Reference :
Date :
From :
Name :
Address of correspondence :
Telephone no. :
Fax no. (if any) :
E-mail address (if any) :
To
The Sanctioning Authority,
Subject : Application for erection of building at Premises No._Street/ Road No._Use group____
Sir,
I / We intend to undertake erection of building on the land specified hereinafter and request that permission for erection of such building may kindly be granted.
In support of the application, I / we wish to make the following statement:-
(A) Particular of the proposed erection of building ____ (Use and total covered area to be written)
(B) Particulars of the plot
(a) Location :-
Complete address
Police Station
: ____ ______
b) Area (square meters) of the plot :- As per document
: ____ ______
(c) Boundary :-
: ____
West
South
East
: ____
: ____
: ____
: ____
(d) Existing and proposed use :-
Total Covered Area :
Proposed Use :
Total Covered Area :
(e) Ownership particulars :-
: ____
: ____
: ____
: ____
Address of Owner(s) : ____
____ ____ ____ ____ ____ ____
Registration Particulars :
____ ____ ____ ____
(C) The building proposal :
(a) Means of Access
| Land abuts the Street/ Road | |
| Name and No. of Street/Road | |
| Width of the Street/ Road | |
(b) Ground Coverage
: ____
Permissible ground coverage (square meters)
: ____
Proposed ground coverage (square meters)
: ____
: ____
(d) Floor Area Ratio
Permissible Floor Area Ratio : ____
Proposed Floor Area Ratio : ____
(e) Extent of Mixing :
For single building or all the buildings within complex —
| Serial No. | Allowable percentage of mixing. | Principal Occupancy. | Mixing of other occupancies. | |||
| Other Occupancy (percentage) | Other Occupancy (percentage) | Other Occupancy (percentage) | Other Occupancy (percentage) | |||
(f) Height of the Building (meters) as per New Town Kolkata (Building) Rules 2009 :
| Permissible. | Proposed. |
|---|---|
(g) Parking Statement :
| Total covered area in square meters | Required Nos. of parking | Proposed Nos. of Covered parking | Proposed Nos. of Open Parking. | Total Nos. of Parking Proposed. |
|---|---|---|---|---|
Open Space (in meters) :
| Front Open Space. | Rear Open Space. | Side1 Open Space. | Side2 Open Space. | ||||
| Required | Provided | Required | Provided | Required | Provided | Required | Provided |
(i) Inter Space of Buildings :
| Serial No.of buildings. | Required. | Provided. |
|---|---|---|
(j) Outer courtyard :
| Serial No.of buildings. | Serial No.of courtyard. | Required. | Provided. |
|---|---|---|---|
(k) Inner Courtyard :
| Serial No.of buildings. | Serial No.of courtyard. | Required. | Provided. |
|---|---|---|---|
(l) Ventilation Shaft :
| Serial No.of buildings. | Serial No. ofventilation shaft | Required. | Provided. |
|---|---|---|---|
(m) Abutting Road Width :
| Serial No.of buildings. | Required. | Provided. |
|---|---|---|
(n) Width and length of Internal Access Roads (format to be changed.) :
| Serial No. | Maximum Width of Internal Roads. | Maximum length of Internal Roads | |||
| Required | Provided. | ||||
| Closed at one end. | Open at both end. | Closed at one end. | Open at both end. | ||
(o) Internal Water Supply :-
(i) The source of filtered water supply as identified and marked on the plan including the Internal layout of distribution : ____
(ii) Nos. of occupants
: ____
(iii) Capacity of semi-underground reservoir in litres : ____
(iv) Capacity of overhead reservoir in litres
: ____
(v) Ferrule size
: ____
(p) Sanitary and Drainage arrangement :-
(i) The connection points for Sewer and Drain
as identified and marked on the plan,
including the internal layout
: ____
(ii) Nos. of occupants
(iii) Area of plot in square meters
: ____
(iv) Size of internal sewer in millimeters
: ____
(v) Size of storm drain in millimetres
: ____
: ____
Note.—Access to the plot shall not be allowed with driveway over the street inlet.
(q) Distribution of area for Public Open Space, Land for Facilities and Land for Utilities : Total area of plot (in square meters) :
(D) Engagement of Technical Persons :
I/We certify that I/we have employed the following technical persons, as per qualifications and experience mentioned in these rules, for the purpose of preparation of plan, design and drawings as well as supervision of construction works, whose particulars are given below:
(a) Architect :
Name
: ____
Address including e-mail, if any
: ____
Telephone no. including Fax no. (if any)
: ____
Registration no. of Council of Architecture
: ____
Valid up to
: ____
Enrolment No. issued
: ____
Signature
: ____
(b) Civil Engineer :
Name
Address including e-mail, if any
: ____
: ____
Telephone no. including Fax no. (if any)
: ____
Enrolment No. issued : ____
(c) Structural Engineer : Name : ____ Address including e-mail, if any : ____ Telephone no. including Fax no. (if any) : ____ Enrolment No. issued : ____
(d) Town Planner/Urban Designer: Name : ____ Address including e-mail, if any : ____ Telephone no. including Fax no. (if any) : ____ Enrolment No. issued : ____
(e) Public Health Engineer : Name : ____ Address including e-mail, if any : ____ Telephone no. including Fax no. (if any) : ____ Enrolment No. issued : ____
(f) Geo Technical Engineer : Name : ____ Address including e-mail, if any : ____ Telephone no. including Fax no. (if any) : ____ Enrolment No. issued : ____
(g) Electrical Engineer: Name : ____ Address including e-mail, if any : ____ Telephone no. including Fax no. (if any) : ____ Qualification and Experience : ____
(E) (a) Gift / transfer of land whether required before commencement / during erection / after completion of erection of building.
