| Case | Proposed Building | Standard Design |
|---|
| 1. Design Model | (a) The simulation model of the proposed design shall be consistent with the design documents. Including proper accounting of fenestration and opaque envelope types and area; interior lighting power and controls; HVAC system types sizes, and controls and service water heating systems and controls(b) When the whole building performance method is applied to buildings in which energy related features have not yet been designed (e.g., a lighting system ), those yet – to be designed features shall be described in the proposed design so that they minimally comply with applicable mandatory and prescriptive requirements from clause 1 through clause 8 | The standard design shall be developed by modifying the proposed design as described in this table. Except as specifically instructed in this table, all building systems and equipment shall be modeled identically in the standard design and proposed design. |
| 2 Space Use Classification | The building type or space type classifications shall be chosen in accordance with clause 7.3.2 or 7.3.3.More than Same as proposed design one building type category may be used in a building if it is a mixed use facility. | Same as proposed design |
| 3. Schedules | The schedules shall be typical of the proposed building type as determined by the designer and approved by the authority having jurisdiction. | Same as proposed design |
| 4. Building Envelope | All components of the building envelope in the proposed design shall be modeled as shown on architectural drawings or as installed for existing building envelopes.Exceptions: The following building elements are permitted to differ from architectural drawings.(a) Any envelope assembly that covers less than 5% of the total area of that assembly type (e.g., exterior walls need not be separately described. If not separately described, the area of an envelope assembly must be added to the area of the adjacent assembly of that same type.(b) Exterior surfaces whose azimuth orientation and tilt differ by no more than 45 degrees and are otherwise the same may be described as either a single surface or by using multipliers.(c) For exterior roofs other than roofs with ventilated attics, the reflectance and emittance of the roof surface shall be modeled. The reflectance and emmitance shall be tested in accordance with clause 4.3.1.1(d) (d) Manually operated fenestration shading devices such as blinds or shades shall not be modeled Permanent shading devices such as fins. overhangs, and lightshelves shall be modeled. | The standard design shall have identical conditioned floor area and identical exterior dimensions and orientations as the proposed design except as noted in (a), (b), (c) and (d) below.a) Orientation, The baseline building performance shall be generated by simulating the building with its actual orientation and again after rotating the entire building 90,180, 270 degrees, then averaging the results. The building shall be modeled so that it does not shade itself.b) Opaque assemblies such as roof, floors, doors and walls shall be modeled as having the same heat capacity as the proposed design but with the minimum Ufactor required in clause 4.3.1 and clause 4.3.2.c) Fenestration - Fenestration areas shall equal that in the proposed design or 40% of gross above grade wall area, whichever is smaller, and shall be distributed uniformly in horizontal bands across the four orientations. No shading projections are to be modeled; fenestration shall be assumed to be flush with the exterior wall or roof. Manually operated fenestration shading devices such as blinds or shades shall not be modeled. Fenestration U-factor shall be the minimum required for the climate, and the solar heat gain coefficient shall be the maximum allowed for the climate and orientation. 64 d) Roof albedo. All roof surfaces shall be modeled with a reflectivity of 0.30. |
| 5. Lighting | Lighting power in the proposed design shall be determined as follows:a. Where a complete lighting system exists, the actual lighting power shall be used in the model.b. Where a lighting system has been designed lighting power shall be determined in accordance with either clause 7.3.2 or clause 7.3.3.c. Where no lighting exists or is specified, lighting power shall be determined in accordance with the clause 7.3.2 for the appropriate building type.d. Lighting system power shall include all lighting system components shown or provided for on plans (including lamps ballasts, task fixtures and furniture mounted fixtures). | Lighting power in the standard design shall be determined using the same categorization procedure (building area or space function) and categories as the proposed design with lighting power set equal to the maximum allowed for the corresponding method and category in either clause 7.3.2 or clause 7.3.3. Power for fixtures not included in the lighting power density calculation shall be modeled identically in the proposed design and standard design. Lighting controls shall be the minimum required. |
| 6. HVAC Systems | The HVAC system type and all related performance parameters, such as equipment capacities and efficiencies, in the proposed design shall be determined as follows:a) Where a complete HVAC System exists, the model shall reflect the actual system type using actual component capacities and efficiencies.b) Where an HVAC System has been designed, the HVAC model shall be consistent with design documents. Mechanical equipment efficiencies shall be adjusted from actual design conditions to the standard rating conditions specified in clause5, if required by the simulation model,c) Where no heating system exists or no heating system has been specified, the heating system shall be modeled as electric resistance. The system characteristics shall be identical to the system modeled in the standard design.d) Where no cooling system exists or no cooling system has been specified, the cooling system shall be modeled as an air cooled single zone system, one unit per thermal block. The system characteristics shall be identical to the system modeled in the standard design. | The HVAC system type and related performance parameters for the standard design shall be determined from Table 10.2: HVAC Systems Map. Equipment performance shall meet the requirements of clause 4. |
| 7. Service hot water | The service hot water system type and all related performance parameters, such as equipment capacities and efficiencies, in the proposed design shall be determined as follows:a. Where a complete service hot water system exists, the model shall reflect the actual system type using actual component capacities and efficiencies.b. Where a service hot water system has been designed, the service hot water model shall be consistent with design documents.c. Where no service hot water system exists or is specified no service hot water heating shall be modeled. | The water heating shall be of the same type of the proposed design. For residential facilities, hotels and hospitals the standard design shall have a solar system capable of meeting 20% of the design load. Systems shall meet the efficiency requirements of clause 6.2.2 the pipe insulation requirements of clause 6.2.4 and incorporate heat traps in accordance with clause 6.2.5. |
| 8. Miscellaneous Loads | Receptacle, motor and process loads shall be modeled and estimated based on the building type or space type category. These loads shall be included simulations of the building and shall be included when calculating the standard design and proposed design All end use load components within and associated with the building shall be modeled unless specifically excluded but not limited to, exhaust fans, parking garage ventilation fans, exterior building lighting swimming pool heater s and pumps elevators and escalators, refrigeration equipment and cooking equipment. | Receptacle motor and process loads shall be modeled the same as the proposed design. The water heating system shall be of the same type of the proposed design |
| 9. Modeling Limitations to the Simulation program | If the simulation program cannot model a component or system included in the proposed design, one of the following methods shall be used with the approval of the authority having jurisdictiona. ignore the component if the energy impact on the trade offs, being considered is not significant.b. Model the component substituting a thermodynamically similar component model.c. Model the HVAC system components or systems using the standard design's HVAC system in accordance with section 6 of this table.Whichever method is selected, the component shall be modeled identically for both the proposed design and standard design models. | Same as proposed design. |