The height or permissible elevation for the structure, requiring grant of NOC, shall be calculated based upon the International Civil Aviation Organization (ICAO) Annex 14 Obstacle Restriction and Removal, Annex 10 the Radio Communication, Navigation and Surveillance (CNS) aids and Doc 8168, Vol II defining the operational requirements for minimum altitudes of various segments of published or proposed instrument approach procedures.
This annexure–II defines various OLS surfaces, requirements w.r.t. CNS and PAN-OPS, procedure to be followed while applying and processing the NOC for height clearance.
- Obstacle Limitation Surfaces (based on ICAO Annex 14 and DGCA India Civil Aviation Requirements (CARs) on Aerodrome Design and Operations) are as under:
1.1 Take-off climb surface-The dimensions of the take-off climb surface shall not be less than the dimensions specified in the table given below except that if a runway is meant for takeoff, a lesser length may be adopted for the takeoff climb surface where such lesser length would be consistent with procedural measures adopted to govern the outward flight of aeroplanes.
Table 2.1 -Dimensions and Slopes of Obstacle Limitation Surfaces
(Runways Meant for Take-Off)
| Surface and dimension * | Code Number | ||
| (1) | 1 | 2 | 3 or 4 |
| (2) | (3) | (4) | |
| TAKE OFF CLIMB | |||
| Length of inner edge | 60 meters | 80 meters | 180 meters |
| Distance from runway end | 30 meters | 60 meters | 60 meters |
| Divergence (each side) | 10% | 10% | 12.5% |
| Final width | 380 meters | 580 meters | 1200 meters 1800 meters** |
| Length | 1600 meters | 2500 meters | 15000 meters |
| Slope | 5% | 4% | 2% |
| * All dimensions are measured horizontally. **When the intended track includes changes of heading greater than 15 degree for operations conducted in IMC, VMC by night. | |||