of a building thereon;
(e) where the site is within 5.00 meters of any side of a tank, the owner will take such measures as shall prevent any risk of drainage from such building passing into the tank;
Explanation.—"soil" shall include rocks, boulders, laterite.
(4) No piece of land in the municipal area, located in a sinking zone or central business area, as determined by the Board of Councillors, shall be used as a building site without prior approval of the State Government:
Provided that for construction of any building on any building on any piece of land in the municipal areas of the hill areas, prior testing of soil by a Government recognised testing organisation, in respect of land shall be made.
(5) No piece of land where a closed, sick or other industry was located or is in operation, shall be used as a site for construction of any building, other than an industrial building, without the prior approval of the competent authority appointed under clause (d) of section 2 of the Urban Land (Ceiling and Regulation) Act, 1976 (33 of 1976).
[ P AR T I
(6) The site shall abut on a street or projected street and there shall be access from any such street by any passage appertaining to such site.
(7) If in the opinion of the Municipal Authority it would be unsafe to construct a building on any piece of land, the Municipal Authority may prohibit any construction thereto.
4Applications for approval of building sites and for permission to construct or reconstruct buildings other than huts:—
(1) Before submission of the building plan, approval of the building site has to be obtained from the municipal authorities.
The applicant may simultaneously submit the site plan and the building plan to the Municipality for approval at his own risk and cost. But the Municipality shall consider the building plan submitted for approval only after the site plan is approved. In case the site plan is not approved, the submitted building plan shall also be treated as not approved.
(2) Every application, under sub-rule (1) submitted in Form A, shall state, inter alia, the proposed use of the land as per use group or occupancy.
(3) Every application, under sub-rule (1), shall be accompanied by a site-plan in triplicate and a fee as may be determined by the Municipality subject to the following:—
(i) for site plan up to 200 sq. meters of area : Rs. 200/- (Rupees two hundred only);
(ii) for every additional 100 sq. meters of areas or part thereof beyond the first 200 sq. meters : Rs. 100/-(Rupees one hundred only):
Provided maximum fees not exceeding five times the minimum fees as specified, may be determined by the Board of Councillors at a meeting.
Note.—The site plan shall be drawn to the scale of not less than one centimetre to six meters and shall be signed by the applicant and by the Licensed Building Surveyor, Architect or Structural Engineer as required for under rule 15 with a certificate to the effect that the site has been inspected personally and the structural design including that of foundation has been made on the basis of recommendations or findings of the Geotechnical Engineer.
(4) Every site-plan, under sub-rule (3), shall show or state on the body of the drawing showing the site-plan, the following:—
(a) the boundaries of the site and of any contiguous land belonging to the owner thereof with number assigned to plot or premises;
(b) the position of the site in relation to neighboring streets with dimensions;
(c) the name of the street on which the site abuts;
(d) the position of the building and of all other buildings including existing buildings, if any, which the applicant intends to erect upon his contiguous land referred to in clause (a) in relation to—
(i) the boundaries of the site and, in case where the site has been sub-divided, the boundaries of the portion owned by the applicant and also the portions owned by the other owners, and
(ii) all adjacent streets, buildings and premises within a distance of 12 meters of the site and of the contiguous land, if any, referred to in clause (a);
(e) the use or occupancy of all the buildings;
(f) the direction of North point;
(g) the means of access from the street to the building, and to all other buildings, if any, which the applicant intends to erect upon his contiguous land referred to in clause (a);
(h) the schematic position and approximate height and the number of storeys of all other buildings within 12 meters of the site;
(i) the free passage or way in front of the building;
(j) the width of the street (if any) in front and at the rear of the building;
(k) the means of drainage of the proposed building leading to existing public drains or drainage channels with their location in relation to the site;
(1) the means of drinking water supply to the proposed building indicating the source and the distance from the site including the route through which the pipe line will be laid, if piped water supply is envisaged;
7
(m) the means of power supply to the proposed building on the site, indicating the route through which power supply will be achieved;
(n) areas of distress;
(o) Such other particulars as are necessary under these rules as may be specified by the Board of Councillors;
(p) the location of power line, water line, sewer line, natural drainage channel, jhora, road side drain, protective works.
(5) In case of a promoter submitting site plan or building plan for approval, all provisions made in the West Bengal Building (Regulations for Promotion of Construction and Transfer by Promoters) Act, 1993 (West Ben. Act XX of 1993) shall apply.
5 Further information required to be submitted by applicant:—
Within fifteen working days from the date of receipt of an application for approval of building-site, the Municipal authority may require the applicant—
(a) to furnish him with any information on matters referred to in these rules which has not already been given in the documents there under; or
(b) to satisfy him that there are no objections which may lawfully be taken to the approval of the site.
6 Incomplete or defective information:—
(1) If any information or document required under these rules is, in the opinion of the Board of Councillors, incomplete or defective, he may, within fifteen working days from the date of receipt of the same, require further information or documents to be furnished.
