A new rule 112 shall be added in the Principal Rules, as follows-
"112. Climate resilient construction - Integration of environmental clearance with sanction:
The new building construction proposals are classified in the following three categories:
A) Category 'A' Buildings: Built-up Area from 5000 sqmt upto 20,000 sqmt
B) Category 'B' Buildings: Built-up Area above 20,000 sqmt upto 50,000 sqmt
C) Category 'C' Buildings: Built-up Area above 50,000 sqmt
A local Authority, i.e. ULB / Development Authority / any other body authorized to sanction building plans shall approve the building plans by ensuring the stipulated conditions in the following Table-1, 2 and 3 for the respective categories of buildings.
Table 1: Environmental Conditions for Building and Construction
(Category "A" from 5000 sqmt upto 20,000 sqmt)
| SI.No. | Medium | Environmental conditions | Rule |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water | |
| 2 | Water Conversations Rain Water Harvesting and Ground Water Recharge | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested is to be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | 110 (a) |
| 2(a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | ||
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | 110(c) |
| 4 | Energy | In common areas, LED/solar lights must be provided. | 105 to 107 |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction, Plastic/tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | |
| 5(a) | The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m |
| above the building | ||
|---|---|---|
| 6 | Green cover | A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. |
| 6(a) | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e., planting of 3 trees for every one tree that is cut) shall be done with the obligation to provide continued maintenances for such plantations |
| SI, No. | Medium | Environmental conditions | Rule |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water | 110 (a) |
| 2 | Water Conversations Rain Water Harvesting and Ground Water Recharge | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested is to be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | |
| 2(a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | ||
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | 110(c) |
| 4 | Energy | In common areas, LED/ solar lights must be provided. | 105 & 107 |
| 4(a) | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. | ||
| 4(b) | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed | 108 & 109 | |
| 4 (c) | Use of fly ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ask Notification of September, 1999 and as amended from time to time. | ||
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction, Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | |
| 5(a) | The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building. | ||
| 6 | Green cover | A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. |
shall be done with the obligation to provide continued maintenances for such plantations.
| SI, No | Medium | Environmental conditions | Rule |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water | |
| 2 | Water Conversations Rain Water Harvesting and Ground Water Recharge | A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested is to be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | 110 (a) |
| 2(a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | ||
| 2(b) | The ground water shall not be withdrawn without approval from the competent authority. | ||
| 2 (c) | Use of potable water in construction should be minimized. | ||
| 2(d) | Low flow fixtures and sensors must be used to promote water conversation. | 105 | |
| 2(e) | Separation of grey and black water should be done by the use of dual plumbing system. | ||
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | 110(c) |
| 3(a) | All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | ||
| 3(b) | Organic waste composter/ vermiculture pit with a minimum capacity of 0.3 kg/tenement/day must be installed wherein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | ||
| 4 | Energy | In common areas, LED/ solar lights must be provided | 105 & 107 |
| 4(a) | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided. | ||
| 4(b) | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed |