Notwithstanding such modifications and revision, anything done or any action taken under the regulations in force prior to such modification shall be deemed to be valid and continue to be so valid, unless otherwise specified.
Specific Saving : Bhavanagar “City Area E”.
Government order No: NRY-232017-6573-L Dt:9/10/2017. Notwithstanding anything contained in the present GDCR the aforesaid variations and modifications with notifications mentioned in the said order shall stand valid and continue so far as approval of layout plan and building plan for "city area E" is concerned. The concern authority shall have power and authority to proceed for necessary approval on the basis of afore mentioned variations under prevailing GDCR at the relevant time for Bhavnagar Area Development Authority.
Section B:
Procedure Regulations
2. DEVELOPMENT PERMISSION AND BUILDING USE PERMISSION
Development Permission Required
Subject to provisions of relevant sections under the Gujarat Town Planning and Urban Development Act, 1976 (President Act No. 27of 1976) or Local Acts or the Gujarat Industrial Development Act-1962 (GIDC Act-1962)or GDA Act-1957 as stated in the context with their amendment from time to time no person shall undertake any building or development activity in or over any land without obtaining a Development Permission prior to commencement of building or development activity. A Development Permission shall mean Permission for development granted by the Competent Authority.
Development Permission Not Required
No Development Permission shall be required for undertaking building works listed in Schedule 1.
Grant of a Development Permission
Grant of a Development Permission by the Competent Authority shall mean an acceptance by the Competent Authority that the development requirements of the proposed building, for which Development Permission has been granted, conforms to these Development Regulations, and that the person holding the Development Permission may undertake proposed development or construction of the proposed building within the limits of the Development Area in conformity with the Development Plan Proposals or with the proposal of GIDC or with the proposal of D8 category Nagarpalika .
It does not constitute acceptance of correctness, confirmation, approval or endorsement of:
proposed;
(b) Variation in area from recorded areas of a Building‐unit;
(c) Location and boundary of Building‐unit;
(d) Workmanship, soundness of material and structural safety of the proposed building;
(e) Structural reports and structural drawings and shall not bind or render the Competent Authority liable in any way in regard to (a), (b), (c) (d) and (e) above.
“Liability”
Notwithstanding any Development Permission granted under the Act and these Regulations, any person undertaking any development work shall continue to be wholly and solely liable for any injury or damage or loss whatsoever that may be caused to anyone in or around the area during such construction and no liability whatsoever in this
regard shall be cast on the Competent Authority or any officer/employee to whom power has been delegated.
Development Requirements
Development Requirements of the following aspects shall be mandatory and may be examined by the Competent Authority for ensuring compliance of the development to these Regulations:
Permissible Ground Coverage
Permissible Floor Space Index
Permissible Height and the various floors
Permissible Open Spaces enforced under these Regulations ‐ Common Plot, Marginal Open Spaces, Setbacks and other open spaces.
Permissible Uses of Land and Buildings
Arrangements of stairs, lifts, corridors and parking
Minimum requirement of sanitary facility
Minimum Common Facility
Required light and ventilation
Minimum requirement of Fire Prevention and Safety, and Clearance from Chief Fire Officer as applicable.
All buildings shall be barrier free accesible to all people.
Lapse of Development Permission
A Development Permission shall mean to have lapsed if construction of the building is not commenced within the period stipulated in Regulation No. 5.5.2
Cancellation of Development Permission
Cancellation of a Development Permission by the Competent Authority shall mean that the Development Permission shall no longer be valid, and that the permission granted by the Competent Authority to undertake construction stands withdrawn.
The Development Permission, if secured by any person by any misrepresentation or by producing false documents, will be treated as revoked and scrutiny fees paid for such development shall be deemed to have been forfeited.
Following Cancellation of a Development Permission, construction may no longer be undertaken on the building‐unit for which the Development Permission was granted. A notice of Cancellation of Development Permission shall be issued in writing by the Competent Authority.
Unauthorized Building
Any building or development, requiring a Development Permission, undertaken without grant of Development Permission, or undertaken after the Development Permission has lapsed, or, after the Development Permission has been cancelled, revoked or suspended, shall be deemed to be an Unauthorized Building.
Dealing with Unauthorized Building
If the Competent Authority deems the construction of any building to be an Unauthorised Construction, it may, by a written notice, require the person undertaking construction of the building to stop the same forthwith. If the person carrying out such work or doing such thing is not the owner at the time of giving such notice, such person shall be liable for carrying out the requisitions of the Competent Authority.
In case of unauthorised development, the Competent Authority shall:
a. Take suitable action which may include demolition of unauthorised works as provided in the Act.
b. Issue directions for the alteration or reconstruction of any works specified that have not been commenced or completed.
c. Take suitable action against the Persons on Record.
If within the period specified in such written notice, the requisitions contained therein are not carried out by the said person or owner, as the case may be, the Competent Authority may remove or undo such thing and the expenses thereof shall be paid by such person or owner as the case may be. The cost(s) of undertaking these measures shall be paid by the said person.
If such building is not stopped forthwith, the Competent Authority may direct the person undertaking such construction to be removed from the premises, may seal the Buildingunit, and may cause such necessary measures including police intervention to ensure that the person does not re‐enter the Building‐unit without written permission of the Competent Authority. Permission to re‐enter the building premise shall only be granted for the purpose of carrying out any work of reinstatement.
In cases where development has already started/commenced on site without obtaining Development Permission, but where this development is in accordance with these Regulations, the Competent Authority may grant Development Permission on the merits of each individual case. Such development will be considered unauthorised and over and above the Development Permission Scrutiny fees as leviable and stipulated in Schedule 3, penalty shall be charged as per Schedule 6.
Procedures for Obtaining, Revising and Revalidating a Development Permission
Commencement
They shall come in to force from the date of publication in the Gujarat Government Gazette.
These regulations shall apply to the land development and building construction in the entire Gujarat State vide the Notification No.- GH / V/ 269 / of 2017 / EDB – 102016 – 3629 – L, dated 12th october 2017 from the same date. Based on the jurisdiction under different Acts, the Urabun Local Bodies are grouped and shown in Table 1.1.1
Table 1.1.1Classification of Development Authorities and ULB’s
Category
Development Authority / ULB
(1)
(2)
D1
Urban Development Authority (Constituted under Section 22 of The GTP&UD Act) Ahmedabad Urban Development Authority (AUDA), Gandhinagar Urban Development Authority (GUDA), Surat Urban Development Authority(SUDA), Vadodara Urban Development Authority (VUDA) & Rajkot Urban Development Authority (RUDA).
D2
Urban/Area Development Authority (Constitued under Section 22 / 5 of The GTP&UD Act) Junagadh Urban Development Authority(JUDA), Jamnagar Area Development Authority(JADA), Bhavnagar Area Development Authority(BADA), Bharuch-Ankleshwar Urban Development Authority(BAUDA)
D3
Area Development Authority (Constitued under Section 5 of The GTP&UD Act)and Municipality (Seismic Zone - V, )
Category
Development Authority / ULB
(1)
(2)
Bhuj Area Development Authority, Bhachau Area Development Authority, Rapar Area Development Authority, Anjar Area Development Authority, and Mandvi (Kutchh) Municipality
D4
Urban Development Authority (Constitued under Section 22 of The GTP&UD Act) (other than Seismic Zone - V ,) Himmatnagar Urban Development Authority(HUDA), Surendranagar-Wadhwan Urban Development Authority(SWUDA), Morbi-Wankaner Urban Development Authority(MWUDA), Bardoli Urban Development, authority(BUDA), Navsari Urban Development Authority(NUDA), Anand-Vidhyanagar-Karmasad Urban Development Authority(AVKUDA).