(2) If any requisition made under these rules is not complied with within one month, the application for approval of the building-site may be refused.
7Signature on approved site plan:—
When the competent authority has approved any site plan, the approved plan or plans shall be signed by such officer as may be authorized in its behalf and in such manner as may be directed and two copies of approved site plan will be returned to the applicant.
Control of development of parks, public open spaces, ponds, wetlands, canals, river and other water front and brick fields:—
(1) For the purpose of these rules, public open space shall mean any open space which is open to the use for enjoyment of the public, whether it is actually used or enjoyed by the public or not and whether the entry is regulated by any charge or not.
(2) (a) Parks and public open spaces shall be classified for the purpose of these rules into three following groups:—
(i) the parks and public open spaces with area up to 1500 sq. m. shall be termed as small parks and public open spaces;
(ii) the parks and public open spaces with area more than 1500 sq. m. but up to 7000 sq. m. shall be termed as medium parks and public open spaces;
(iii) the parks and public open spaces with area more than 7000 sq. m. shall be termed as large parks and public open spaces.
(b) The structure above ground level shall be subject to the following provisions:
No structure other than the following shall be permitted in parks and public open spaces:—
(i) statue of public interest;
(ii) structure related to play equipments and fixtures;
(iii) structure related to public amenities provided that the height of such buildings shall not exceed 4.00 meters and that total area covered by such building shall not exceed 10% of the total area of the parks and public open spaces, 5% in the case of medium parks and public open spaces and 3% in the case of large parks and public open spaces.
[PART I
Note.—For the purpose of calculation of total area of parks and public open spaces as aforesaid the area of water body, if any, shall be excluded.
(c) The underground structure shall be subject to the following provisions:—
(i) no underground structure shall be allowed in small and medium parks and public open spaces;
(ii) in large parks and public open spaces underground structure for amenities or parking facilities may be allowed, provided such structure shall not affect the environment or create traffic problem.
(3) No canal, pond, water body, wetland, rivulets, jhora, water source, natural spring, streams, drains, culverts shall be filled up:
Provided that after taking due consideration of the existing relevant Acts, the drainage, slope, slip, landslide, ecology, culture, environment, pisciculture, fire fighting or any other material consideration, and for reasons to be recorded in writing the Board of Councillors with the prior approval of the State Government, may allow any canal, pond, rivulets, streams, rivers, Hood plain area to be filled up.
(4) (a) In the case of a building in the river zone (within 15 meters from river bank) or other water fronts of large water bodies (more than 1000 acres), the maximum permissible height of a building in such zone shall be 5.00 meters of river.
(b) in the case of a building on stilts, the maximum permissible height of the building shall be 6.50 meters including the stilts, the minimum height of which shall be 3.00 meters. In such building, the stilted portion shall not be allowed to be walled up or covered along the sides;
(c) no building shall be more than 20.00 meters long alongside the river or other water fronts. There shall be a clear linear gap between the two buildings alongside the river or other water front as per following:—
(i) 30 meters in case the river width is more than 75 meters;
(ii) 20 meters in case the river width is between 50 and 75 meters; (iii) 15 meters in case the river width is less than 50 meters;
(d) the maximum permissible covered area of such building shall be 200.00 sq. meters;
(e) the structures for recreational purpose conforming to this sub-rule may be permitted within the adjoining land.
(5) Existing brick fields shall be allowed to be continued as brick fields within their own boundaries. After being declared as abandoned, the excavated portions shall have to be maintained by the owner at his cost as water bodies where pisciculture or any type of recreational activity may be allowed.
Sub-division of plots in areas other than municipalities in hill areas.—
(1) No sub-division of any plot within the municipal area shall be undertaken without the prior approval of the Board of Councillors.
(2) (a) A plot to be sub-divided shall be termed as "mother plot";
(b) sub-division may not be allowed if the "mother plot" abuts a means of access having a width of less than 3.50 meters for plains;
(c) every individual plot obtained by sub-division of the "mother plot" shall abut a means of access having width of not less than 3.50 meters;
(d) the junctions of means of access within the "mother plot" shall be provided with splayed corners measuring not less than 2.50 meters on each side;
Note.—Clauses (a) to (d) shall not apply to a scheme for Economically Weaker Section and Low Income Group Housing approved by the Government, and Salt Lake Township;
(e) sub-division may be allowed on the condition that the following facilities shall be provided by the owner at his own cost to the satisfaction of the Board of Councillors:—
(i) drainage facilities with pucca drain ensuring drainage of each individual plot and of the means of access and passages leading to existing public drains or natural drainage channels;
(ii) all weather means of access and related protective works, if necessary, along with street lighting;
9
(iii) streets and passages along with street lighting;
(iv) sanitary facilities including garbage disposal facilities;
(v) water supply facilities;
(f) no permission for sub-division of a plot of land shall be granted unless each sub divided plot is at least 80 sq. meters in area with minimum width of 6.0 m;
(g) no sub-division of a plot shall be granted unless a detailed layout plan of the area proposed to be sub-divided is submitted before the Municipality duly integrating the site layout plan with the general use of the land in the adjoining areas. The existing street pattern as also the other physical infrastructural facilities like drainage, sewerage, water supply, electricity supply with location of high tension or low tension electric line with poles are also required to be shown.
