8.1 Rain Water Harvesting
(1) In the areas specified by the Competent Authority, through a notification arrangement of roof rain-water harvesting within the plot shall have to be made by the plot owner, constructing the building on the plot where the area of the rooftop is 100 square metres or more.
(2) Ground Water Recharge:
(i) Recharging of ground water shall be mandatory not only for residential buildings but for all types of buildings, including Group Housing Societies having a plot area more than 500 square metres and above.
(ii) The Ground Water Recharge shall be mandatory for open spaces like parks, parking, plazas, playgrounds and other common areas. The harvesting and recharge structures could be constructed by the Authority with the involvement of communitybased organizations like Resident Welfare Associations.
(3) Rain Water Harvesting System Measures:
(i) The system of collection, conveyance and dispersion of rain-water for harvesting shall be made in such a manner that only clear water is able to enter and no contaminated waste water from the building or surrounding area finds its way in this system.
75[The entry points of the rain-water for harvesting shall be designed in such a manner that in dry season and dry days, these remain covered.]
(iii) The arrangement of quick filtration of rain-water shall also be made in the rain-water harvesting well/ tubewell so that rain-water does not pollute or choke the strata.
(iv) The complete system of rain-water harvesting shall be constructed within the plot area available with the owner.
(v) The recharge well shall be located at a distance of not less than 10 metres away from any structure handling sewage or industrial waste water (such as septic tank or effluent treatment plant etc.). This minimum distance of 10 metres
75 Substituted vide memo no. Misc.2339-VOL-I(Loose)/2026/7/15/2026-2TCP Dated:12/5/2026.
[83]
shall not be applicable to manholes or sewer lines although it shall be ensured that they are leak proof.
(vi) The detailed proposal of the system comprising collection, conveyance and dispersion of rain-water harvesting well/ tube well shall have to be shown on the building plan submitted for approval.
(vii) An Architect/ Engineer duly engaged for supervision and execution of the construction of the building shall submit the certificate stating that the rain water harvesting system is functional at site and same conforms to the provisions of this code. However, if the Architect/ Engineer found guilty of misrepresentation of the facts, penal proceedings shall be initiated along with debarring the concerned Architect/ Engineer from practicing in the State of Haryana.
(viii) The provision of Water (Prevention and Control of Pollution) Act, 1974 (Act 6 of 1974), with all amendments made from time to time, shall be applicable.
(ix) The construction of the building as laid down in sub-clause (1) shall be the part of occupation certificate. Unless such construction is completed as per the approval, no occupation certificate shall be issued.
(x) The owner of every building in the code shall ensure that the rain water harvesting structure is maintained in good repair for storage of water of Non-potable purposes and recharge of ground water at all time.
76 [(xi) The competent authority (including any authorised person/ body) shall conduct periodic inspections of premises wherein Rainwater Harvesting system stand installed based on which Occupation Certificate was granted with prior notice to the concerned to ensure proper functionality, maintenance and up-keep of the Rainwater Harvesting systems.
(xii) During the inspection, if any violation(s) is found, then notice shall be served by the competent authority (including authorised person/ body) to rectify the violations within a period of 4 weeks. In case the deficiencies are not rectified within the stipulated time period, then the defaulter shall be liable for penal action. In case of failure to rectify the deficiencies within a period of total 8 weeks
76 Inserted vide memo no. Misc.2339-VOL-I(Loose)/2026/7/15/2026-2TCP Dated:12/5/2026.
[84]
from issuance of initial notice, the Occupation certificate may be revoked on the recommendation of inspection authority.
(xiii) For effective operation/ functioning of Rain water Harvesting Systems, Selfcertificate by owner of the property stating that proper functioning of RWH structure is being ensured shall be uploaded in the first quarter on the online portal developed by competent authority issuing Occupation Certificate. The report of inspection authority shall also be hosted on the said online portal for transparency and information of all concerned.
(xiv) The Haryana Water Resources (Conservation, Regulation and Management) Authority being the nodal authority to encourage rainwater harvesting and catchment conservation as per geo-hydrological conditions may consider installation of Automatic Water Level Recorders (AWLR) for effective monitoring of water level preferably at cluster level.]
(4) The above said provisions of Rain Water Harvesting shall be strictly implemented in following districts/ towns:
(i) Panchkula
(ii) Kurukshetra
(iii) Shahabad
(iv) Karnal
(v) Panipat
(vi) Sonepat
(vii) Gohana
(viii) Faridabad
(ix) Yamuna Nagar
(x) Gurgaon
8.2 Provision of Rooftop Solar Photo Voltaic Power Plant
(1) The mandatory installation of Rooftop Solar Photovoltaic Power Plant for the buildings/ areas shall be in accordance with the order bearing no. 22/52/2005-5 Power, dated 21st March 2016 notified by Renewable Energy Department, Haryana and as amended from time to time.
(2) Installation of Solar Photovoltaic Power Plant as laid down in Code 8.2(1) above, shall be part of the occupation certificate.
(3) The Competent Authority shall empanel consultants (experts in solar photo voltaic power plant installations) for inspecting,
[85]
verifying and issuing certification for installation of Rooftop Solar Photovoltaic Power Plant.
8.3 Provision of Energy Conservation Building Code
(1) The provision for Energy Conservation Building Code shall be mandatory applicable on buildings/ areas in accordance to the direction no. 19/6/2016-5P, dated 31stMarch 2016 notified by Renewable Energy Department, Haryana and as amended from time to time.
(2) The applicant/ owner along with building plan application shall submit a certificate from an Architect confirming that the building plans confirms to the Energy Conservation Building Code.
(3) Occupation certificate of building shall be issued by the Competent Authority only after the applicant/ owner submit a certificate from an Architect (who has supervised the construction of building) that the building has been constructed in accordance with the provision of the Energy Conservation Building Code.
8.4 Water Re-Use and Recycling
(1) All buildings having a minimum discharge of 50,000 litres and above per day shall incorporate waste-water recycling system. The recycled water shall be used for horticultural, flushing and cooling tower purposes.
(2) The dual pipe system shall be adopted for these buildings.
8.5 Sustainable Building Materials
The following supplementary building materials (derived or processed waste) may be suitably used while constructing building in combination with conventional resources:
(i) Panels, hollow slabs, hollow blocks - Conservation of materials, less water requirement.
(ii) Fly Ash bricks, Portland Pozzolana cement, Fly ash concrete, phosphor gypsum based walling & roofing panels, particle wood – Recycled use of industrial/ agricultural by-products.
(iii) Fly ash/ AAC (Autoclaved Aerated light weight Concrete) panels/ CLC (Cellular Light weight Concrete) panels-Ensures thermal comfort (significant reduction in airconditioning requirement)
[86]
(iv) Use of bamboo & rapidly growing plantation timbers-Environmental benefits.
(v) Compressed Soil Earth Block and Rammed Earth Walls and Vaults- Environmentally friendly.
[87]