3.7.1 Every person intending to construct or reconstruct or alter any building under sections 299, 304 and 312, of the Act shall pay to the Corporation fund, the building licence fee as prescribed by the Authority subject to a minimum of Rs. 300/- (Rupees three hundred only)
Provided that no licence fee shall be payable by the Central and the State Governments for the construction of buildings by them on their lands.
Note: The fixation of licence fee shall be governed by the following:
a) For re-erection of existing buildings, the fees chargeable shall be the same as for the erection of new buildings.
b) For additions and alterations in the existing buildings the fees shall be chargeable on the added portions only at the same rate applicable to the new building.
3.7.2 Part of the building licence fee which shall not be less than 5% of the licence fee and subject to a minimum of Rs. 50/- (Rupees fifty) only shall be paid together with the application for building licence, as scrutiny fee, which is not refundable. The balance amount of licence fee shall be paid on receipt of demand notice from the Authority.
3.7.3 Licence fee for compound wall at Rs. one only per running meter shall be paid on receipt of demand notice.
3.8 Ground rent - The ground rent for stocking of building materials on public land as prescribed by the Authority without causing obstruction to movement of vehicles and pedestrians subject to the permission of the Authority.
Note: (i) The ground rent charges shall be based on the total floor area of all the floors in the buildings. The ground rent is valid for a period of two years only. If the building is not completed and the occupancy certificate is not obtained within the period of two years, further rent is to be paid at half the rate per annum or part thereof till the building is completed.
Note: (ii) The ground rent applies only for the storing of building materials and not for any other purpose.
Note: (iii) If the public land is utilised for storing of excavated materials and debris, separate charges will have to be paid at four times the rate fixed as ground rent.
3.9 Ground rent for high rise buildings : High rise buildings are not exempted from payment of ground rent irrespective of the set backs and coverage.
4.0Grant of Licence
4.1 Grant or refusal of licence –
4.1.1. Subject to sections 303 and 304 of the Act, the Authority, after having examined the application for licence, may either grant the licence as per the proposal or with such modifications or conditions as it may deem necessary or refuse licence and thereupon shall communicate its decision to the applicant within 30 days as per KMC Act in the proforma given in Schedule V-A or Schedule V-B.
4.1.2. While granting licence, the Authority shall impose a condition that atleast two trees shall be grown in the sites where the sital area exceeds 200 sqm. in the interest of improving the environment of the area.
4.1.3. The Authority may require the owner, builder, or any other person responsible for construction of a building to erect and maintain during construction such barricading as considered necessary to prevent dust, debris and other materials endangering the safety of people/structures, etc., in and around the site.
4.1.4. Revised plans – (i) Where plans have been scrutinised and modifications or objections have been pointed out by the Authority, the applicant shall modify the plans to comply with the modifications or objections raised and resubmit the plans. The plans submitted for approval shall not contain superimposed corrections.
(ii) A plan once sanctioned may be revised or modified by the Authority on payment of additional fee for scrutiny, and additional fee, if any, to be paid, due to the increase in the permissible floor area. If the modified plan is sanctioned after the commencement of work, penalty at the rates prescribed by the Corporation shall be paid by the applicant
4.1.5. Security deposit – 1) The applicant shall deposit a sum at the rate of Rs.25/= per sq.mtr. of floor area as refundable non-earning security and earnest deposit for the following categories of buildings, namely:
a) Residential group housing / multi dwellings / apartments, with 5 dwelling units and more.
b) Commercial buildings exceeding 300 sq. mtrs. of total floor area.
The security deposit shall be refunded two years after completion of the construction as per approved plan as certified by the Corporation. If the construction is not as per approved plan this deposit amount would be forfeited.
