The Whole Building Performance Method is an alternative to the Prescriptive Method compliance path contained in §4 through §7 of this Code. It applies to all building types covered by the Code as mentioned in §2.5.
9.1.2 Compliance
A building complies with the Code using the Whole Building Performance (WBP) Method, when the estimated EPI Ratio is equal to or less than 1, even though it may not comply with the specific provisions of the prescriptive requirements in §4 trough §7. The mandatory requirements of §4 through §7 (§4.2, §5.2, §6.2, and §7.2) shall be met when using the WBP Method.
9.1.3 Annual Energy Use
Annual energy use for the purposes of the WBP Method shall be calculated in kilowatt-hours (kWh) of electricity use per year per unit area. Energy sources other than electricity that are used in the building shall be converted to kWh of electric energy at the rate of 0.75 kWh per megajoule.
Note: The annual energy use calculation as per the Whole Building Performance Method is not a prediction of the actual energy use of the building once it gets operational. Actual energy performance of a building depends on a number of factors like weather, occupant behaviour, equipment performance and maintenance, among others, which are not covered by this Code.
9.1.4 Trade-offs Limited to Building Permitb
The WBP Method may be used for building permit applications that include less than the whole building; however, any design parameters that are not part of the building permit application shall be identical for both the Proposed Design and the Standard Design. Future improvements to the building shall comply with both the mandatory and prescriptive requirements of concurrent code.
9.1.5 Documentation Requirements
Compliance shall be documented and compliance forms shall be submitted to the authority having jurisdiction. The information submitted shall include, at a minimum, the following:
(a) Summary describing the results of the analysis, including the annual energy use for the Proposed Design and the Standard Design, and software used.
(b) Brief description of the project with location, number of stories, space types, conditioned and unconditioned areas, hours of operation.
(c) List of the energy-related building features of the Proposed Design. This list shall also document features different from the Standard Design.
(d) List showing compliance with the mandatory requirements of this code.
(e) The input and output report(s) from the simulation program including a breakdown of energy usage by at least the following components: lights, internal equipment loads, service water heating equipment, space heating equipment, space cooling and heat rejection equipment, fans, and other HVAC equipment (such as pumps). The output reports shall also show the number of hours any loads are not met by the HVAC system for both the Proposed Design and Standard Design.
(f) Explanation of any significant modelling assumptions made.
(g) Explanation of any error messages noted in the simulation program output.
(h) Building floor plans, building elevations, and site plan.
9.2 MandatoryRequirements
All requirements of §4.2, §5.2, §6.2, and §7.2shall be met. These sections contain the mandatory provisions of the Code and are prerequisites for demonstrating compliance using the WBP Method.
9.3SimulationRequirements
9.3.1 Energy Simulation Program
The simulation software shall be a computer-based program for the analysis of energy consumption in buildings and be approved by the authority having jurisdiction. The simulation program shall, at a minimum, have the ability to model the following:
(a) Energy flows on an hourly basis for all 8,760 hours of the year,
(b) Hourly variations in occupancy, lighting power, miscellaneous equipment power, thermostat set points, and HVAC system operation, defined separately for each day of the week and holidays,
(c) Thermal mass effects,
(d) Ten or more thermal zones,
(e) Part-load and temperature dependent performance of heating and cooling equipment,
(f) Air-side and water-side economizers with integrated control.
In addition to the above, the simulation tool shall be able to produce hourly reports of energy use by energy source and shall have the capability to performing design load calculations to determine required HVAC equipment capacities, air, and water flow rates in accordance with §5 for both the proposed and Standard building designs.
The simulation program shall be tested according to ASHRAE Standard 140 Method of Test for the Evaluation of Building Energy Analysis Computer Programs (ANSI approved) and the results shall be furnished by the software provider.
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
9.3.2 Climate Data
The simulation program shall use hourly values of climatic data, such as temperature and humidity, from representative climatic data for the city in which the Proposed Design is to be located. For cities or urban regions with several climate data entries, and for locations where weather data are not available, the designer shall select available weather data that best represent the climate at the construction site.
9.3.3 Compliance Calculations
The Proposed Design and Standard Design shall be calculated using the following:
(a) Same simulation program,
(b) Same weather data, and
(c) Identical building operation assumptions (thermostat set points, schedules, equipment and occupant loads, etc.) unless an exception is allowed by this Code or the authority having jurisdiction for a given category.
9.4.2HVAC Systems
The HVAC system type and related performance parameters for the Standard Design shall be determined from Table 9-2and the following rules:
(a) Other components: Components and parameters not listed in Table 9-2 or otherwise specifically addressed in this subsection shall be identical to those in the Proposed Design.
Exception to § 9.4.2(a): Where there are specific requirements in §5.2.2, the component efficiency in the Standard Design shall be adjusted to the lowest efficiency level allowed by the requirement for that component type.
(b) All HVAC and service water heating equipment in the Standard Design shall be modeled at the minimum efficiency levels, both part load and full load, in accordance with § 5.2.2.
(c) Where efficiency ratings, such as EER and COP, include fan energy, the descriptor shall be broken down into its components so that supply fan energy can be modeled separately.
(d) Minimum outdoor air ventilation rates shall be the same for both the Standard Design and the Proposed Design except for conditions specified in §9.4.2.1.
(e) The equipment capacity for the standard design shall be based on sizing runs for each orientation and shall be oversized by 15% for cooling and 25% for heating, i.e., the ratio between the capacities determined by the sizing runs shall be 1.15 for cooling and 1.25 for heating.
(f) Unmet load hours for the Proposed Design shall not differ from unmet load hours for the Standard Design by more than 50 hours. Maximum number of unmet hours shall not exceed 300 for either case.
9.4.2.1Minimum Outdoor air rates:
Minimum outdoor air rates shall be identical for both the Standard Design and Proposed Design, except
(a) when modeling demand controlled ventilation (DCV) in the Proposed Design (DCV is not required in the Standard Design as per §5.2.1.3.
(b) when the Proposed Design has a ventilation flow higher than the minimum required by the applicable code, the Standard Design shall be modelled as per the minimum
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
ventilation rate required by the applicable code and the Proposed Design shall be modeled as per actual design (higher than Standard Design)
9.4.2.2 Fan Schedules
Supply and return fans shall operate continuously whenever the spaces are occupied and shall be cycled to meet heating and cooling loads during unoccupied hours.
9.4.2.3 Fan Power
(a) For Systems Types A, B and D,
Pfan = cmh x .51
Where Pfan= Standard Design fan power in watts
cmh = Standard Design supply airflow rate auto-sized by the simulation software
(b) For System Type C
Fan power shall be modeled as per efficiency limits specified in Table 5-9 using a static pressure of 622 Pa or the design static pressure, whichever is higher. The simulation software shall automatically calculate the Standard Design fan power based on the above inputs.
