A water storage tank shall be dug on marginal open Space of building so that rain water drains into the tank, and a tap at appropriate place shall be inserted for extraction of water from the tank and circulation of air. Stored water in the tank shall be used for house hold use such as waning clothes, floor sweeping and gardening.
For waste water of premises of 100 dwelling units a storage tank stall be dug as per proposal of Authority in marginal open space of building and on that tank a sewerage treatment plant shall be installed so that treated water can be used in gardening and plantation.
1
Design
Comments
Design / Drawings available?
Y/N
Design Category
Type Design?
Y/N
Specific Design
Design to be collected to refer to Design Consultant /H.O.
Drawing prepared/checked by competent Authority?
Y/ N
Design Drawing/details
Y/ N
Structural details included
Y/ N
Earthquake/cyclone resistant features Included?
Y/ N
Design verified/vetted by Dept./Govt. approved agency/competent authority?
Y/N
Design changes approved by Dept./Govt. approved agency/competent authority
Y/N
2
Foundation
(2.1) Foundation used
Existing/ New
(2.2.1) If existing foundation used
(2.2.1) Depth of foundation below ground
: <50 cm @ 50-70/> 70cm
(22.2) Type of masonry
: Stone / Bncks / PCC Blocks
(2.2.3) Thickness of masonry (above ground)
: 23cin /35 />35
(2.2.4) Mortar used
Cement - Sand
(2.2.5) Mix of cement mortar
As per NBC Indicate
(2.2.6)Height up to Plinth
_______ Mtr. As per GDCR Y/N
(2.2.7) If stone masonry
(2.2.7.1) Through Stones
Yes / No. If Yes Adequate/Inadequate
(22.7.2) Corner Stones
Yes / No. If Yes Adequate/Inadequate
(2.3) If a new foundation used
(2.3.1) Depth of foundation below ground
<50/50-70/>70 cm
(2.32) Type of masonry blocks
Stone / bricks / PCC
(2.3.3) Thickness of Masonry above plinth -
23cm/35/>35cm
(2.3.4) Mortar used •
Cement-sand / lime / mud
(2.3.5) Mix of cement mortar (1:4)/As Per NBC
Yes/No
(2.3.6)Height up to plinth
________Mtr, As per GDCR Y/N
(2.3.7)If stone masonry
(2.3.7.1) Through Stones
Yes / No. If Yes Adequate/Inadequate
(2.3.7.2) Comer Stones
Yes / No. If Yes Adequate/Inadequate
(2.4) Vertical reinforcement in foundation
: Yes ./ No
3
Walling
(3.1) Type of masonry
: Stone/ Brick / PCC Blocks
(32) Mortar used
: Cement- sand / Lime / Mud
(3.3) Mix of cement mortar
: 1:4 /1:1.6/Leaner
(3.4) Thickness of wall
: >23cm/23cm/23cm
(3.5) Mixing of mortar
: OK /Not OK
(3.6) Join property filled
: OK /Not OK
(3.7) Wetting of bricks
: Good / Medium / Poor
(3.8) 1 stone masonry
(3.8.1) Through Stones
: Yes/No
(3.82) Corner Stones
: Yes / No
(3.9) Overall workmanship
Good / Medium / Poor
4
Roofing
(4.1) Type of roof
: Flat / Sloping
(4.2) If sloped
: Morbid tiles / AC. sheet / G.I. sheet
(4.3) Purlins
: Angle-
Iron / Timber / NA
(4.4) Truss type
(4.5) Anchorage with wall
: Adequate / Inadequate / NA
5
Materials
: Specifications must be conforming to NBC/Relevant IS Codes
(5.1) Cement
(5.1.1)Source
Authorised Dealer / Market OPC/PPC/ PSC
(5.1.2) Type of cement
Grade (33 / 43 / 53)
(5.1.3) If OPC
OPC / PPC/ PSC
(5.2) Sand
(5.2.1) Type of sand
Mild / Moderate / High
(5.2.2) Presence of deleterious
materials
(5.3) Coarse Aggregates
(5.3.1) Type coarse Aggregates
Gravel / Crushed Stone
(5.3.2) Presence of deleterious material
Mild / Moderate / High
(5.4) P.C.C. Blocks (Applicable for onsite
production)
(5.4.1) Type of P.C.C. Blocks
Solid blocks/Hollow blocks
(5.42) Ratio of concrete in block
(5.4..3) Interlocking feature
Yes / No
(5.4.4) Course aggregates used
Natural / Crushed stone
(5.5) Bricks Blocks, Stone etc.
(5.5.1) Strength (field assessment)
Low / Medium / High
(5.52) Dimensional accuracy
Yes / No
(5.6) Concrete
(5.6.1) Mix of concrete
(1:1 1/2:3)/(1:2:4)/ Design Mix
(5.62) Batching
Weight batching/ Volume batch ing
(5.6.3) Compaction
Vibrators / Thappies and rods
(5.6.4) Workability
Low / Medium / High
(5.6.5) Availability of water
Sufficient / Insufficient
(5.6.6) Curing
Satisfactory/ unsatisfactory
(5.7) Reinforcing Steel
(5.7.1) Type of Steel
Plain mild steel HYSD bars
(5.72) Source
Authorised Dealer /Market
(5.7.3) Whether IS Marked
Yes/No
(5.7.4) Conditions of bars
Clean / Corrugated
(5.7.5) Fixing of reinforcement as per
Yes / No
drawing
(5.7.6) Suitable cover
Yes/No
(5.7.7) Spacing of bars
Regular / Irregular
(5.7.8) Overlaps as per specifications
Yes / No
(5.8) Form work
Timber/ Play board /Steet
(5.8.1) Type of form work
Forms
Form 2A: Certificate of Undertaking for Persons on Record
(See Regulation No. 3.4,3.5.1, 3.5.2, 3.5.3,3.5.6, 3.6.1and Schedule 4a, 4b, 4c and Regulation No. 24.7 with Schedule 4a)
To
The Chief Executive Authority / Municipal Commissioner/Chief Officer Urban Development Authority / Municipal Corporation/Area Development Authority/Nagarpalika
Proposed building:
(Title of the work)
Plot No.:
Area of the Plot:
Survey No.: City Survey No.:
Inward No.: Final Plot No.:
Sub Plot / Property No.: at Village:
Address of proposed building:
Name of the Owner / Developer:
Sir/Mm,
I , am currently registered as Architect on Record with the Competent Authority. I, hereby certify that I am appointed as the Architect on Record to prepare the plans, ,sections and details as required under the Development Regulations for the above mentioned project and that I have prepared and signed the same and that the execution of the project shall be carried out under my direction and supervision of supervisor or owner, as per the approved drawings. I am fully conversant with the provisions of the Regulations, which are in force, and about my duties and responsibilities under the same and I undertake to fulfill them in all respects, except under the circumstances of natural calamities.
I, is currently registered as Engineer on Record with the Competent Authority.
I, hereby certify that I am appointed as the Engineer on Record to prepare the plans, sections and details as required under the G e n e r a l Development Control Regulations for the above mentioned project and that I have prepared and signed the same and that the execution of the project shall be carried out under my
direction and supervision of supervisor or owner, as per the approved drawings. I am fully conversant with the provisions of the Regulations, which are in force, and about my duties and responsibilities under the same and I undertake to fulfill them in all respects, except under the circumstances of natural calamities.
I is currently registered as Structural Engineer on Record with the Competent Authority as per Regulation No. 3.4, 3.5.3and Schedule 4a, 4b, 4c
This is to certify that I, is appointed as the Structural Engineer on Record to prepare the structural report, structural details and structural drawings for the above mentioned project. I am fully conversant with the Regulations and of my duties and responsibilities under the Regulations and assure that I shall fulfill them in all respects. I have prepared and signed the structural design and drawings of the proposed building as per the prevailing Indian Standard Specifications and further certify its structural safety and stability in design.
I, is currently registered as Clerk of Works on Record with the Competent Authority as per Regulation No. 3.4, 3.5.3and Schedule 4a, 4b, 4c
This is to certify that I, is am appointed as the Clerk of Works on Record for the above mentioned project. I, am fully aware of my duties and responsibilities under the Regulations and assure that I shall fulfill them in all respects. . I shall undertake all necessary measures, including but not limited to adequate inspection during construction, to ensure that the construction of the building is undertaken in accordance with the detailed design and specifications provided by (name of the Architect on Record) and (name of the Structural Engineer on Record), and, with the sanctioned design and specifications.
• I undertake not to supervise more than ten works at a given time as provided in Development Regulations.
I undertake not to supervise work simultaneously at one point of time on any other sites during my supervision of the execution of this work.
I fully understand that in case my certificate is found to be false, or if it is found that I have not fulfilled my responsibilities as prescribed therein, the Competent Authority shall be at liberty to penalize me as per the provisions of the Act.
I, is am currently registered as Fire Protection Consultant on Record with the Chief Fire Officer.and as per Regulation No. 3.4, 3.5.4 and Schedule 4a, 4b, 4c
I, is hereby certify that I have been appointed as the Fire Protection Consultant on Record of the proposed building.I am fully conversant with the Regulations and of my duties and responsibilities under the Regulations and assure that I shall fulfill them in all respects. I have prepared and signed the fire safety drawings of the proposed building as per the Regulations and further certify its fire safety.
I, is fully understand that in case my certificate is found to be false, or if it is found that I have not fulfilled my responsibilities as prescribed therein, the Competent Authority shall be at liberty to penalize me as per the provisions of the Act.
I, is currently registered as supervisor of Works on Record with the Competent Authority per regulation No. 3.4a, 3.5.4a and Schedule 4a, 4b, 4c
This is to certify that I am appointed as the supervisor of Works on Record for the above mentioned project. I am fully aware of my duties and responsibilities under the Regulations and assure that I shall fulfill them in all respects. . I shall undertake all necessary measures, including but not limited to adequate inspection during construction, to ensure that the construction of the building is undertaken in accordance with the detailed design and specifications provided by
(name of the Architect on Record) and (name of the Structural Engineer on Record), and, with the sanctioned design and specifications.
• I undertake not to supervise more than ten works at a given time as provided in Development Regulations.
• I undertake not to supervise work simultaneously at one point of time on any other sites during my supervision of the execution of this work.
I fully understand that in case my certificate is found to be false, or if it is found that I have not fulfilled my responsibilities as prescribed therein, the Competent Authority shall be at liberty to penalize me as per the provisions of the Act.
As per Regulation No. 24.7 and Schedule 4a of this Comprehensive General Development Control Regulations we all undersigned except Fire Protection Consultant on Record
1.Certified that the building plans submitted for approval satisfy the safety requirements as stipulated under Building Regulation No. and the information given therein is factually correct to the best of our knowledge and understanding.
2.It is also certified that the structural design including safety from hazards based on soil conditions shall be duly incorporated in the design of the building and these provisions shall be adhered to during the construction
Name of EOR
Registration No.:
Address:
Tel. No.: Signature: Date:
Name of SEOR:
Registration No.:
Address:
Tel. No.:
Signature:
Date:
Name of Clerk of Works:
Registration No.:
Address:
Tel. No.: Signature:
Date:
Name of FPCoR:
Registration No.:
Address:
Tel. No.: Signature: Date:
Signature of Owner with date
Name
Address
Tele No.
SPECIAL BUILDING INFORMATION SCHEDULE (TO BE ANNEXED WITH FORM 2D) (In case of small houses of one or two storeyed load bearing masonry construction)
1 Building address
Sub-Plot
RSNo/F PNo/
TPScheme Name/No.
Town:
Taluka:
District
Reference
2 Building category
2.1 Type of Construction
Brick masonry or other rectangular units
Dressed stone masonry
RCR masonry
3 Location
3.1 Seismic zone
V
IV
III
Table : 1
3.2 Design intensity (MM/MSK)
IX
VIII
VII
Table : 1
3.3 Cyclone zone
20%
40%
50%
60%
75%
80%
100%
4 Foundation
4.1 Soil type at site (Note 2)
Rocky/Stiff
Medium
Soct/Black Cotton Soil
Liquefiable Ref.(1)
4.2 Depth of water
In Meter:____
4.3Type of footing/ Foundation used
Strip with or without sand bed
Individual column
Under- room
*Any other (specify)
5 Super-structure
5.1 Storeys etc.
Basements:0/1
G.F:
1st Floor
2nd
Water tank on roof
5.2. Mortar
C:S = 1:4
C:L:S -1:1:6
*Any other
5.3 Floors
RC slabs
Stone slabs
Prefab floori
*Any other (specify)
5.4 Roof
Flat like floors/ Sloning
Trussed/raftered/'A' frame/Sloning RC
* Any other
5.5 Roof covering
CGI sheeting
AC sheets
Morbitiles
* Any other
6 Safet
6.1 Bra
In pl
In plane of
In plane of vertical columnsYes/No/NA
Cyclone guideline
6.2 Ro
To walls=byBolt : length=_cm
Cyclone guideli
6.3 Co
Connecting to Purlins
Purlins to raftersBolt/Wire
Truss elements
Cyclone guideline
7 Load be a ri
7.1 On
Control used on sizes
Control used on location
Strengthen ing
GSDMA guideline
7.2 Ban
Plinth
Lint el
Eave ban
Roof
Gable
Ridge
Construction
7.3 Ver tica
At corners of roomsYes/No/NA
At Jambs of openingsYes/No/NA
Constructi
7.4 Stif fen
RC screed & bandYes/No/NA
Peripheral band and
Diagonal planks and
Constructi
g N NofrsNote: You have to encircle appropriate data/fact or
wA AfloYes/No/NGive relevant fact/data where option is not given or
orsSpecify particular fact/data where options are not applicable in your case.
bui.5,roofClauRef: 1. Guidelines for reconstruction and new construction of houses in Kachchh l18wse:earthquake affected areas of Gujarat ‐ Gujarat State Disaster Management Authority, dGovt. of hGujarat ‐ June, 2001.
is.4,2. Guidelines for cyclone resistant construction of buildings in Gujarat ‐ Gujarat State epaDisaster Management Authority, Govt. of Gujarat ‐ December, 2001
Form 1: Application for Registering as Person on Record
(Regulation No. 3.1.1)
To
The Chief Executive Authority / Municipal Commissioner/Chief Officer
Urban Development Authority / Municipal Corporation/ Area Development Authority/ Nagarpalika
Name:
Local Address:
Permanent Address:
Telephone / Fax No:
Qualification:
Membership of Professional:
Associations (indicate appropriate professional affiliations)
Experience (No. of years):
Previous year’s Registration: _ No.
Name of Employer:
(if employed)
Sir/Mm,
Kindly register me as (Architect on Record/Engineer on Record/Structural Engineer on Record/Clerk of Works on Record/ FPCOR/ SOR/ Developer) of the Competent Authority. I meet with the minimum qualifications and competence requirements as specified in Regulation No. 3.0 and schedule 7.0. Relevant documents attesting to the same are attached herewith.
I hereby undertake to abide by all rules, regulations, standing orders, requisitions and instructions given by the Competent Authority and shall carry out my responsibilities as prescribed in the General Development Control Regulations. I also understand that if I fail to perform my responsibilities as above, the Competent Authority reserves the right to de‐register me, forfeit my security deposit and take other appropriate action as defined in the General Development Control Regulations and as per the provisions of the Act.
Name of the Applicant:
Signature:
Date:
Form 3: Notice to the Competent Authority of Non‐Compliance of Building to Sanctioned Design and Specifications
(See Regulation Nos. 3.5.1, 3.5.2, 3.5.3, 3.5.4, and 3.5.5, 3.5.6,)
The Chief Executive Authority / Municipal Commissioner /Chief Officer
Urban Development Authority / Municipal Corporation/Area Development Authority/ Nagarpalika
Proposed building:
(Title of the work)
Plot No.:
Area of the Plot:
Survey No.: City Survey No.:
Inward No.: Final Plot No.:
Sub Plot / Property No.: at Village :
Address of proposed building:
Name of the Owner / Developer:
Sir/Mm,
I am currently registered as
(Architect/Engineer/Structural
Engineer/Clerk of
Works/Fire Protection Consultant) on Record with the Competent Authority. I have been appointed as (Architect/Engineer/Structural Engineer/Clerk of Works/Supervisor of Works/Fire Protection Consultant) on Record for the proposed building.
This is to bring to your notice that construction of the building is not being undertaken in accordance with the sanctioned design and specifications and/or with the following Development Regulations. Details of non‐compliance are as follows:
Name:
Registration No.:
Address:
Tel. No.: Signature: Date:
Form 4: Notice to the Competent Authority of Discontinuation as Person on Record
(See Regulation Nos. 3.5.1, 3.5.2, 3.5.3, 3.5.4, and 3.5.5)
To
The Chief Executive Authority / Municipal Commissioner/Chief Officer Urban Development Authority / Municipal Corporation/ Area Development Authority/ Nagarpalika
Proposed building:
(Title of the work)
Plot No.:
Area of the Plot:
Survey No.: City Survey No.:
Inward No.: Final Plot No.:
Sub Plot / Property No.: at Village:
Address of proposed building:
Name of the Owner / Developer:
Sir/Mm,
This is to bring to your notice that I have been relieved of my responsibility/have relieved myself of my responsibility as (Architect/Engineer/Structural Engineer/Clerk of Works/Supervisor of Works) on Record for the proposed building, with effect from (date).
I wish to place on record that with effect from the said date, I shall neither be associated with this building nor be responsible for its compliance to the sanctioned design and specifications and to the Development Regulations.