(3) The maximum permissible length for the means of access shall be as given in the following table:—
Maximum length of the means of access
Width of means of access
For means of access closed at one end
For means of access open to street at both ends
(i) 3.50 meters and above but not more than 7.00 meters
25.00 meters
75.00 meters
(ii) Above 7.00 meters but not more than 10.00 meters
50.00 meters
150.00 meters
(iii) Above 10.00 meters
No restriction
No restriction
(4) For "mother plot" measuring more than 5,000.00 sq. meters in area, sub-division may be allowed, provided eight per cent of the total area of the "mother plot" is developed as public open space. The width of each such open space shall not be less than 10.00 meters and each such open space shall abut a street having a width of not less than 7 .00 meters. The minimum area of each such open space in one parcel shall be 400 square meters. This open space shall be in addition to the land required for providing the means of access to the individual plots obtained by sub-division of "mother plot".
(5) For "mother plots" measuring more than 25,000.00 sq. meters in area, subdivision may be allowed, provided seven per cent of the total area of the mother plot is reserved for use for facilities like school, health centre, market, police outpost, milk booth, post office, power sub-station, transport terminal, tree cover, rain water harvesting, sewage recycling, water treatment plant, sewage treatment plant and the like. Such land shall abut a street having a width of not less than 10.00 meters in addition to the land necessary for means of access and for open spaces mentioned in sub-rule (3).
14Preparation of plan and supervision of execution of work in areas other than Municipalities in hill areas.—
(1) Every person who intends to erect, re-erect or add to, or alter, any building shall get its plan prepared and structural work designed and supervised by an architect or structural engineer or licensed building surveyor as required under rule 15. While submitting the plan the architect or licensed building surveyor or structural engineer shall certify to the effect that the site has been personally inspected while planning the building and/or designing the structural members, as well as he has taken into account the findings of or recommendations of stability analysis as well as soil tests performed as and where necessary under this rule.
(2) In all such cases, the licensed building surveyor, structural engineer or Geo-technical Engineer shall have to be empanelled with the Municipality.
(3) The name, address and license or empanelment number of the person so employed and serial number or registration number in the case of architect shall be stated in the application in respect of such building.
(4) In case of building plans or site plans submitted by the Central Government or the State Government or by organization controlled by the Central or the State Government, if the plans are prepared and submitted under the signature of the Government engineer or Architect, who are employees of the applicant organization, sub-rule (1) of this rule shall not be applicable:
15
Provided that the minimum qualification of the Government Engineer or Government Architect will be same as in the case of Architect or Licensed Building Surveyor, Empanelled Structural Engineer or Geo-technical Engineer.
10Masonry building not to be erected without special permission in certain cases.—
(1) Save with the special permission of the Board of Councillors, no building, other than a hut, shall be erected unless—
(a) the site of such building abuts on a public street or a projected public street or a private street duly sanctioned and constructed in accordance with the provisions of the Act or any other law in force immediately before the commencement of the Act; or
(b) there is access to the building from any such street by a passage or pathway appertaining to such site, and not less than 2.40 meters wide at any part.
(2) No building shall be erected so as to deprive any masonry or framed building of the appropriate means of access.
(3) The following buildings shall be exempt from the operation of this rule:—
(a) any building erected or intended to be erected by or with the sanction of the competent authority for use solely as a temporary hospital for the reception and treatment of persons suffering from any infectious or contagious disease;
(b) any hoarding or like means of protection (other than a masonry wall) which the owner of any premises certifies to the competent authority, not less than seven days after erection, to have been erected for the purpose of preventing threatened acquisition of any easement over his own premises or any portion thereof, provided the stability of such hoarding or other means of protection is certified by the competent authority.
[PART I
B. Submission of Building Plan:
Application to the Board of Councillors with a building plan for permission; to erect a new building or to make addition or alteration to a building.—
(1) No person shall erect a new building, or re-erect or make addition to and/or alteration of any building or cause the same to be done without first obtaining a sanction in the form of a Building Permit from the Board of Councillors under these rules.