9.4.2.4 Design Airflow Rates
Design airflow rates for the Standard Design shall be sized based on a supply air to room air temperature difference of 11°C for cooling and 1 8 ° C for heating. The Proposed Design airflow rates shall be as per design.
9.4.2.5 Economizers (airside and waterside)
Airside economizers shall be modeled in the Standard Design as per the requirements of §5.3.6.
Exception to §9.4.2.5: Airside economizer shall not be modeled for Standard Design HVAC System Type A.
9.4.2.6 Energy Recovery
Energy recovery shall be modeled in the Standard Design as per the requirements of §5.3.
9.4.2.7 Chilled Water Design Supply Temperatures
Chilled water design supply temperature shall be modeled at 6 . 7 ° C and return temperature at 13.3°C.
9.4.2.8 Chillers
Only electric chillers shall be modeled in the Standard Design for System C. Chillers shall meet
the minimum efficiency requirements indicated in Table 9-4 and Table 9-5. Chillers in the Standard Design shall be selected as per Table 9-6 below:
Table 9-4Minimum Energy Efficiency Requirements for water cooled Chillers
Chiller Capacity (kWr)
COP
IPLV
<260
4.7
5.8
≥260 &<530
4.9
5.9
≥530 &<1,050
5.4
6.5
≥1,050 &<1,580
5.8
6.8
≥1,580
6.3
7.0
Table 9-5Minimum Energy Efficiency Requirements for air cooled Chillers
Chiller Capacity (kWr)
COP
IPLV
<260
2.8
3.5
≥260
3.0
3.7
Table 9-6Types and Number of Chillers for Standard Design
Peak Building Cooling Load (kWr)
Chiller Type
<1,055
1 Water Cooled Screw Chiller
1,055 to 2,110
2 Water Cooled Screw Chillers equally sized
>2,110
2 or more Water Cooled Centrifugal Chillers, equally sized such that no Chiller is greater than 2,813 kWr
Exception to 9.4.2.8: Air cooled chillers are allowed to be modeled in the Standard Design if the Proposed Design has air cooled chillers. If the proposed building has a mix of air and water cooled chillers, then the Standard Design shall be modeled with a mix of air and water cooled chillers in the same proportion as in the Proposed Design.
9.4.2.9 Chilled Water Pumps
Chilled and condenser water pumps for the Standard Design shall be modeled as per power and efficiency limits specified in
Table 5-12. Standard Design chilled water pumps shall be modeled as primary-secondary with variable secondary flow.
9.4.2.10 Cooling Tower
Standard Design cooling tower shall be modeled as an open circuit axial flow tower with power and efficiency as per §5.3.3. The fans shall be modeled as two speed.
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Condenser water design supply temperature shall be 2 9 . 4 ° C or 5 . 6 ° C approach to wet bulb temperature, whichever is lower, with a design temperature rise of 5 . 6 ° C
9.4.2.11 Boiler
Standard Design boilers shall be modeled as natural draft boilers and shall use the same fuel as the Proposed Design. Boiler efficiency shall be modeled as per Table 54.
9.4.2.12 Hot Water Design Supply Temperatures
Hot water design supply temperature shall be modeled at 8 2 ° C and return temperature at 5 4 ° C .
9.4.2.13 Hot Water Pumps
The Standard Design hot water pumps shall be modeled with a minimum efficiency of 70% and a pump power of 300 W/l-s-1.
Standard Design hot water pumps shall be modeled as primary-secondary with variable secondary flow.
9.4.2.14 Campus/District Cooling Systems
All district cooling plants shall be assumed to be on grid electricity, unless otherwise specified and supported through pertinent documents. New district plants shall comply with the mandatory requirements of ECBC irrespective of who owns and/or operates the district plant.
Projects may choose either option A or option B given below for modelling campus/district cooling systems.
Option A
The cooling source shall be modeled as purchased chilled water in both the Standard Design and Proposed Design. For the Standard Design, Table 9-2, shall be modified as follows:
(a) For System Type C; purchased chilled water shall be modeled as the cooling source.
(b) System Types A and B shall be replaced with a two-pipe fan coil system with purchased chilled water as the cooling source.
The chilled water/thermal energy consumption simulated by the software shall be converted to units of kWh and added to the overall building energy consumption. The following conversion factors shall be used to convert chilled water/thermal energy consumption to units of kWh.
1 ton hour = 0.85 kWh
1 MBtu = 1,000,000 Btu = 293 kWh
Option B
The Standard Design shall be modeled as per Table 9-2 HVAC Systems Map.
For the Proposed Design, model a virtual onsite chilled water plant with Chiller, Pumps and cooling towers modeled at minimum efficiency levels as per § 9.4.2.7 to § 9.4.2.10 Airside/low side capacities shall be modeled as per design and the plant capacities shall be auto-sized by the software.
9.4.3 Compliance Thresholds for ECBC compliant, ECBC+ and Super ECBC Buildings
For buildings to qualify as ECBC+ and SuperECBC Buildings, the WBP Method shall be followed for the Standard Design as detailed above. The Proposed Design for ECBC+ and SuperECBC Buildings shall meet the mandatory provisions of §4.2, §5.2, §6.2, and §7.2.
The EPI Ratio for ECBC+ and SuperECBC Buildings shall be equal to or less than the EPI Ratios listed under the applicable climate zone in Table 9-7 through Table 9-11 of §9.5
The simulation model for calculating the Proposed Design and the Standard Design shall be developed in accordance with the requirements in Table 9-1. The Standard Design is based on the mandatory and prescriptive requirements of the ECBC compliant building. The Standard Design will be the same for all compliance levels (ECBC, ECBC+, Super ECBC).
Table 9-1Modelling Requirements for Calculating Proposed and Standard Design
Case
Proposed Design
Standard Design
1. Design Model
(a) The simulation model of the Proposed Design shall be consistent with the design documents, including proper accounting of fenestration and opaque envelope types and area; interior lighting power and controls; HVAC system types, sizes, and controls; and service water heating systems and controls.(b) When the whole building performance method is applied to buildings in which energy-related features have not been designed yet (e.g., a lighting system), those yet-to-be-designed features shall be described in the Proposed Design so that they minimally comply with applicable mandatory and prescriptive requirements of§4.2, §5.2, §6.2, and §7.2 and §4.3, §5.3, and §6.3 respectively.
The Standard Design shall be developed by modifying the Proposed Design as described in this table. Unless specified in this table, all building systems and equipment shall be modeled identically in the Standard Design and Proposed Design.
2.Space Use Classification
The building type or space type classifications shall be chosen in accordance with §2.5. More than one building type category may be used in a building if it is a mixed-use facility.
Same as Proposed Design.
3.Schedules
Operational schedules (hourly variations in occupancy, lighting power, equipment power, HVAC equipment operation, etc.) suitable for the building and/or space type shall be modeled for showing compliance. Schedules must be modeled as per §9.6. In case a schedule for an occupancy type is missing in §9.6, appropriate schedule may be used.Temperature and humidity schedules and set points shall be identical in the Standard and Proposed Designs.Temperature control/thermostat throttling ranges shall also be modeled identically in both the Designs.
