Chapter 2[ Specific Site Development Requirements ]
23 Construction Safety Precautions and Procedures:
1) Safety Precautions to Protect Adjacent Public and Private Property-
During the entire time from the date of issuance of the permit to the date of final approval for all site development operations, the permit holder shall take all appropriate and necessary precautions to protect adjacent public and private property from any damage that may result from the construction of site development works.
This includes temporary measures identified as necessary by the geotechnical report or required by the Building Official, which may include shoring of excavations, timely construction of retaining walls, control of surface runoff and erosion, or other protective measures.
2) Ability to stop work / unsafe conditions -
If at any stage of the work the Building Official determines by inspection that further site development as authorized is likely to endanger any public or private property or result in the deposition of debris on any public way or interfere with any existing drainage course, the Building Official may order the work stopped by notice in writing served on any persons engaged in doing or causing such work to be done, and any such person shall immediately stop such work. The Building Official may authorize the work to proceed if the Building Official finds adequate safety precautions will be taken or corrective measures incorporated in the work to avoid likelihood of such danger, deposition or interference.
If the site development work as done has created or resulted in an unsafe condition, the Building Official shall give written notice requiring correction thereof as specified in Regulation 21.
3) Documents at Site -
The person to whom the site development permit is issued shall, during the site development work, keep a copy of the approved layout plan, drawings and specifications at the site.
24Cuts/Excavations :
General -
For engineered site development, the geotechnical report must prescribe all proposed cuts, stating the site has been investigated and giving an opinion that the proposed cut slope will be stable and not create a hazard to public or private property.
For regular site development, cuts shall conform to the provisions of this section.
All proposed cuts shall be reviewed per the procedures in Regulation 8.
2) Cut Slopes -
The slope of cut surfaces shall be no steeper than is safe for the intended use and shall be no steeper than one horizontal to one vertical, unless the permit holder furnishes a geotechnical report stating the site has been investigated and giving an opinion that a cut at a steeper slope will be stable and not create a hazard to public or private property.
3) Retained Cuts -
Retaining walls not over one meter in height measured from the bottom of the footing to the top of the wall are exempt from permit requirements. If such a wall is subjected to a surcharge, such as a structure or vehicle load, sufficient engineering shall be provided to demonstrate the adequacy of such a retaining wall to perform the function as designed and either a site development permit or building permit must be obtained depending upon the amount and depth of soil moved.
Cuts, regardless of height, which tend to alter the natural drainage of property and accelerate erosion, concentrate runoff, or otherwise create a hazardous condition, shall be reviewed by an engineer and permits obtained as provided for in these regulations.
Cuts which will be retained must be adequately shored/supported during construction in order to protect adjacent public and private property.
25 Fills :
For engineered site development, all fills shall be designed by an engineer, and fill designs reviewed by Aizawl Municipal Corporation. For regular site development, the following general guidelines shall apply:
1) Fill Slopes -
Fill slopes shall not be constructed on natural slopes steeper than 2 to 1. The ground surface shall be prepared to receive fill by removing vegetation, noncomplying fill, topsoil and other unsuitable materials, scarifying to provide a bond with the new fill and, where slopes are steeper than 2 to 1 and the height is greater than 1.5 meters, by benching into sound bedrock or other competent material as determined by the soils engineer. The bench under the toe of a fill on a slope steeper than 5 to 1 shall be at least three meters wide. The area beyond the toe of the fill shall be sloped for sheet overflow or a paved drain shall be provided. Such drains shall be constructed with energy dissipaters and shall discharge into an approved area. When fill is to be placed over a cut, the bench under the toe of fill shall be at least three meters wide, but the cut shall be made before placing the fill and acceptance by the soils engineer or engineering geologist or both as a suitable foundation for fill.
2) Fill Material -
Detrimental amounts of organic material shall not be permitted in fills. Except as permitted by the Building Official, no rock, broken concrete, asphalt, or similar irreducible materials with a maximum dimension greater than 300 millimeters shall be buried or placed in fills. No soils containing hazardous or toxic material of any kind may be used as fill within the Aizawl Municipal Corporation area.
