Chapter 6Siting, Planning and Architectural Control
6.1 Use of site, type and character of building
(1) Type and character of building, including ancillary buildings, that may be erected or re-erected on a site and the purpose for which these may be used shall not be other than that shown in the Development Plan or the approved layout plan or sector plan or zoning plan.
(2) Where the site does not form part of such layout or sector plan or zoning plan, the use shall be in conformity with the use of the surrounding area, or use prescribed in development plan and the decision of the Competent Authority shall be final in this respect.
(3) Every building that may be erected or re-erected on a site shall, in addition to the foregoing restriction, comply with the restriction shown in the Architectural Control Sheets, wherever applicable, shall have precedence over the zoning plan or the building Code.
(4) Every building that may be erected or re-erected on site shall, in addition to other restrictions under this Code, comply with the provisions made in the National Building Code of India (amended from time to time), wherever this building Codeis silent.
6.2Sub-division and amalgamation of plots
(1) Division of plot into smaller units is permissible in core areas with the prior approval of the Competent Authority. Each such plot shall be accessible separately and independently through a public road laid out and constructed to the satisfaction of the Competent Authority.
(2) 28[Except as otherwise expressly provided at the time of sale of a plot, not more than one building unit shall be erected on any one plot, but two or more plots may be amalgamated for purpose of erection of one “building unit”. In case of back to back plots which are to be amalgamated, two building units may be allowed maintaining the rear setbacks intact subject to the condition that a maximum of four dwelling units shall be permissible on the amalgamated plot. Note:- “Building unit” means a self-contained building with
28 Substituted vide memo no. Misc-2339-(ULB)-VOL-II/7/5/2006-2TCP dated 06.11.2020 and shall be implementable from date of issuance of said memo.
[41]
such out buildings as are ordinarily ancillary to the main building used in connection therewith and physically incapable of sub-division into two or more independent building units. A building unit may, however, be owned by an individual/ firm/ company or may be jointly and severally owned, provided it remains in a single indivisible ownership.]
(3) The Competent Authority shall be competent to refuse permission for construction on consideration of compact and economical development of the area till such time as availability of water supply, drainage arrangement, and other facilities are ensured to his satisfaction.
(4) In case plots which are to be amalgamated are back to back, then rear setback shall be maintained as per already approved zoning plan.
(5) In case plots adjacent plots are to be amalgamated, then setbacks shall be maintained as per zoning plan approved by the Competent Authority for whole amalgamated plot.
(6) Amalgamation of adjacent plots (side by side or back to back or both) where building stand constructed is permitted, subject to the condition that the constructed buildings shall not violate the provisions of zoning plan issued by the competent authority for the amalgamated plot.
(7) 29[The plots once amalgamated (either adjacent or back to back) may be allowed to be de-amalgamated subject to the condition that constructed buildings on these de-amalgamated plots shall conform to the approved zoning regulations of individual plots.]
37[Note:
i. In case of educational institutes (College/ University/ Schools), the Hostel component is restricted to 20% of maximum permissible covered area, and
ii. The residential component (i.e. residential facility for principal, teachers/ professors, staff, etc.) is restricted to 10% of maximum permissible covered area (separate from hostel component).
However, the Competent Authority after considering the requirement of the project can permit residential component above the stated percentage by recording the reasons, subject to maximum limit of 50% of FAR.]
(iv) 38[Industrial and IT
S r. N o.
Type of Industry
Maximum Ground Coverage
Permissible Basement
Maximum Permissible Floor Area Ratio
Maximum Permissible Height
1.
General
Unrestricted
Unrestricted
Unrestricted
Unrestricted
2.
Apparel and Footwear
3.
Biotechnology other than Pharmaceutica ls
4.
Information Technology/Information Technology Enable Services
5.
Date Centre Industry
Note for above Code 6.3(3)(ii), (iii) and (iv):
a. Unrestricted basement means as many numbers of basements subject to fulfilment of parking norms and/ or storage requirements and/ or use of maximum permissible FAR (in case of habitable use of basement) required in accordance to use of building.
b. Four levels basement shall be allowed only on-site having area more than 8000 square metres & in other cases as decided by Competent Authority.
