10.1 General
10.1.1 Scope
The whole building performance method is an alternative to the prescriptive requirements contained in clause 1 through clause 8 of this code. It applies for all building types covered by the code.
10.1.2 Compliance
A building complies with the whole building performance method when the estimated annual energy use of the proposed design is less than the standard design, even though it may not comply with the specific requirements of the prescriptive requirements in clause 1 through clause7. The mandatory requirements of clause 1 through clause8 (clause 4.2, clause 5.2, clause6.2, clause7.2 and clause 8.2) shall be satisfied with the whole building performance method.
10.1.3 Annual Energy Use
Annual energy use for the purposes of the whole building performance method shall be calculated in kilowatt-hours (kWh) of electricity use per year. Energy sources other than electricity which are used in the building shall be converted to kWh of electric energy at the rate of 0.75 kWh per mega Joule.
10.1.4 Trade- offs Limited to Building Permit
The whole building performance method may be used for building permit applications that include less than the whole building; however, any design parameters that are not part of the building permit application shall be identical for both the proposed design and the standard design. Future improvements to the building shall comply with both the mandatory and prescriptive requirements.
10.1.5 Documentation Requirements
Compliance shall be documented and submitted to the authority having jurisdiction. The information submitted shall include the following:
a. The annual energy use for the proposed design and the standard design.
b. A list of the energy –related building features in the proposed design that is different from the standard design.
c. The input and output report (s) from the simulation program including a breakdown of energy usage by at least the following components : lights, internal equipment loads, service water heating equipment, space heating equipment, space cooling and heat rejection equipment, fans and other HVAC equipment ( such as pumps). The output reports shall also show the amount of time any loads are not met by the HVAC system for both the proposed design and standard design.
d. An explanation of any error messages noted in the simulation program output.