Name:
Registration No.:
Address:
Tel. No.: Signature: Date:
Form No. 5. Application for Development Permission for Building
See Regulation No. 4.1.1
FORM NO. C. (See Rule ‐9)
Application for development permission under sections 27, 34 and 49 of G.T.P. & U. D. Act. 1976
/ The Notice u./s. 253 and 254 of the G.P.M.C. Act, 1949.
To,
Owner’ s/
The Chief Executive Authority/Chief Officer/Municipal Commissione App Urban/ Area Development Authority/ Nagarpalika/Municipal Corporationc
I/We hereby apply for permission for development as described in the accompanying mapsselfand drawings. The names of the persons employed by me for the preparation of plans,attes structural details and supervision of the work area as under:
(pl Specify the license number and date of expiry)
b) The structural report, details and drawings are to be prepared and supplied by Registered
Structural Engineer: (pl Specify the license number and date of expiry)
c) The site supervision of the construction work will be done by Registered Clerk of
Work (if Applicable): ____ (pl Specify the license number and date of expiry)
I have read the Development Regulation framed by the Authority under the provisions of the relevant Act and claim to be fully conversant with it. I shall fulfill my duties and responsibilities in
accordance with the provisions of the Development Regulations.
Signature of
Owner/Developer or
owner Title Details Date:
1
OwnershipDetails
1.
Applicant'sName
1
Postal Address for
1.
correspondence
1.23
Addressof Land in Question Applicants interest/title in land
1.
with respect of record of
2 4
LarnigdhDtsetails- Legal
2.
Land Description
2.1
Village Name
2
TPS/ Revenuevillage/
2.
Gamtal
2.
FP No/ Revenue Survey No./CS No
2.
Sub-Plot No/Tenement No
2.
Ward
2.
Zone
2.
Details of Approval before taken
3.
Type of Case for Application
Type of Case for Application
Type of Case for Application
Type of Case for Application
Type of Case for Application
Type of Case for Application
3.
New / Revision/ Reopen/Recovery/ Addition/Alteration
4.
Land Occupancy TypeExisting
Tickas
LandOccupancy
LandOccupancy
Tick as applicable
Tick as applicable
4.
Vacant
Vacant
Vacant
4.
Partly - Built
Partly - Built
Partly - Built
4.
Fully - Built
Fully - Built
Fully - Built
5.
Site Details
Width of Road Abutting the Site
TP
Non TPRoad/DR
Non TPRoad/DR
RPTS Corridor
RPTS Corridor
5.
Road 1: Front Side
5.
Road 2: Other than Front Side
5.
Road 3: Other than Front Side
5.
Road 4: Other than Front Side
Seismic Details
Yes/ No
Zone No.
Zone No.
Details
Details
5.
Seismic Zone
Water Supply
Available by Local Government/Authority
Available by Local Government/Authority
Available by Local Government/Authority
Bore Well
Bore Well
5.
Water Supply Facility in Building unit
Drainage
Available by Local Government/Authority
Available by Local Government/Authority
0Attachments: Annexure as above regulation
Form 5A: Application for Development Permission for Brick‐kiln, Mining and Quarrying
FORM NO. C(a)
(See Rule ‐9 and Regulation No. 4.1.1)
Application for permission of Brick‐kiln, Mining and Quarrying under Section – 27, Gujarat Town
Planning and Urban Development Act, 1976.
To,
The Chief Executive Authority/Municipal Commissioner/Chief Officer
Urban Development Authority / Municipal Corporation/Area Development Authority/ Nagarpalika
I/We hereby apply for permission for development as described below. I/We are applying for development on this land for the first time. I/We certify that all terms and conditions laid down in the development permission granted during last year/previous years have been scrupulous observed.
Form 5A: Application for Development Permission for Brick Kiln, Mining and Quarrying
Form 5A: Application for Development Permission for Brick Kiln, Mining and Quarrying
Form 5A: Application for Development Permission for Brick Kiln, Mining and Quarrying
1
Ownership Details
1
Applicant's Name
1
Postal Address for correspondence
1
Address of Land in Question
1
Applicants interest/title in land with respect of record of rights
2
Land Details - Legal
Land Details - Legal
2
Land Description
2
Village Name
2
TPS/ Revenue village/ Gamtal
2
FP No/ Revenue Survey No./ C S No
2
Sub-Plot No/Tenement No
2
Details of 7/12 attached
2
Ward
2
Zone (Before DP 2021)
2
Zone (After DP 2021)
3
Was land in question used for brick-kiln/mining/quarrying in the past?
Was land in question used for brick-kiln/mining/quarrying in the past?
3
Yes/ No
If YES please specify the details below
4
Whether Development Permission and N.A. permission were obtained in past?
Whether Development Permission and N.A. permission were obtained in past?
4
Yes/ No
If YES please specify the details below
5
Total area of land in question:
Total area of land in question:
6
Present Use of Land:
Present Use of Land:
7
Proposed Use of Land:
Proposed Use of Land:
8
Mention the area of land used for above mentioned uses so far (sq.mt).