D5
Area Development Authority (Constitued under Section 5 of The GTP&UDAct) (Special Project related areas.) Alang Area Development Authority, Ambaji Area Development Authority, Shamlaji Area Development Authority,
D6
The Gandhidham (Development and Control On Erection Of Buildings) Act -1957. (Bombay Act No. Xix Of 1958) : Gandhidham Development Authority
D7
Area Development Authority (Designated under Section 6 of The GTP&UD Act)
Nagarpalika declared under the Gujarat Municipalities Act, 1963 All Nagarpalika not included in D1 to D7(A) and D7(B)
D9
Gujarat Industrial Development Act, 1962. All Industrial estates or industrial areas under the jurisdiction of Gujarat Industrial Development Corporations included in D1 to D8 or otherwise
પત્રક 1.1.1: વિકાસ સત્તામડં ળ / સમચુ િત સત્તામડં ળોનુંિર્ગીકરણ
િર્ગગ
વિકાસસત્તામંડળ/ સમુચિતસત્તામંડળો
વિકાસસત્તામંડળ/ સમુચિતસત્તામંડળો
(1)
(2)
(2)
D1
શહેરીવિકાસસત્તામંડળ(નર્ગર આયોજનઅનેશહેરીવિકાસઅવિવનયમનીકલમ-૨૨હેઠળરિાયેલ)અમદાિાદશહેરીવિકાસસત્તામંડળ(ઔડા), ર્ગાંિીનર્ગરશહેરીવિકાસસત્તામંડળ(ગુડા),સુરતશહેરીવિકાસ સત્તામંડળ (સુડા), િડોદરા શહેરી વિકાસ સત્તામંડળ (વુડા) અને રાજકોટ શહેરી વિકાસસત્તામંડળ (રૂડા).
શહેરીવિકાસસત્તામંડળ(નર્ગર આયોજનઅનેશહેરીવિકાસઅવિવનયમનીકલમ-૨૨હેઠળરિાયેલ)અમદાિાદશહેરીવિકાસસત્તામંડળ(ઔડા), ર્ગાંિીનર્ગરશહેરીવિકાસસત્તામંડળ(ગુડા),સુરતશહેરીવિકાસ સત્તામંડળ (સુડા), િડોદરા શહેરી વિકાસ સત્તામંડળ (વુડા) અને રાજકોટ શહેરી વિકાસસત્તામંડળ (રૂડા).
વિસ્તાર વિકાસ સત્તામંડળ (નર્ગર આયોજન અને શહેરી વિકાસ અવિવનયમની કલમ - ૫ હેઠળરિાયેલ)અને નર્ગર પાચલકા (ભુકંપ ઝોન - V )ભુજવિસ્તારવિકાસસત્તામંડળ, ભિાઉવિસ્તારવિકાસસત્તામંડળ, રાપરવિસ્તારવિકાસસત્તામંડળ,અંજારવિસ્તારવિકાસસત્તામંડળ., માંડિી(કચ્છ) નર્ગર પાચલકા
વિસ્તાર વિકાસ સત્તામંડળ (નર્ગર આયોજન અને શહેરી વિકાસ અવિવનયમની કલમ - ૫ હેઠળરિાયેલ)અને નર્ગર પાચલકા (ભુકંપ ઝોન - V )ભુજવિસ્તારવિકાસસત્તામંડળ, ભિાઉવિસ્તારવિકાસસત્તામંડળ, રાપરવિસ્તારવિકાસસત્તામંડળ,અંજારવિસ્તારવિકાસસત્તામંડળ., માંડિી(કચ્છ) નર્ગર પાચલકા
વિસ્તાર વિકાસ સત્તામંડળ (નર્ગર આયોજન અને શહેરી વિકાસ અવિવનયમની કલમ - ૫ હેઠળરિાયેલ)(સ્પેશીયલપ્રોજેક્ટવિસ્તાર)અલંર્ગ વિસ્તાર વિકાસ સત્તામંડળ, અંબાજી વિસ્તાર વિકાસ સત્તામંડળ, શામળાજી વિસ્તાર વિકાસસત્તામંડળ.
વિસ્તાર વિકાસ સત્તામંડળ (નર્ગર આયોજન અને શહેરી વિકાસ અવિવનયમની કલમ - ૫ હેઠળરિાયેલ)(સ્પેશીયલપ્રોજેક્ટવિસ્તાર)અલંર્ગ વિસ્તાર વિકાસ સત્તામંડળ, અંબાજી વિસ્તાર વિકાસ સત્તામંડળ, શામળાજી વિસ્તાર વિકાસસત્તામંડળ.
D6
Existing approved building
Nothing in the CGDCR shall require the removal, alteration or abandonment, nor prevent continuance of the lawfully established use or occupancy of an existing approved building unless, in the opinion of the Competent Authority such a building is unsafe or constitutes a hazard to the safety of adjacent property or to the occupants of the building itself, or endanger to any premises or person adjoining to it.
Repeal
All existing rules, regulations, byelaws orders that are in conflict or inconsistent with these Regulations shall stand modified to the extent of the provisions of these rules.
Co nte nt
Comprehensive General Development Control Regulations - 2017
(These regulations shall apply to the entire Gujarat state
as classified categories in the notification)
Section A:
Preamble, Short Title, Applicability
1 PREAMBLE
1.1 SHORT TITLE, APPLICABILITY & COMMENCEMENT:
1.1.1 Short Title
1.1.2 Commencement
1.1.3 Applicability
1.1.4 Existing approved building
1.1.5 Repeal
1.1.6 Saving
Section B:
Procedure Regulations
2.DEVELOPMENT PERMISSION AND BUILDING USE PERMISSION
2.1 Development Permission Required
2.2 Development Permission Not Required
2.3 Grant of a Development Permission
2.3.1 “Liability”
2.4 Development Requirements
2.5 Lapse of Development Permission
2.6 Cancellation of Development Permission
2.7 Unauthorized Building
2.7.1 Dealing with Unauthorized Building
2.8 Procedures for Obtaining, Revising and Revalidating a Development Permission
2.8.1 Obtaining a Development Permission
2.8.2 Revising a Development Permission
2.8.3 Revalidating a Development Permission
2.9 Building Use Permission Required
2.10 “Grant of Building Use Permission”
2.11 “Revocation of Building Use Permission”
2.12 Unauthorized Use of Building
2.12.1 Dealing with Unauthorized Use of Building and Unsafe Buildings
2.13 Procedure for Obtaining Building Use Permission
2.13.1 Building Use Permission
2.13.2 Permission to Change a Sanctioned Use of a Building
2.14 Relaxation
2.14.1 "Grant of Relaxation" 45
િીર્ગાંિીિામ( Development And Control On Erection Of Buildings)Act -1957. (Bombay Act No. Xix Of 1958) :ર્ગાંિીિામવિકાસસત્તામંડળ
િીર્ગાંિીિામ( Development And Control On Erection Of Buildings)Act -1957. (Bombay Act No. Xix Of 1958) :ર્ગાંિીિામવિકાસસત્તામંડળ
િીગુજરાતઔિોચર્ગકવિકાસઅવિવનયમ-૧૯૬૨.ડી- ૧ થી ડી- ૮ માં સમાવિષ્ટ કરાયેલ હોય તે તમામ ઔિોચર્ગક િસાહતો અથિા ઔિોચર્ગકવિસ્તાર જેિીગુજરાતઔિોચર્ગકવિકાસ કોપોરેશનના કાયગક્ષેત્રમાં હોય તે તથા અન્દ્ય..
