(1) The construction of the basement shall be allowed by the Competent Authority in accordance with the provisions of Zoning Plan.
(2) The basement shall be constructed within the zoned area and may be put to following uses:
(i) Storage of household or other goods of ordinarily non-combustible material; (ii) Strong rooms, bank cellars, etc.;
(iii) Air-conditioning equipment and other machines used for services and utilities of the building.
(iv) Modern automated laundry shall be allowed only in the basement of Hotel and Hospital/ Nursing Home sites, group housing, service apartment, as an ancillary services for the purpose for which permission is granted by Competent Authority and meant for in-house services only subject to the condition that the effluent of the laundry shall be properly pumped up to ground floor inspection chambers and discharged to the main sewer;
(v) Car wash, security room, ticketing booth, driver waiting room, toilets, loading/ unloading activities, lift/ escalator lobbies and parking.
(3) The basement may be used for habitable purpose subject to fulfilment of fire safety, light & ventilation and exit provisions on opposite directions. However, in case basement is used for habitable purpose, the area utilized will be counted towards total covered area of building i.e. FAR. The basement is used for uses other than specified in Code 7.16(2) above, shall be considered for habitable use and shall be counted towards FAR, subject to fulfilment of fire safety, light and ventilation and exit provisions on opposite directions.
(4) The use of basement shall be specified in the building plans at the time of submission, stated in Code 2.1 and 2.2.
(5) The basement shall have the following provisions:
(i) Light and ventilation of basement:
(a) An open area of a minimum width of 1.8 metres shall be provided across the full length and/ or width of the basement storey. This area shall be within the limits of the site and shall be paved with impervious material above a concrete bed. It shall be completely unobstructed except that in this area steps may be allowed for access to it, if considered necessary.
(b) In the case of buildings governed by the zoning, basement storeys shall be lighted and ventilated by means of windows of the minimum area within 1/10th to 1/25th of the total floor area, at least half of which must open subject to the condition that the deficit of light and ventilation shall be made up by providing artificial lighting and mechanical ventilation as per provision of National Building Code of India.
In case of buildings governed by Architectural Control and the basement are for storage/ services, the provisions of light and ventilation shall be as shown on the control sheets. In case the basement is extended, the deficit in light and ventilation be proportionately increased subject to fulfilment of fire safety norms and structural stability is ensured by the Structural Engineer.
In the second basement and basement below the lower ground floor where it is to be used for parking/ services, the provisions contained in National Building Code and Fire Safety Codes as applicable shall be followed. The basement story for any other purpose conforming to the land of the site can be allowed.
(c) Adequate ventilation shall be provided for the basement. The ventilation requirements shall be the same as required by the particular occupancy according to Code. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans, airconditioning systems, etc.;
(ii) Damp proofing of basement:
The walls of the basement story shall be properly damp proofed and if in contact with the soil, they must be effectively secured against dampness from the soil with the approved vertical and horizontal damp proof course.
(iii) Height of the basement:
(a) The minimum clear height of the basement shall be 2.4 metres and maximum clear height of the basement shall be up to 4.75 metres from floor to the underside of the roof slab or ceiling subject to structural stability to be certified by the Structural Engineer.
(b) The minimum height of the roof of basement shall be metre and maximum 1.5 metres above the average surrounding ground level for plots upto 1000 square metres.
(c) For plots above 1000 square metres, the roof of basement shall be either flushed with ground or the maximum height shall be 1.5 metres above the average surrounding ground level.
(iv) Drainage of basement:
(a) Open area adjoining a basement story, if any, shall be effectively drained to the satisfaction of the Competent Authority:
(b) The responsibility of draining a basement storey and for protecting it from rain shall be that of the owner.
(c) The access to the basement shall be separate from the main and alternative staircase providing access and exit from higher floors.
(d) Where the staircase is continuous in the case of buildings served by more than one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and higher floors. Open ramps shall be permitted if they are constructed within the building line subject to the provision of Code 7.9.
(e) The “Exit” requirements in basements shall comply with the provisions of Part 4 ‘Fire and Life Safety’ of National Building Code of India.
(6) Basement shall not be constructed beyond the zoned area or in case existing adjacent building, setback of 2.4 metres shall be taken from the existing adjacent building.