9
IMndeinctaitoenth tehesam preopoonsesidte aprleaan to be used. (sq.mt) Indicate the same on
10
Mseintetiopnlanthe duration for which permission is sought (in
10
Mmenotniotnh/ tyimeaer-)limit for completion or termination of such use (in
11
Fomr Roennthe/wyaelaor)f Permission
11
Case No. and Date of previous
11
AmPeorumntisosifotnhe Security Deposit
Attachments: Annexure as per regulations
Signature
of
Form 6A: Area Statement for Buildings
(See Schedule 4a)
FORM 6A: AREA STATEMENT
Area Statement For Land
No
Title
Details (Area in
Supporting Documents Provided Yes/ No/ Not required
A
Building-unit Area
sq.mt)
A.1
(a) As per Revenue Record
A.2
(b) As per TPS Record
A.3
(c) Per site condition
B
Deduction Area
B.1
(a) Roads ( proposed or under process)
B.2
(b) reservations (under TP or DP or any other
B.3
Statutory Area- not in
B.4
OtheproPslsaensss/iUonnder
C
Net A prroevaision of
EXISTING GDR)
No
Title
Details (Area in sq.mt/ Nos./
Supporting Documents Provided
Remqut)ired
Provided
Yes/ No/ Not required
1
Common Plot
2
Width of Road Side Margin
2.1
Width of Other than Road Side Margin
2.2
Total Marginal Area
3
Width of Internal
3.1
IntReorandal Road Area
4
Total Permissible Ground-coverage
5
Permissible FSI - Base (as per old DP)
6
Permissible FSI - Chargeable
7
FSI Consumed
8
Ground Coverage
8
Use
Use Sub-type
Total Built-up
No of Units
Drawings Provided Yes/ No
Existing Use - as per old
8.1
Residential
8.2
Commercial
8.3
Mixed Use
8.4
Industrial
8.5
Others (please
8.6
Total
9
Floors
Numbers of Units
Floor Area/ Built-up Area
Payment FSI (in sq mt)
Provide Details for individual Building
9.1
Hollow Plinth
9.2
Ground Floor
9.3
Typical Floor
9.4
Floors other than Typical
9.5
Total
9.6
Total of all buildings
9.7
Building
Building Height in
Number of
10
Dwelling Units
Numbers of
Total Unit Area (in sq mt)
Details of unit area (Size)of Individual Unit (in sq mt)
Provide Details for individual Building
10.1
1BHK
10.2
2BHK
10.3
3BHK
10.4
4BHK
10.6
More than 4BHK
10.7
Others (eg. Studio units penthouse
10.8
Other than Dwelling Units
10.9
Total
10.10
Total of all buildings
11
Basement
Number of Basement
Area per Basement (in sq mt)
Total Basement Area
11.1
Basement 1:Area
11.2
Basement 2: Area
11.3
Others
12
Parking
Area (in sq.mt)
Percentage (%)
12.1
Area under parking (including visitors parking)
% of Total Built-up
12.2
Visitors Parking
%Aorfea Total Parking
12.3
Covered Parking
%Aorfea Total Parking
12.4
Open Parking
Are %a of Total Parking
PROPOSED
PROPOSED
PROPOSED
PROPOSED
PROPOSED
PROPOSED
PROPOSED
No
Title
Details(Area in sq.mt/ Nos./ mt)
Details(Area in sq.mt/ Nos./ mt)
Details(Area in sq.mt/ Nos./ mt)
Supporting Documents Provided Yes/ No/ Not required
Supporting Documents Provided Yes/ No/ Not required
Required
Provided
Provided
13
Common Plot
13.1
Additional 6% for Thick
13.2
No. of Percolation
13.3
No. of Trees
14
Width of Margin-Road
14.1
Width of Margin-Other than Road
14.2
Total Margin Area
15
Internal Road Width
15.1
Internal Road Area
16
Built-up Area in Common
16.1
Built-up Area in Margins
17
Total Developable
18
Permissible FSI - Base (as per new
18.1
Permissible FSI - Chargeable
18.2
FSI Utilised
19
Ground Coverage
20
Proposed Use (as described in Section C-0.3 - Use)
Use Sub-ture
Built-up Area (in sq.mt)
No of Units
Drawings Provided Yes/ No
Drawings Provided Yes/ No
20.1
Dwelling
20.2
Mercantile
20.3
Business
20.4
Educational
20.5
Assembly
20.6
PROPOSED AREA STATEMENT FOR PARKING
24
Parking
Area (in sq.mt)
Percentage (%)
24.1
Parking Area required as per
% of Total Built-up Area
Reagsuwlaetilol nas are(pal)ease
24.2
Psproepciofyseidn %Parking Area (please specify in %
% of Total Built-up
24.3
Visaistowrsell pasarakrienag) area required at Ground Level (please
Plinth) PLerovpeol sed Parking on levels above Hollow
12.3
CoPvleinrtehd Parking
12.4
Open Parking
25.4
Total
Build-to-line
* BUILDING-UNIT (PLOT) AS MENTIONED IN LOCAL AREA PLAN, PLEASE PROVIDE THE FOLLOWING DETAILS.
1
Length of Build-to-
in meters
2
LeLnignteh of Build-to-Line co- inciding the front façade of
in meters
3
Petrhceen btuaigldeinogf length of Build-to- line co-inciding the front
%
Proposal Detafilasçade of the
Description ofbpurioldpionsged property
List of Drawings
Landscape Plan
Ref Description of last approved plans
Date
Form 6B: Area Statement for Subdivision and Amalgamation of Land
(See Schedule 4B)
A
Area Statement
Sq Mt
For Subdivision/Amalgamation/Layout of Land
1
Area of Plot/Plots
I. List of Drawing
No.
Internal Road Area
Common plot/ Plots
Amalgamated Area ( in case
2
Deduction for :
(a) Proposed roads
II.Ref. & Description of Last approved
Dat
(b) Any reservation
(c) Not in
(d) Other
SITE PLAN [under regulation no. 2.3 IV and VI (a)] Layout Plan [under regulation no. 2.3 VII(b)]
Total : (a+b+c+d)
3
Net area of plot (1-
4
(in case of Sub Division)Common plot/ Plots Internal Roads
III. Description of proposed development and property
5
Balance area of Sub
Permissible F.S.I.
Total Built-up area
IV.
Existing floor area
North
Scal
Rema
F.S.I.
Notes :
V. Certificate
Certified that the plot under reference was surveyed by me on and the dimensions of sides etc. of plot state on plan are as measure on site and the area so worked out tallies with the area stated in document of ownership/T.P.record.
Architect/Engineer Signature.
VI. Signatories
Signatory, Name and address with
Regn. No.