37 Inserted vide memo no. Misc-138A-Loose/7/5/2006-2TCP datd 22.12.2017
38Substituted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
[49]
c. 39[The facility of enhanced FAR upto 150% beyond the General level of 125% in industrial use shall be permissible on payment of proportionate charges/ infrastructure strengthening charges i.e. proportionate EDC & conversion charges at existing rates. This shall apply only to existing buildings i.e. cases where permission was granted before 30.06.2016.
Provided that in case of general industries, purchasable FAR beyond 150% ; in case of Apparel and Footwear, Biotechnology other than Pharmaceuticals, Information Technology/ Information Technology Enable Services, purchasable FAR beyond 250% and in case of Data Centre Industry, purchasable FAR beyond 500% shall be allowed upon payment of fee/charges as prescribed by the Government .
Provided further that purchasable FAR shall be allowed to be availed subject to fulfilment of fire safety, structural safety, light & ventilation and parking norms as specified in this code.]
d. 40 [The facility of enhanced FAR of 25% beyond the General level of 150% in resorts, five star hotels, motels (with/without banquet hall facilities) shall be permissible on payment of proportionate charges/ infrastructure strengthening charges i.e. proportionate EDC & conversion charges at existing rates. This shall apply only to existing buildings i.e. cases where permission was granted before 30.06.2016 and zoning plan stood approved with FAR upto 150%.
Provided that purchasable FAR beyond 175% for commercial use, wherever applicable as per clause (ii) of Sub-code 6.3(3), shall be allowed upon payment of fee/charges as prescribed by the Government.
Provided further that purchasable FAR shall be allowed to be availed subject to fulfilment of fire safety, structural safety, light & ventilation and parking norms as specified in this code.]
39Substituted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
40Substituted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
[50]
e. 41 [The facility of enhanced FAR of 50% beyond the general level of 100% in institutional and educational use shall be permissible subject to payment of proportionate EDC & conversion charges at existing rates (in the form of augmentation charges) for the cases where permission was granted before 30.06.2016 and zoning plan stood approved with FAR of 100%. However, no such payment is required for such buildings where permission was granted by competent authority on or after 30.06.2016.]
f. 42 [The following norms shall be applicable for Data Centres: -
(i) 43[For Data Centres, parking requirement of 1 ECS for 200 sqm of covered area will be provided in open area.]
(ii) Multi-level DG stacking upto G+4 structure shall be allowed subject to NOC from Fire Department and shall not be considered as part of FAR.
(iii)Chillers on the roof can be installed subject to structural safety and clearance from competent authorities/ Fire Department/ Airports Authority of India.
(iv)Boundary wall upto height 3.6m, with further 1m height for ‘Y’ fencing shall be permitted.
(v) Minimum number of windows subjects to compliance with building and fire safety regulations and having modern fire-fighting equipments installed within the premises.]
44 [The setbacks of Industrial plots (excluding IT/ITes Industrial plots) to be developed by HSIIDC/HSVP/any other development agency/ licensed colonies should be on single side.
h. In case of industrial and commercial units falling under the category of special buildings as per The Haryana Fire and Emergency Services Act, 2022, the provisions laid down in Act ibid shall be strictly followed and all
41Substituted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
42Inserted vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
43Substituted vide memo no. Misc-720/2024/7/16/2024-TCP dated 25.07.2024
44Inserted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
[51]
stipulations specified by competent authority shall be adhered to.
i. In industrial plots/sites, a maximum of 10% FAR shall be allowed for Industrial/Labour Housing component in the form of dormitories for industrial workers only, which shall not be allowed to be sold independently.
(b) Group Housing
Sr. No.
Maximum permissible ground coverage
Permissible Basement
Floor Area Ratio
Maximum Permissible height
1.
35%
Upto four levels
175%
Unrestricted
Note:
I. The height of mumty/ lift room/ water tank/Building Maintenance Unit shall be exclusive of building height;
II. The parking requirement of group housing shall be governed by Code 7.1 or any other policy issued by the Government in this regard, from time to time.