Same as Proposed Design.Exception: Schedules may be allowed to differ between the Standard and Proposed models wherever it is necessary to model non standard efficiency measures and/or measures which can be best approximated by a change in schedule. Measures that may warrant a change in operating schedules include but are not limited to automatic controls for lighting, natural ventilation, demand controlled ventilation systems, controls for service water heating load reduction. Schedule change is not allowed for manual controls under any category. This is subject to approval by the authority having jurisdiction.
4.Building Envelope
All components of the building envelope in the Proposed Design shall be modeled as shown on architectural drawings or as installed for existing building envelopes.Exception: The following building elements are permitted to differ from architectural drawings.(a) Any envelope assembly that covers less than 5% of the total area of that assembly type (e.g., exterior walls) need not be separately described. If not separately described, the area of an envelope assembly must be added to the area of the adjacent assembly of that same type.(b) Exterior surfaces whose azimuth orientation and tilt differ by no more than 45 degrees and are otherwise the same may be described as either a single surface or by using multipliers.
The Standard Design shall have identical conditioned floor area and identical exterior dimensions and orientations as the Proposed Design, except as noted in (a), (b), (c),(d) and (e) below.(a) Orientation. The Standard Design performance shall be generated by simulating the building with its actual orientation and again after rotating the entire building 90, 180, 270 degrees, then averaging the results.The building shall be modeled so that it does not shade itself(b) Opaque assemblies such as roof, floors, doors, and walls shall be modeled with the maximum U-factor allowed in §4.3.1 and §4.3.2.
WHOLE BUILDING METHOD
Case
Proposed Design
Standard Design
(c) For exterior roofs, other than roofs with ventilated attics, the reflectance and emittance of the roof surface shall be modeled in accordance with §4.3.1.1.(d) Manually operated fenestration shading devices such as blinds or shades shall not be modeled. Permanent shading devices such as fins, overhangs, and light shelves shall be modeled.(e) The exterior roof surface shall be modeled using the solar reflectance in accordance with ASTM E903-96 and thermal emittance determined in accordance with ASTM E408-71. Where cool roof is proposed, emittance and reflectance shall be modeled as per ASTM E408-71 and ASTM E903-96 respectively. Where cool roof is not proposed, the exterior roof surfaces shall be modeled as per §4.3.1.1 i.e. the exterior roof surface shall be modeled with a solar reflectance of 0.70 and a thermal emittance of 0.75.
(c) Fenestration. Fenestration areas shall equal that in the Proposed Design or 40% of gross above grade wall area, whichever is smaller, and shall be distributed on each face in the same proportions as in the Proposed Design No shading projections are to be modeled; fenestration shall be assumed to be flush with the exterior wall or roof. Manually operated fenestration shading devices such as blinds or shades shall not be modeled. Fenestration U-factor shall be the maximum allowed for the climate, and the solar heat gain coefficient shall be the maximum allowed for the climate and orientation.(d) Skylight areas shall equal that in the Proposed Design or 5% of gross roof area, whichever is smaller.(e) Roof Solar Reflectance and Thermal Emittance: The exterior roof surfaces shall be modeled using a solar reflectance of 0.70 and a thermal emittance of 0.75 as per §4.3.1.1
5. Lighting
Lighting power in the Proposed Design shall be determined as follows:Where a complete lighting system exists, the actual lighting power shall be used in the model.Where a lighting system has been designed, lighting power shall be determined in accordance with either §6.3.4.Where no lighting exists, or is specified, lighting power shall be determined in accordance with the §6.3.2 or §6.3.3 for the appropriate building type.Lighting system power shall include all lighting system components shown or provided for on plans (including lamps, ballasts, task fixtures, and furniture-mounted fixtures).Lighting power for parking garages, exterior spaces and building facades shall be modeledMinimum Lighting controls, as per the ECBC requirements of §6.2.1, shall be modeled in the Proposed case.
Interior lighting power in the Standard Design shall be determined using the same categorization procedure (building area or space function) and categories as the Proposed Design with lighting power set equal to the maximum allowed for the corresponding method and category in either §6.3.2 or §6.3.3. Power for fixtures not included in the lighting power density calculation shall be modeled identically in the Proposed Design and Standard Design. Lighting controls shall be as per the ECBC requirements of §6.2.1. Exterior lighting power in the standard design shall be set equal to the maximum allowed in §6.3.5
WHOLE BUILDING METHOD
Case
Proposed Design
Standard Design
Automatic daylighting controls shall be modeled directly in the software or through schedule adjustments determined by a separate daylight analysis approved by the authority having jurisdiction.Other automatic lighting controls shall be modeled directly in the software by adjusting the lighting power as per Table 9-3.
6.HVAC Thermal Zones
HVAC Zones Designed: Where HVAC zones are defined on design drawings, each HVAC zone shall be modeled as a separate thermal block.Exception: Identical zones (similar occupancy and usage, similar internal loads, similar set points and type of HVAC system, glazed exterior walls face the same orientation or vary by less than 45°) may be combined for simplicity.HVAC Zones Not Designed: Where HVAC zones are not defined on design drawings, HVAC zones shall be defined based on similar occupancy and usage, similar internal loads, similar set points and type of HVAC system, glazed exterior walls that face the same orientation or vary by less than 45° in combination with the following rules:Perimeter Core Zoning: Separate thermal block shall be modeled for perimeter and core spaces. Perimeter spaces are defined as spaces located within 5 meters of an exterior or semi exterior wall. Core spaces are defined as spaces located greater than 5 meters of an exterior or semi exterior wall.Separate thermal blocks shall be modeled for floors in contact with ground and for floors which have a ceiling/roof exposure to the ambient.
Same as Proposed Design
7.HVAC Systems
The HVAC system type and all related performance parameters, such as equipment capacities and efficiencies, in the Proposed Design shall be determined as follows:(a) Where a complete HVAC system exists, the model shall reflect the actual system type using actual component capacities and efficiencies.
The HVAC system type shall be as per
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Case
Proposed Design
Standard Design
(b) Where an HVAC system has been designed, the HVAC model shall be consistent with design documents.Mechanical equipment efficiencies shall be adjusted from actual design conditions to the rating conditions specified in §5, if required by the simulation model.(c) Where no heating system has been specified, the heating system shall be assumed to be electric. The system characteristics shall be identical to the system modeled in the Standard Design.(d) Where no cooling system has been specified, the cooling system and its characteristics shall be identical to the system modeled in the Standard Design.
Table 9-2 and related performance parameters for the Standard Design shall be determined from requirements of §9.4.2.Equipment performance shall meet the requirements of §5 for code compliant building.
