Rule 25 of the Principal Rules shall be substituted with the following-
"(1) The ULB or Tripura Urban Planning & Development Authority, as the case may be, shall levy a fee for sanction of building plan, at such rates as determined by them subject to minimum as may be determined by State Government, by notification, from
Tripura Gazette, Extraordinary Issue, February 25, 2019 A. D.
time to time, on the basis of the sanctioned total covered area of the building in all floors;
(2) The ULB or Tripura Urban Planning & Development Authority, as the case may be, may levy a development fee, in addition to the fees specified in sub-rule (1), for any building, at such rate, as may be determined by the state government, by notification, from time to time."
Amendment of Rule 30:
(i) In clause (b) of sub rule (2) of rule 30 of the Principal Rules, a proviso shall be added as follows-
"Provided that, notwithstanding anything contained in this rule, if the person referred to in sub-rule (1) of rule 13, fails to submit a revised plan incorporating the deviations intended to be carried out, for obtaining necessary sanction prior to carrying out such erection or execution of works, he may do so subsequently, by paying a penalty of three times of the prevailing per unit fee applicable towards approval of building plan to the concerned ULB, for the deviated covered area of the constructed building."
(ii) In sub-rule (2) of rule 30 of the Principal Rules, after clause (b), a new clause (c) shall be added as follows-
"(c) if during the erection or execution of a work, any external deviation beyond sanctioned covered space is intended to be made, which violate the provisions of the Act or these rules, the person referred to sub-rule (1) of rule 13 shall, prior to carrying out such erection or execution of works, submit, in accordance with the provisions of this rule, a revised plan incorporating the deviations intended to be carried out, for obtaining necessary relaxation of rules and sanction thereof."
(iii) In sub-rule (3) of rule 30 of the Principal Rules, after the expression 'clause (b)', the expression "or (c)" shall be added;
(iv) In sub-rule (3) of rule 30 of the Principal Rules, a proviso shall be added as follows-
Provided that, for marginal external deviations made during construction as mentioned below for a building having height upto 18 meters, may be compounded on payment of compounding fee as specified against each type of deviation. The total Compounding fees will be the aggregate of Compounding fees for all types of deviations as mentioned below-
a) Inadequate Open Space, in violation of Rule 48 and 50:
| Quantum of infringement in open space | Compounding fee |
|---|---|
| Infringement in open space upto 5% of required open space for the height of the constructed building (not the approved building height) as per requirement of rule - 48 and 50 in one or more sides(front, rear or any sides) of the building. | per unit fee applicable for approval of building plan of concerned ULB or Authority, and to be calculated for the entire covered area of the constructed building. |
| Infringement in open space upto 10% of required open space for the height of the constructed building (not the approved | 2 (three) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, and to be |
| building height) as per requirement of rule - 48 and 50 in one or more sides(front, rear or any sides) of the building. | calculated for the entire covered area of the constructed building. |
| Infringement in open space upto 20% of required open space for the height of the constructed building (not the approved building height) as per requirement of rule - 48 and 50 in one or more sides(front, rear or any sides) of the building. | 3 (three) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, and to be calculated for the entire covered area of the constructed building. |
| Infringement in open space more than 20% of required open space for the height of the constructed building (not the approved building height) as per requirement of rule - 48 and 50 in one or more sides(front, rear or any sides) of the building. | Non-compoundable and liable for action as per rule - 31. |
b) Cantilever projection:-
For the cantilever projections not shown in the approved building plan, the per unit compounding fee will be 10 (ten) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, for the cantilever portion only;
Provided that, in any case the cantilever projection should not be more than 0.9 meter and it should not be projected beyond the property line of the owner of the building;
c) Height of the building: -
For increase in height during construction, beyond approved building height within overall building height, not exceeding 18 meters without increasing number of storey, the compounding fee will be as follows-
| Usage of building | Increase in height | Compounding fee |
|---|---|---|
| Residential use | Increase in height forevery 30 centimeters orpart there off | Rs 10,000/- |
| other than residentialuse | Increase in height forevery 30 centimeters orpart there off | Rs 30,000/- |
d) Covered area:
For excess covered area beyond sanctioned covered area as per approved building plan, the compounding fee will be 5 (five) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, for the excess covered area;
e) Ground coverage: -
For excess ground coverage beyond permissible coverage as per rule - 46 but maximum upto overall ground coverage of 90%, the compounding fee will be Rs. 10,000/- for every 1% or part thereof excess ground coverage;
f) Parking provision: -
For shortfall of parking space required as per rule - 49, the compounding fee will be as follows:
| Requirement of parking as per rule - 49 | Shortfall of parking space | Compounding fee |
| Upto 3 (three) | Shortfall upto 2 (two) parking space | Rs 1,00.000/- per parking space |
| Shortfall cf 3 (three) parking space | Non-compoundable | |
| More than 3 (three) | Shortfall upto nearest whole number of 20% of requirement of parking space | Rs 1,50.000/- per parking space |
| Shortfall more than nearest whole number of 20% of requirement of parking space | Non-compoundable |
g) FAR (if applicable): -
For excess FAR availed beyond permissible limit, the compounding fee will be Rs. 10,000/- for every 0.1 excess FAR or part thereof;
h) Use of building:
For change in usage of building from Residential to Commercial or in any other manner, the compounding fee will be 3 (three) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, and to be calculated for the covered area for which use has been changed:
i) Construction without approved plant -
a) For the buildings constructed without prior approval of the building plan but the construction so made fully conforms to the provisions of the Tripura Building Rules, 2017, the compounding fee will be 3 (three) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, and to be calculated for the entire covered area of the constructed building;
b) For the buildings constructed without prior approval of the building plan and the construction so made does not conform to the provisions of the Tripura Building Rules, 2017, the compounding fee will be 3 (three) times of the per unit fee applicable for approval of building plan of concerned ULB or Authority, and to be calculated for the entire covered area of the constructed building in addition to the compounding fees applicable for violation of the respective provision of Tripura Building Rules, 2017, as specified in rule -- 30(3);
Provided that, in all the above cases of construction without approved plan, the owner should submit the structural safety certificate for the existing building from appropriate technical personnel as specified in rule -17."