III. 33[The siting and planning norms for Group Housing in Transit Oriented Development Zone (as defined in clause xciii-b of Code 1.2) shall be governed by clause 1 of Annexure D and policy notified on 09.02.2016, as amended from time to time.
32Inserted vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
33Inserted/amended vide memo no. Misc-2339-ULB-C/7/5/2006-2TCP dated 18.10.2022.
[46]
IV. The siting and planning norms for Affordable Group Housing (as defined in clause ii-a of Code 1.2) shall be governed by clause 2 of Annexure D and policy notified on 19.08.2013, as amended from time to time.]
(ii) 34[Commercial
Sr.n o.
Type of building
Area norm
Maximum permissible Ground Coverage
Permissible number of Basements
Maximum permissible Floor Area Ratio (FAR)
Maximum permissible Height
1
Shop-cum-Flat (SCF) or Shop-cum-Office (SCO) or Shop-cum-Office-cum-Flat (SCOF) or Double Storey Shop (DSS) purposes or for shopping booths/plots
Unrestricted
100%
Unrestricted
Unrestricted
Unrestricted
2
Commerci al colony: includes shopping mall, multiplex, Department al store, Integrated commercial Complex, Service Apartment, starred Hotel/Unstarred Hotel, offices.
Unrestricted
Unrestricted
Unrestricted
Unrestricted
Unrestricted
3
Dhabas
1000 square metres to 1 acres
Unrestricted
Unrestricted
40 %(maximum 50 sqm for kiosks like STD, Books, Cassettes,
5 metres
34Substituted vide memo no. Misc-2339-ULB-Vol-I/7/8/2025-2TCP dated 08.12.2025
[47]
CDs etc.)
4
Banquet Hall
Unrestricted
Unrestricted
Unrestricted
Unrestricted
Unrestricted
5
Starred Hotels, Non Starred Hotels, Restaurants Resort, Motel(with/without banquet hall facilities), Guest Houses
Unrestricted
Unrestricted
Unrestricted
Unrestricted
Unrestricted
6
Amusement Park
Unrestricted
Unrestricted
Unrestricted
50 %(with permissible15%commercial component)
Unrestricted
7
Big box retail stores
Unrestricted
Unrestricted
Unrestricted
175%
Unrestricted
8
Petrol Stations
Unrestricted
As per terms and conditions of Oil companies.]
35[Note: The siting and planning norms for Integrated Commercial Complex (as defined in the Act No. 8 of 1975) in Transit Oriented Development Zone (as defined in clause xciii-b of Code 1.2) shall be governed by clause 1 of Annexure D and policy notified on 09.02.2016, as amended from time to time.]
(iii) 36[Institutional and Educational
Plot area slabs
Maximum permissible Ground Coverage
Permissible Basement
Maximum permissible Floor Area Ratio (FAR)
Maximum permissible Height
For all plot sizes
35 %
Upto four levels
150%
Unrestricted
Nurshing Home and Clinic Sites
50%
Single level
150 %
Unrestricted
35Substituted vide memo no. Misc-2339-ULB-C/7/5/2006-2TCP dated 18.10.2022.
36Inserted/amended vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
[48]
Note:-
Clause 1:- All references to National Building Code 2016 in the Haryana Building Code 2017, wherever appearing, shall stand omitted.
Clause 2:- If any clause/entry elsewhere in the Haryana Building Code 2017 comes in conflict with the table in Clause ii & iv, the table in the Clause ii & iv shall prevail.]
(v) Ware house/ Storage/ Godown
Sr. no.
Type of building
Maximum permissible Ground coverage
Maximum permissible Floor Area Ratio (FAR)
Setbacks all around the plot (in metres)
1
Integrated Inland Container Depots/ Custom Bounded Areas
60%
75 %
15
2
Warehouse other than agricultural produces/ Grain Godowns/ Silos
9
3
Warehouse For Agricultural Produces/ Grain Godowns/ Silos
6
4
Gas Go-down
As per zoning plan
Note:
If a warehouse contains storage of agro produce and also products other than agriculture produce, then the setbacks of 9 metres shall be followed.
(vi) Recreational
Sr. no.