8. Service Hot Water
The service hot water system type and all related performance parameters, such as equipment capacities and efficiencies, in the Proposed Designshall be determined as follows:(a) Where a complete service hot water system exists, the model shall reflect the actual system type using actual component capacities and efficiencies.(b) Where a service hot water system has been designed, the service hot water model shall be consistent with design documents.(c) Where no service hot water system exists, or is specified, no service hot water heating shall be modeled.
The service water heating system shall be of the same type as the Proposed Design.For residential facilities, hotels and hospitals the Standard Design shall have a solar hot water system capable of meeting 20% of the hot water demand.Systems shall meet the efficiency requirements of §5.2.7.2.
9. Miscellaneous Loads
Receptacle, motor, and process loads shall be modeled and estimated based on the building type or space type category. These loads shall be included in simulations of the building and shall be included when calculating the Standard Design and Proposed Design. All end-use load components within and associated with the building shall be modeled, unless specifically excluded by this Table, but not limited to, exhaust fans, parking garage ventilation fans, exterior building lighting, swimming pool heaters and pumps, elevators and escalators, refrigeration equipment, and cooking equipment.
Receptacle, motor and process loads shall be modeled the same as the Proposed Design.
10.Modelling Limitations to the Simulation Program
If the simulation program cannot model a component or system included in the Proposed Design, one of the following methods shall be used with the approval of the authority having jurisdiction:(a) Ignore the component if the energy impact on the trade-offs being considered is not significant.(b) Model the component substituting a thermodynamically similar component model.(c) Model the HVAC system components or systems using the HVAC system of the Standard Design in accordance with Section 6 of this table.Whichever method is selected, the component shall be modeled identically for both the Proposed Design and Standard Designmodels.
9.5MaximumAllowedEPIRatios
Table 9‑7 Maximum Allowed EPI Ratios for Building in Composite Climate
Building Type
Composite
Hotel (No Star and Star)
ECBC1
ECBC+0.91
SuperECBC0.81
Resort
1
0.88
0.76
Hospital
1
0.85
0.77
Outpatient
1
0.85
0.75
Assembly
1
0.86
0.77
Office (Regular Use)
1
0.86
0.78
Office (24Hours)
1
0.88
0.76
Schools and University
1
0.77
0.66
Open Gallery Mall
1
0.85
0.76
Shopping Mall
1
0.86
0.74
Supermarket
1
0.81
0.7
Strip retail
1
0.82
0.68
Table 9‑8 Maximum Allowed EPI Ratios for Buildings in Hot and Dry Climate
Building Type
Hot and Dry
Hotel (No Star and Star)
ECBC1
ECBC+0.9
SuperECBC0.81
Resort
1
0.88
0.76
Hospital
1
0.84
0.76
Outpatient
1
0.85
0.75
Assembly
1
0.86
0.78
Office (Regular Use)
1
0.86
0.78
Office (24Hours)
1
0.88
0.76
Schools and University
1
0.77
0.66
Open Gallery Mall
1
0.85
0.77
Shopping Mall
1
0.84
0.72
Supermarket
1
0.73
0.69
Strip retail
1
0.82
0.68
Table 9‑9 Maximum Allowed EPI Ratios for Buildings in Temperate Climate
Building Type
Temperate
Hotel (No Star and Star)
ECBC1
ECBC+0.9
SuperECBC0.8
Resort
1
0.88
0.75
Hospital
1
0.82
0.73
Outpatient
1
0.85
0.75
Assembly
1
0.85
0.76
Office (Regular Use)
1
0.85
0.75
Office (24Hours)
1
0.87
0.74
Schools and University
1
0.77
0.66
Open Gallery Mall
1
0.83
0.74
Shopping Mall
1
0.84
0.71
Supermarket
1
0.81
0.69
Strip retail
1
0.81
0.67
Table 9‑10 Maximum Allowed EPI Ratios for Buildings in Warm and Humid Climate
Building Type
Warm and Humid
Hotel (No Star and Star)
ECBC1
ECBC+0.91
SuperECBC0.81
Resort
1
0.88
0.75
Hospital
1
0.86
0.77
Outpatient
1
0.86
0.76
Assembly
1
0.88
0.8
Office (Regular Use)
1
0.86
0.76
Office (24Hours)
1
0.88
0.76
Schools and University
1
0.77
0.66
Open Gallery Mall
1
0.86
0.77
Shopping Mall
1
0.85
0.72
Supermarket
1
0.82
0.7
Strip retail
1
0.83
0.68
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑11 Maximum Allowed EPI Ratios for Buildings in Cold Climate
Building Type
Cold
Hotel (No Star and Star)
ECBC1
ECBC+0.91
SuperECBC0.82
Resort
1
0.88
0.75
Hospital
1
0.88
0.8
Outpatient
1
0.85
0.75
Assembly
1
0.87
0.81
Office (Regular Use)
1
0.88
0.8
Office (24Hours)
1
0.87
0.75
Schools and University
1
0.85
0.73
Open Gallery Mall
1
0.82
0.73
Shopping Mall
1
0.96
0.93
Supermarket
1
0.8
0.68
Strip retail
1
0.8
0.66
Same as Proposed Design.