Exception : The Building Official may permit placement of larger rock when the soils engineer devises a method of placement and continuously inspects its placement and approves the fill stability. The following shall also apply:
i) Prior to issuance of a site development permit, provisions shall be made to separate organic materials, such as tree stumps and brush, as well as large rocks. An area for stockpiling shall be delineated on the site development plans as well as provisions for their disposition.
ii) Rock greater than 300 mm in size may be placed a minimum of 3 meters under the surface of the finish grade. Soils shall be compacted in short lifts around such materials to assure adequate filling around the large rock and preventing voids.
3) Compaction -
All fills shall be compacted to a minimum relative density of 90%. The top 450 mm may be excepted when no load is expected, and the slope does not exceed 2 horizontal to 1 vertical.
4) Slope -
The maximum slope of fill surfaces shall not exceed 2 horizontal to 1 vertical or steeper than is safe, whatever occurs first. The above prescribed slope may be exceeded if a proper engineered batter wall using only large aggregates is provided.
27Drainage :
Drainage plans that provide for control of surface runoff, sewage, sullage and seepage from septic systems shall be prepared according to the following provisions.
1) Terraces -
For engineered site development, all terraces shall be prescribed by the geotechnical engineer or engineering geologist and described in the geotechnical report and on the site development plans, and reviewed by the Building Official. However, the following minimum restrictions apply for both engineered site development and regular site development. Terraces at least 2 meters in width shall be established at not more than 10 meter intervals on all cut or fill slopes to control surface drainage and debris, except that where only one terrace is required, it shall be at mid-height. For cut or fill slopes greater than 20 meters and up to 40 meters in vertical height, one terrace at approximately mid-height shall be four meters in width. Terrace widths and spacing for cut-and-fill slopes greater than 40 meters in height shall be designated by the civil engineer and approved by the Building Official. Suitable access shall be provided to permit proper cleaning and maintenance.
Swales or ditches on terraces shall have a minimum gradient of 1 vertical to 20 horizontal and must be paved with reinforced concrete not less than 75 mm in thickness or an approved equal paving. They shall have a minimum depth at the deepest point of 300 mm and a minimum paved area of 0.7 square meters. A single run of swale or ditch shall not collect runoff from a tributary area exceeding 400 square meters (projected horizontally) without discharging into a down drain.
Subsurface Drainage -
Cut-and-fill slopes shall be provided with subsurface drainage as necessary for stability.
3) Disposal of Drainage -
Sites developed downhill of existing sites shall convey drainage, sewage or seepage from the adjacent site uphill, as well as from the site being developed, in a safe manner to the nearest practicable drainage way or sewer approved by the appropriate jurisdiction as a safe place to deposit such waters or sewage. Erosion of ground in the area of discharge shall be prevented by installation of non-erosive downdrains and other devices. "Building pads shall have a minimum drainage gradient of 1 vertical to 50 horizontal toward approved drainage facilities unless waived by the Building Official." Exception. The gradient from the building pad may be 1 vertical to 100 horizontal if all of the following conditions exist throughout the permit boundary area:
i) No proposed fill area is greater than three meters in maximum depth;
ii) No proposed finish cut or fill slope faces have a vertical height in excess of three meters;
iii) No existing slope faces that have a slope face steeper than 10 horizontal to 1 vertical have a vertical height in excess of three meters.
4) Interceptor Drains -
Paved interceptor drains shall be installed along the top of all cut slopes where the tributary drainage area above the slopes that drains toward the cut, has a drainage path greater than 10 meters measured horizontally. Interceptor drains shall be paved with a minimum of 75m of concrete or gunite and reinforced. They shall have a minimum depth of 300mm and a minimum paved width of 800 mm, measured horizontally across the drain. The slope of the drain shall be approved by the Building Official.
Maintenance of drainage -
The owner shall be responsible for maintaining drainage facilities installed under their permit.