(b) Dimensions of building.
(F) Undertakings
-
I/We confirm that the erection of building to be undertaken shall be strictly in accordance with the Act and the rules made thereunder.
-
I/We confirm that no building materials shall be deposited in any street except with the written permission of the Sanctioning Authority.
-
I/We confirm that I / we shall not transfer the open space or any part thereof, shown in building plan, as land appurtenance to the proposed building.
(G) Enclosures
(a) Copy of the document showing the exclusive right to develop the land;
(b) Four sets of hard copies of the drawings and soft copy in compact disc including the areas in polyline. Out of Four sets of hard copies, three sets of Ammonia prints and one set of Blue Print with signature of Applicant(s), Architect and other concerned technical persons of the project as per the rules made under the Act;
Note : All drawings should contain necessary certification and signature of Architect, Civil Engineer /Structural Engineer, Town Planner / Urban Designer (as the case may be), and signature of the applicant;
(c) Key (location) Plan, scale not less than 1:1000;
(d) Site Plan, scale not less than 1:600;
(e) Building plans, elevations, sections scale 1:100;
(f) Details drawings, if any, scales 1:50, 1:25, if any;
(g) Major Specifications;
(h) FAR calculation sheet and car parking statement signed by the Architect and Applicant(s);
(i) Services, plumbing and sanitary layouts showing the plumbing installations, signed by the Civil Engineer or Public Health Engineer and the Architect;
(j) Plan showing the location of substation, captive genset signed by Electrical Engineer or Electrical Supervisor and the Architect, as the case may be;
(k) Soil investigation report by Geo-technical Engineer, as the case may be;
(I) Structural drawings and detail design calculations including piling drawings and calculations, if any and Certificate of Structural Stability of the building signed by the Structural Engineer or Civil Engineer (as the case may be;
(m) No Objection Certificate as the case may be, from: - (i) West Bengal Fire and Emergency Services, (ii) Civil Aviation Authority,
A note stating that all the recommendations or the "No Objection Certificates" of West Bengal Fire and Emergency Services, Civil Aviation Authority, if any, will be adhered to the project shall be incorporated in all the drawings;
(n) Indemnity Bond for construction to be undertaken;
(o) Undertaking from the professionals engaged for the project;
(p) Undertaking for starting of pile work, if any;
(q) NOC from Planning Authority and other competent authority regarding source of water supply, discharging of sewage, drainage and disposal of solid waste.
(r) Mutation / Conversion Certificate along with ULC clearance wherever applicable.
(s) copy of deed regarding transfer / gift of land, if applicable.
Note : All enclosures shall be authenticated by the applicant.
(H) Declaration
I/We hereby declare that the information given above (as well as in the enclosures and annexure including drawings, plans) is true and correct to the best of my knowledge and belief.
Date & Place :
Yours faithfully,
Signature of the applicant(s)
INDEMNITY BOND FOR CONSTRUCTIONS TO BE UNDERTAKEN (To be made on a non-judicial stamp paper of Rs. 10) [see schedule I (F)(n)]
BY THE PRESENT INDEMNITY BOND EXECUTED by us on this ____ day of _________________ 200 _________________ I/We, _________ having registered office / residing at _________ _______ (hereinafter) called
the 'OBLIGOR/'OBLIGORS' which expression shall mean and include my/our successors, and legal representatives and assigns do hereby bind myself/ourselves with the promise and undertaking in favour of the .... (hereinafter called the 'OBLIGEE', which expression shall mean and include its successor, legal representatives, administrators and assigns).
WHEREAS the OBLIGOR/OBLIGORS has /have started / shall start construction of the proposed building at .... morefully, described in the schedule given hereunder as per Sanctioned Building Plan more particularly the Structural design formulated in the National Building Code of India (hereinafter referred to as the 'NBCI') and has maintained / shall maintain all necessary safety measures during as well as after such construction as per the provisions spelt out in the NBCI, and with regard to natural hazards say by way of earthquake etc. the OBLIGOR/OBLIGORS has/have followed / shall follow all the provisions as per the provisions contained in the ....
AND WHEREAS all materials already in use or to be used and workmanship already adopted or to be adopted in such construction work are as far as possible of good quality as referred to in the NBCI, and any alternative materials or workmanship, if uses, must be in conformity with the standards recommended by NBCI.
NOW THIS INDENTURE WITNESSESS that in view of such averments I/we do hereby undertake :-
-
That the OBLIGEE shall not be held responsible for any type of negligence or non-compliance of or deviation from rules in respect of the faulty specification of materials/alternative materials used or faulty workmanship / alternative workmanship adopted by the OBLIGOR, at any stage during construction or thereafter.
-
The OBLIGOR/OBLIGORS undertakes/undertake to indemnity and keep harmless the OBLIGEE from all claims actions and proceedings and against all risks, danger or damager to any person whether an occupier or other than occupier and any other persons not belonging to the OBLIGOR/OBLIGORS.
-
"FURTHER MORE THE OBLIGOR/OBLIGORS" undertakes/undertake to indemnify the OBLIGEE against any damage to the said structure due to faulty design, defective construction technique or using substandard materials or any other reasons whatsoever.
-
If at any time, during the period of construction it is found that the construction is not in accordance with the plan and design on which construction work was allowed, or if it is subsequently detected that any paper/document submitted by the OBLIGOR/OBLIGORS is/are false or has/have not been issued by the concerned competent authority, or, construction