9.6Schedules
Table 9‑12 Schedules for Business - Office Buildings
Business - Office
Time Period
Elevator Schedules
External Lighting Schedule
Basement Ventilation
Basement Lighting
e ss tiDmay i Bensu
sr ss 2 H4ou iBensu
/D7say keew
e ss tiDmay i Bensu
sr ss 2 H4ou iBensu
e ss tiDmay i Bensu
sr ss 2 H4ou iBensu
00:00-01 00
0.05
0.55
0.80
0.00
1.00
0.05
1.00
01:00-02:00
0.05
0.25
0.80
0.00
1.00
0.05
1.00
02:00-03:00
0.05
0.25
0.80
0.00
1.00
0.05
1.00
03:00-04:00
0.05
0.15
0.80
0.00
1.00
0.05
1.00
04:00-05:00
0.05
0.35
0.80
0.00
1.00
0.05
1.00
05:00-06:00
0.05
0.50
0.80
0.00
1.00
0.05
1.00
06:00-07:00
0.20
0.20
0.00
0.00
1.00
0.05
1.00
07:00-08:00
0.40
0.40
0.00
0.00
1.00
0.05
1.00
08:00-09:00
0.80
0.80
0.00
1.00
1.00
1.00
1.00
09:00-10:00
0.80
0.80
0.00
1.00
1.00
1.00
1.00
10:00-11:00
0.55
0.55
0.00
1.00
1.00
1.00
1.00
11:00-12:00
0.35
0.35
0.00
1.00
1.00
1.00
1.00
12:00-13:00
0.25
0.25
0.00
1.00
1.00
1.00
1.00
13:00-14:00
0.95
0.95
0.00
1.00
1.00
1.00
1.00
14:00-15:00
0.95
0.95
0.00
1.00
1.00
1.00
1.00
15:00-16:00
0.35
0.35
0.00
1.00
1.00
1.00
1.00
16:00-17:00
0.15
0.35
0.00
1.00
1.00
1.00
1.00
17:00-18:00
0.75
0.70
0.00
1.00
1.00
1.00
1.00
18:00-19:00
0.95
0.95
0.80
1.00
1.00
1.00
1.00
19:00-20:00
0.50
0.50
0.80
1.00
1.00
1.00
1.00
20:00-21:00
0.30
0.35
0.80
1.00
1.00
1.00
1.00
21:00-22:00
0.20
0.25
0.80
0.00
1.00
0.05
1.00
22:00-23:00
0.05
0.25
0.80
0.00
1.00
0.05
1.00
23:00-24:00
0.05
0.55
0.80
0.00
1.00
0.05
1.00
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑13: Schedules for Business - Office Building Daytime Business
Business - Office Daytime Business
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
HVAC FanSchedule(On/Off)
e ffiOc
bb Loy /dirorrCo
/enc ng fereno tiMee C
e ffiOc
bb Loy /dirorrCo
/enc ng fereno tiMee C
e ffiOc
/enc Rmoo fereno tineeg C M
/e bb Loy ffiOc /dirorr Co
/enc ng fereno tiMee C
00:00-01:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
01:00-02:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
02:00-03:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
03:00-04:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
04:00-05:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
05:00-06:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
06:00-07:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
0
0
07:00-08:00
0.00
0.00
0.00
0.10
0.10
0.00
0.00
0.00
1
0
08:00-09:00
0.20
0.70
0.00
0.90
Table 9‑14: Schedules for Business - Office Building 24-hours Business
Business - Office 24-hour Business
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
HVAC FanSchedule(On/Off)
ec ffiO
bybo / L diror ro C
/ec g ne tinfreno Mee C
ec ffi O
bybo / L diror ro C
/ec g ne tinfreno Mee C
ec ffi O
/ec g ne tinfreno Mee C
/ro / di ecg rro /by ne tin / Cec b Lo freno Mee ffi C O
00:00-01:00
0.90
0.20
0.00
0.90
0.90
0.00
0.95
0.00
1
01:00-02:00
0.90
0.50
0.00
0.90
0.90
0.00
0.95
0.00
1
02:00-03:00
0.90
0.20
0.00
0.90
0.90
0.00
0.95
0.00
1
03:00-04:00
0.90
0.20
0.00
0.90
0.90
0.00
0.95
0.00
1
04:00-05:00
0.50
0.20
0.50
0.50
0.90
0.50
0.00
0.90
1
05:00-06:00
0.20
0.50
0.50
0.05
0.90
0.50
0.00
0.90
1
06:00-07:00
0.10
0.50
0.50
0.05
0.50
0.50
0.00
0.90
1
07:00-08:00
0.10
0.50
0.00
0.90
0.50
0.00
0.95
0.00
1
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑15: Schedules for Business - Server Room
Business Building - Server Room
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
HVAC Fan Schedule(ON/OFF)
em ssetiy ins DaBu
rousse h- ins 24 bu
em ssetiy ins DaBu
rousse h- ins 24 bu
em ing l tinn lA ru
00:00-01:00
0.00
0.00
0.10
0.10
1.00
1
01:00-02:00
0.00
0.00
0.10
0.10
1.00
1
02:00-03:00
0.00
0.00
0.10
0.10
1.00
1
03:00-04:00
0.00
0.00
0.10
0.10
1.00
1
04:00-05:00
0.00
0.00
0.10
0.10
1.00
1
05:00-06:00
0.00
1.00
0.10
0.10
1.00
1
06:00-07:00
0.00
1.00
0.10
0.10
1.00
1
07:00-08:00
0.00
1.00
0.10
0.10
1.00
1
08:00-09:00
1.00
1.00
0.10
0.10
1.00
1
09:00-10:00
1.00
1.00
0.50
0.50
1.00
1
10:00-11:00
1.00
1.00
0.50
0.50
1.00
1
11:00-12:00
1.00
1.00
0.50
0.50
1.00
1
12:00-13:00
Table 9‑16: Schedules for Assembly Buildings (A)
Assembly Buildings - Common Areas
Time Period
Elevator Schedule
HVAC Fan Schedule (On/Off)
External Lighting Schedule
Basement Ventilation
Basement Lighting
Seating/Public Space
Exhibit Space
Meeting/Conference Room
00:00-01:00
0.00
0
0
0
0.80
0.00
0.05
01:00-02:00
0.00
0
0
0
0.80
0.00
0.05
02:00-03:00
0.00
0
0
0
0.80
0.00
0.05
03:00-04:00
0.00
0
0
0
0.80
0.00
0.05
04:00-05:00
0.00
0
0
0
0.80
0.00
0.05
05:00-06:00
0.00
0
0
0
0.80
0.00
0.05
06:00-07:00
0.00
0
0
1
0.00
0.00
0.05
07:00-08:00
0.00
1
1
1
0.00
0.00
0.05
08:00-09:00
0.20
1
1
1
0.00
1.00
1.00
09:00-10:00
0.50
1
1
1
0.00
1.00
1.00
10:00-11:00
0.50
1
1
1
0.00
1.00
1.00
11:00-12:00
0.50
1
1
1
0.00
1.00
1.00
12:00-13:00
0.50
1
1
1
0.00
1.00
1.00
13:00-14:00
0.50
1
1
1
0.00
1.00
1.00
14:00-15:00
0.50
0
1
1
0.00
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑17: Schedules for Assembly Buildings (B)
Assembly Buildings
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
lbic /Pngu Seapc tiae S
eacbii StphEx
/ ec tineeg fneren M Co
lbic /Pngu Seapc tiae S
eacbii StphEx
/ ec tineeg fneren M Co
eacbii Stph Ex
/ ec tineeg fneren M Co