(2) Notwithstanding the provisions of sub-rule (1), no Building Permit shall be required subject to consideration of structural safety of the said building as well as adjoining structure at the responsibility of owner and further subject to prior intimation to the Municipal Authority for,—
(a) erection, re-erection, addition to, or alteration of—
(i) an internal partition wall which does not violate any of the provisions of the Act or these rules, or
(ii) a parapet wall or a cornice or chajja within the boundaries or the site are not overhanging a street, so, however, that the total height of the parapet wall shall not be more than 1.50 meters and width of the cornice or chajja shall not be more than 50 centimeters;
(b) repairing of a staircase or lift-shaft; boundary wall;
(c) white washing or painting;
(d) reflooring of the surface of an existing floor;
(e) re-construction of an existing damaged roof without changing the character and dimension of such roof:
Provided that no such work as is referred to in clauses (a) and (c) shall be undertaken without giving the Board of Councillors fifteen days notice in writing stating the nature of work proposed to be undertaken;
(f) erection of a false ceiling in any floor for air-conditioning, lighting or decorative purpose;
(g) plastering and patch work;
(h) providing or closing, an internal door or window, or a ventilator, not opening directly opposite a door or a window of another building;
(i) replacing of fallen bricks, stones or repairing of damaged pillars or beams;
(j) repairing or renewing existing plumbing services;
(k) carrying out such other work as is necessary in the opinion of the Board of Councillors, for reasons to be recorded in writing, to maintain the building in a condition of good repair or to secure it to prevent danger to human life.
(3) Every person intending to erect a new building or to make addition and/or alteration to any building, shall apply for sanction giving notice in writing in Form B attached to this rule along with the following:—
(a) the Application shall contain, in addition to the notice as aforesaid, all declarations, indemnities, which the applicant has to comply with under the building rules, the duties payable under the Indian Stamp Act, in its application to West Bengal, on the various declarations, indemnities;
(b) copies of documents showing that the applicant has exclusive right to undertake such works;
(c) duly authenticated copies of receipts showing payment of tax to the Municipality for the quarter previous to the date of the application in respect of the land, building or portion thereof upon which the building is proposed to be erected, re-erected, added to or altered and a declaration from the Municipality stating that there is no arrear dues payable to the Municipality;
(d) a declaration, stating the name, address and other particulars of technical personnel as the case may be, along with their consent, who are engaged as per rule 15;
(e) requisite number of copies of the drawings as stipulated in rule 12;
(f) (i) certified copy of the approved site plan;
(ii) certified copy of the reports of tests for stability of slopes and for soil as per requirements in rule 3 and such test report shall also indicate the maximum load that can be transferred to the soil of the particular site safely;
(g) in the case of steel towers, the authenticated copy of the relevant license issued by the Government of India or the State Government.
11
(4) In the case of site or plot measuring 500 square meters or above, covered by the Urban Land (Ceiling and Regulation) Act, 1976 (33 of 1976), the notice shall be accompanied by a "no objection certificate" from the competent authority, appointed under clause (d) of section 2 of the said Act, to the effect that there is no objection in respect of transfer of the site or plot under sub-section (3) of section 5 of that Act:
Provided that the requirement as aforesaid shall be deemed to have been waived on the failure of the competent authority to furnish the certificate within three months from the date of reference to it.
(5) In case the intended use of the proposed building or part thereof is such that a license or permission is required from Government or any statutory body under any law for the time being in force, the necessary permission or license shall have to be obtained prior to use of such space and by virtue of the sanction the applicant will not have any automatic right of such use nor the sanction will have any overriding effect on any other law or statute in force.
(6) The notice shall, where necessary, be accompanied by,—
(a) documents, namely Clearance Certificate or Permission or Observation or No Objection Certificate, as the case may be, as may be required for obtaining sanction of the building plan;
(b) certified copy of the registered deed of gift for gifting the land to the Municipality, where necessary;
(c) a composite declaration of the applicant in the form 'B'.
(7) (a) All the building plans, enclosures and statements shall be signed by an Architect or a Licensed Building Surveyor, a Structural Engineer, and a Geo-technical Engineer as the case may be, and also by the person intending to erect, re-erect, or alter the building;
(b) An undertaking that the work of erection, re-erection or alteration will be planned, designed and supervised by an Architect or Licensed Building Surveyor, a Structural Engineer and a Geo-technical Engineer, as the case may be, as required under these rules;
(c) an undertaking that no building materials shall be deposited in any street except with the prior written permission of the Municipal Authority and on deposit of fees for stacking materials as specified in rule 25 of these rules, the same will be stacked only at a place as may be directed by the Municipality.
(8) In a case involving pile work, deep foundation work or construction of basement or any other underground structures, including superstructure, the notice shall be accompanied by an Indemnity Bond.
(9) The notice shall be accompanied by two sets initially of—
(a) key (location) plan :—The key plan drawn to a scale of not less than 1 : 4000 shall show the boundary of the location of the site with respect to neighborhood landmarks and public streets;
(b) site plan;
(c) building plan (Architectural); and
(d) specifications.
Note.—Four number of sets, as may be required, along with structural plan, design calculation as well as Geotechnical report, if applicable, shall be submitted for record before issuance of formal sanction.
(10) The applicant shall, prior to the sanction of the building plan, be required to produce the originals of all the documents duly authenticated copies of which have been enclosed with the notice, for scrutiny.