4.4 Special powers of the Authority :
The Authority may direct the owner (i) to change the location of the proposed building, (ii) to provide open space or ventilation, [iii] to use specified materials for construction, if such measures are considered necessary keeping in view the existing or proposed power lines, water and sewage lines passing through the site, or due to any proposed widening of the road or formation of new roads passing through the site; which shall not be inconsistant with the Act and the development plan;
3.10Exemptions for ground rent -
Ground rent may be exempted in the following cases, namely
(1) individual residential bungalows with front set back of 6 metres and more with coverage of not more than 55 per cent.
(2) schools, colleges and other institutions with a front set back of 8 meters and more with coverage of not more than 33.33 per cent.
(3) religious and cultural buildings with a front set back of 8 meters and more with coverage of not more than 45 per cent.
(4) heavy industries and Government buildings with large extents of land capable of storing the building materials within the periphery of the property.
Note: Exemption shall be granted only on production of undertaking from the applicant on a stamped paper of Rs. 30 that the Corporation land, footpath and road will not be used for stocking building materials as well as depositing debris and in case of violation of this condition, they shall be liable to pay the ground rent at the normal rates in addition to the penalty of 50 % of the amount specified which will be recovered as arrears of tax on land and buildings, etc.
3.11.1 Construction of temporary shed - Temporary shed to be used as construction shed may be permitted in that plot (excluding public land) along with the sanction to a building and may be put up not earlier than a month before the commencement of the work and shall be removed immediately after the completion of the work. Occupancy certificate for the building shall be issued only after the removal of the temporary shed.
3.11.2 Temporary Structructres – Temporary Structruers used for running establishments of commercial in nature, Religious and Cultural Programmes etc,., shall be permitted according to the purpose for which these are used by the special permission of the authority for a limited period and subject to such conditions as may be imposed in the permission. Such temporary structrues shall be completely removed on the expiry of period specified in it.
3.12 Demand notice -The demand notice for the payment of licence fee, ground rent and such other fee for the issue of building licence will be valid for a period of forty five days only from the date of issue of the notice. After the expiry of the above period, fees shall be paid as per the revalidated demand notice. The revalidation shall be subject to the then in force at the time of such revalidation.
3.13 Revision of licence fee and ground rent - The Licence fee and ground rent are subject to revision from time to time by the Commissioner without notice.
5.0Procedure After Grant of Licence
5.1 Responsibility of owner – The granting of licence, approval of the plan and specifications, or inspections made by the Authority shall not in any way relieve the owner of a building from full responsibility for carrying out the work in accordance with the requirements of the sanctioned building plan along with such conditions as have been imposed while sanctioning the licence.
5.2 Commencement of work – (i) The construction or reconstruction of a building shall be commenced within a period of two years from the date of issue of licence. Before the expiry of two years, the owner shall give intimation to the Authority of the intention to start work in the form prescribed in Schedule VI. Further, the owner shall give intimation to the Authority on completion of the foundation or footings of walls/columns on the foundation.
(ii) After the expiry of two years from the date of licence, construction or reconstruction of a building shall not be commenced without obtaining a fresh licence from the Authority.
5.3 Inspection – (i) Generally all construction and work for which a licence is required shall be subject to inspection by the Authority and certain types of construction involving unusual hazards or requiring constant inspection, shall have continuous inspections by the Authority.
(ii) Within 15 days from the date of the receipt of intimation under bye-law 5.2, the Authority shall inspect the site to verify the line out marked for the building according to the sanctioned plan. The owner shall commence the work after the grant of commencement certificate in the form prescribed in Schedule VII.
(iii) If the commencement certificate is not issued within a period of 15 days from the date of intimation by the owner, the construction may proceed according to the sanctioned plan.
5.4 Documents at sites - Where tests of any materials are required to be in conformity with the requirements of these bye-laws, or conditions of licence, records of the test data shall at all times be kept for inspection during the construction of the building and for such period thereafter as may be required by the Authority.
5.5Display of sanctioned plan and licence at construction site
i) The owner/builder/contractor shall during the construction, display the following documents in a conspicuous place of the licensed premises;
a) A copy of the building licence; and
b) A copy of the approved plans of the property in respect of which the licence was issued and the specifications of the building to be constructed.
ii) The building licence and the copies of sanctioned plans with specifications shall be mounted on a frame and displayed and they shall be made available during inspections.
5.6 Occupancy certificate
(a) Every person shall before the expiry of five years from the date of issue of licence shall complete the construction or reconstruction of a building for which the licence was obtained and within one month after the completion of the erection of a building shall send intimation to the Commissioner in writing of such completion accompanied by a certificate in Schedule VIII certified by a Registered Architect / Engineer / Supervisor and shall apply for permission to occupy the building. The Authority shall decide after due physical inspection of the building (including whether the owner had obtained commencement certificate as per section 300 of the Karnataka Municipal Corporations Act, 1976 and compliance regarding production of all required documents including clearance from the Fire Service Department in the case of high rise buildings at the time of submitting application) and intimate the applicant within thirty days of receipt of the intimation whether the application for occupancy certificate is accepted or rejected. In case, the application is accepted, the occupancy certificate shall be issued in the form given in Schedule IX provided the building is in accordance with the sanctioned plan.
(b) Physical inspection means the Authority shall find out whether the building has been constructed in all respects as per the sanctioned plan and requirement of building byelaws, and includes inspections by the Fire Service Department wherever necessary.
5.6.1
If the construction or reconstruction of a building is not completed within five years from the date of issue of licence for such a construction, the owner shall intimate the Authority, the stage of work at the expiry of five years. The work shall not be continued after the expiry of five years without obtaining prior permission from the Authority. Such continuation shall be permitted, if the construction or reconstruction is carried out according to the licenced plan and if the Authority is satisfied that at least 75 percent of the permitted floor area of the building is completed before the expiry of five years. If not, the work shall be continued according to a fresh licence to be obtained from the Authority.
5.6.2 For all high rise buildings, the work shall also be subject to inspection by the officers of the Karnataka State Fire Service Department and the occupancy certificate shall be issued only after obtaining a clearance certificate from the Director of Fire Services.
5.7 Occupancy or letting of the new buildings - No person shall occupy or allow any other person to occupy any new building or part of a new building for any purpose whatsoever until occupancy certificate to such buildings or part thereof has been granted by an officer authorised to give such certificate if in his opinion in every respect the building is completed according to the sanctioned plans and fit for the use for which it is erected. The Authority may in exceptional cases (after recording reasons) allow partial occupancy for different floors of a building .
Part IIAdministration
3.0 Building Licence
3.1 Licence – Every person who intends to erect or re-erect a building or make material alterations or cause the same to be done, is required to obtain a licence from the Authority.
3.2 Application and documents to be submitted with the application - Every person who intends to erect or re-erect or alter a building, including temporary structures for the purpose of exhibitions, trade fair or circus or execute any of the works other than repairs, as specified in Sections 299, 304 or 312, of the Act, shall give an application in writing to the Authority in the Form set forth in Schedule II and such application shall be accompanied by plans, documents and information as required hereunder.
3.2.(1) Title deed/possession certificate – A copy of the title deed or possession certificate of the property, issued a competent authority.
3.2.(2) Property card and latest assessment book extract – A copy of the property card along with the sketch issued by the Department of Survey and Settlement, and Land Records (City Survey) and latest assessment book extract issued by the Corporation indicating the measurements of the property .
3.2.(3) Upto date tax paid receipt – The receipt for having paid up to date property tax to the Corporation shall be enclosed.
3.2.(4) Previously sanctioned plan - Attested copy of the previously sanctioned plan if the application is for addition/ alteration/modification to the existing building. If the applicant for any reason cannot produce the previously sanctioned plan of the existing building, then in such cases the plan of the existing building along with site plan, etc., will have to be submitted.
3.2.(5) Drawings – The following drawings in ammonia prints. One drawing on tracing cloth / polyester tracing film shall be enclosed in addition to the ammonia prints.