28Erosion Control :
The following shall apply to all cut-and-fill slopes -
The faces of cut-and-fill slopes shall be prepared and maintained to control against erosion. This control may consist of effective planting, use of armor rock, terracing, water breaks, check dams, cribbing, riprap, or combinations thereof. The protection for the slopes shall be installed as soon as practicable and prior to calling for final inspection. During the approach of the rainy season, the contractor performing the work shall be prepared to install temporary measures as required to protect exposed areas until permanent measures can be taken. Where cut slopes are not subject to erosion, due to the erosion resistant character of the materials, such protection may be omitted with the permission of the Building Official.
For plots adjacent to or including natural streams, the riverine reserve shall be maintained, and measures shall be taken to prevent erosion of materials or sediment from the site into the stream or riverine reserve.
26Set-backs :
Cut-and-fill slopes shall be set back from site boundaries in accordance with this section, but in no case shall the amount of set-back be less than that prescribed by Regulation 22 of the Building
Regulations. Set back dimensions shall be horizontal distances measured perpendicular to the site boundary.
For engineered site development, the amount of set-back shall be determined by the geologist or soils engineer and included in the geotechnical report. For regular site development, the following provisions apply:
Top of Cut Slope -
The top of cut slopes shall not be made nearer to a site boundary line than one-fifth of the vertical height of the cut, with a minimum of 0.6 meters and a maximum of three meters. The setback may need to be increased for any required interceptor drains.
Toe of Fill Slope -
The toe of a fill slope shall be made not nearer to the site boundary line than one-half the height of the slope, with a minimum of 0.6 meters and a maximum of 6 meters. Where a fill slope is to be located near the site boundary and the adjacent off-site property is developed, special precautions shall be incorporated in the work as the Building Official deems necessary to protect the adjoining property from damage as a result of such site development. These precautions may include, but are not limited to :
i) Additional set-backs;
ii) Provision for retaining or slough walls;
iii) Mechanical or chemical treatment of the fill slope to minimize erosion;
iv) Provisions for the control of both surface water and subsurface water, such as springs, which may exert undesirable pressures on the fill slope.
3) Modification of Slope Location -
The Building Official may approve alternative set-backs. The Building Official may require an investigation and recommendation by a qualified engineer or engineering geologist to demonstrate that the intent of this section has been satisfied.
29Disposal of Excavated Material :
Any person performing any site development that involves imported or exported materials shall take special precautions, as approved by the Building Official, to prevent such materials from being deposited on the adjacent public way, and/or drainage courses or riverine reserves.
Dispose of excavated material not used at the site at a location approved by the Aizawl Municipal Corporation.
SCHEDULE - I
REQUIREMENTS FOR REGISTRATION AND COMPETENCE OF PROFESSIONAL, AND PROFESSIONAL LICENCE FEES
Sl. No.
Professional Licencee
Qualification Requirement
Competency
Licence Fee
Renew Fee Pay annual
1
Engineering Geologist
At least four year degree in Geology from a recognized university, or member of the Indian Society of Engineering Geology or equivalent overseas institution, with minimum 3 years relevant experience in professional geology practice with site investigation field work : i) under a qualified geologist - OR-ii) passing of the AMC examination for engineering geologists.
a) Preparation of geotechnical report in support of a site development permit.b) Inspection of construction excavation.c) Issuing of certificate of supervision.
Rs.500.00
Rs.250.00
2
Civil Engineer
Degree in Civil Engineering from a recognized Indian or foreign university, or the Member of Civil Engineering Division of the Institute of Engineers (India) of the statutory body governing such profession, as and when established.
a) Preparation of all site, grading and drainage plans and related information connected with site development permit;b) Design of drainage structures, including hydrology and hydraulic calculations;c) Inspection of civil works excluding stability of excavations; andd) Issuing certificate of supervision and completion for site development works.