Owner/ Developer/
Architect/
Engineer/ Clerk of works/ Site
Form 7: Grant/Refusal of Development Permission
(See Regulation No. 4.1.5, 4.2.5, 4.3.5)
FORM NO. D.
DEVELOPMENT PERMISSION
Permission is hereby granted/refused under Section 29(1) (i)/29(1)(ii)/29(1)(iii), 34, 49(1)(b) of the Gujarat Town Planning and Urban Development Act, 1976 / under Section 253 and 254 of
Gujarat Provincial Municipal Corporation Act, 1949.
To
(Name of person)
For
(Description of work)
On the following conditions/grounds
Conditions:
(in case of grant)
Subject to the submission of detailed working drawings, and structural drawing(s) along with soil investigation report before the commencement of the work.
Grounds:
(in case of refusal)
a.Documents/N.O.C. etc.:
Following documents/plans/N.O.C./undertakings as mentioned in form no. 1 are not submitted.
b. Site Clearance :
I. Site is not cleared as per the provisions of Development Plan with respect to
‐ Road line
‐ Reservations
‐ Zone
‐ Other (specify)
II. Site is not cleared as per the provision of T.P. Scheme........ with respect to
‐ Road
‐ Reservation
‐ Final plot
‐ Other (specify)
III. Proposed use is not permissible according to the width of road as per the Provision No.11.2.
c. Scrutiny of Layout :
Following provisions are not as per the Development Regulations :
‐ Set back
‐ Margin
‐ Common plot
‐ Internal roads
‐ Parking space
‐ Ground coverage
‐ Any other (specify)
d. Scrutiny of Building Requirements :
Following provisions are not as per the Development Regulations.
‐ F.S.I.
‐ Height
‐ Ventilation
‐ Open air space
‐ Provisions for Fire protection
‐ Any other (specify)
For The Chief Executive Authority / Municipal Commissioner /Chief Officer Urban Development Authority / Municipal Corporation /Area Development Authority/ Nagarpalika
Form 8: Application for Revising Development Permission
(See Regulation No. 4.2.1)
To
The Chief Executive Authority / Municipal Commissioner/Chief Officer Urban Development Authority / Municipal Corporation / Area Development Authority/ Nagarpalika
Proposed building:
(Title of the work)
Plot No.:
Area of the Plot:
Survey No.:
City Survey No.:_
Block No. : Final Plot No.:
Sub Plot / Property No.:
Address and location of proposed building:
Sir/Mm,
I am the Owner/Developer of the plot and wish to undertake construction of the proposed building on the plot.
The Development Permission No. has been granted to me by the Competent Authority vide Letter No. _ dated . I wish to vary the sanctioned layout of the proposed building. I shall be responsible for ensuring that the building complies with the G e n e r a l Development Control Regulations.
I request that the Revised Development Permission be granted to me.
Name of the Owner/Developer:
Address:
Tel. No.:
Signature: Date:
Form 9: Application for Revalidating Development Permission
(See Regulation No.4.3.1)
To
The Chief Executive Authority / Municipal Commissioner /Chief Officer Urban Development Authority / Municipal Corporation /Area Development Authority/ Nagarpalika
Proposed building:
(Title of the work)
Plot No.:
Area of the Plot:
Survey No.:
City Survey No.:_
Block No. :
Final Plot No.:
Sub Plot / Property No.:
Address and location of proposed building:
Sir/Mm,
I am the Owner/Developer of the plot and wish to undertake construction of the proposed building on the Building‐unit.
The Development Permission has been granted to me by the Competent Authority vide Letter
No. dated . The Development Permission that was issued on
(date) by the Competent Authority shall lapse on
(date) due to
I shall be responsible for ensuring that the building complies with the General Development C o n t r o l Regulations. I request that the Revalidated Development Permission be granted to me.
Name of the Owner/Developer:
Address:
Tel. No.:
Signature: Date:
Form 10: Notice for Commencement of Construction
(See Regulation No. 5.1.1)
To
The Chief Executive Authority / Municipal Commissioner/Chief Officer Urban Development Authority / Municipal Corporation /Area Development Authority/ Nagarpalika
File No:
Dated:
Proposed building:
(Title of the work)
Plot No.: Area of the Plot:
Address and location of proposed building:
Sir/Mm,
This is to notify you that the construction of the proposed building shall commence on (date). The construction of the building shall be undertaken in compliance with the sanctioned drawings and the Development Regulations.
Enclosed with this Notice are:
Detailed Working Drawings including structural design and specifications duly verified and certified by the AOR or EOR and SEOR for the project.
Name of the AOR/EOR:
Registration No.: Address:
Name of the SEOR: Registration No.: Address:
Tel. No.: Signature: Date:
Tel. No.: Signature: Date
Name of the Owner/Developer: Address:
Tel. No.: Signature: Date:
Name of the COWOR: Registration No.: Address:
Tel. No.: Signature: Date:
Form 13: Application for Building Use Permission
(See Regulation No. 6.1.1, 6.2.1)
To
The Chief Executive Authority / Municipal Commissioner/Chief Officer
Urban Development Authority / Municipal Corporation/Area Development Authority/ Nagarpalika
File No:
Dated:
Proposed building:
(Title of the work)
Plot No.: Area of the Plot:
Address and location of proposed building:
Sir/Mm,
This is to notify you that the proposed building/ part of the building has been completed in compliance with the sanctioned drawings and the General Development Control Regulations.
Enclosed with this application are:
Notice of Completion of Construction and Compliance Certification as prescribed in Form
No. 12;
One set of Completion Plans and as‐built drawings, duly certified by the POR;
Form No. 2/2A: Certificates of Undertaking by the Architect on Record or Engineer on
Record; and form No. 2E: Certificates of undertaking by the FPCOR
Form No. 2A: Certificates of Undertaking by the Structural Engineer on Record,
Form No. 2A: Certificates of Undertaking by the Clerk of Works on Record,
Clearance from Chief Fire Officer, Ahmedabad, as applicable & mentioned in Schedule No.22
A copy of valid Registration Certificate of the Persons on Record issued by the Competent
Authority.