(11) The applicant shall also indemnify the municipal authorities for any action, suits, proceedings, claim of damages by any third party, or tenant. Further in case the boundary and site plan is not mentioned in the title document submitted by the applicant in such event a deed of declaration along with boundary plan as well as detail of the boundary along with land area should be registered with the concerned registration authority and the same should be submitted along with application.
12Particulars to be furnished in, and with, an application.—
(1) Every application made under rule 11 shall be written on a printed form (to be supplied by the Municipality) and shall state the location of the site, reference number of approval of the site plan, the number assigned to the premises in the assessment book and its dimensions, and such other particulars as may be specified by the Board of Councillors.
(2) All site plans, building plans, elevations and sections shall be on drawing sheets which shall be in any of the sizes specified in the table below:—
[PART I
TABLE
Drawing Sheet sizes
Serial No.
Designation
Trimmed Size mm
1
A0
990x 1198
2
Al
594 x 990
3
A2
495 x 594
4
A3
297 x 495
5
A4
247 x 297
6
A5
148 x 247
(3) The plans may be ordinary prints of Ferro-paper or other paper or blue printed or generated print, but one set of such plans shall be blue printed. Prints of plans shall be in the manner specified in the table given below:—
TABLE
SI. No
Item
Site Plan
Building Plan
.
White Plan
Blue Plan
Amonia Print
White Plan
Blue Plan
Amonia Print
1.
Plot Lines
Thick Black
Thick Black
Thick Black
Thick Black
Thick Black
Thick Black
2.
Existing Street
Green Wash
Green Wash
Green Wash
Green Wash
Green Wash
Green Wash
3.
Future street if
Green Dotted
Green Dotted
Green Dotted
Green Dotted
Green Dotted
Green Dotted
4.
any Permissible Building Lines
Thick Dotted Black
Thick Dotted Black
Thick Dotted Black
Thick Dotted Black
Thick Dotted Black
Thick Dotted Black
5.
Open Spaces
No colour
6.
Existing Work
Yellow
Yellow
Yellow
Yellow
Yellow
Yellow
7.
Work proposed to be demolished
Yellow Hatched
Yellow Hatched
Yellow Hatched
Yellow Hatched
Yellow Hatched
Yellow Hatched
8.
Proposed Work
Red Filled in
Red Filled in
Red Filled in
Red Filled in
Red Filled in
Red Filled in
9.
Drainage and sewerage work
Red Dotted
Red Dotted
Red Dotted
Red Dotted
Red Dotted
Red Dotted
10.
Water supply work
Black Dotted thin
Black Dotted thin
Black Dotted thin
Black Dotted thin
Black Dotted thin
Black Dotted thin
11.
Deviations
Red Hatched
Red Hatched
Red Hatched
Red Hatched
Red Hatched
Red Hatched
12.
Recreation Ground
Green Wash
Green Wash
Green Wash
Green Wash
Green Wash
Green Wash
(4) The plans shall be coloured as specified in Table of sub-rule
(5) Building plans, elevations and sectional elevations shall be drawn to scale of 1 : 100 and 1 : 200 for Plans, in case of sites whose area exceeds 2000 square meters.
(6) The plans, sections (longitudinal and sectional) and elevations of building shall indicate and show:— A. For buildings upto 14.5 m. height—
(a) the floor plans of all the floors including roof plan together with the covered area;
(b) existing buildings and the basement plan, if any, the sizes of rooms and sizes and spacings of structural members and their materials;
13
(c) the location of essential services, that is to say, water closet, sink, baths, septic tank and the like, and arrangement for drainage or sewerage and other waste water disposal including sewer connection, if any;
(d) the sizes of footings, the thickness of basement walls, other walls, floor and roof slabs, the construction materials, sizes and spacing of framing members, floor to ceiling heights, parapet heights with their materials, taking at least one fully dimensioned section (both longitudinally and crosswise) through staircase, bath and water-closet as well as such other sections as would clearly indicate the details of architectural features, mezzanine floors, and lofts;
(e) the front elevation and all other elevation from the abutting public streets;
(f) the house drainage plan and site drainage plan up to nearest Municipal outfall or natural outfall;
(g) the dimensions of all projected portions beyond the permissible building line;
(h) the roof plan indicating the drainage and slope of the terrace; showing position of Rain Water pipes; (i) the plans
and details of private water-supply and sewerage disposal system, if any;
(j) (i) the details of breast wall, retaining walls or other protective measures, if any, which are required to be undertaken; (ii) no part of the proposed building shall be permitted to be erected directly over the retaining or other similar protective walls;
(k) where structural design or soil stability and similar other tests are necessary for a building under any provision of these rules, the copy of details of reports and/or recommendations of soil stability or other tests and/or copy of details of calculations for structural design duly signed by the competent personnel as specified in rule 15 or rule 161 (for Municipalities in hill areas).