િીગુજરાતઔિોચર્ગકવિકાસઅવિવનયમ-૧૯૬૨.ડી- ૧ થી ડી- ૮ માં સમાવિષ્ટ કરાયેલ હોય તે તમામ ઔિોચર્ગક િસાહતો અથિા ઔિોચર્ગકવિસ્તાર જેિીગુજરાતઔિોચર્ગકવિકાસ કોપોરેશનના કાયગક્ષેત્રમાં હોય તે તથા અન્દ્ય..
2.15 Competent Authority to Clarify and Interpret Provisions of the Regulations 45
2.16 Development Undertaken on Behalf of Government and Appropriate Authority 46
3 RESPONSIBILITIES OF OWNER AND/OR DEVELOPER AND PERSONS ON RECORD 47
3.1 Registration of Persons on Record (POR) 47
3.1.1 Registering with the Competent Authority 47
3.1.2 Minimum Qualifications and Competence Requirements 47
3.1.3 Registration Fee 47
3.2 Revocation of Registration 47
3.3 Responsibilities of Individual Persons on Record (POR) 47
3.3.1 Owner or Developer to Apply for a Development Permission 47
3.3.2 Responsibilities of Owner or Developer 47
3.4 Responsibilities of all POR 49
3.5 Responsibilities of Individual Persons on Record (POR) 50
3.5.1 Architect on Record (abbreviated as AOR) 50
3.5.2 Engineer on Record (abbreviated as EOR) 51
3.5.3 Structural Engineer on Record (abbreviated as SEOR) 52
3.5.4 Clerk of Works on Record (abbreviated as COWOR) 52
3.5.5 Supervisor of Works on Record (abbreviated as SOR) 53
3.5.6 Fire Protection Consultant on Record (abbreviated as FPCOR) 54
3.6 Development Permission to be withheld with Change of Ownership or Change in Persons on Record 55
3.6.1 Change of Ownership 55
3.6.2 Change in Persons of Record 55
3.7 Revocation of Development Permission in case of Misrepresentation and De-registering of Person on Record 55
3.8 Safety requirement for the building height above 45 mt. 55
4 PROCEDURE FOR OBTAINING, REVISING AND REVALIDATING A DEVELOPMENT PERMISSION 58
4.1 Obtaining a Development Permission 58
4.1.1 Application 58
4.1.2 Scrutiny Fees 58
4.1.3 Drawings, Specifications and Documents 58
4.1.4 Scrutiny of Application 58
4.1.5 Grant or Refusal of a Development Permission 58
4.1.6 Penalties 59
4.2 Revising a Development Permission 59
4.2.1 Application 59
4.2.2 Fees 59
4.2.3 Drawings, Specifications and Documents 59
4.2.4 Scrutiny of Application 59
4.2.5 Grant or Refusal of a Revised Development Permission 59
4.2.6 Penalties 59
4.3 Revalidating a Development Permission 59
4.3.1 Application 59
4.3.2 Fees 60
4.3.3 Documents 60
4.3.4 Scrutiny of Application 60
4.3.5 Grant or Refusal of a Revalidated Development Permission 60
4.3.6 Penalties 60
4.4 Common Protocol 60
4.5 Conflict Resolution Mechanism 62
5 PROCEDURE DURING CONSTRUCTION 64
5.1 Inspection of Construction 64
5.1.1 Inspection of Construction at Any Time 64
5.1.2 Inspection where Development Permission is Granted 64
5.1.3 Inspection for Fire Safety and Protection of Building under Construction 64
5.2 Information to be Prominently Displayed on Site 64
5.3 Documents and Drawings to be Maintained on Site 64
5.4 Reducing Inconvenience and Ensuring Safety during Construction 65
5.4.1 Stacking, Storing and Disposal of Building Material 65
5.4.2 No Damage or Undue Inconvenience during Construction 65
5.4.3 Liability for Ensuring Safety during Construction 65
5.5 Progress of Construction and Inspection - Development Permission 65
5.5.1 Notice for Commencement of Construction 65
5.5.2 Development Permission may Lapse if Construction Not Commenced on Time 66
5.5.3 Competent Authority to be Notified of Progress of Construction 66
5.6 RISK BASED CHECKS INSPECTIONS 66
5.6.1 Consequences Class. 66
5.6.2 Principles of Risk Categorization 66
5.6.3 Design Supervision Levels, or DSL 67
6 PROCEDURE FOR OBTAINING A BUILDING USE PERMISSION 76
6.1 Obtaining Building Use Permission 76
6.1.1 Notice of Completion of Construction and Building Use Permission 76
6.1.2 Fees 76
6.1.3 Final Inspection 76
6.1.4 Grant / Refusal of Building Use Permission 76
6.1.5 Penalties 77
6.2 Obtaining Permission to Change Sanctioned Use of Building 77
6.2.1 Application 77
6.2.2 Drawings, Specifications and Documents 77
6.2.3 Fees 77
6.2.4 Scrutiny of Application 77
6.2.5 Grant / Refusal of Permission to Change Sanctioned Use of Building 77
6.2.6 Penalties 77
6.3 Authorizing Private Inspector For Inspection 78
7.2.11 Knowledge and Institutional Zone -1, 2 (KZ1, KZ2) 85
7.2.12 Public Purpose Zone -1 (PPZ1) 86
7.2.13 Public Purpose Zone -2 (PPZ2) 86
7.2.14 Recreation zone (REZ) 86
7.2.15 Parks, Gardens and Open Space - PGO (P) 86
7.2.16 Agricultural-1, 3 (AG1, AG3) 86
7.2.17 Agricultural-2(AG2): 86
7.2.18 Agricultural-4 (AG4) 86
7.2.19 Logistics Zone (L) 86
7.2.20 Special Planned Area Development Zone-1 of GIFT(SPD-1) 86
7.2.21 Special Planned Development Zone-2 Sabarmati Riverfront (SPD-2) 87
7.2.22 Special Planned Development Zone-3 Science Park (SPD-3) 87
7.2.23 Special Planned Development Zone-4 Gandhi Ashram (SPD-4) 87
7.2.24 Smart City & TOZ (SPD-5) 87
7.2.25 Closed Textile Mill Zone (CZ) 87
7.2.26 Forest Zone (FZ) 87
7.2.27 Special Zone-1(SZ1) 87
7.2.28 Special Zone- 2(SZ2) 88
7.2.29 Special Zone-3(SZ3) 88
7.2.30 Special Zone-4(SZ4) 88
7.2.31 Special Zone-5 (SZ5) 88
7.2.32 Special Zone-6 (SZ6) 88
7.2.33 Vacant Land(VL) 88
7.3 USE ZONE AND PERMISSIBLE USES 88
7.4 USE CLASSIFICATION 92
7.5 Restrictions on Uses 95
7.6 Permissible Uses with respect to road width. 96
7.7 Floor Space Index (F.S.I) for different categories: 97
7.7.2. Use Zone and F.S.I.: 99
8 GENERAL DEVELOPMENT REQUIREMENTS 110
8.1 Road, Approach and Access 110
8.2 Land-Locked Building-Unit and Required road width. 110
8.3 Building Height 111
8.3.1 Road Width and Building Height 111
8.4 Road Side, Rear side and side Margins 112
8.4.1 Build-to-Line 112
8.4.2 Road Side Margins for different categories. 113
8.4.3 Margins other then road side and side margins for different categories. 114
8.4.6: Margin for D9 Category. 120
8.4.7 Permissible uses in Margin 121
8.4.8 Restriction on Development in Margin 123
8.5 Floor space index (FSI) 124
8.5.1 Areas not counted towards computation of FSI: 124
8.5.2 Relaxation in Floor Space Index (FSI) 125
8.6 Development Work to be in Conformity with the Regulations 125
8.7 Re-Development work on road having width less than 9.0m 126
8.8 Minimum area of building unit for different uses. 126
8.9 Development of Land 127
8.9.1 Internal Road and Approach to Building and Common Plot 127
8.9.2 General Requirements for Internal Roads 128
8.9.3 Amalgamation and Subdivision of Building-urt 129
8.9.4 Amalgamation and Subdivision of Building-unit with Existing Structures 129
8.9.5 Layout for Amalgamation and /or Subdivision of Building-unit 129
