12.1 Environmental clearances for building and construction
(1) The Competent Authority shall approve and certify the compliance of environmental clearances requirements for following categories building:
| Sr. No. | Building Category | Built up area (in square metres) |
|---|---|---|
| 1 | Category A | 5000- 20000 |
| 2 | Category B | Above 20000-50000 |
| 3 | Category C | Above 50000-150000 |
(2) The Competent Authority shall approve and certify the compliance of environmental clearances by ensuring the conditions stated below are fulfilled:
Environmental conditions for Category A buildings:
| Sr. No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage. | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | Along with Occupation Certificate application. |
| 2 | Water Conservation-Rain Water Harvesting and Ground Water Recharge. | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application. |
| 2a | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application. |
| 4 | Energy | In common areas, LED/ solar lights must be provided. | Along with Occupation Certificate application. |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ | Along with notice of commencement of construction |
[101]
| tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | |||
|---|---|---|---|
| 5a | The exhaust pipe of the DG set, if installed, must be minimum 10 metres away from the building. In case it is less than 10 metres away, the exhaust pipe shall be taken up to 3 metres above the building. | Along with Occupation Certificate application. | |
| 6 | Green cover | A minimum of 1 tree for every 80 square metres of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | Along with notice of commencement of construction. |
| 6a | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | Along with notice of commencement of construction. |
Environmental conditions for Category B buildings:
| Sr. No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage. | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | Along with Occupation Certificate application. |
| 2 | Water Conservation-Rain Water Harvesting and Ground Water Recharge. | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application. |
| 2a | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application. |
[102]
| 4 | Energy | In common areas, LED/ solar lights must be provided. | Along with Occupation Certificate application. |
|---|---|---|---|
| 4a | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. | Along with Occupation Certificate application. | |
| 4b | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. | Along with Occupation Certificate application. | |
| 4c | Use of flyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | Along with notice of commencement of construction. | |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | Along with notice of commencement of construction. |
| 5a | The exhaust pipe of the DG set, if installed, must be minimum 10 metres away from the building. In case it is less than 10 metres away, the exhaust pipe shall be taken up to 3 metres above the building. | Along with Occupation Certificate application. | |
| 6 | Green cover | A minimum of 1 tree for every 80 square metres of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | Along with notice of commencement of construction. |
| 6a | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | Along with notice of commencement of construction. |
Environmental conditions for Category C buildings:
| Sr. No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage. | The inlet and outlet point of natural drain system should be maintained | Along with Occupation |
[103]
| with adequate size of channel for ensuring unrestricted flow of water. | Certificate application. | ||
|---|---|---|---|
| 2 | Water Conservation-Rain Water Harvesting and Ground Water Recharge. | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application. |
| 2a | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application. | |
| 2b | The ground water shall not be withdrawn without approval from the competent authority. | Along with notice of commencement of construction. | |
| 2c | Use of potable water in construction should be minimized. | Along with notice of commencement of construction. | |
| 2d | Low flow fixtures and sensors must be used to promote water conservation. | Along with notice of commencement of construction. | |
| 2e | Separation of grey and black water should be done by the use of dual plumbing system. | Along with notice of commencement of construction. | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application. |
| 3a | All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | Along with Occupation Certificate application. | |
| 3b | Organic waste composter/ vermiculture pit with a minimum capacity of 0.3 Kg/tenement/day must be installed wherein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | Along with Occupation Certificate application. |
[104]
| 4 | Energy | In common areas, LED/ solar lights must be provided. | Along with Occupation Certificate application. |
|---|---|---|---|
| 4a | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. | Along with Occupation Certificate application. | |
| 4b | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. | Along with Occupation Certificate application. | |
| 4c | Use of fly ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | Along with notice of commencement of construction. | |
| 4d | Use of concept of passive solar design of buildings using architectural design approaches that minimize energy consumption in buildings by integrating conventional energy-efficient devices, such as mechanical and electric pumps, fans, lighting fixtures and other equipment, with the passive design elements, such as building orientation, landscaping, efficient building envelope, appropriate fenestration, increased day lighting design and thermal mass. | Along with Occupation Certificate application. | |
| 4e | Optimize use of energy systems in buildings that should maintain a specific indoor environment conducive to the functional requirements of the building by following mandatory compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India. | Along with Occupation Certificate application. | |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | Along with notice of commencement of construction. |
[105]
| 5a | The exhaust pipe of the DG set, if installed, must be minimum 10 metres away from the building. In case it is less than 10 metres away, the exhaust pipe shall be taken up to 3 metres above the building. | Along with Occupation Certificate application. | |
|---|---|---|---|
| 6 | Green cover | A minimum of 1 tree for every 80 square metres of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | Along with notice of commencement of construction. |
| 6a | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | Along with notice of commencement of construction. | |
| 7 | Sewage Treatment Plant | Sewage treatment plant with capacity of treating 100% waste water shall be installed. Treated water must be recycled for gardening and flushing. | Along with Occupation Certificate application. |
| 8 | Environment Management Plan | The environment infrastructure like Sewage Treatment Plant, Landscaping, Rain Water Harvesting, Power backup for environment, Infrastructure, Environment Monitoring, Solid Waste Management and Solar and Energy conservation, should be kept operational through Environment Monitoring Committee with defined functions and responsibility. | Along with Occupation Certificate application. |
(3) The applicant shall self-certify the above stated environmental conditions with the certification of supervision/ completion from the Architect or Engineer or Bureau of Energy Efficiency Certified Energy Auditors, as the case may be, responsible for supervising the construction of building and/ or installing the solar photovoltaic power plant. Sewage Treatment Plant, Solid waste management system, ECBC Code & others.
(4) The applicant shall submit the self-certification of environmental conditions to the Competent Authority as per schedule given in Code 12.1(2).
(5) The Competent Authority shall verify the certification and shall issue consent/ comments within 10 (Ten) working days of receiving the certification. The Environmental Clearance certificate shall deemed to be accepted, if it is in conformity with
[106]
conditions stated above, but no consent/ comments have been passed by Competent Authority within specified time.
(6) If the owner or Architect or Engineer or Consultant as mentioned in Code 12.1(3) as the case may be, submits a wrong/ false self-certification or if any additional construction or violation is reported to exist at site or has concealed any fact or misrepresented regarding environmental conditions stated in Code 12.1(2), he shall be jointly and severally held responsible for such omission and complaint against the Architect for suspension of his registration and the owner shall be liable to pay for the penalty as may be decided by the Competent Authority after giving an opportunity of hearing. Further, if it is emerged that the information is concealed by Engineer/ Consultant/ Owner, necessary penal proceedings will be initiated along with debarring Engineer/ Consultant/ Architect from practicing in the State of Haryana.
(7) In case environmental clearance is issued by Competent Authority, no separate prior environmental clearance shall be required.
(8) In case the building is certified from GRIHA, there is no requirement for issue environmental clearance.
[107]