3.2.(5.1) Key plan – A key plan drawn to a scale of not less than 1 in 10,000 showing the boundary locations of the site with respect to neighbourhood landmarks.
3.2.(5.2) Site plan – Site plan drawn to a scale of 1:500 for sites of area upto one hectare and 1:1000 for sites of area more than one hectare. The site plan shall indicate the following, namely:-
a) title of drawing consisting of the property number of the site name of the block, street or road in which the site is situated, number of the site if situated in an approved layout, and reference number of such approval with the use of the building;
b) the boundaries of the site and of any contiguous land belonging to the owner thereof;
c) the north direction relative to the plan of the building;
d) the name and description of the adjacent roads, street, or lanes, if any, with the width thereof;
e) the position of the adjacent plots whether vacant or built up;
f) the area to be occupied by the proposed building and the set backs proposed for proper air and ventilation;
g) the nature of the ground on which the proposed building is to be erected, whether natural like, rocky, gravelly, clayey, sandy etc., or made up ground. In the case of made up ground, the time when it was so made up and the materials used in making it up shall be indicated. In case of sloping ground where the gradient exceeds 5% (1:20) block levels have to be furnished in the site plan;
h) any physical features such as wells, drains, transmission lines, etc.;
i) natural features like existing trees, ridges, valleys etc.,
j) block levels in cases where basement/cellar floors are proposed below ground level;
k) such other particulars, as may be specified by the Authority.
3.2.(5.3) Building plan – Building plan drawn to a scale of not more than 1:100 showing the following particulars, namely
a) floor plans of all floors indicating north line and the various parts of the building, sizes of rooms, position of stair-cases and lifts, machine rooms, ramps etc., in detail along with street elevation;.
b) use or occupancy of all parts of the building;
c) exact location of essential services viz., water closets, baths, sinks, etc;
d) sectional drawing showing sizes of footing, thickness of walls, spacing of columns, thickness of roof slab, height of rooms, height of parapet, drainage and slope of the terrace roof details of staircase showing tread, rise and landing width, railing, etc;
e) details of ventilation of all rooms;
f) open spaces or yards inside or surrounding the buildings;
g) sewerage arrangements;
h) the schedule of all doors, windows, and ventilators showing sizes and numbers;
i) dimensions of projected portions beyond the walls like chajja, balcony, canopy, etc;
j) in case of basement floor, position of the ramp with respect to the entrance, ground level and building, with a slope not exceeding 1 to 10, the drainage arrangements in the basement floor, etc;
k) arrangements for vehicular parking as per standards laid down in bye-law 16.0 indicating the entry, exit of vehicles, drive way, etc;
l) such other particulars like, site area, plinth area of all buildings, areas of each floor and total floor area, building coverage, total height of building, etc shall be indicated;
m) The drawing must be fully dimensioned so as to have easy, quick and accurate measurements.
3.2.(6) Licence fee receipt – Receipt for having paid to the Corporation fund licence fee as prescribed in bye-law 3.7.1 and 3.7.2.
3.2.(7) Indemnity bond on stamp paper as prescribed by the Authority.
3.2.(8) Schedule II of the National Building Organisation duly filled in duplicate as per Schedule XIII of these bye-laws.
3.2.(9) Foundation certificate – Foundation certificate which certifies the fitness of foundation to bear the additional building load in respect of old buildings above which new floors are proposed to be added which is issued by a Registered Architect / Engineer / Supervisor specified in Schedule IV of these bye-laws.
3.2.(10) Other certificates – Certificates from the following authorities, wherever applicable.
Agency
In respect of
3.2(10.1)
Bangalore Development Authority
a) Commencement certificate for the change of land use in the Development Plan of Bangalore as per section 14 & 15 of the Karnataka Town and Country Planning Act, 1961.b) Bifurcation or amalgamation of plot as per Section 17 of KTCP Act 1961.c) Approval in case of buildings permissible under special circumstances as per Schedule I.d) Approval of layout plan in case of Group Housing Schemes where sital area of group housing exceeds 4,000 sq. mtrs.e) In case of civic amenity site, leased out by the Bangalore Development Authority, commencement certificate under sections 14 and 15 of the Karnataka Town and Country Planning Act, 1961 for construction of the building.
