While engaging persons for the job the supervisor should check up and make sure that they are skilled in the particular job they have to perform.
18.2.1.1 The helmets shall be worn properly and at all times during the work and shall conform to the accepted standards [7(9)].
18.2.1.2 The safety goggles shall be used while performing duties which are hazardous to eye like
drilling, cutting and welding. The goggles used shall conform to the accepted standards [7(15)] and should suit individual workers.
18.2.1.3 The welders and gas cutters shall be equipped with proper protective equipment like gloves, safety boots, aprons and hand shields [see accepted standard 7(15)]. The filter glass of the hand shield shall conform to the accepted standards [7(16)] and should be suitable to the eyes of the particular worker.
18.2.1.4 When the work is in progress, the area shall be cordoned off by barricades to prevent persons from hitting against structural components, or falling into excavated trenches or getting injured by falling objects.
18.2.1.5 Warning signs shall be displayed where necessary to indicate hazards, for example (a) ‘440 VOLTS’, (b) ‘DO NOT SMOKE’, (c) ‘MEN WORKING AHEAD’, etc. Hand lamps shall be of low voltage preferably 24 V to prevent electrical hazards.
18.2.1.6 All electrically operated hand tools shall be provided with double earthing.
18.2.2 Anchors for guys or ties shall be checked for proper placement. The weight of concrete in which the anchors are embedded shall be checked for uplift and sliding.
18.2.2.1 Split-end eye anchors shall only be used in good, solid rock.
18.2.2.2 The first load lifted by a guy derrick shall be kept at a small height for about 10 min and the anchors immediately inspected for any signs or indications of failure.
18.2.3 When a number of trusses or deep girders is loaded in one car or on one truck, all but one being lifted shall be tied back unless they have been tied or braced to prevent their falling over and endangering men unloading.
18.2.4 The erection gang shall have adequate supply of bolts, washers, rivets, pins, etc, of the correct size. Enough number of bolts shall be used in connecting each piece using a minimum of two bolts in a pattern to ensure that the joint will not fail due to dead load and erection loads. All splice connections in columns, crane girders, etc, shall be completely bolted or riveted or welded as specified in the drawing before erection.
18.2.5 Girders and other heavy complicated structural members may require special erection devices like cleats and hooks, which can be shop assembled and bolted or riveted or welded to the piece and may be left permanently in the place after the work.
18.2.6 If a piece is laterally unstable when picked at its centre, use of a balance beam is advisable, unless a
pair of bridles slings can be placed far enough apart for them to be safe lifting points. The top flange of a truss, girder or long beam may be temporarily reinforced with a structural member laid flat on top of the member and secured temporarily.
18.2.7 On deep girders, and even on some trusses, a safety ‘bar’ running their full length will aid the riggers, fitters and others employed on the bottom flange or bottom chord to work with greater safety. This can be a single 16 mm diameter wire rope through vertical stiffeners of such members about one metre above the bottom flange and clamped at the ends with wire rope clamps. If the holes cannot be provided, short eye bolts can be welded to the webs of the girder at intervals to be removed and the surface chipped or ground to leave it smooth after all work on the piece has been completed.
18.2.8 Safety belts shall always be available at work spot to be used whenever necessary. The rope shall be chemically treated to resist dew and rotting. These shall not be tied on sharp edges of steel structures. They shall be tied generally not more than 2 m to 3 m away from the belt.
18.2.9 On a guy derrick or climbing crane job, the tool boxes used by the erection staff shall be moved to the new working floor each time the rig is changed. On a mobile crane job, the boxes shall be moved as soon as the crane starts operating in a new area too far away for the men to reach the boxes conveniently. While working a tall and heavy guy derrick, it is advisable to control tension in guys by hand winches to avoid jerks, which may cause an accident.
18.2.10 The proper size, number and spacing of wire rope clamps shall be used, depending on the diameter of the wire rope. They shall be properly fixed in accordance with good practice [7(17)]. They shall be checked as soon as the rope has been stretched, as the rope, especially if new, tends to stretch under the applied load, which in turn may cause it to shrink slightly in diameter. The clamps shall then be promptly tightened to take care of this new condition. In addition, the clamps shall be inspected frequently to be sure that they have not slipped and are tight enough.
18.2.11 When the men can work safely from the steel structure itself, this is preferable to hanging platforms or scaffolds, as it eliminates additional operations, which in turn, reduces the hazard of an accident.
18.2.11.1 To aid men working on floats or scaffolds, as well as men in erection gangs, or other gangs using small material, such as bolts and drift pins, adequate bolt baskets or similar containers with handles of sufficient strength and attachment to carry the loaded containers, shall be provided.
18.2.11.2 The men should be trained to use such containers, and to keep small tools gathered up and put away in tool boxes when not in use. Material shall not be dumped overboard when a scaffold is to be moved. Rivet heaters shall have safe containers or buckets for hot rivets left over at the end of the day.
18.2.12 During the erection of tall buildings, it is desirable to use nylon nets at a height of 3 m to 4 m to provide safety to men. The safety net should be made from man or machine-made fibre ropes which are UV stablized and conforming to the acceptable standard [7(18)].
18.2.13 Safety Against Fire
A fire protection procedure is to be set up if there is to be any flame cutting, burning, heating, rivetting or any operation that could start a fire. For precautions to be observed during welding and cutting operations, reference may be made to good practice [7(19)].
18.2.13.1 The workers should be instructed not to throw objects like hot rivets, cigarette stubs, etc, around.
18.2.13.2 Sufficient fire extinguishers shall be placed at strategic points. Extinguishers shall always be placed in cranes, hoists, compressors and similar places. Where electrical equipments are involved, CO or dry powder extinguishers shall be provided {see also good practice [7(4)]}.
18.2.14 Riding on a load, tackle or runner shall be prohibited.
18.2.15 The load shall never be allowed to rest on wire ropes. Ropes in operation should not be touched. Wire rope with broken strand shall not be used for erection work. Wire ropes/manila ropes conforming to acceptable standards [7(20)] shall be used for guying.