9.1 Level of Implementation of Development Plan
The existing Development Plan (DP) was sanctioned by Govt. on 18th August 1979 and 18th January 1980 and came into force on 01st March 1980. DP was prepared by CIDCO and sanctioned by Govt. as well as modified up to June 2021. As the initial development was slow, a large number of land pockets were not developed to reduce land appropriation costs and to avoid environmental impacts through land engineering. Most of the unacquired and undeveloped land parcels in Navi Mumbai New Town fall in the ‘Regional Park Zone’ having an area of about 62 sq. km. out of 344 Sq km. Inevitably, the development of RPZ can no longer be fastened. Hence, it is necessary to evolve a suitable mechanism to regulate the development in a systematic and balanced manner, with due regard to the characteristics of various locations in this zone. By imparting orderly development, it would invite value-added facilities. Moreover, it would help to protect the area from indiscrete exploitation of natural resources and revitalize the overall living environment.
9.2 Identification of problems
i. Most of the land is above 30 m contours in hilly terrain, it is not feasible to develop in the Regional Park Zone and owned by the Forest Department, Govt. of Maharashtra.
ii. Environmentally significant areas such as forest areas are excluded from developable lands.
iii. Physically undevelopable areas such as hills with steep slopes (greater than 1:5) are also excluded from developable areas
iv. Old and historical fort located in the SPA area required to be preserved.
v. Encroachment rises in forest lands in the hilly terrain.
vi. Due to the increase in demand for warehousing/ container yards due to JNPT port activity, unauthorized container yards are developed on the Southern side.


Priyadarshan T. Waghmare Associate Planner (DP) CIDCO Ltd. Navi Mumbai

Jagdish B. Patil Senior Planner (DP) & Town Planning Officer (SPA) CIDCO Ltd. Navi Mumbai