00:00-01:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
01:00-02:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
02:00-03:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
03:00-04:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
04:00-05:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
05:00-06:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
06:00-07:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
07:00-08:00
0.00
0.00
0.00
0.10
0.10
0.10
0.00
0.00
08:00-09:00
0.50
0.50
0.00
0.90
0.90
0.10
0.00
0.00
Table 9‑18: Schedules for Assembly Buildings (C)
Assembly Buildings - Museum
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
HVAC Fan Schedule (ON/OFF)
mu tiino es bi Mu h Ex
mu tinoa es ro Mutse R
mu tiino es bi Mu h Ex
mu tinoa es ro Mutse R
mu tiino es bi Mu h Ex
mu tinoa es ro Mutse R
mu tiino es bi Mu h Ex
mu tinoa es ro Mutse R
00:00-01:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
01:00-02:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
02:00-03:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
03:00-04:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
04:00-05:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
05:00-06:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
06:00-07:00
0.00
0.00
0.10
0.10
0.00
0.00
0
0
07:00-08:00
0.00
0.00
0.10
0.10
0.00
0.00
1
1
08:00-09:00
0.50
0.80
0.90
0.90
0.00
0.90
1
1
09:00-10:00
0.50
0.25
0.90
0.50
0.90
0.25
1
1
10:00-11:00
0.80
0.25
0.90
0.50
0.90
0.25
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑19: Schedules for Assembly Buildings (D)
Assembly Buildings - Gym and Transport
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
HVAC Fan Schedule (ON/OFF)
m Gy
tro sg p in sn ldi TarBu
m Gy
tro sg p in sn ldi TarBu
m Gy
tro sg p in sn ldi TarBu
m Gy
tro sg p in sn ldi TarBu
00:00-01:00
0.00
0.00
0.00
0.00
0.00
0.80
0
1
01:00-02:00
0.00
0.00
0.00
0.00
0.00
0.80
0
1
02:00-03:00
0.00
0.00
0.00
0.00
0.00
0.80
0
1
03:00-04:00
0.00
0.00
0.00
0.00
0.00
0.80
0
1
04:00-05:00
0.00
0.50
0.50
0.50
0.50
0.80
1
1
05:00-06:00
0.60
0.90
0.90
0.75
0.75
0.90
1
1
06:00-07:00
0.90
0.90
0.90
0.75
0.75
0.90
1
1
07:00-08:00
0.90
0.90
0.90
0.75
0.75
0.90
1
1
08:00-09:00
0.90
0.90
0.90
0.75
0.75
0.90
1
1
09:00-10:00
0.60
0.90
0.90
0.50
0.50
0.90
1
1
10:00-11:00
0.20
0.50
Table 9‑20: Schedules for Healthcare - Hospital Buildings (A)
Healthcare - Hospital
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
In Patient & ICU
Public Spaces
OPD & Offices
Diagnostic, emergency & OT
Public Spaces
In Patient & ICU
Diagnostic, emergency & OT
OPD & Offices
In Patient & ICU
Diagnostic, emergency & OT
OPD & Offices
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
00:00-01:00
0.9
0
0
0.5
0.1
0.1
0.5
0.05
0.4
0
0
01:00-02:00
0.9
0
0
0.4
0.1
0.1
0.5
0.05
0.4
0
0
02:00-03:00
0.9
0
0
0.4
0.1
0.1
0.5
0.05
0.4
0
0
03:00-04:00
0.9
0
0
0.4
0.1
0.1
0.5
0.05
0.4
0
0
04:00-05:00
0.9
0
0
0.4
0.1
0.1
0.5
0.05
0.4
0
0
05:00-06:00
0.9
0
0
0.4
0.1
0.1
0.5
0.05
0.4
0
0
06:00-07:00
0.9
0
0
0.5
0.1
0.1
0.5
0.1
0.4
0
0
07:00-08:00
0.9
0.1
0.1
0.7
0.5
0.2
0.5
0.3
0.7
0.7
0.7
08:00-09:00
0.9
0.5
0.3
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑21: Schedules for Healthcare - Hospital Buildings (B)
Healthcare - Hospital
Time Period
HVAC Fan Schedule (On/Off)
External Lighting Schedule
Elevators
Service Hot Water
Basement Ventilation
Basement Lighting
Public Spaces
Beds & ICU
Diagn, emerg, & OT
OPD & Offices
Building Summer
Building Winters
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
7 Days/week
00:00-01:00
0
1
1
0
1.00
0.20
0.00
0.30
0.50
0.50
01:00-02:00
0
1
1
0
1.00
0.20
0.00
0.30
0.50
0.50
02:00-03:00
0
1
1
0
1.00
0.20
0.00
0.30
0.50
0.50
03:00-04:00
0
1
1
0
1.00
0.20
0.00
0.30
0.50
0.50
04:00-05:00
0
1
1
0
1.00
0.20
0.00
0.30
0.50
0.50
05:00-06:00
0
1
1
0
1.00
0.20
0.00
0.30
0.50
0.50
06:00-07:00
0
1
1
0
0.00
0.20
0.00
0.30
0.50
0.50
07:00-08:00
1
1
1
0
0.00
0.50
0.00
0.20
0.50
0.50
08:00-09:00
1
1
1
1
0.00
0.75
0.20
0.60
1.00
1.00
09:00-10:00
1
1
Table 9‑22: Schedules for Healthcare – Out-patient Healthcare Buildings (A)
Healthcare – Out-patient Healthcare
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
Lobby
Diagnostic & Emergency
OPD & Back Office
Diagnostic & Emergency
OPD & Back Office
Diagnostic & Emergency
OPD & Back Office
6 days/week
6 days/week
6 days/week
6 days/week
6 days/week
6 days/week
6 days/week
00:00-01:00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
01:00-02:00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
02:00-03:00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
03:00-04:00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
04:00-05:00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
05:00-06:00
0.00
0.00
0.00
0.10
0.00
0.00
0.00
06:00-07:00
0.00
0.20
0.20
0.10
0.10
0.00
0.00
07:00-08:00
0.10
0.20
0.20
0.50
0.30
0.50
0.00
08:00-09:00
0.50
0.30
0.20
0.90
0.90
0.95
0.95
09:00-10:00
0.80
0.90
0.90
0.90
0.90
0.95
0.95
10:00-11:00
0.80
0.90
0.90
0.90
0.90
0.95
0.95
11:00-12:00
0.80
0.90
0.90
0.90
0.90
0.95
0.95
12:00-13:00
0.80
0.90
0.50
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑23: Schedules for Healthcare – Out-patient Healthcare Buildings (B)