8.9.6 Contribution of Land for any development in Non-TP Areas 129
8.9.7 Development on kabrastan, burial ground etc. 130
8.9.8 Development on Open Space Plots 130
8.9.9 Discrepancy Removal 130
8.10 Open-to-Sky Space: 130
8.10.1 Regulation based on Building Dimensions: 131
8.10.2 General Requirement for Open-to-Sky space 131
8.11 Common Plot 132
8.11.1 General Requirement for Common Plot 133
8.12 Parking 134
8.12.1 General Requirements for Parking 135
8.13 Basement in a Building-unit, 136
8.13.1 Margins 136
8.13.2 Extent of Basement 136
8.13.3 Height of Basement 137
8.13.4 Permissible uses in basement 137
8.13.5 Services 137
8.14 Addition to existing structure 137
8.15 Addition in building units with existing Buildings 137
8.16 Development in Existing Chawls 138
8.17 Development in Core Walled City and Gamtal by steel structure for maintenance purpose. 138
Table 8.17.1 Scrutinity Charges for Steel Structure for maintenance purpose in Gamtal and Core Walled City 139
9 CORE WALLED CITY (CW) 140
9.1 Introduction 140
9.1.1 Heritage Conservation Plan 140
9.2 Permissible Uses 140
9.2.1 For Heritage Areas 140
9.2.2 For Other Areas of Core Walled City 140
9.3 Tradable Development Right (TDR) 141
9.4 Permissible Ground Coverage 142
9.4.1 For Building-units with area 500 sq.mts or less 142
9.4.2 For Building-units with area more than 500 sq.mts and up to 1500 sq. mts 142
9.4.3 For Building-units with area more than 1500 sq.mts 142
9.5 Parking: 142
9.5.1 For Heritage Areas 142
9.5.2 For Other Areas in Core Walled City 142
9.6 Basement: 143
9.6.1 Use of Basement 143
9.7 Addition or Extensions to Existing Structure: 143
9.7.1 For Heritage Areas 143
9.7.2 For Other Areas in Core Walled City 143
9.8 SET BACK 144
9.9 BUILDING HEIGHT 144
9.10 OPEN TO SKY SPACE 145
9.10.1 REGULATION BASED ON BUILDING DIMENSIONS 145
9.10.2 REGULATION BASED ON BUILDING HEIGHT 145
9.10.3 GENERAL REQUIREMENT FOR OPEN-TO-SKY SPACE 145
9.11 CHOWK 146
9.12 COMMON PLOT 146
9.13 Regulation for Heritage Core Area: (Udawada Nagarpalika) 146
9.13.1 Definition: 146
9.13.2 Function of HCC: 147
9.13.3 Terms of References of the HCC: 147
9.13.4 Planning Regulation:- 148
10 GAMTAL AREA (GM) 150
10.1 Minimum Area of a Building-unit 150
10.2 Permissible Uses 150
10.3 Permissible Ground Coverage 151
10.3.1 For Building-units with area 500 sq.mts or less 151
10.3.2 For Building-units with area more than 500 sq.mts and up to 1500 sq. mts 151
10.3.3 For Building-units with area more than 1500 sq.mts 151
10.4 Basement: 151
10.4.1 Use of Basement 151
10.5 Addition or Extensions to Existing Structure: 152
10.5.1 For Heritage Areas 152
10.5.2 For Other Areas in Core Walled City 152
10.6 SET BACK 152
10.7 BUILDING HEIGHT 153
10.8 OPEN TO SKY SPACE 153
10.8.1 REGULATION BASED ON BUILDING DIMENSIONS 153
10.8.2 REGULATION BASED ON BUILDING HEIGHT 153
10.8.3 GENERAL REQUIREMENT FOR OPEN-TO-SKY SPACE 154
10.9 CHOWK 154
10.10 COMMON PLOT 155
11 GAMTAL EXTENSION (GME) 156
11.1 Permissible Use: 156
11.2 BUILDING HEIGHT 156
12 RESIDENTIAL AFFORDABLE HOUSING (RAH) 157
12.1 Introduction 157
12.2 Floor Space Index 157
12.2.1 Permissible Floor Space Index (FSI) 157
12.3 Permissible Ground Coverage 158
12.4 Parking 158
12.4.1 Minimum Requirements for Parking 158
13 TRANSIT ORIENTED ZONE, SMART CITY NODE AND TRANSPORT NODE (SPD4) 159
13.1 Introduction 159
13.2 Permissible Ground Coverage 159
13.2.1 Relaxation in Parking 159
14 Restricted Zone (RZ) 161
Introduction 161
15 CENTRAL BUSINESS DISTRICT (C4) 163
15.1 Maximum Permissible Height 163
15.2 Permissible Ground Coverage 163
16 MINING, QUARRYING AND BRICK KILN 164
17 SPECIAL BUILDINGS 165
17.1 Special Buildings 165
17.1.1 Location: 165
17.1.2 Margins 165
18 FUELLING STATIONS 166
18.1 Area and Frontage 166
18.2 Location 166
18.3 Maximum Permissible Ground Coverage 166
18.4 Margins 167
18.4.1 For Fuelling Station: 167
18.4.2 For Fuelling Station with Service Station: 167
18.5 Height 167
18.6 Floor Space Index 167
18.7 Common Plot 167
18.8 Parking 168
18.9 Basement 168
19 ADVERTISING DISPLAY & COMMUNICATION INFRASTRUCTURE 169
19.1 Advertising Display Infrastructure 169
19.1.1 Billboards I Hoardings in Marginal Space 169
Table 19.1.2Billboards/ Hoardings on Roof tops I Terrace 169
19.1.2 Billboards/ Hoardings on Public Roads 170
19.1.3 Billboards in Urban Renewal Project Areas 170
19.1.4 Heritage Buildings and Precincts 170
19.1.5 General Restrictions: 170
19.2 Communication Infrastructure Telecommunication infrastructure/ microwave communication tower 171
19.2.1 Location: 171
20 SPECIAL REGULATIONS 172
20.1 Permissible Uses in Closed Textile Mills Zone (CZ) 172
20.1.1 Definition: 172
20.1.2 Permissible Uses & FSI inClosed Textile Mill Zone (CZ) shall be as per: 172
20.2 Regulations for Knowledge Precinct 172
20.3 Regulations for Gandhi Ashram (AUDA) : Comprehensive Area Improvement Scheme (GACAIS) 173
20.4 Regulations for SPD-2- Science Park 173
Section D:
Performance Regulations 175
21 BUILDINGS AND INFRASTRUCTURE 177
21.1 Architectural Elements 177
21.1.1 Boundary Wall/ Compound Wall For all Buildings other than Industrial: 177
Footpath Road Max 1.5m Max 0.8m Private property 177
21.1.2 Boundary Gate/ Compound Gate 177
21.1.3 Level of Building-unit 177
21.1.4 Paving in Building unit 178
21.1.5 Access Path 178
21.1.6 Plinth 179
21.1.7 Entrance 179
21.1.8 Minimum Clearance Height in Buildings 180
21.1.9 Mezzanine 180
21.1.10 Loft 180
21.1.11 Basement 180
21.1.12 Railings 181
21.1.13 Terrace 181
21.1.14 Staircases 181
21.1.15 Ramp 183
21.2 Parking 184
21.2.1 Parking to be provided 184
21.2.2 Design of Parking for Cars 185
21.2.3 Design of Parking for Two-Wheelers 185
21.2.4 Design of Parking for Trucks 185
21.2.5 Specified Parking for loading and unloading 186
21.3 Lighting 186
21.4 Ventilation 186
21.4.1 Ventilation of Rooms 186
21.4.2 Ventilation of Basement 186
21.4.3 Ventilation of Atrium 186
21.4.4 Ventilation of Bathrooms and Water Closets 186
21.4.5 Ventilation of Staircase for Dwelling-1&2: 187
21.4.6 Ventilation of Industrial Buildings 187
21.4.7 Ventilation of Special Buildings 187
21.4.8 Change of ventilation system 187
21.5 Heating and Air Conditioning 188
21.5.1 Air-Conditioning of Special Buildings 188
21.6 Water related Requirement 188
21.6.1 Water Storage Tank 188
21.6.2 Drinking Water Supply 188
21.7 Signage 188
21.8 Letter Box 189
21.9 Sanitation 189
21.9.1 For Residential Buildings 189
21.9.2 For All Buildings other than Residential 189