B. For buildings exceeding 14.5 meters in height—
The building plan shall, in addition to the provision of sub-rule (1) also show:—
i l i t t i l ti b ildi i d f t h h lth d Fi (a) spec a requ remen s as o access, c rcu a on, u ng serv ces an sa e y, uman ea an re
based on occupancies or use group as laid down in National Building Code of India, and in the West Ben. West Bengal Fire Services Act, 1950; Act XVIII £1050
(b) parking layout plan showing parking spaces, driveways together with ingress or egress arrangements;
(c) width of main and alternate staircases along with balcony approach, corridor, ventilated lobby approach;
(d) location and details of lift enclosures;
(e) location and size of fire lift;
(f) smoke-stop lobby or door, where provided;
(g) details of exits including provision of ramps in the case of hospitals and for special risks;
(h) location of smoke exhauster and fan;
(i) location of smoke exhauster in basement;
(j) details of fire alarm network;
(k) location of centralized control connecting the alarm system, built-in fire protection arrangements and public address system;
(1) location and dimensions of static water storage tank and pump room along with fire service inlets for mobile pump and water storage tank;
(m) location and details of fixed fire protection installations such as sprinklers, wet risers, hose reels, drenchers and carbon dioxide installation;
(n) location and details of first aid equipment;
(o) special requirements, if any, of occupancies for residential building, educational building, institutional building, assembly building, business building, mercantile building, storage building, industrial building and hazardous building under these rules;
(p) location for installation of a sub-station for electric supply, transformer, generator and switch gear room,
(q) location of the air-conditioning plant room, if any;
(r) plan for installation of boilers, if any;
(s) refuse chutes and refuse chamber, if any;
(t) location for signs and outdoor display structures, if any;
(u) conveniences for physically challenged personnel.
[P AR T I
(7) Doors and windows schedule shall show sizes of doors, windows, and frames.
(8) The plan in its headline shall indicate specifically,—
(a) the purpose of construction,
(b) the name of the owner,
(c) the name of the police-station, and
(d) the name and jurisdiction list number of the mouza and cadastral survey or revisional settlement number of the plot or plots of the site, if required.
(9) The nearest road of 3 metre width or more with the pathway connecting the road and the site should be shown in case of plot abutting roads less than 3 metre.
(10) In case of addition, alteration or reconstruction of old buildings, which were constructed prior to enforcement of any building rules in the concerned area without the approval of any authority, in addition to the documents, as stipulated in this rule, structural stability certificate as per provisions of sub-rule (1) of rule 170 shall be submitted with the building plan, and in all such cases the sanction shall be made as per the provisions of these rules.
Specification and other information to accompany the application with building plan.—Every such application shall further be accompanied by a brief specification giving the following information:—
(a) the materials, and method of construction to be used for external walls, partition walls, foundations, roofs, floors, stairs, fire place and chimneys;
(b) the manner in which roof drainage and house drainage and the surface drainage of the site will be disposed of;
(c) the manner, if any, in which it is proposed to pave the court-yard and open spaces in the building or premises and the scope to which the surface is to be made in each case;
(d) the means of access that will be available for removal of nuisance;
(e) proposed occupancy or use of the building for ensuring conformity with the provisions of Chapter XIV of the Act;
(f) the area of plot, area of the plinth of the proposed and existing buildings, if any, and the area of open spaces left;
(g) the number and area of each tenement, the area put to different occupancy or use group in all the floors of the proposed building including the same for existing building, if any;
(h) safety measures proposed to be taken during the construction of the building;
(i) for buildings, other than residential and educational buildings, the means of ingress and egress of vehicles shall be indicated;
(j) the position of water tanks with size which shall have to be constructed below the ground or just above; (k) the area of garage, if any;
(l) number of flats proposed to be built in each floor and total number of flats, if any; (m)
calculation of F.A.R.; and
(n) an indemnity bond in Form 'L', in the case of building plans having provisions for deep foundation work, piling work, construction of basement or underground construction.
15Engagement of technical personnel in areas other than municipalities in hill areas.—
(1) Every person who intends to erect,- re-erect, add to or alter any building shall, subject to the provisions of the Act and these rules, engage,—
(a) for all buildings below 11.5 meter in height, a technical personnel not below the rank of a Licensed Building Surveyor for planning, design and construction of the building structure and the foundation;
(b) for all buildings from 11.5 meter to 14.5 meter in height and/or for erection involving pile works, deep foundation works or construction of basement or any other underground structure thereto, a Licensed Building Surveyor and/or an Architect and a Structural Engineer, for planning, design and construction of the building including foundation; and
(c) for all other buildings above 14.5 meter in height and/or for erection involving pile works, deep foundation works or construction of basement or any other underground structure thereto or separately, a Licensed Building Surveyor and/or an Architect, a Structural Engineer and a Geo-technical Engineer for planning, design and construction of building:
Provided that the Licensed Building Surveyor, the Architect, the Structural Engineer and the Geo-technical Engineer will work in association with one another and they will be individually or collectively responsible for ensuring the safety of the building structure and its foundation.
