The natural and manmade features for environmental conservation and preservation, including water bodies, forests and drains, parks, playgrounds, burial and crematoria.
6.5.1 Uses/ Activities Permitted
Parks/ Gardens, playgrounds, sports facilities including stadium, swimming pools, burial/cemeteries and crematoria are permitted under this category.
The Parking for these facilities shall be provided as per the provisions in Table 4. Up to 2% of the total land area with FAR of 0.50 and G+1 structure may be permitted for ancillary uses required to support the main activity such as eating joints/ restaurants, stalls, sheds for storage etc.
6.5.2 Use/ Activities permissible under special circumstance by the Authority
i. Open air theatres, indoor recreational uses, dwelling for watch and ward, sports clubs, water front tourism development projects, libraries, milk booths, HOPCOMS, public toilets.
ii. The ground coverage for such use shall not exceed 5% of the total area and shall not be more than G+1 floor, in any case with required parking facility.
6.5.3 Regulations for Eco-sensitive Zones and Water Bodies including Valley/ Streams
i. Restrictions imposed ďLJ Competent Authoƌities aƌe to be maintained as ͞buffeƌs͟ foƌ various eco-sensitive zones such as Arkavathi, TG Halli, Bannergatta Nationa Park/ Reserve Forests/ Protected Forests etc. Permissions in sensitive areas earmarked on the land use plan shall be considered only by the Planning Authority.
ii. The buffer for Water bodies such as Lakes/Streams/ Drains shall be governed as per the NGT Oƌdeƌ. IŶ case of ǁateƌ bodies a 75 ŵ buffeƌ of ͚no deǀelopment zone͛ is to be maintained around the lake (as per revenue records) with exception of activities associated with lake and this buffer may be taken into account for reservation of park while sanctioning plans.
iii. The Streams have been categorized into 3 types namely Primary, Secondary and Tertiary as per the NGT Order. These drains will have a buffer of 50, 35 and 25 m (measured from the edge of the stream) respectively on either side. In case the buffer has not been marked due to cartographical error for any of the above types of drains, then based on the revenue records buffer and the existing ground situation
shall be considered by the Authority in all such cases without referring the land use plan while according approval for building/development/ layout plan.
iv. In addition, any other notifications or directions and applicable buffers which may be issued by the Competent Authority from time to time for such eco-sensitive areas shall become applicable.
v. In case of any amendment in the existing regulations of the Competent Authority resulting in reduction of the extent of buffer, the land use of the adjoining parcel of land will be the land use for such exempted land parcels.
vi. Within the demarcated buffers for the valley systems excluding the requirements of buffer as per NGT Judgement, the following uses are allowed:
(a) Sewerage Treatment Plants and Water treatment plants
(b) Roads, pathways, formation of drains, culverts, bridges, etc which will not obstruct the water course, run offs, channels.
vii. If the valley portion is a part of the layout/ development plan, then that part of the valley zone could be taken into account for reservation of parks and open spaces both in development plan and under sub-division regulations subject to fulfilling section 17 of KTCP Act, 1961 and Section 32 of BDA Act, 1976.
viii. Any land falling within the valley for which permission was accorded by the Authority or Government prior to the date of Notification, and then such permission shall be valid irrespective of the land use classification in the RMP 2031.