Certificate of lift Inspector (Govt. of Gujarat) for buildings taller than 15 mt.
We request that the Building Use Permission be granted to the building. Any subsequent change from the completion drawings will be our responsibility.
Name of the Owner/Developer:
Address:
Tel. No.:
Signature: Date:
Form 14: Grant/Refusal of Building Use Permission
(See Regulation No. 6Error! Reference source not found.)
To
File No:
Dated:
Proposed building:
(Title of the work)
Plot No.: Area of the Plot:
Address and location of proposed building:
With reference to your Application No: dated: _, I am
directed to inform you that the Building‐unit has been inspected on date and the development is as per sanctioned design and specifications; and that Building Use Permission has been granted. The building/part of building may be used as per sanctioned drawings. This Building Use Permission is to be read in conjunction with all other documents and drawings which are enclosed as per the provisions of Regulation No 6 and its Schedules, and that all such documents, drawings and specifications form part of this Building Use Permission.
OR
With reference to your Application No: dated: _, I am
directed to inform you that the Building‐unit has been inspected on date and that a Building Use Permission has not been granted on the following grounds:
Yours faithfully
For The Chief Executive Authority / Municipal Commissioner/ Chief Officer Urban/Area Development Authority / Municipal Corporation/ Nagarpalika
Units /FSI (in Provide Details for individual Building
Units /FSI (in Provide Details for individual Building
Units /FSI (in Provide Details for individual Building
Units /FSI (in Provide Details for individual Building
Units /FSI (in Provide Details for individual Building
Units /FSI (in Provide Details for individual Building
Units /FSI (in Provide Details for individual Building
21.1
Basement
sq.mt)
21.2
Hollow Plinth
21.3
Ground Floor
21.4
Typical Floor
21.5
Floors other than Typical
21.6
TFlootoarl
21.7
Total of all
22
buildings Dwelling Units
Numbers of
Total Unit Area
Details of unit area (Size) of Individual Unit
Details of unit area (Size) of Individual Unit
Details of unit area (Size) of Individual Unit
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
Units (in sq.mt) (in sq.mt) Provide Details for individual Building
22.1
1BHK
22.2
2BHK
22.3
3BHK
22.4
4BHK
22.5
More Than
22.6
Ot4hBeHrsK (eg. Studio units,
22.7
Ot pheenrthouseThan eDtwc.e)lling
22.8
TUontiatsl
22.9
Total of all
23
buildings Dwelling Units
Carpet Area of each Unit (in sq.mt)
Details of Balcony&Vernadah area
Proportionate Commom Aminities area in Sq.mt.
Proportionate Commom Aminities area in Sq.mt.
p u lt i Bu la to T
23.1
Ground Floor
(Size) of
23.2
First Floor
Individual
Unit sq.mt)
24
Building
Building Heigh(tinIn meters
Building Heigh(tinIn meters
Number of Floors
Number of Floors
Number of Floors
No. of
North
Scale of drawing
Remarks
Plans
Copies
Layout Plan
Site plan
Detailed Plan
Sections
Elevations
Services & Amenities
Form 11: Notice of Progress of Construction
(See Regulation No. 5.5.3)
To
The Chief Executive Authority / Municipal Commissioner /Chief Officer
Urban Development Authority / Municipal Corporation Area Development Authority/ Nagarpalika
File No:
Dated:
Proposed building:
(Title of the work)
Plot No.: Area of the Plot:
Address and location of proposed building:
Sir/Mm,
This is to notify you that the construction of the proposed building has reached the following stage:
No
Stage
Date
1.
Plinth level
2.
Ground Floor
3.
Middle storey
4.
Last storey
The construction of the building is in compliance with the sanctioned drawings and the General Development Control Regulations. We declare that the amended plan is not necessary at this stage.
Name of the
AOR/EOR:_
Name of the Owner/Developer:
Registration
Address:
No.:
Address: Tel. No.:
Signature:
Tel. No.:
Date:
Signature: Date:
Name of the SEOR:
Name of the COWOR:
Registration No.:
Registration No.: Address:
Address:
Tel.no
Tel. No.:
Signature :
Signature: Date:
Form 12: Notice of Completion of Construction and Compliance Certification
(See Regulation No.6.1.1)
To
The Chief Executive Authority / Municipal Commissioner /Chief Officer
Urban Development Authority / Municipal Corporation /Area Development Authority/ Nagarpalika
File No:
Dated:
Proposed building:
(Title of the work)
Plot No.: _Area of the Plot:
Address and location of proposed building:
Form 15: Structural Inspection Report
(Maintainance of Building - See Schedule 17)
(This form has to be completed by registered Structural Engineer on Record after his site Inspection and verification regarding compliance of all recommendation by the owner, which in the opinion of the registered Structural Engineer on Record is necessary for safety of the structure)
No
Description
Information
Notes
1.
Title, Location and Address of the building including
2.
TN.aPm. Neoo,fFP.Pre. sNeon,teOtcwner
3.
Name of Structural Engineer on Record
4.
Use of the building
5.
Year of construction
Year of subsequent additions
Nature of additions or alterations
6.
Date of Last Inspection Report
SEOR for Last Inspection Report
7.
Class 1 Building
8.
Class 2 Building
9.
Type of structure ƒ Load bearing walls ƒ R.C.C frame ƒ R.C.C frame and Shear walls ƒ Steel frame
10.
Soil data ƒ Type of soil ƒ Design safe bearing capacity ƒ Any change subsequent to construction ƒ Any open excavation pit ƒ Any water body near by ƒ Proximity of drain ƒ Underground water tank ƒ Outlets of rain water pipes ƒ Settlements
IS: 1893 Cl.6.3.5.2IS: 1904
(a)
(b) Framedconstruction
Function
Reside nce (with or
Apartme nts (with or
Offic e Bldg.