21.9.3 For Special Buildings 191
21.10 Drainage 191
21.10.1 Provision of Septic Tank, Seepage Pit and Soak Well 191
21.11 Electrical Infrastructure 192
21.12 Lifts and Elevators 192
21.12.1 For Buildings exceeding 4mts height with following uses: Institutional, Assembly, Public Institutional, Educational-2 192
21.12.2 For Buildings exceeding 10mts height 192
21.12.3 General Requirements for Lifts and Elevators 193
21.13 External Facade 193
21.14 Display Structures 193
21.15 Occupant Load 194
22 FIRE PREVENTION AND SAFETY 195
22.1 Requirement for Fire Safety Professionals in Buildings 195
22.1.1 Fire Protection Consultant on Record (FPCOR) 195
22.1.2 Fire Officer 195
22.1.3 Fire Men 195
22.1.4 Applicability of Fire Safety Professionals 195
22.2 Applicability of Fire Prevention Provisions 197
22.3 Marginal Open Space 201
22.4 Corridors and Passageway 201
22.5 Exit Requirements 202
22.5.1 General Exit Requirements for all buildings: 202
22.5.2 Doorways for Special Buildings and Buildings with height more than 25mts: 203
22.5.3 Horizontal Exits for Special Buildings and Buildings with height more than 25mts: 203
22.6 Staircase 204
22.6.1 General Staircase Requirements for all Buildings: 204
22.6.2 Additional Staircase: 205
22.6.3 Staircase for Buildings with height more than 25mts and up to 45mts: 205
22.6.4 Staircase for Buildings with height more than 45mts: 205
22.6.5 Fire Escape Staircase: 206
22.7 Ramp 206
22.8 Lift 207
22.8.1 General Requirements of lift in buildings 207
22.8.2 Fire Lift 208
22.9 Escape Lighting and Signages 209
22.9.1 Emergency Escape Lighting for Buildings with height more than 25mts and Special Buildings 209
22.9.2 Fire Exit Signages for Commercial Buildings, Special Buildings and Buildings with height more than 25mts: 210
22.10 Fire Alarm System 210
22.11 Smoke and Fire Venting 211
22.12 Electrical Services for all buildings 211
22.13 Electrical Sub-station for all buildings 211
22.14 Emergency Power Supply for Buildings with height more than 45mts and Special Buildings 212
22.15 Electric Supply and Installation for Buildings with height more than 25mts and Special Buildings 212
22.16 Lightning Arrester for Buildings with height more than 25mts 212
22.17 Service Ducts / Shafts for Buildings with height more than 25mts and Special Buildings 212
22.18 Ventilation for all Buildings 213
22.19 Air-conditioning 213
22.20 Boiler and Boiler-room 214
22.21 Water Storage Tank 214
22.22 Fire Fighting System 214
22.22.1 Portable Fire Extinguishers 214
22.22.2 Automatic Sprinkler System 214
22.22.3 Internal/Yard Hydrants, Hose Reels and Fire Service Inlet 215
22.22.4 Ultra High-Pressure Fire Fighting System 215
22.22.5 Other Automatic Fire Extinguishing System 216
22.22.6 Compartmentation for Buildings with height more than 45mts 216
22.23 Basement 216
22.24 Refuge Area for Buildings with height more than 25 mts 217
22.25 Skip Floor for Buildings with height more than 45 mts 217
22.26 Control Room for Buildings with height more than 45 mts 217
22.27 Materials 218
22.27.1 Materials for Interior of Building 218
22.27.2 Materials for External Glazing 218
22.28 Fire Prevention and Safety Provisions during Construction 218
22.29 Fire Safety of Existing Buildings 218
22.30 Classification of Buildings for Fire Prevention and Safety Provisions 219
22.30.1 Classification of Buildings 219
22.30.2 Fire Resistance Test 219
22.30.3 Steel Framed Construction 219
23 SPECIAL BUILDINGS PERFORMANCE REGULATIONS 220
23.1 Visibility 220
23.2 Mixed Occupancy 220
23.3 Institutional Buildings 222
23.4 Public Safety 223
24 STRUCTURAL SAFETY 224
24.1 Applicability 224
24.2 Structural Stability and Maintenance of Existing Buildings 224
24.3 Additions and Alterations to Existing Buildings 224
24.4 Change of Use of Buildings or Part of a Building 224
24.5 Structural Safety Provisions during Construction 225
24.6 Structural Safety Tests for Special Buildings 225
24.7 Design for Structural and Seismic Safety 226
24.7.1 Design Standards 226
24.7.2 Structural Inspection Report 227
24.8 Structural Safety of Display Structures 227
25 ENVIRONMENTAL MANAGEMENT 228
25.1 Minimum Distance from Water body 228
25.2 Rain Water Management 228
25.2.1 Rain Water Disposal 228
25.2.2 Rain Water Harvesting 229
25.2.3 Rain Water Storage: 230
25.3 Solid Waste Management 230
25.3.1 Solid Waste Bin for Residential Use 230
25.3.2 Solid Waste Bin for Non-Residential Use 231
25.4 Grey water Recycling 231
25.4.1 Applicability 231
25.4.2 231
25.4.3 Provisions of Recycling System 231
25.4.4 Quality of Water and Treatment 232
25.4.5 General Provisions 232
25.4.6 Enforcement of Regulations 233
25.5 Tree Plantation 233
25.6 Solar Water Heating System 234
25.6.1 Roof Top Solar Energy Installations and Generation 234
25.7 Energy Efficient Buildings 234
25.8 Environment Impact Assessment 235
26 POLLUTION CONTROL 236
26.1 Air Pollution 236
26.2 Water Pollution 236
26.3 Noise Pollution 236
26.4 Industrial Pollution 236
27 MAINTENANCE AND UPGRTION 237
27.1 Maintenance of Buildings 237
27.1.1 Responsibility for Maintenance of Buildings 237
27.1.2 Periodic Inspection and Maintenance Certificate 237
27.2 Maintenance of Lifts and Escalators 237
27.2.1 Responsibility for Maintenance of Lifts and Escalators 237
27.2.2 Maintenance Protocol 237
27.3 Maintenance of Fire Prevention and Safety Provisions 238
27.3.1 Periodic Inspection and Maintenance Certificate 238
28 CONFORMITY TO OTHER ACTS AND REGULATIONS 239
28.1 Minimum Clearances from Trunk Infrastructure 239
28.1.1 Minimum Clearances from Electrical Lines 239
28.1.2 Minimum Clearances from Petroleum Pipelines 239
28.1.3 Minimum Clearances from Oil Well 239
28.1.4 Minimum Clearances from Water Body 239
28.2 No Objection Certificates (NOC) 240
28.2.1 NOC from Airport Authority 240
28.2.2 NOC from Railway 240
28.2.3 NOC from Commissioner of Police 240
28.2.4 NOC from Jail Authority 240
28.2.5 NOC from ISRO 240
28.2.6 NOC from ASI 240
28.2.7 NOC from Defence Establishment 240
28.2.8 Environmental Clearance 240
28.2.9 NOC under Urban Land Ceiling Act 241
28.3 Conformity to other Acts 241
28.3.1 Factories Act 1948 and Factories Rules under the Govt. of Gujarat 241
28.3.2 Gas Cylinders Rules 1981 241
28.3.3 Explosives Rules 1983 under Indian Explosives Act 1884 241
28.3.4 Manufacture, Storage and Import of Hazardous Chemicals Rules 1989 241
29 Quality Control and Inspection. 242
29.1 Applicability 242
29.2 Inspection and Safety Certificate: 242
Section E: Definitions 243