Healthcare - Out-patient Healthcare
Time Period
Elevator Schedule
HVAC Fan Schedule (On/Off)
External Lighting Schedule
Service Hot Water (SHW)
Basement Ventilation
Basement Lighting
All Spaces
Building Summer
Building Winters
6 days/week
6 days/week
7 Days/week
6 days/week
6 days/week
6 days/week
6 days/week
00:00-01:00
0.05
0
0.20
0.00
0.00
0.00
0.00
01:00-02:00
0.05
0
0.20
0.00
0.00
0.00
0.00
02:00-03:00
0.05
0
0.20
0.00
0.00
0.00
0.00
03:00-04:00
0.05
0
0.20
0.00
0.00
0.00
0.00
04:00-05:00
0.05
0
0.20
0.00
0.00
0.00
0.00
05:00-06:00
0.05
0
0.20
0.00
0.00
0.00
0.00
06:00-07:00
0.05
0
0.00
0.00
0.00
0.00
0.00
07:00-08:00
0.50
0
0.00
0.00
0.20
0.00
0.00
08:00-09:00
0.75
1
0.00
0.20
0.60
1.00
1.00
09:00-10:00
1.00
1
0.00
0.30
0.60
1.00
1.00
10:00-11:00
1.00
1
0.00
0.30
0.80
1.00
1.00
11:00-12:00
1.00
1
0.00
0.30
0.80
1.00
1.00
12:00-13:00
0.75
1
0.00
0.25
0.70
Table 9‑24: Schedules for Educational School Building (A)
Educational - School Building
Time Period
Elevator Schedule /s k ayee D w7
HVA Student Area /s k ayee D w5
C Fan Sche (On/Off)Back Office /s k ayee D w5
dule Corridor/Lobby /s k ayee D w5
External Lighting Schedule /s k ayee D w7
Basement Ventilation /s k ayee D w7
Basement Lighting /s k ayee D w7
00:00-01:00
0.00
0
0
0
0.80
0.00
0.05
01:00-02:00
0.00
0
0
0
0.80
0.00
0.05
02:00-03:00
0.00
0
0
0
0.80
0.00
0.05
03:00-04:00
0.00
0
0
0
0.80
0.00
0.05
04:00-05:00
0.00
0
0
0
0.80
0.00
0.05
05:00-06:00
0.00
0
0
0
0.80
0.00
0.05
06:00-07:00
0.05
0
0
1
0.00
0.00
0.05
07:00-08:00
0.80
1
1
1
0.00
0.00
0.05
08:00-09:00
0.80
1
1
1
0.00
1.00
1.00
09:00-10:00
0.25
1
1
1
0.00
1.00
1.00
10:00-11:00
0.25
1
1
1
0.00
1.00
1.00
11:00-12:00
0.25
1
1
1
0.00
1.00
1.00
12:00-13:00
0.25
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑25: Schedules for Educational - School Buildings (B)
Educational - School Buildings
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
tn e de no tu Z S
ffiec O kc Ba
/ro y dir bbro Lo C
tn e de no tu Z S
ffiec O kc Ba
/ro y dir bbro Lo C
tn e de no tu Z S
ffiec O kc Ba
00:00-01:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
01:00-02:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
02:00-03:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
03:00-04:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
04:00-05:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
05:00-06:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
06:00-07:00
0.00
0.00
0.00
0.00
0.20
0.00
0.00
0.00
07:00-08:00
0.70
0.00
0.90
0.90
0.70
0.90
0.35
0.35
08:00-09:00
0.90
0.90
0.20
0.90
0.90
0.50
0.95
0.95
09:00-10:00
0.90
0.90
0.20
0.90
0.90
0.50
0.95
0.95
Table 9‑26: Schedules for Educational - University Building (A)
Educational – University Buildings
Time Period
Elevator Schedule
HVAC Fan Schedule (On/Off)
External Lighting Schedule
Basement Ventilation
Basement Lighting
Library & Comp. Centre
Student and Back office
Student Area
Back Office
Library & Comp. Centre
Corridor/Lobby
7 days/week
7 days/week
5 days/week
5 days/week
7 days/week
5 days/week
7 days/week
7 days/week
7 days/week
00:00-01:00
0.00
0.00
0
0
0
0
0.80
0.00
0.05
01:00-02:00
0.00
0.00
0
0
0
0
0.80
0.00
0.05
02:00-03:00
0.00
0.00
0
0
0
0
0.80
0.00
0.05
03:00-04:00
0.00
0.00
0
0
0
0
0.80
0.00
0.05
04:00-05:00
0.00
0.00
0
0
0
0
0.80
0.00
0.05
05:00-06:00
0.00
0.00
0
0
0
0
0.80
0.00
0.05
06:00-07:00
0.00
0.05
0
0
0
0
0.00
0.00
0.05
07:00-08:00
0.00
0.25
1
1
1
1
0.00
0.00
0.05
08:00-09:00
0.50
0.85
1
1
1
1
0.00
1.00
1.00
09:00-10:00
0.50
0.25
1
1
1
1
0.00
1.00
1.00
10:00-11:00
0.30
0.25
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑27: Schedules for Educational - University Buildings (B)
Educational – University Buildings
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
Student Zone
Back Office
Library & Computer Centre
Corridor/ Lobby
Student Zone
Back Office
Library & Computer Centre
Corridor/ Lobby
Student Zone
Back Office
Library & Computer Centre
5 Days/week
5 Days/week
7Days/week
5 Days/week
5 Days/week
5 Days/week
7 Days/week
5 Days/week
5 Days/week
5 Days/week
7 Days/week
00:00-01:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
01:00-02:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
02:00-03:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
03:00-04:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
04:00-05:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
05:00-06:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
06:00-07:00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.10
0.10
07:00-08:00
0.40
0.00
0.00
0.00
0.90
0.00
0.00
0.00
0.35
Table 9‑28: Schedules for Hospitality Buildings (A)
Hospitality
Time Period
Elevator Schedule
External Lighting Schedule
Service Hot Water (SHW)
Basement Ventilation
Basement Lighting
G u e s t rooms
Kitchen
Laundry
Week Days
Weekends
7 Days/week
Week Days
Weekends
7 Days/week
7 Days/week
7 Days/week
7 Days/week
00:00-01:00
0.10
0.10
1.00
0.01
0.01
0.00
0.00
0.50
0.50
01:00-02:00
0.10
0.10
1.00
0.01
0.01
0.00
0.00
0.50
0.50
02:00-03:00
0.10
0.10
1.00
0.01
0.01
0.00
0.00
0.50
0.50
03:00-04:00
0.10
0.10
1.00
0.01
0.01
0.00
0.00
0.50
0.50
04:00-05:00
0.10
0.10
1.00
0.01