Type of building
Area norms
Maximum permissible Ground coverage
Permissible basement
Maximu m permissib le Floor Area Ratio (FAR)
Maxmi mumper missible height
1
Recreational site in residential zone such as Club/ Community Centre including swimming pools, Badminton/ Tennis/
0.5acre to ac 2res
35 %
Single level
100 %
Unrestric ted
[52]
Sr. no.
Type of building
Area norms
Maximum permissible Ground coverage
Permissible basement
Maximu m permissib le Floor Area Ratio (FAR)
Maxmi mumper missible height
Squash Court, Indoor Games, Canteen/ Restaurant (not exceeding 200 square metres area) and related uses. Note: a. Not more than 10% of the permitted FAR to be allowed for rooms. b. Maximum 10% of the total FAR can be utilized for commercial use viz, Canteen/ Restaurants.
2
Open Space Zone such as Mini Amusement Park, Outdoor games facility, Canteen (not exceeding 200 square metres area) and related infrastructure requiring minimal construction activity Note: The overall character of the site shall be maintained as open with minimum construction to be permitted at site. However, Joy rides/ water parks etc. Installed in such projects, which are open to sky shall not be considered to be part of covered area/ FAR.
2acres to 5 acres
10%
Single level
10%
Unrestric ted
[53]
(vii) Mixed land use
In case of mixed landuse site/ plot, the ground coverage, FAR, setback and other norms shall be in accordance with the zoning plan issued by Competent Authority.
45 [Note: The siting and planning norms for Mixed land use in Transit Oriented Development Zone (as defined in clause xciii-b of Code 1.2) shall be governed by shall be governed by clause 1 of Annexure D and policy notified on 09.02.2016, as amended from time to time.]
(viii) General note: -
(a) The unrestricted height shall only be allowed subject to submission of No Objection Certificate from the appropriate authority (i.e. Defence Establishment, Air Force Establishment, Airport Authority of India, etc.), if any in the area.
Note: It is the responsibility of the competent authority to procure the zoning map/ instructions issued by the appropriate authority (i.e. Defence Establishment, Air Force Establishment, Airport Authority of India, etc.), if any present in its jurisdiction.
(b) The basement may be allowed to the maximum roof height of not more than 1.5 metres from the ground level for the foot print of the building and after that till the zoned area, the roof of basement shall be flush with the ground level.
(c) 46 [The Additional FAR that can be availed by the applicant himself or by the purchaser of TDR Certificate (as defined in clause xciii-a of Code 1.2) shall be governed by clause 3 of Annexure D and policy notified on 16.11.2021, as amended from time to time.]
(d) 47[Electric Vehicle Charging Infrastructure shall be made free from FAR and shall be provided as follows: -
(i) Non-Residential (Shopping complexes, malls, hotels, office spaces etc.) with parking demarcated for at least 10 cars – At least 1 Electric Charging Spots for every 3 parking slots and 100% EV ready with conduits in place for New and Renovated Buildings.
45Inserted/amended vide memo no. Misc-2339-ULB-C/7/5/2006-2TCP dated 18.10.2022.
46Inserted/amended vide memo no. Misc-2339-ULB-C/7/5/2006-2TCP dated 18.10.2022.
47Inserted/amended vide memo no. Misc-720/2024/7/16/2024-TCP dated 25.07.2024 and thereafter substituted vide memo no. MISC-2339(ULB)-Loose/2026/7/15/2026-2TCP dated 05.06.2026.
[54]
(ii) Residential (housing societies run through co-operatives, group housing and those managed through RWAs) with parking demarcated for at least 10 cars – At least 1 Electric Charging Spots for every 5 parking slots and 100% EV ready with conduits in place for New and Renovated Buildings.
The Electric Charging Spots may be provided in basement and/or stilt floors subject to adherence to suitable fire safety and electrical safety norms, to be certified by Fire Department.
Provided that allocation of Electric Charging Spots with regard to parking spaces, as per norms, shall be disclosed at the time of submission of application for grant of Occupation Certificate.
Provided further that in case of existing buildings, if the individual allottee(s) intends to install electrical charging infrastructure for Electric Vehicle(s) in his allocated parking space, then the same may be allowed subject to adherence to suitable electrical safety and fire safety norms, to be certified by the Fire Department as well as concerned DISCOM.]