30 Definitions 245
30.1 Act 245
30.2 TP Act/GTPUD Act 245
30.3 Local Act 245
30.4 GDA Act 245
30.5 GIDC Act 245
30.6 Additions and / or Alterations 245
30.7 Advertising Display Infrastructure /Advertising Sign and Hoarding 246
30.8 Air Conditioning 246
30.9 Amenities 246
30.10 Amusement Park 246
30.11 Apartment / Flats 246
30.12 Application 246
30.13 Approved 246
30.14 Appropriate Authority 247
30.15 Atrium (Plural Atria) 247
30.16 Authorized Officer 247
30.17 Auto Repair Workshop 247
30.18 Auxiliary Power Back-up 247
30.19 Balcony 247
30.20 Barsati 247
30.21 Boiler 247
30.22 Banquet Hall 247
30.23 Basement or Cellar 248
30.24 Bed and Breakfast 248
30.25 Botanical Garden 248
30.26 Building 248
30.27 Building Line 248
30.28 Build-to-line 248
30.29 Building-unit 249
30.30 Building-unit Area 249
30.31 Building-unit Level 249
30.32 Built-up Area 249
30.33 Unit Built-up Area 249
30.34 Builder 249
30.35 Building Contractor 249
30.36 Building Envelope 250
30.37 Call Center 250
30.38 Camping Ground 250
30.39 Carpet Area 250
30.40 Chimney 250
30.41 Chowk 250
30.42 Cinema 250
30.43 Clear Height 250
30.44 Club 251
30.45 Cold Storage 251
30.46 College 251
30.47 Common Plot 251
30.48 Community Hall 251
30.49 Committee 251
30.50 Corporation 251
30.51 Competent Authority 252
30.52 Contiguous Holding 252
30.53 Convention Center/ Exhibition Center 252
30.54 Corridor 252
30.55 Cottage Industry 252
30.56 Courtyard 252
30.57 Developer 253
30.58 Disability 253
30.59 Discharge or Discharge of Waste 253
30.60 Dharamshala 253
30.61 Drain 253
30.62 Domestic Waste Water 254
30.63 Drive-in Cinema 254
30.64 Dwelling Unit 254
30.65 Emergency Lighting 254
30.66 Emergency Lighting System 254
30.67 Enclosed Staircase 254
30.68 Escalator 254
30.69 Escape Route 254
30.70 Escape Lighting 255
30.71 Exhibition Hall 255
30.72 Existing Development/ Building/ Use 255
30.73 Exit 255
30.74 External Wall 255
30.75 Fabrication Workshop 255
30.76 Farm House 256
30.77 Fire Protection and Life Safety 256
30.78 Fitness Center 258
30.79 Floor 258
30.80 Floor Area 258
30.81 Floor Space Index 258
30.82 Footing 259
30.83 Foundation 260
30.84 Front 260
30.85 Fueling Station 260
30.86 Gamtal 260
30.87 Garage-Private 260
30.88 Garage-Public 260
30.89 Garden 261
30.90 Garden Restaurant 261
30.91 Golf Course 261
30.92 Grey Water 261
30.93 Ground Coverage 261
30.94 Ground Level 261
30.95 Guest House 261
30.96 Guiding Floor Material 261
30.97 Habitable Room 262
30.98 Hazardous Building or Industry 262
30.99 Hazardous Material 262
30.100 Height of Building 262
30.101 Height of a Room 262
30.102 High-rise / Low-rise building (For buildings constructed in the jurisdiction of GIDC Act) 263
30.103 Hollow Plinth 263
30.104 Hospital 263
30.105 Hostel 263
30.106 Hotel 263
30.107 Laboratory 263
30.108 Lift / Elevators 264
30.109 Light Industries 264
30.110 Lobby 264
30.111 Local Area Plan 264
30.112 Local Authority 264
30.113 Loft 264
30.114 LPG Delivery Centre 264
30.115 Margin 265
30.116 Means of Egress 265
30.117 Mezzanine Floor 265
30.118 Mixed-Use Building 265
30.119 Motel 265
30.120 Multiplex 266
30.121 Museum 266
30.122 Natural Hazard 266
30.123 Natural Hazard Prone Areas 266
30.124 Neighborhood /Civic Centre 266
30.125 New Building 266
30.126 Non-Combustible Material 266
30.127 Non-potable water 267
30.128 Occupancy or Use 267
30.129 Occupant Load 267
30.130 Occupiable Space 267
30.131 Occupier 267
30.132 Open Space 267
30.133 Overlay Zone 267
30.134 Owner 267
30.135 Parapet 268
30.136 Park 268
30.137 Parking Space 268
30.138 Party Plot 268
30.139 Person 268
30.140 Pergola 268
30.141 Permission 269
30.142 Persons on Record 269
30.143 Planetarium 269
30.144 Playfield 269
30.145 Plinth 269
30.146 270
30.146.1 Hollow Plinth 270
30.146.2 Parking space / area 270
30.146.3 Porch 270
30.147 Polytechnic 270
30.148 Poultry Farm 270
30.149 Premises 270
30.150 Pre-school: 271
30.151 Pre-treatment 271
30.152 Prohibited Industrial waste 271
30.153 Public-Institutional Building 271
30.154 Public Library 271
30.155 Public Purpose 271
30.156 Rear 272
30.157 Refuge Area 272
30.158 Retention of Non-conforming Activity 272
30.159 Research Center 272
30.160 Restaurant 272
30.161 Road/Street 272
30.162 Road/Street Level or Grade 273
30.163 Road/Street Line 273
30.164 Road Width or Width of Road / Street 273
30.165 Roof Exit 273
30.166 Row House 273
30.167 School 273
30.168 Semidetached building 274
30.169 Service Apartment 274
30.170 Service Road 274
30.171 Sewerage system 274
30.172 Special Economic Zone (SEZ) 274
30.173 Shop 274
30.174 Shopping Center or Commercial Center 274
30.175 Shopping Mall 275
30.176 SIR 275
30.177 Skip Floor 275
30.178 Slum Rehabilitation 275
30.179 Solar Assisted water heating system 275
30.180 Special Building 275
30.181 Sports Complex 275
30.182 Stair Cabin or Stair Cover 276
30.183 Staircase 276
30.184 Stairwell 276
30.185 Storey 276
30.186 Studio 276
30.187 Swimming Pool 276
30.188 Temporary Structure 276
30.189 Tenement Building 276
30.190 Theatre 277
30.191 Township 277
30.192 Tradable Development Rights (TDR) 277
30.193 Training Center 277
30.194 Travel Distance 277
30.195 Trunk Infrastructure 277
30.196 University 277
30.197 Unsafe Building 277
30.198 Use 278
30.199 Use-Agricultural 278
30.200 Use-Assembly 278
30.201 Use-Business 278
30.202 Use-Commercial 278
30.203 Use-Dwelling 279
30.204 Use-Educational 279
30.205 Use-Hospitality 279
30.206 Use-Industrial 279
30.207 Use-Institutional 280
30.208 Use-Mercantile 280
30.209 Use-Public Utility 280
30.210 Use-Public Institutional 280
30.211 Use-Residential 280
30.212 Use-Religious 280
30.213 Use-Storage 281
30.214 Ventilation 281
30.215 Waste 281
30.216 Water Closet (W.C.) 281
30.217 Water Course 281
30.218 Water Body/Talav/Lake 281
30.219 Warehouse 281
30.220 Wayside Shop 281
30.221 Wholesale 282
30.222 Window 282
30.223 Wood Workshop 282
30.224 Zoo 282
30.225 Single Room Occupancy or SRO: 282
Section F: 283
Schedules and Forms 283
Schedule 1: List of Building Works that do not Require Development Permission 285
Schedule 2: Mandatory Design and Specifications 286
Schedule 3: Scrutiny Fees and other charges for the Grant of a Development Permission/Revised Development Permission 287
Schedule 4a: Drawings, Specifications and Documents to be Submitted with Application for Obtaining/Revising Development Permission for Buildings 289
Schedule 4b: Drawings, Specifications and Documents to be submitted with Application for Obtaining/Revising Development Permission for Sub-division and Amalgamation 293