Shop pin g cen
Scho ol, Colle ge
Hos te l
Aud it-oria
Fact ory
1 witho
2 Witho
3
4 tre
5
6
7
8
A. Load bearing masonry wall
ut shops
ut shops
B. construc tioFnrame
codnstructi sotnruct aunrd e structur al
Critical load beari ng
Brick
RCC
Stone
Timb er
Stee l
material s
Ro eolefm Floeonrt
RCC
Timb er
RBC
Steel
Jack-
Part 2 Load bearing masonry buildings
Description
Information
Notes
1.
Building category
2.
Any cracks in masonry walls
Extent of cracks
Location of cracks
Sketch of cracks, if necessary
3.
Recommendations, if any
Part 3 Reinforced Concrete framed buildings
Part 3 Reinforced Concrete framed buildings
Part 3 Reinforced Concrete framed buildings
Part 3 Reinforced Concrete framed buildings
Description
Information
Notes
1.
Type of Building
2.
Any cracks in beams
Extent of cracks
Probable causes
3.
Any cracks in columns
Extent of cracks
Probable causes
4.
Any cracks in slab
Extent of cracks
Probable causes
Spilling of concrete or plaster of slab
Corrosion of Reinforcement
5.
Cover Spell
Part 3 Reinforced Concrete framed buildings
Part 3 Reinforced Concrete framed buildings
Part 3 Reinforced Concrete framed buildings
Part 3 Reinforced Concrete framed buildings
Description
Information
Notes
6.
Exposure of reinforcement
7.
Subsequent damage by user for taking pipes, conduits, hanging fans or any other fixtures, etc.
8.
Loads in excess of design loads
9.
Recommendations, if any
Part 4 Buildings in Structural Steel
Description
Information
Notes
1.
Building category
2.
Painting
3.
Corrosion
4.
Joints, nuts, bolts, rivets, welds, gusset
5.
Bepnldaitnegs or buckling of members
6.
Base plate connections with columns of pedestal
7.
Loads in excess of design loads
8.
Recommendations, if any
This is to certify that the above is a correct representation of facts as given to me by the owner and as determined by me after Site Inspection to the best of my ability and judgment.
The recommendations made by me to ensure adequate safety of the structure are compiled with by the owner to my entire satisfaction.
Name of the SEOR:
Registration No.:
Address:
Tel. No.:
Signature: Date:
Form 16: Fire Safety Certificate
(See Regulation, Schedule 17)
To
The Chief Executive Authority / Municipal Commissioner /Chief Officer
Urban Development Authority / Municipal Corporation/Area Development Authority/ Nagarpalika
Existing Building: _
Survey No.: City Survey No.: ____
Block No.: ____ Final Plot No.: ____
Sub Plot / Property No.: ____
Address and location of existing building: ____
Name of Owner: _
Type of Structure: ____
Sir/Mm,
I am currently registered as Fire Protection Consultant on Record for the above building.
This is to notify that I have inspected the above building on _and to the best of my knowledge; I certify that the fire safety of the building has not been compromised due to lack of maintenance.
Name of the FPCOR: ____
Registration No.: ____
Address: ________
Tel. No.: ____
Signature: Date:
Form 17: Undertaking for Built up area up to 125.00sq.mt.
(See Regulation no. 2.8.1)
Affidavit
I, under signed Shri/Smt/Kum. .... Engineer/Architect having Registration No. .... is appointed by the owner. I hereby certify that, for the development on land bearing revenue survey No./Block No./City Survey No. .... of Village .... T.P Scheme No. .... O.P.No. .... F.P. No. .... . Designated as .... zone in the development plan of .... Area/Urban Development Authority. The brief of proposed construction the specified here under. I have scrutinized the plans, documents and other information to be submitted for getting the development permission of a residential unit. I have, after due diligence and proper inquiry found to be in compliance with the regulations. I hereby affirm and allow the owner to commence the construction of building from .... on the aforesaid land with the following conditions. Further I certify that, for the aforesaid development the layout is sanctioned, a valid Non Agriculture Permission is issued by relevant authority, the built-up area does not exceed 125 sq.mt. and the existing building is owned by the single owner and for which the permission is issued by the competent authority.
I have verified all documents and found to be authentic. I further assure that the owner shall:
a. comply all regulations required for safety,
b. carryout the work as per the attached plan which is as per the sanctioned General Development Control Regulations(GDCR), Rules, Regulations, Standing Orders issued by competent authorities.
c. submit the plans as per regulation before the commencement of the work.
I understand that in case any of the aforesaid conditions/permission/responsibilities are not complied then the competent authority reserves the right to revoke my registration and forfeit my security.
I, Shri/Smt/Kum. ....under signed owner of the above mentioned Land/building hereby declare that the undersigned architect/engineer is appointed by me and is authorized to make representation/application with regard to aforesaid development to any of the authorities. I further declare that I am aware of all the action taken or representation made by the architect/engineer authorized by me. I further declare that during construction I will appoint supervisor/clerk of works as required under regulations. Also I submit that I abide to remove whole or part of the construction, at my cost and risk and as advised by the competent authority or architect/engineer.
If any deviation will found by the supervisor or any person of the concerned authority, I and the owner abide to remove whole/partial construction as shown by authority within stipulated time given by concerned authority at my risk and cost. I agree that, I and the
owner will not challenge any of the action/decision of the concerned authority in this regards.
Name of architect/engineer : ......Registration No. ......Address : ......Tel. No. ......e-Mail ID ......Signature ......Date : ......
Name of Owner : ......Address : ......Tel. No. ......e-Mail ID ......Signature ......Date : ......
Sir/Mm,
This is to notify you that the construction of the proposed building has been completed under our supervision.
We hereby certify that the construction of the building has been undertaken in compliance with the sanctioned drawings and the General Development C o n t r o l Regulations. We declare that the building is to be used for _purpose as per approved plan and it shall not be changed without obtaining written permission.
Any subsequent change from the completion drawings will be our responsibility.