6.4Architectural/ Frame Control and siting of building
(1) In the case of building sites where architectural control is considered necessary by the Competent Authority, he shall cause to be prepared Architectural Control Sheets for this purpose showing the extent of architectural control on the various units of the buildings or on a portion of such buildings, among others in the following respects: -
(i) Compulsory elevations for a particular building or a row of buildings.
(ii) Compulsory height on the front or on any side exposed to view from a street upon which building shall have to be erected and completed within a certain period.
(iii) Compulsory height of floors.
(iv) Compulsory height and design of cornices, sills and top of windows in the first and higher storeys.
(v) Compulsory building line along which the building shall have to be erected and completed within a certain period.
(vi) Compulsory type designs of balconies.
(vii) Compulsory use of materials texture and colour.
[55]
(2) Building line in front, rear and side shall be as per the zoning plan approved by the Competent Authority.
(3) Special zoning:
In case competent authority decides that it is not feasible to keep setbacks/ spaces as prescribed above due to peculiar shape and condition of the site, then the competent authority after recording reasons in writing may issue special zoning plan, keeping in view the fire safety.
(4) Frame Control:
No frame control shall be applicable on residential plotted buildings.
6.3Proportion of the site which may be covered with buildings
(1) The proportions of covered area of a building, including ancillary buildings, shall be in accordance with the plot categories given in following sub-Codes and the remaining portion shall be left open in the form of open space around the building.
(2) Core Areas
(i) 30[Residential
Sr. no.
Plot area slabs
Maximum permissible Ground
Permissible basement
Maximum permissible Floor Area
Maximum permissible Height (G+3
29Substituted vide memo no. Misc-2339-(ULB)-VOL-II/7/5/2006-2TCP dated 06.11.2020 and shall be implementable from date of issuance of said memo.
30Inserted/amended vide memo no. Misc-2339(ULB)-Vol-III/SD(DK)/2019/7/19/2019-2TCP dated 04.06.2019 and further substituted vide memo no. Misc-2339-VOL-III-ULB/7/5/2006-2TCP dated 20.10.2020 and shall be implementable from date of issuance of said memo.
[42]
Coverage
Ratio (FAR)
Floor) (including stilt (S+4 Floor)) (in metres)
1
Upto 60 square metres
85%
Single level
220 %
16.5
2
Above 60 to 150 square metres
80%
Single level
200 %
16.5
3
Above 150 to 225 square metres
70%
Single level
180%
16.5
4
Above 225 to 450 square metres
60%
Single level
160 %
16.5
5
Above 450 square metres
50%
Single level
140 %
16.5]
(ii) Commercial
Sr. no.
Plot area slabs
Maximum permissible Ground Coverage
Permissible basement
Maximum permissible Floor Area Ratio (FAR)
Maximum permissible Height
1
upto 50 square metres
100%
Single level
200 %
Unrestricted
2
Above 50 to 150 square metres
85%
Single level
200 %
Unrestricted
3
Above 150 to 225 square metres
75 %
Single level
200 %
Unrestricted
4
Above 225 to 450 square metres
60 %
Single level
175 %
Unrestricted
5
Above 450 to 1000 square metres
40%
Single level
175 %
Unrestricted
Note: Example for calculating FAR and ground coverage as per plot area slabs for 14 marla and 1 Kanal plot:
Calculations for Ground Coverage
Plot area slabs
Area in each slab (in square metres)
Maximum permissible Ground Coverage
14 marla plot (354.1 square metres)
1 Kanal plot(505.86square metres)
Upto 75
75
66
49.5
49.5
76-100
24
66
15.84
15.84
101-150
49
60
29.4
29.4
151-250
99
60
59.4
59.4
251-350
99
50
49.5
49.5
[43]
351-500
149
50
4.05
74.5
501-1000
499
45
4.8861
207.69
283.0261
Actual permissible ground coverage
58.6529229
55.94971316
Calcul
ations for Floor Area R
atio (FAR)
Plot
Area in each
1
area
slab (in square
Maximum
Kanal(505.