Schedule 4c: Drawings, Specifications and Documents to be Submitted with Application for Obtaining/Revising Development Permission for Brick Kiln, Mining and Quarrying 296
Schedule 5: Format for submission of Documents, Drawings and Specifications 297
Schedule 6: Penalties for Undertaking Unauthorized Development 298
Schedule 7: Minimum Qualification, Experience and Document Requirements for Being Considered for Registering with the Competent Authority as Persons on Record 299
Schedule 8: Registration Fees for Registration with the Competent Authority as Persons on Record 304
Schedule 10: Documents to be submitted along with Application for Revalidating a Development Permission 306
Schedule 11: Information to be Displayed on Site 307
Schedule 12: Documents and Drawings to be Maintained on Site During Period of Construction 308
Schedule 13: Stages of Construction Work for which Notice for Progress of Construction are to be Submitted to the Competent Authority 309
Schedule 14: Documents and Drawings to be Submitted along with the Application for Building Use Permission 310
Schedule 15: Building Use Permission Fees and other charges for the Grant of a Building Use Permission 311
Schedule 16: Penalties for Making Unauthorized Use of a Building 312
Schedule 17: Schedule for Maintenance and Inspection for Structural Stability and Fire Safety 313
Schedule 18: Documents and Fees Required with Application for Advertising Display & Communication Infrastructures 314
Schedule 19: Fees Required for Purchasing Additional FSI for Residential Affordable Housing 316
Schedule 20: Documents and Drawings to be Submitted for Development Undertaken on Behalf of Government and Appropriate Authority 317
Schedule 21: List of Building Specifications verified by Competent Authority before Issue of Building Use Permission 318
Schedule 22: Building requiring Fire Protection Consultant and Inspection by Chief Fire Officer 319
Schedule 23: List of Recommended Trees 320
Schedule 24: Conversion for Road Widths 321
Schedule 25: Minimum Qualification and Experience Requirements for Fire Safety Professionals in a Building 322
Schedule 26: Illustrations of Internal Road and Approach Road 323
Schedule 27: Standalone Multi-Level Public Parking 324
Schedule 28: Technical Audit Report Forms 329
Form 1: Application for Registering as Person on Record 330
Form 2A: Certificate of Undertaking for Persons on Record 331
Form 3: Notice to the Competent Authority of Non-Compliance of Building to Sanctioned Design and Specifications 337
Form 4: Notice to the Competent Authority of Discontinuation as Person on Record 339
Form No. 5. Application for Development Permission for Building 341
Form 5A: Application for Development Permission for Brick-kiln, Mining and Quarrying 344
Form 6A: Area Statement for Buildings 346
Form 6B: Area Statement for Subdivision and Amalgamation of Land 353
Form 7: Grant/Refusal of Development Permission 355
Form 8: Application for Revising Development Permission 358
Form 9: Application for Revalidating Development Permission 360
Form 10: Notice for Commencement of Construction 362
Form 11: Notice of Progress of Construction 364
Form 12: Notice of Completion of Construction and Compliance Certification 365
Form 13: Application for Building Use Permission 366
Form 14: Grant/Refusal of Building Use Permission 367
Form 15: Structural Inspection Report 368
Form 16: Fire Safety Certificate 371
Form 17: Undertaking for Built up area up to 125.00sq.mt. 372
Form 18: Certificate of Undertaking for Person on Record 374
Section A:
Preamble, Short Title, Applicability
Any errors and / or ambiguities are subject to correction
Preamble
For different jurisdictions in different Acts, the State Government, in exercise of the powers, specified hereunder, conferred under different acts, hereby issue the following regulations,-
Sub-section (1) of Section 116A read with sub-section(1) of section 122 of the Gujarat Town Planning and Urban Development Act 1976;
Section 155 of Gujarat Nagarpalika Act, 1963;
Clause (a) of Section 31 the Gandhidham (Development and Control on Erection of Buildings) Act 1957;
Section 54 of the Gujarat Industrial Development Act, 1962 (Guj. XXIII of 1962)
Short Title, Applicability & Commencement:
Short Title
These Regulations may be called
“Comprehensive Development Control Regulations - 2017.”
Schedule
Variations in the General Development Control Regulation of the Appropriate Authority specified in Annexure-1, Annexure-3, and Annexure-4, sanctioned under the respective Government Notifications of Urban Development and Urban Housing Department, Gujarat Industrial Development Corporation, Gandhidham Development Authority and make General Development Control Regulation for the local authorities functioning under the Gujarat Municipality Act-1963 as specified in Annexure-2. These Comprehensive General Development Control Regulations - 2017 is categorised in D 1 to D 9 as below.
Classification of Development Authorities and ULB's
Class
Development Authority / ULB
D1
Urban Development Authority (Constituted under Section 22 of The GTP&UD Act)Ahmedabad Urban Development Authority(AUDA), Gandhinagar Urban Development Authority(GUDA), Surat Urban Development Authority(SUDA), Vadodara Urban Development Authority (CUDA)& Rajkot Urban Development Authority(RUDA).
D2
Urban/ Area Development Authority (Constitued under Section 22/ 5 of The GTP&UD Act)Junagadh Urban Development Authority(JUDA), Jamnagar Area Development Authority(JADA), Bhavnagar Area Development Authority(BADA), Bharuch-Ankleshwar Urban Development Authority(BAUDA)
D3
Area Development Authority (Constitued under Section 5 of The GTP&UD Act)and Municipality(Seismic Zone - V, )Bhuj Area Development Authority, Bhachau Area Development Authority, Rapar Area Development Authority, Anjar Area Development Authority, and Mandvi (Kautch)MUnicipality
D4
Urban Development Authority (Constitued under Section 22 of The GTP&UD Act) (other than Seismic Zone - V,)
Classification of Development Authorities and ULB's
Class
Development Authority / ULB
Himmatnagar Urban Development Authority(HUDA), Surendranagar-Wadhwan Urban Development Authority(SWUDA), Morbi-Wankaner Urban Development Authority(MWUDA), Bardoli Urban Development, authority(BUDA), Navsari Urban Development Authority(NUDA), Anand-Vidhyanagar-Karmasad Urban Development Authority(AVKUDA).