3.2 (10.2)
Bangalore Water Supply & Sewerage Board
N.O.C. in case of high rise building or group housing.
3.2 (10.3)
BESCOM
N.O.C. in case of high rise building or group housing.
3.2 (10.4)
Fire Services Department
N.O.C. in case of high rise building. (Bye-law 2.45 definition)
3.2(10.5)
Airport Authority of India
N.O.C. in case of high rise building.
3.2(10.6)
Telecommunication Department
N.O.C in case of high rise building above 7 floors.
3.2(10.7)
Karnataka Slum Clearance and Improvement Board
N.O.C. with regard to non-interference with improvement schemes, in respect of areas notified under section. 3 of the Karnataka Slum Areas (Improvement & Clearance) Act, 1973.
3.2(10.8)
District Magistrate
N.O.C. in case of permanent and/or semi permanent cinema theatres including drive-in-theaters, and petrol pumps.
3.2(10.9)
Director of Factories and Boilers
N.O.C. in case of industrial buildings
3.2(10.10)
Controller of Explosives
N.O.C. in case of buildings proposed for storage or sale of combustible articles.
3.2(10.11)
Railways
N.O.C. in case of buildings abutting railway margin.
3.2.(11) Supervision certificate – A certificate in the form given in Schedule III by the competent Registered Architect / Engineer / Supervisor who shall be undertaking the supervision.
3.3 Preparation and signing of plans - All the plans shall be duly signed by the owner or his legally authorised agent or attorney and also by the Registered Architect / Engineer / Supervisor, and shall indicate their names and addresses, qualification and the registration number allotted by the Authority.
3.4 Size of drawing sheets - The following sizes shall be adopted for the drawings to be submitted.
TABLE 1(Bye-law 3.4) SIZES OF DRAWING SHEETS
Sl. No.
Standard
Trimmed size (mm)
Untrimmed size (min) in mm
1
A0
841 x 1189
880 x 1230
2
A1
594 x 841
625 x 880
3
A2
420 x 594
450 x 625
4
A3
297 x 420
330 x 450
5
A4
210 x 297
240 x 330
6
A5
148 x 210
165 x 240
Any of the above convenient standard sizes may be adopted considering the details to be shown.
3.5 Colouring of plans – All the plans should be coloured as specified in Table 2 and folded to A4 size.
TABLE 2
(Bye-law 3. 5)
Colouring of plans
SI.No.
Item
Site Plan
Building Plan
White Plan
Blue Print
Ammonia Print
White Plan
Blue Print
Ammonia Print
1
Plot lines
Thick Black
Thick Black
Thick Black
Thick Black
Thick Black
Thick Black
2
Existing Street
Green
Green
Green
-
-
-
3
Future street if any
Green dotted
Green dotted
Green dotted
-
-
-
4
Permissible building line
Thick dotted
Thick dotted
Thick dotted
-
-
-
5
Open Space
No Colour
No Colour
No Colour
No Colour
No Colour
No Colour
6
Existing Work
Black outline
White
Blue
Black
White
Blue
7
Work proposed to be demolished
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
8
Proposed work (see Note 1)
Red filled in
Red filled in
Red
Red
Red
Red
9
Drainage & Sewerage work
Red dotted
Red dotted
Red dotted
Red dotted
Red dotted
Red dotted
10
Water Supply work
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
Note: (1) Item No.8 does not apply, in case of an entirely new construction on the site.
(2) For land development, sub-division, layout, suitable colouring notations shall be used which shall be indexed.
3.6 Registration of Architects / Engineers / Supervisors – Architects / Engineers / Supervisors referred to under these bye-laws shall be registered by the Authority as stipulated in Schedule IV.