slabs
metres)
permissible Floor Area Ratio (FAR)
14 marla(354.1 square metres)
86 square metres)
Upto 75
75
165
123.75
123.75
76-100
24
165
39.6
39.6
101-150
49
145
71.05
71.05
151-250
99
145
143.55
143.55
251-350
99
125
123.75
123.75
351-500
149
120
9.72
178.8
501-1000
499
100Actual permissible FAR
511.42144.4281276
10.858691.358136.6703699
(iii) Plot setbacks (core areas)
The buildings shall not project beyond the building lines as shown in the zoning plan of respective schemes. However, in case where zoning plans are not prepared, the minimum setbacks shall be provided as below:-
Sr. No.
Area of plot (in square metres)
Minimum Front Setback (in metres)
Minimum Rear Setback (in metres)
1.
Upto 60 square metres
0.5
0.5
2.
Above 60 to 150 square metres
1.5
1.0
3.
Above 150 to 225 square metres
2.5
2.0
4.
Above 225 to 450
3.0
3.0
[44]
Note: -
square metres
5.
Above 450 square metres
4.5
4.0
(a) The front setbacks can be adjusted to achieve permissible Ground Coverage subject to the condition that rear setbacks are fixed.
(b) In core areas single level basement may be allowedupto the maximum roof height of not more than 1.5 metres from the ground level for the area of maximum permissible coverage and after that till the zoned area, the roof of basement shall flush with the ground level.
(3)Areas other than core areas
(i) Residential
(a) 31[Plotted
Sr. no.
Plot area slabs
Maximum permissible Ground Coverage
Permissib le Basement
Maximu m permissib le Floor Area Ratio (FAR)
Maximum permissible Height (G+3 Floor) (including stilt (S+4 Floor)) (in metres)
1
Upto 100 square metres
75%
Single level
165 %
16.5
2
Above 100 to 250 square metres
75%
Single level
145 %
16.5
3
Above 250 to 350 square metres
66%
Single level
130 %
16.5
4
Above 350 to 500 square metres
66 %
Single level
120 %
16.5
5
Above 500 to 1000 square metres
66 %
Single level
100 %
16.5]
I. The additional FAR is allowed on payment of charges as approved by Government from time to time.
II. Provided that the building shall conform to the restriction contained in the zoning plans or the architectural control sheets of respective area of sector.
III. Provided further that in case of sites measuring 100 square metres or less under any scheme relating to houses for economically weaker section framed by the Government, Housing Board, Improvement Trust or any other authority, the Competent Authority may relax the above condition.
IV. Provided further that the 25% of the built up area of the building or upto 50 square metres, whichever is less, can be used for non-
31Substituted vide memo no. Misc-2339-ULB-Vol-II-A/7/5/2006-2TCP dated 25.04.2022. This amendment shall come into force from 25.04.2022.
[45]
nuisance professional consultancy services, after getting permission from Competent Authority in writing. The applicant shall apply for specific use of consultancy services as mentioned in Code 1.2(1)(lx) in Form N-I along with fee as mentioned inSchedule IV-A. The permission shall be granted in Form N-II”.
V. The stilts are permitted for parking purposes in residential and commercial plots of all sizes, subject to the condition that maximum permissible height of building shall not exceed 15 metres.
VI. 32[Any violation of the permissible ground coverage limits as indicated in the table above shall be non-compoundable.
VII. Plot setbacks (areas other than core areas)
Sr. No
Area of Plot (in square metres)
Minium Front Setback (In meters)
Minimum Rear Setback (in meters)
1.
Upto 75 square metres
1.0
1.5
2.
Above 75upto 150 square metres
1.5
2.0
3.
Above 150 upto 250 square metres
2.0
2.0
4.
Above 250 square metres
3.0
3.0
Note: No Balcony beyond the rear zoning shall be permitted]
6.5Green building measures and incentives
(1) For reducing consumption of total energy, fresh potable water and reduction in total waste generation by modern buildings, the green building measures are to be adopted by all building on various plot sizes above 500 square metres.