Rs.500.00
Rs.250.00
3
Soil / Geotechnical Engineer
Degree in Civil Engineering from a recognized university and(i) Post-graduate degree in soils/Geotechnical Engineering from a recognized Indian or foreign university -OR-(ii) Minimum 3 years relevant experience in professional soils/geotechnical engi- neering practice with design work under a qualified soils/geotechnical engineer-OR-(iii) Minimum of 3 years relevant experience in professional soils/geotechnical engineering practice with design work and passing of the AMC examination for soils/geotechnical engineers.
a) Preparation of geotechnical report in support of a site development permit.b) Inspection of fills and excavations in soil.c) Issuing of certificate of completion for site development works.
Rs.500.00
Rs.250.00
4
Group/Firm
As given under sl.no. 1 through sl.no. 4.
As given under sl.no. 1 through sl.no. 4.
Rs.1000.00
Rs.500.00
ANNEXURE - I
FORM NO. 1
APPLICATION FOR REGULAR SITE DEVELOPMENT OF LAND [Regulation 6 of the AMC Site Development & Slope Modification Regulations, 2017]
To
The Secretary
Aizawl Municipal Corporation,
Aizawl
Sir,
I/We____[Name(s) in full], owner(s)/lessee(s) of the land the particulars of which are given below, hereby apply for permission to conduct site development works on the Land of L.S.C. No._ on/in Plot No._ in ____ Veng and in accordance with Regulation 6 of the AMC Site Development & Slope Modification Regulations, 2017. I/we forward herewith the following documents in triplicate duly signed by me/us and the Licensed Geologist/Geotechnical Engineer/Civil Engineer/Supervisor/Group/Firm:
Site Plan as prescribed in Regulation 6.3.
Estimated quantities of excavation and fill.
Statement of proposed land use for the site on which the site
development is to be performed.
Ownership title.
Attested copy of receipt of application fee.
No Objection Certificate (NOC) from the concerned Local Council.
I request that the construction be approved and site development permit issued to me.
Yours faithfully,
Signature :
NAME (in block letters) :
Address :
(Indicate House No.)
Phone :
FORM NO. 2
Ex-161/2017
APPLICATION FOR ENGINEERED SITE DEVELOPMENT OF LAND [Regulation 6 of the AMC Site Development & Slope Modification Regulations, 2017]
To
The Secretary
Aizawl Municipal Corporation
Aizawl
I/We____[Name(s) in full], owner(s)/lessee(s) of the land the particulars of which are given below, hereby apply for permission to conduct site development works on the Land of L.S.C. No._ on/in Plot No._ in ____ Veng and in accordance with Regulation 6 of the AMC Site Development Regulations, 2017. I/we forward herewith the following documents in triplicate duly signed by me/us and the Licensed Geologist/Geotechnical Engineer/Civil Engineer/Supervisor/Group/Firm:
Geotechnical report as prescribed in Regulations 6.4 and 7.
Site Plan as prescribed in Regulation 6.4.
Estimated quantities of excavation and fill.
Estimated starting and completion dates for proposed work.
Specifications
Ownership title.
Attested copy of receipt of application fee.
No Objection Certificate (NOC) from the concerned Local Council.
I request that the construction be approved and site development permit issued to me.
Yours faithfully,
Signature :
NAME (in block letters) :
____
Address :
(Indicate House No.)
Phone :
FORM NO. 3
22
GRANT OR REFUSAL OF DEVELOPMENT PERMIT [Regulation 13 of the AMC Site Development & Slope Modification Regulations, 2017]
No._
Dated____
To
____
____
Sir,
With reference to your application No.____ Dated ____ for site development of the Land of L.S.C. No. ____ on/in Plot No. ____ in____ Veng, I have the honour to inform you that permission has been granted/permission has been granted with the following modifications/conditions/permission cannot be granted by the Municipality on the following grounds:
Modifications/Conditions/Grounds for rejection of the application:
(1) ____
(2) ____
Office Seal
Yours faithfully.
( )
Memo No ____
Copy to :
Dated Aizawl, the ____
i) The President, Local Council /Court____
Secretary
Aizawl Municipal Corporation
FORM NO. 4
Ex-161/2017
NOTICE FOR COMMENCEMENT OF DEVELOPMENT WORK [Regulation 15 of the AMC Site Development & Slope Modification Regulations, 2017]
To
Secretary,
Aizawl Municipal Corporation,
Aizawl
Sir,
I have the honour to inform you that site development works on the Land of L.S.C.