D5
Area Development Authority (Constitued under Section 5 of The GTP&UDAct) (Special Project related areas.)Alang Area Development Authority, Ambaji Area Development Authority, Shamlaji Area Development Authority
D6
The Gandhidham (Development and Control On Erection Of Buildings) Act - 1957. (Bombay Act No. Xix Of 1958) : Gandhidham Development Authority
D7
Area Development Authority (Designated under Section 6 of The GTP&UD Act)
Nagarpalika declared under the Gujarat Municipalities Act, 1963All Nagarpalika not included in D1 to D7(A) and D7(B)
D9
Gujarat Industrial Development Act, 1962.All Industrial estates or industrial areas under the jurisdiction of Gujarat Industrial Development Corporations included in D1 to D8 or otherwise
The provisions of the sanctioned the General Development Control Regulation stands replaced by the Schedule - 1.
By order and in the name of the Governor of Gujarat,
Officer on Special Duty & Ex-Officio Joint Secretary to the Government of Gujarat Urban Development and Urban Housing Department
Copy forwarded with compliments to :
PS to Hon'ble Governer of Gujarat.
PS to Hon'ble Chief Minister of Gujarat.
PS to Hon'ble Dy. Chief Minister of Gujarat.
PS to Hon'ble State Minister of Urban Development and Urban Housing Department of Gujarat.
PS to Chief Secretary, Government of Gujarat.
PS to all secretaries of all secretariats of Government of Gujarat.
Principal Secretary, Industries and Mines Department, Gujarat
Principal Secretary, Panchayat and Rural Department, Gujarat.
Vice Chancellor and Managing Director, Gujarat Industrial Development Corporation, Gujarat.
Municipal Commissioner, All Municipal Corporations.
Chief Executive Authority, All Urban/Area Development Authorities.
Director Municipalities, Gujarat State, Gandhinagar.
Chief Officer, All Municipalities
Chief Officer, All Gram-Nagar Panchayats
Chief Town Planner, Gujarat State, Gandhinagar.
Collector, All Districts
Senior Town Planner, All Region Office of Town Planning and Valuation Department.
District Development Officer, All District Offices.
Manager, Government Central Press, Gandhinagar - With a request to publish the aforesaid notification in Part IV-B central Section, in the Gujarat Government Extra Ordinary Gazette of Dated.12.10.2017 and forward 500 printed copies of the same to this department. The Gujarati version of the Notification will be forwarded shortly to you by the Legislative and Parliamentary Affairs Department, Sachivalaya, Gandhinagar.
Legislative and Parliamentary Affairs Department, Sachivalaya, Gandhinagar - with request to send Gujarati version of the said Notification directly to the Manager, Government Central Press, Gandhinagar for its publication in the official gazette urgently.
Director of Information, Gandhinagar- with request to issue suitable presses note.
The Revenue Department, New Sachivalaya, Gandhinagar.
System Manager, Urban Development and Urban Housing Department, Gandhinagar- with requesttopublish in the department web site.
心 The Select file of'L'Branch, U. D. & U. H. Deptt.
The personal file of Dy. Section Officer, L-Branch, U. D. & U. H. Deptt.
Annexure -1
Sr.No.
Name of the Authority
1
Ahmedabad Urban Development Authority
2
Rajkot Urban Development Authority
3
Surat Urban Development Authority
4
Vadodara Urban Development Authority
5
Gandhinagar Urban Development Authority
6
Junagadh Urban Development Authority
7
Bhavanagar Area Development Authority
8
Jamanagar Area Development Authority
9
Anand-VallabhVidhyanagar-Karamasad Urban Development Authority
10
Bharuch-Ankaleshwar Urban Development Authority
11
Morbi-Wankaner Urban Development Authority
12
Surendranagar-Wadhvan Urban Development Authority
13
Mahesana Area Development Authority
14
Patan Area Development Authority
15
Palanpur Area Development Authority
16
Nadiad Area Development Authority
17
Godhra Area Development Authority
18
Navasari Urban Development Authority
19
Jetpur-Navagadh Area Development Authority
20
Botad Area Development Authority
21
Veraval-Patan Area Development Authority
22
Porbandar Area Development Authority
23
Vapi Area Development Authority
24
ValsadArea Development Authority
25
Himatnagar Urban Development Authority
26
Alang Area Development Authority
27
Ambaji Area Development Authority
28
Anjar Area Development Authority
29
Bhuj Area Development Authority
30
Khambhaliya Area Development Authority
31
Rapar Area Development Authority
32
Shamlaji Area Development Authority
33
Vadinar Area Development Authority
34
Bavla Area Development Authority
35
Dhandhuka Area Development Authority
36
Annexure -1
Sr.No.
Name of the Authority
48
Siddhapur Area Development Authority
49
Idar Area Development Authority
50
Khedbrahma Area Development Authority
51
Prantij Area Development Authority
52
Talod Area Development Authority
53
Modasa Area Development Authority
54
Deesa Area Development Authority
55
Dakor Area Development Authority
56
Kapadvanj Area Development Authority
57
Kheda Area Development Authority
58
Matar Area Development Authority
59
Vaso Area Development Authority
60
Anklav Area Development Authority
61
Borsad Area Development Authority
62
Dharmaj Area Development Authority
63
Khambhat Area Development Authority
64
Petlad Area Development Authority
65
Sojitra Area Development Authority
66
Umreth Area Development Authority
67
Dahod Area Development Authority
68
Devgadhbaria Area Development Authority
69
Halol Area Development Authority
70
Kalol(Godhara) Area Development Authority
71
Balasinor Area Development Authority
72
Lunawada Area Development Authority
73
Santarampura Area Development Authority
74
Dharampur Area Development Authority
75
Pardi Area Development Authority
76
Umargam Area Development Authority
77
Udwada Area Development Authority
78
Vapi Area Development Authority
79
Bilimora Area Development Authority
80
Gandevi Area Development Authority
81
Bardoli Area Development Authority
82
Kathor Area Development Authority
83
Kosamba Area Development Authority
Annexure -1
Sr.No.
Name of the Authority
95
Sankheda Area Development Authority
96
Jagadiya- Sultanpura Area Development Authority
97
Jambusar Area Development Authority
98
Rajpipla Area Development Authority
99
Bhayavadar Area Development Authority
100
Dhoraji Area Development Authority
101
Gondal Area Development Authority
102
Upleta Area Development Authority
103
Halwad Area Development Authority
104
Dhangadhra Area Development Authority
105
Limbdi Area Development Authority
106
Thangadh Area Development Authority
107
Jamjodhpur Area Development Authority
108
Kalawad Area Development Authority
109
Dwarka Area Development Authority
110
Okha Area Development Authority
111
Mahuva Area Development Authority
112
Palitana Area Development Authority
113
Shihor Area Development Authority
114
Barwara Area Development Authority
115
Ranpur Area Development Authority
116
Chorwad Area Development Authority
117
Keshod Area Development Authority
118
Manavadar Area Development Authority
119
Mangrol Area Development Authority
120
Kodinar Area Development Authority
121
Una Area Development Authority
122
Chhaya Area Development Authority
123
Amreli Area Development Authority
124
Bagasara Area Development Authority
125
Savarkundala Area Development Authority
126
Mandvi (Kautch) Area Development Authority
127
Bhachau Area Development Authority
128
Rapar Area Development Authority
129
Vadinar Area Development Authority
130
Bardoli Urban Development Authority
Annexure -3
Sr. No.
The Gandhidham (Development and Control on Erection of Building)
1.
Gandhidham Area Development Authority
Sr. No.
Gujarat Industrial Development Corporations Area
1.
All Industrial estates or industrial areas under the jurisdiction of Gujarat Industrial Development Corporations under the Gujarat Industrial Development Act, 1962.