(2) The applicant shall be awarded benefits of additional Floor Area Ratio (on plot area) for adopting either green norms specified in sub-Code (3) or by getting his building/ site/ project certified from Green Rating for Integrated Habitat Assessment(GRIHA) 48 [/Indian Green Building Council (IGBC)/ Leadership in Energy and Environmental Design (LEED)] and achieving rating as specified in Code 6.5 (4):
green norms and additional Floor Area Ratio (FAR):
(i) For installing solar photovoltaic power plant:
Generating power in respect of total connected load of building from solar photovoltaic power plant
15 to25%
26 to50%
51 to75%
76 to100%
Additional FAR for all building uses (except plotted residential)
3%
6%
9%
12%
(ii) For installing Solid Waste Management Plant:
Installing Solid Waste Management Plant for treatment of total generated waste.
Additional FAR for all building uses (except plotted residential)
3%
48 Inserted vide memo no. Misc-2339 (ULB)-Vol-III/SD(BS)/7/5/2006-2TCP dated 08.05.2018
[56]
(4) 49[The details of rating achieved from GRIHA/IGBC/LEED and Additional Floor Area Ratio (FAR) is as under:-
Additional FAR for all building uses (except plotted residential)
3%
6%
9%
12%
15%
GRIHA rating
1star
2star
3 star
4star
5 star
IGBC/LEED rating
-
-
Silver
Gold
Platinum
Note: -
a. The additional FAR shall be given over and above the maximumpermissible FAR as stated in Code 6.3.
b. The incentive of additional FAR for achieving GRIHA/IGBC/LEED rating shall be applicable only on new buildings. The incentive of additional FAR would also be applicable on buildings which are under construction and registered with the rating agencies (GRIHA/IGBC/LEED) and incorporating features for making Green Buildings but have not yet obtained Occupation Certificate. The FAR would be calculated proportionately discounting the buildings for which Occupation Certificate has been granted.
c. The applicant has to pay only Infrastructure Development Charges on additional FAR granted as incentive under Code 6.5.]
(5) Procedure for availing incentive:
(i) The applicant is required to submit provisional rating from “Green Rating for Integrated Habitat Assessment (GRIHA)/ 50 [Indian Green Building Council (IGBC)/ Leadership in Energy and Environmental Design (LEED) at the time of submission of building plan application to the Competent Authority (Code 4.1 and 4.2) for claiming incentive of additional FAR stated at Code 6.5 (4).
(ii) At the time of applying for Occupation Certificate of building, the applicant is required to submit final rating from GRIHA.
(iii) The Competent Authority only after verifying that the GRIHA rating achieved in final rating is same as provisional rating submitted at the time of building plan application, shall issue the Occupation Certificate:
Provided, in case the final rating achieved is lesser than the provisional rating, the occupation certificate shall be issued after compounding the additional FAR (i.e. difference of additional FAR from provisional rating and
49 Inserted/amended vide memo no. Misc-2339 (ULB)-Vol-III/SD(BS)/7/5/2006-2TCP dated 08.05.2018
50Inserted/amended vide memo no. Misc-2339 (ULB)-Vol-III/SD(BS)/7/5/2006-2TCP dated 08.05.2018
[57]
final rating) acquired by the applicant, at ten times the rates of EDC applicable at the time of submission of occupation certificate application.
Provided, the applicant may claim additional FAR, if final rating is higher than the provisional rating.
(iv) 51The details of rating achieved from GRIHA/IGBC/LEED and Additional Floor Area Ratio (FAR) is as under:-
(a) The additional FAR shall be given over and above the maximum permissible FAR as stated in Code 6.3.
(b) The incentive of additional FAR for achieving GRIHA/IGBC/LEED rating shall be applicable only on new buildings. The incentive of additional FAR would also be applicable on buildings which are under construction and registered with the rating agencies (GRIHA/IGBC/LEED) and incorporating features for making Green Buildings but have not yet obtained Occupation Certificate. 2 The FAR would be calculated proportionately discounting the buildings for which Occupation Certificate has been granted.
(c) The applicant has to pay only Infrastructure Development Charges on additional FAR granted as incentive under Code 6.5.
51Inserted/amended vide memo no. Misc-2339 (ULB)-Vol-III/SD(BS)/7/5/2006-2TCP dated 08.05.2018