No._ on/in Plot No._ in _
Veng will be commenced on ______ as per your permission given vide
No._ dated ____
I request that the construction be approved and site development permit issued to me
Yours faithfully,
Signature
NAME (in block letters)
Address
____
(Indicate House No.)
____
____
Phone :
____
FORM NO. 5
COMPLETION CERTIFICATE: [Regulation 18 of the AMC Site Development & Slope Modification Regulations, 2017]
To
Secretary,
Aizawl Municipal Corporation,
Aizawl.
Sir,
I have the honour to inform you that the site development works on the LandofL.S.C.No._ on/in Plot No._ in _ Veng has been completed in accordance with permit No._ dated _. The work has been completed on _.
The work has been executed in accordance with the permit given and no provisions of the Site Development Regulations have been violated.
Yours faithfully,
Signature
Name of Permit Holder :
Address
____
____
____
Certificate
I hereby certify that the work has been supervised by me and completed in accordance with the plans and specifications approved by the Municipality and that no provisions of the AMC Site Development and Slope Modification Regulations, 2017 have been violated.
Date:
Address
: ____
Signature
: ____
Name of Technical Personnel
•
Licence/Registration No.
:
ANNEXURE - II
Duties and Responsibilities of Technical Personnel and Applicant/owner
Duties and responsibilities of Engineers, Structural Engineers, Architects, Supervisors and Groups/Firms:
(1) They shall be well-conversant with the provisions of the Act, these Regulations and all relevant rules and regulations made under the Act.
(2) They shall submit all reports, estimates, plans or drawings, as may be necessary, together with all documents and other details which are required to be submitted under these Regulations.
(3) They shall comply with all directions of the Aizawl Municipal Corporation in connection with the site development work, for which they have prepared reports, estimates, plans or drawings, expeditiously and fully. When they do not agree with such directions, they shall state their objections in writing within the stipulated time.
(4) They shall immediately intimate corrections or other changes made by them in the reports, estimates, plans or drawings, as per direction from the Aizawl Municipal Corporation to the owner.
(5) They shall not take up preparation of reports, estimates, plans or drawings, if the same are intended to be executed in contravention of the provisions of these Regulations.
(6) They shall give all facilities to the Aizawl Municipal Corporation to inspect and examine the work in progress.
(7) They shall be held responsible for any work executed on site in contravention of the provisions of these Regulations.
(8) They shall not deviate or allow any deviation from the sanctioned Site Development Permit in the execution of work at site.
(9) They shall submit certificates in regard to commencement of work at site, and completion certificate within 15 days after the work is completed.
(10) They shall be deemed to have continued their supervision of the site development work unless they have intimated the Aizawl Municipal Corporation, in writing, that they have ceased to serve as the technical personnel for the site development work, and shall be held responsible for the work executed up to the date of intimation.
(11) The Aizawl Municipal Corporation may, in the case of violation of any of the provisions of the Act and these Regulations, take action against any technical personnel in accordance with the provisions of these Regulations.
II Duties and Responsibilities of Applicant/Owner:
(1) Permit holder shall engage technical personnel as required under these Regulations.
(2) He shall provide safety of workers and others during construction, from commencement to completion.
(3)He shall ensure that no undue inconvenience is caused to others in the course of the construction activities.
(4) He shall observe and perform directions of the Aizawl Municipal Corporation, as issued from time to time, and all terms and conditions of the site development permit and the provisions of the Act, Rules and Regulations relating to site development/slope modification work.
(5) He shall be responsible for non-compliance of instructions, details and specifications supplied by the technical personnel during site development work.
(6) He shall not allow any deviation from the sanctioned site development permit in the course of site development work.
(7) Any expenditure for demolition, repairs, or restoration work arising out of damage to neighbouring property/land, shall be borne by the owner/ permit holder.
Published and Issued by Controller, Printing & Stationery Department, Government of Mizoram Printed at the Mizoram Government Press, Aizawl. C/230