0.01
0.00
0.00
0.50
0.50
05:00-06:00
0.20
0.20
1.00
0.01
0.01
0.00
0.00
0.50
0.50
06:00-07:00
0.40
0.50
0.00
0.50
0.70
0.60
0.00
0.50
0.50
07:00-08:00
0.50
0.60
0.00
0.50
0.70
0.80
0.00
0.50
0.50
08:00-09:00
0.50
0.60
0.00
0.30
0.50
0.80
1.00
1.00
1.00
09:00-10:00
0.35
0.40
0.00
0.15
0.30
0.60
1.00
1.00
1.00
10:00-11:00
0.15
0.20
0.00
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑29: Schedules for Hospitality Buildings (B)
Hospitality - Occupancy
Time Period
Occupancy Schedule
m Rtoos Geu
bboy L
se i Sapcc lbPu
t tnarau Rse
e ffik Oc Bac
/e mo fnerec Rtoeu Cno qna B
hitnec K
say D kee W
dsne kee W
say D kee W
dsne kee W
say D kee W
dsne kee W
say D kee W
dsne kee W
say D kee W
dsne kee W
/sy ke D7a e w
/sy ke D7a e w
00:00-01:00
0.65
0.90
0.10
0.10
0.00
0.00
0.00
0.00
0.20
0.20
0.00
0.00
01:00-02:00
0.65
0.90
0.10
0.10
0.00
0.00
0.00
0.00
0.20
0.20
0.00
0.00
02:00-03:00
0.65
0.90
0.10
0.10
0.00
0.00
0.00
0.00
0.20
0.20
0.00
0.00
03:00-04:00
0.65
0.90
0.10
0.10
0.00
0.00
0.00
0.00
0.20
0.20
0.00
0.00
04:00-05:00
0.65
0.90
0.10
0.10
0.00
0.00
0.00
0.00
0.20
0.20
0.00
0.00
05:00-06:00
0.65
0.90
0.10
0.10
0.20
Table 9‑30: Schedules for Hospitality Buildings (C)
Hospitality - Lighting
Time Period
Lighting Schedule
m Rtoos Geu
bboy L
se i Sapcc lbPu
t tnarau Rse
e ffik Oc Bac
/e mo fnerec Rtoeu Cno Bqna
hitnec K
s Day ke e W
s dne ke e W
s Day ke e W
s dne ke e W
s Day ke e W
s dne ke e W
s Day ke e W
s dne ke e W
s Day ke e W
s dne ke e W
ke e w /sya D7
ke e w /sya D7
00:00-01:00
0.20
0.30
0.30
0.30
0.20
0.20
0.50
0.50
0.05
0.05
0.00
0.50
01:00-02:00
0.20
0.25
0.30
0.30
0.15
0.20
0.10
0.10
0.05
0.05
0.00
0.05
02:00-03:00
0.10
0.10
0.30
0.30
0.10
0.10
0.10
0.10
0.05
0.05
0.00
0.05
03:00-04:00
0.10
0.10
0.30
0.30
0.10
0.10
0.10
0.10
0.05
0.05
0.00
0.05
04:00-05:00
0.10
0.10
0.30
0.30
0.10
0.10
0.10
0.10
0.05
0.05
0.00
0.05
05:00-06:00
0.20
0.10
0.30
0.30
0.20
0.10
0.10
0.10
0.05
0.05
0.00
0.05
06:00-07:00
0.45
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑31: Schedules for Hospitality Buildings (D)
Hospitality - Equipment
Time Period
Equipment Schedule
Guest Room
Public Spaces
Restaurant
Back Office
Conference/Banquet Room
Kitchen
sy Da ke e W
dsne ke e W
k ee w/sya D7
sy Da ke e W
dsne ke e W
sy Da ke e W
dsne ke e W
k ee w/sya D7
k ee w/sya D7
00:00-01:00
0.20
0.20
0.30
0.50
0.50
0.05
0.05
0.00
0.30
01:00-02:00
0.20
0.20
0.20
0.00
0.00
0.05
0.05
0.00
0.10
02:00-03:00
0.20
0.20
0.20
0.00
0.00
0.05
0.05
0.00
0.10
03:00-04:00
0.20
0.20
0.20
0.00
0.00
0.05
0.05
0.00
0.10
04:00-05:00
0.20
0.20
0.20
0.00
0.00
0.05
0.05
0.00
0.10
05:00-06:00
0.20
0.20
0.30
0.00
0.00
0.05
0.05
0.00
0.10
06:00-07:00
0.30
0.30
0.50
0.00
0.00
0.05
0.05
0.00
0.30
07:00-08:00
0.40
0.60
0.50
0.60
0.60
0.10
0.10
0.00
0.30
08:00-09:00
0.70
0.90
0.50
0.60
0.60
0.30
0.30
0.50
0.30
09:00-10:00
0.20
Table 9‑32: Schedules for Hospitality Buildings (E)
Hospitality -HVAC Fan Schedules
Time Period
HVAC Fan Schedule
Guest Room
Lobby
Public Spaces
Restaurants
Back Office
Conference/ Banquet Room
Kitchen
7 Days/ week
7 Days/ week
7 Days/ week
7 Days/ week
7 Days/ week
7 Days/ week
7 Days/ week
00:00-01:00
1
0
0
0
0
0
0
01:00-02:00
1
0
0
0
0
0
0
02:00-03:00
1
0
0
0
0
0
0
03:00-04:00
1
0
0
0
0
0
0
04:00-05:00
1
0
0
0
0
0
0
05:00-06:00
1
1
1
0
0
0
1
06:00-07:00
1
1
1
1
0
0
1
07:00-08:00
1
1
1
1
0
0
1
08:00-09:00
1
1
1
1
1
1
1
09:00-10:00
1
1
1
1
1
1
1
10:00-11:00
1
1
1
1
1
1
1
11:00-12:00
1
1
1
1
1
1
1
12:00-13:00
1
1
1
1
1
1
1
13:00-14:00
1
1
1
1
1
1
1
14:00-15:00
1
1
1
1
1
1
1
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑33: Schedules for Shopping Complexes Buildings (A)
Shopping Complex
Time Period
HVAC Fan Schedule (ON/OFF)
External Lighting Schedule
Basement Ventilation
Basement Lighting
Elevator Schedule
Retail
Corridor & Atrium
Special Zones
k ee w/sya D7
k ee w/sya D7
k ee w/sya D7
k ee w/sya D7
k ee w/sya D7
k ee w/sya D7
sy da ke e W
dsne ke e W
00:00-01:00
0
0
0
1.00
1.00
1.00
0.20
0.20
01:00-02:00
0
0
0
0.50
0.00
0.05
0.05
0.20
02:00-03:00
0
0
0
0.50
0.00
0.05
0.05
0.05
03:00-04:00
0
0
0
0.50
0.00
0.05
0.05
0.05
04:00-05:00
0
0
0
0.50
0.00
0.05
0.05
0.05
05:00-06:00
0
0
0
0.50
0.00
0.05
0.05
0.05
06:00-07:00
0
0
0
0.00
0.00
0.05
0.05
0.05
07:00-08:00
0
0
0
0.00
0.00
0.05
0.10
0.10
08:00-09:00
0
0
0
0.00
0.00
0.05
0.10
0.10
09:00-10:00
0
1
1
0.00
1.00
1.00
0.20
0.20
10:00-11:00
1
1
1
Table 9‑34: Schedules for Shopping Complexes Buildings (B)
Shopping Complex
Time Period
Occupancy Schedule
Lighting Schedule
Equipment Schedule
li tae R
&sr mdioirurro At C
en Zolia ec Sp
li tae R
&sr mdioirurro At C
en Zolia ec Sp
li tae R
en Zolia ec Sp
day ke We
dne ke We
day ke We
dne ke We
day ke We
dne ke We
ke e w /sDay7
ke e w /sDay7
ke e w /sDay7
ke e w /sDay7
ke e w /sDay7
00:00-01:00
0.00
0.00
0.00
0.10
0.00
0.00
0.05
0.05
0.05
0.05
0.05
01:00-02:00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.05
0.05
0.05
0.05
02:00-03:00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.05
0.05
0.05
0.05
03:00-04:00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.05
0.05
WHOLE BUILDING METHOD
WHOLE BUILDING METHOD
Table 9‑35: Schedules for Shopping Complexes Buildings – Food Court