Construction phase of the project transfers the project conceived on paper in the form of plans and designs, into reality by use of resources like materials, machines
and men through one or more construction agencies. To fulfil the construction scope with quality, in time and under safe conditions within a reasonable cost, it is desired that the project is planned for managing construction for amalgamation of above resources for their optimum use and its continuous monitoring. Agencies managing the supervision and/or construction are desired to plan and document a management system with clear cut responsibilities and for managing various parameters like scope, time, quality, health, safety and environment and cost for implementation, monitoring and control for their effectiveness. This may be preferably inline with proven National/International documentation system covering all aspects of monitoring and controls. Various parameters to be managed during construction are as below.
2.2.1 Time Management
Considering the importance of time in a project, it is desirable that project is completed in the defined time schedule to get its fruitful benefits. The system planned should cover total schedule of completion with one or more construction agencies, number of vendors, identification of total resources, timely availability of all inputs, including critical ones, its processing during construction of a project. The system should include a periodic review of a project with all parameters as well as catch up plans in case of delay identified for controls and reporting from time to time. The system planned should preferably be computer friendly and simple to follow for implementation, monitoring and controls and for reporting from time-to-time.
2.2.2 Quality Management
Quality of a project should be planned for all activities from inception to completion. It is desirable that the system planned gives adequate assurance and controls that it shall meet project quality objectives. The system shall cover review of existing requirements, subcontracting, materials, processes and controls during process, auditing, training of personnel, final inspection and acceptance. All activities shall be planned and controlled. Quality systems approach may be referred for planning, suitable to a particular project for implementation.
2.2.3 Health, Safety and Environement
Each project affects the safety and health of the workmen and surroundings during construction. Various activities having impact on health, safety and environment need to be identified with their likely effect and proposed preventive corrective actions, together with the concerned statutory obligations. The system planned for health, safety and environment shall address and cover the above including use of personnel protective equipments by all concerned, and reporting
on their monitoring and controls during project implementation.
2.2.4 Cost Management
To keep the project under viable proposition, it is desired that cost of the project during construction are monitored and controlled through a documentation system. The various parameters which may affect the basic cost, escalations, cost due to variation in scope and quantities, etc need to be monitored at a defined frequency. The system planned may be in line with a proven cost control method or similar in nature and cost incurred vis-a-vis cost sanctioned and cost anticipated to be reported and controlled from time to time.