(2) In case of death, resignation or removal of Architect, Structural Engineer, Geotechnical Engineer or Licensed Building Surveyor, as the case may be, a fresh engagement shall be made forthwith and shall be notified to the Chairman of the Municipality. No work shall be carried out in the intervening period, if any.
(3) The validity of any engagement made under this rule shall lapse, in the case of an Architect with lapse of validity or registration granted under the Architects Act, 1972, (2 of 1972), or in the case of a Structural Engineer and a Geotechnical Engineer, with the lapse of empanelment, or in the case of a Licensed Building Surveyor, with lapse of the validity of license.
(4) A Licensed Building Surveyor shall have—
(a) a minimum Bachelors' degree in Civil Engineering or Construction Engineering or Architecture from a recognised university or an equivalent engineering qualification recognised by the Government and shall not have less than 2 years' experience in planning, design and execution of building works including sanitary and plumbing works related to buildings, or
(b) a diploma in Civil Engineering or Architecture from a recognised university or an equivalent engineering qualification recognised by the Government and shall not have less than 5 years' experience in planning, design and execution of building works including sanitary and plumbing works related to buildings.
16Duties and responsibilities of Architect and Licensed Building Surveyor.—
Duties of the Architect and Licensed Building Surveyor shall be as follows:-—
(a) they shall be conversant with the provisions of the Act, these rules and all relevant rules and regulations made under the Act and shall prepare plans, sections, elevations and other structural details as per the provisions of these rules,
(b) they shall prepare and submit all plans as may be necessary together with all documents and other details which are required to be submitted under these rules,
(c) they shall comply with all requisitions received from the Municipal Authority in connection with the work under their charge promptly, expeditiously and fully. When they do not agree with such requisition, they shall state their objections in writing within the stipulated time, in default of which the plans and the notice shall be rejected,
(d) they shall immediately intimate to the owners of the corrections or other changes they make on the plans, documents and details as per requisition from the Municipal Authority,
(e) they shall not prepare and submit plans, if the same is intended to be executed in contravention of the provisions of the Act,
(f) they shall give all facilities to the Municipal Authority to inspect and examine the work in progress,
(g) they shall be held responsible for any work executed on site in contravention of the provisions of the Act, these rules or other relevant rules and regulations,
[P AR T I
(h) they shall not deviate or allow any deviation from the sanctioned plan in the execution of work at site except in accordance with the provisions of rule 31,
(i) they shall submit the completion certificate and completion plan immediately after the work is completed,
(j) they shall be deemed to have continued their supervision and control of construction of the building unless they have given notice in writing to the Municipal Authority that they have ceased to serve as the Architect or Licensed Building Surveyor for the building and shall be held responsible for the work executed up to the date of intimation,
(k) the Municipal Authority shall exercise control over the action of any Architect or Licensed Building Surveyor, as the case may be, and may in the case of violation of any of the provisions of the Act and these rules—
(i) in the case of a Licensed Building Surveyor, suspend or revoke the license;
(ii) in the case of an Architect, make a reference to the Council of Architecture for taking necessary action under the Architects Act, 1972.
17Duties and Responsibilities of Structural Engineers.—
Duties and responsibilities of Structural Engineers shall be as follows:—
(a) he shall be conversant with the provisions of the Act and all relevant rules and regulations made under the Act and shall prepare structural designs and structural details as per the provisions of these rules,
(b) he shall prepare and submit all such structural plans together with all documents, calculations in proper forms and other details including structural design of foundations, prepared in consultation with the Geotechnical Engineer, as are required to be submitted under these rules,
(c) he shall comply with all requisitions received from the Municipal Authority in connection with the work under his charge promptly, expeditiously and fully. When he does not agree with such requisition, he shall state his objections in writing within stipulated time, in default of which the plans and the notice shall be rejected,
(d) he shall immediately intimate the person, who has engaged him of the corrections or other changes, he makes on the structural plans, documents and details as per requisitions from the Municipal Authority.
(e) he shall not prepare and submit the structural plans, if the same are found to be in contravention of the provisions of the Act.
(f) he shall be responsible for full quality control of materials and workmanship at site and carry out necessary tests on materials used at site, conducted by recognized institutions or recognized organization. No completion certificate will be issued unless copies of such test reports are submitted by the structural engineer for departmental record alongwith the structural stability certificate of the building/s,
(g) he shall give all facilities to Municipal Authority to inspect the work in progress,
(h) he shall be held responsible for the structural design and execution of the same on site and for contravention of the provisions of the Act, these rules and other relevant rules and regulations relating to structural safety,
(i) he shall not deviate or allow any deviation from the submitted structural plan in the execution of work at site,
(j) the Licensed Building Surveyor, the Architect, the Structural Engineer and the Geo-technical Engineer shall work in association with one another and they shall be individually or collectively responsible for ensuring the safety of the building structure and its foundation,
(k) he shall submit a certificate that the structure has been constructed as per submitted structural plans and the building is safe for occupation along with the application for completion certificate after the completion of the building,
(1) he shall be deemed to have continued his supervision unless he has given notice in writing to the Municipal Authority that he has ceased to serve as the Structural Engineer for the work and submits a status report of the work completed under his supervision. He shall be held responsible for the work executed up to the date of intimation,
(m) he shall forthwith inform the Municipal Authority as to the person who has engaged him under rule 15 of these rules.
