General -
For engineered site development, the geotechnical report must prescribe all proposed cuts, stating the site has been investigated and giving an opinion that the proposed cut slope will be stable and not create a hazard to public or private property.
For regular site development, cuts shall conform to the provisions of this section.
All proposed cuts shall be reviewed per the procedures in Regulation 8.
2) Cut Slopes -
The slope of cut surfaces shall be no steeper than is safe for the intended use and shall be no steeper than one horizontal to one vertical, unless the permit holder furnishes a geotechnical report stating the site has been investigated and giving an opinion that a cut at a steeper slope will be stable and not create a hazard to public or private property.
3) Retained Cuts -
Retaining walls not over one meter in height measured from the bottom of the footing to the top of the wall are exempt from permit requirements. If such a wall is subjected to a surcharge, such as a structure or vehicle load, sufficient engineering shall be provided to demonstrate the adequacy of such a retaining wall to perform the function as designed and either a site development permit or building permit must be obtained depending upon the amount and depth of soil moved.
Cuts, regardless of height, which tend to alter the natural drainage of property and accelerate erosion, concentrate runoff, or otherwise create a hazardous condition, shall be reviewed by an engineer and permits obtained as provided for in these regulations.
Cuts which will be retained must be adequately shored/supported during construction in order to protect adjacent public and private property.
25 Fills :
For engineered site development, all fills shall be designed by an engineer, and fill designs reviewed by Aizawl Municipal Corporation. For regular site development, the following general guidelines shall apply: