12.1 Environmental clearances for building and construction.
(1) The Competent Authority shall approve and certify the compliance of environmental clearances requirements for following categories building:
| Sr. No. | Building Category | Built up area (in square metres) |
|---|---|---|
| 1 | Category A | 5000- 20000 |
| 2 | Category B | Above 20000-50000 |
| 3 | Category C | Above 50000-150000 |
(2) The Competent Authority shall approve and certify the compliance of
environmental clearances by ensuring the conditions stated below are fulfilled:
Environmental conditions for Category A buildings:
| Sr. No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage. | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | Along with Occupation Certificate application. |
| 2 | Water Conservation-Rain Water Harvesting and Ground Water Recharge. | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application. |
| 2a | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application. |
| 4 | Energy | In common areas, LED/ solar lights must be provided. | Along with Occupation Certificate application. |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | Along with notice of commencement of construction |
| 5a | The exhaust pipe of the DG set, if installed, must be minimum 10 metres away from the building. In case it is less than 10 metres away, the exhaust pipe shall be taken up to 3 metres above the building. | Along with Occupation Certificate application. | |
| 6 | Green cover | A minimum of 1 tree for every 80 square metres of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | Along with notice of commencement of construction. |
| 6a | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | Along with notice of commencement of construction. |
Environmental conditions for Category B buildings:
| Sr. No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage. | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | Along with Occupation Certificate application. |
| 2 | Water Conservation-Rain Water Harvesting and Ground Water Recharge. | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application. |
| 2a | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application. |
| 4 | Energy | In common areas, LED/ solar lights must be provided. | Along with Occupation Certificate application. |
| 4a | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or | Along with Occupation | |
| wind mills or hybrid should be provided. | Certificate application. | ||
| 4b | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. | Along with Occupation Certificate application. | |
| 4c | Use of flyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | Along with notice of commencement of construction. | |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. |