12.1 General
This draft Development Plan is prepared for the horizon year of 2044 and contains land use zoning proposals for a projected population of 4,000 for the said year. This aspect is well taken care of in this Development Plan and provisions made in this regard will lead to better, satisfactory and remarkable implementation of the Development Plan. The analysis in this regard, is enumerated in the following paragraphs.
There are mainly three components that constitute the implementation of the Development Plan.
- Zoning.
2. Road Network.
- Sites for social amenities and public utilities.
The land use zoning is provided in the plan. As development progresses, it is guided by these proposals and no financial aspect is involved in this implementation. The land under proposed roads is to be acquired but much of the land can be obtained through approval of layouts in residential zone. Some road lands will need to be acquired independently. However, the problem is more serious with the acquisition of land under sites reserved for social amenities and public utilities. There are four ways to acquire such land i.e.
-
Through Town Planning schemes (TPS),
-
Acquisition through monetary compensation,
-
Development of reservation through accommodation reservation principle (AR).
-
In lieu of transferable development rights (TDR).
12.2 Cost of development plan proposals
The total cost of Development works out approximately to Rs. 253.57 crores. These development costs can only be met by adopting the correct land development methods for the implementation of the Development Plan proposals. Some of the tools that could be adopted by the CIDCO SPA for land development are outlined below along with their relevance to the proposed Development Plan.
12.3 Town planning scheme

The basic concept of the T. P. Scheme is pooling together all the land under different ownerships for unified planning and thereafter subdividing and redistributing it to original landowners in a properly reconstituted form after deducting the land required for the open spaces,
social infrastructure, services, housing for the economically weaker section and road network. The reconstituted developed plots are allotted to the land owners in proportion to the value of their undeveloped land. CIDCO envisages implementing the proposals of the Development Plan by enabling the provision of Town Planning Schemes which will considerably reduce the liability towards the cost of acquisition of land required for social and physical infrastructure.
12.4 Transferable development right
Transferable Development Right means a development right to transfer the potential of a plot designated for a public purpose in a Development plan. It is expressed in terms of total permissible built space and is calculated based on the Floor Space Index or Floor Area Ratio allowable for that plot which can be utilized by the owner himself or by way of transfer by him to someone else from the present location to a specified area in the plan. This can be used as additional built space over and above the permissible limit in lieu of monetary compensation for the surrender of the concerned plot to the Planning Authority. By providing incentive TDR through DCPRs provision, CIDCO SPA will be able to acquire the land under the reservations for spine roads and service roads at ease.
12.5 Accommodation reservation
This tool enables the development of Public reservations without land acquisition. In this concept, the Owner whose land is under reservation has to develop a certain percentage of land under reservation and surrender it to the Planning Authority. In lieu of this surrendered land, the owner shall be entitled to develop the remaining land under reservation for the uses permissible in the adjoining zone with full permissible FSI of the entire plot and permissible TDR potential of the entire plot.
12.6 Implementation through monetary compensation
Any land required or reserved for any of the public purposes specified in the draft Development Plan may be acquired by agreement that is by paying an amount agreed to the land owner (by way of private negotiations) or such land may be acquired compulsorily by the Planning Authority under the provisions of LARR Act 2013 by paying monetary compensation.
12.7 Implementation by public participation:
It is possible that instead of shouldering the entire burden of creation and maintenance of amenities by the CIDCO, this work may be entrusted to willing private and government institutions that are engaged in similar activities. The modalities can be worked out for such a

<details> <summary>seal</summary>
M 2 K 2 </details>
venture. Amenities like gardens, road street furniture, etc. may also be developed under this concept.
12.8 Need for monitoring:
At present implementation of the Development Plan is not monitored by separate cell though, it is of utmost importance. The creation of better amenities through the Development Plan enhances the quality of life of the citizens. Therefore, this aspect needs to be taken seriously. The aspects like types of amenities to be created immediately, course of action to be adopted for acquisition and development of reserved land, selection of the new road linkages to be taken on priority, augmentation of resources, etc. need to be monitored frequently and for that purpose, a devoted cell is required on a permanent basis.
12.9 Programming
In order to implement the Development Plan proposals in an orderly and systematic manner it is essential to adopt tools of Project Management during the construction and delivery of Infrastructure projects so that cost overruns and wasteful expenditure are avoided to conserve and properly utilize scarce financial resources. As a matter of rule, no project should be taken up for implementation on an ad-hoc basis but be based on programming utilizing Project Management tools and techniques. In other words, the successes of the implementation of the Development Plan proposals depend on Programming and Project Monitoring.
12.10 Conclusion
The development potential of the Draft Revised Development Plan 2024-2044 SPA area is certainly high from an environmental point of view. This Development Plan has many new provisions, which will give impetus to the development and steer the development in a proper way. Most of the area in CIDCO SPA covers hilly terrain and forest lands. The said pockets are proposed as Regional Park Zone and maintain an environment in the SPA area as well as for the adjoining Navi Mumbai project. Many provisions are introduced in this plan first time in the State and will be known for pioneering such provisions. Not only the provisions but also the implementation of the plan is of utmost importance. This Development Plan gives ways and means to implement it in a realistic way. This plan is simpler and understandable to the general public. There is no doubt that this plan will set an example in the State because of its uniqueness.
Annexures
Annexures-1
Planning Norms.
| SI.No | Facilities | Comparison | ||||||||||||||||
| UDPFI | New URDPFI (2013) | 1979 GR Norms | CIDCO(Navi Mumbai) Norms | Waluj Nagar Project Draft Development plan | ||||||||||||||
| Popn | Area (sqm) | PCPP (sqm) | Popn | Area (sqm) | PCPP (sqm) | Popn | Area (sqm) | PCPP (sqm) | Popn | Area (sqm) | PCPP (sqm) | Popn | Area (sqm) | PCPP (sqm) | ||||
| A | Social Amenities | |||||||||||||||||
| 1 | Balwadi/Creche | Balwadi/Creche | 2,500 | 800 | 0.32 | 5,000 | 200 | 0.04 | Nil | Nil | 12,000 | 500 | 0.04 | |||||
| 2 | Facility center | Public Health Center/Polyclinic | 100,000 | 2,000 | 0.02 | 100,000 | 2,000 | 0.02 | Nil | Nil | ||||||||
| Library (community hall and library) | 15,000 | 2,000 | 0.13 | 15,000 | 2,000 | 0.13 | 10,000 | 500 | 0.05 | Nil | 10,000 | 500 | 0.05 | |||||