18Duties and Responsibilities of Geo-technical Engineers.—
Duties and responsibilities of Geo-technical Engineers shall be as follows:—
(a) he shall be conversant with the provisions of the Act and all relevant rules and regulations made under the Act and shall conduct soil investigation and submit report as per provisions of these rules,
17
(b) he shall prepare and submit all such reports, calculation in proper forms recommending the size, shape and type of foundation confirming all relevant B.I.S. Codes and National Building Code of India,
(c) he shall be responsible for the execution of the type of foundation as recommended by him and other relevant rules and regulations relating to the safety of the foundation of the structure,
(d) he shall submit a certificate that the type of foundation of the structure has been constructed as per the recommendations made by him in the report and the building is safe in respect to its foundation along with the notice of completion of work upto plinth level,
(e) the Licensed Building Surveyor, the Architect, the Structural Engineer and the Geo-Technical Engineer shall work in association with one another and they shall be individually or collectively responsible for ensuring the safety of the building structure and its foundation,
(f) he shall be deemed to have continued his supervision unless he has given notice in writing to the Municipal Authority that he has ceased to serve as the geo technical engineer for the work and submits a status report of the work completed under his supervision. He shall be held responsible for the work executed upto the date of intimation,
(g) he shall forthwith inform the Municipal Authority as to the person who has engaged him under the rule 15 of these rules,
(h) he shall comply with all requisitions received from the Municipal Authority in connection with the work under his charge promptly, expeditiously and fully. When he does not agree with such requisition, he shall state his objections in writing within stipulated time given by the Board of Councillors, in default of which the plans and the notice shall be rejected.
19 Time and manner of disposal of application under rule 11.—
Within sixty days from the date of receipt of an application with building plan, the Board of Councillors may require the applicant—
(a) to furnish it any information on matters referred to in these rules which has not already been given in the documents thereunder; or
(b) to satisfy it that there are no objection which may lawfully be taken to the approval of the building plan.
20 Action to be taken while a building is under construction.—
One copy of the sanctioned building plan shall be kept at the site of the building at all times when building operations are in progress and such plans shall be made available at all such times for the inspection of the Municipality or of any officer authorised by it in that behalf.
21Sanction of building and permission to execute work.—
(1) Within sixty days of the receipt of any application with building plan or of any information or documents which the Board of Councillors may reasonably require the applicant to furnish before deciding whether permission shall be granted to execute any work, the Board of Councillors shall, by written order—
(a) accord sanction, in Form ‘C’, to the building plan conditionally or unconditionally and to give permission to execute the work, or
(b) refuse in Form ‘D’ on one or more of the grounds mentioned in section 210 to accord such sanction, or
(c) accord sanction but impose conditions for permission to execute the work, or
(d) accord provisional sanction under the proviso to section 210:
Provided that in the case of a provisional sanction, the applicant shall furnish a statement to the effect that, if he is unable to produce the license or permission as required, the provisional sanction shall be at his own risk and cost and shall not be made final and the occupancy certificate under sub-section (2) of section 212 shall not be issued in respect of the use which is affected by the provisions of section 210.
(2) The Building Permit shall not be issued till a duly authenticated copy of a receipt showing payment to the Municipality of the Building Permit Fees payable under rule 24 or rule 100 of these rules for the sanction of the building, is produced before the Chairman-in-Council.
22(i) Building Permit (sanction for building construction plan).—
The Building Permit shall, in conformity with the provisions of the Act, clearly and specifically state the occupancy or use group for which the Building Permit is valid.
[P AR T I
In the case of a building which is intended to be erected at the corner of two streets, the Building permit shall specify the conditions imposed under clause (d) of section 213.
The Building Permit shall, as required, specify the conditions imposed regarding use of inflammable materials.
One Set of the plan (along with another set of certified copy of plan) and specification submitted along with the notice duly countersigned by the Municipal Authority, shall be returned to the applicant along with the Building Permit
23Duration and expiry of sanction of building plan.—
(1) A sanction to erect a building accorded under these rules shall be valid for three years from the date on which it is sanctioned and may be renewed thereafter for a further period of two years on payment, in cash or bank draft, of such fee as may be determined by the Chairman-in-Council on the basis of rule 24, and on production of the previously sanctioned building plan. A building plan may be revalidated for a further period of 5 years only in case a building has been partly completed and occupancy certificate in terms of rule 34 has been issued as well as on production of the previous sanctioned building plan, the completion certificate and on receipt of fees subject to minimum of 25% and maximum of 50% of sanction for construction of building fee required to be paid as to be determined by the municipality from time to time.
(2) The erection of a building or work shall be completed within the period specified by the Board of Councillors under section 211.