Chapter 4Procedure for Obtaining, Revising and Revalidating a Development Permission
Obtaining a Development Permission
Application for Development Permission shall be made by the Owner of the Building units/land on which the building is proposed in the format prescribed in:
Form No. 5 for Buildings, and for Sub‐division and Amalgamation and Form No. 5A for Brick Kiln, Mining and Quarrying.
Scrutiny Fees
Scrutiny Fees and other charges for obtaining a Development Permission shall be determined by the Competent Authority and are listed in Schedule 3.
Drawings, Specifications and Documents
Drawings, specifications and documents to be submitted along with Application for Obtaining a Development Permission shall be determined by the Competent Authority and are listed in: Schedule 4a for Building, Schedule 4b for Sub‐division and Amalgamation and Schedule 4c for Brick Kiln, Mining and Quarrying. The format for submission of drawings, specifications and documents is specified in Schedule 5.
On receipt of the application for Development Permission, the Competent Authority shall undertake scrutiny of the Application for Development Permission and communicate to the applicant.
Lack of compliance with Development Regulations and/or queries pertaining to the Building‐unit shall be communicated.
Acceptance or rejection of compliant modifications in the design and specifications of the proposed building and responses to queries shall be communicated. Acceptance or rejection of further compliant modifications in the application and responses to queries shall also be communicated.
Grant or Refusal of a Development Permission
Development Permission shall be granted to the applicant when the Competent Authority is satisfied that the design and specification of the proposed building comply with the Development Regulations. On receipt of the application for Development Permission, the Competent Authority may grant or refuse permission to the applicant as per the provisions of the Act within thirty days from the date of payment of the Scrutiny fees. The permission may be granted with or without conditions or subject to any general or special orders made by the State Government in this behalf.
The Development Permission shall be in the format of Form No.7 and it shall be issued by an officer authorised by the Competent Authority in this behalf. Reasons for rejection of application shall be communicated to the applicant.
In cases where the building design requirements are as per regulations but the co owner of the property or Chairman/Secretary of the Cooperative Society are not giving consent at the time of development permission, the Competent Authority may issue permission after
giving opportunity of hearing to the co-owner of the property or Chairman/Secretary of the Cooperative Society considering the merits and demerits of individual case.But in no case Competent authority shall decide the ownership right without the consent of the co-owner of the property or chairman/secretary of the co-operative society.
Penalties for not complying with Regulation No. 4.1 are stipulated in Schedule 6.
Revising a Development Permission
Application for Revising a Development Permission shall be made by the Owner or Developer of the Building‐unit, in the format prescribed in Form No.8.
Fees
Development Permission Fees and other charges for revising a Development Permission shall be determined by the Competent Authority and are listed in Schedule 3.
Drawings, Specifications and Documents
Drawings, specifications and documents to be submitted along with Application for Revising a Development Permission shall be determined by the Competent Authority and are listed in Schedule 4a, 4b and 4c for the respective uses. The format for submission of drawings, specifications and documents is specified in Schedule 5.
The Competent Authority shall undertake scrutiny of the Application for Revising a Development Permission. Lack of compliance with Development Regulations and/or queries pertaining to the Building‐unit shall be communicated. Acceptance or rejection of compliant modifications in the application, modifications made in the design and specifications of the proposed building and responses to queries shall be communicated. Acceptance or rejection of further compliant modifications in the application and responses to queries shall also be communicated.
Grant or Refusal of a Revised Development Permission
A Revised Development Permission in the format prescribed in Form No. 7 shall be issued to the applicant when the Competent Authority is satisfied that the design and specification of the proposed Building‐unit comply with Development Regulations. Reasons for rejection of application shall be communicated to the applicant.
Penalties for not complying with Regulation No. 4.2 are stipulated in Schedule 6.
4.3Revalidating a Development Permission
Application for Revalidating a Development Permission shall be made by the Owner or Developer of the building, before the expiry of the Development Permission. The
revalidated period shall in no case exceed three years in the aggregate that is for a total period of four years.
Lapsed Development Permission may be revalidated after the expiry of the original Development
Permission, within a period of six months, with payment of penalty charges.
Revalidation of a Lapsed Development Permission after one and half year from the issue of the original Development Permission shall not be permitted. New application for Development Permission shall have to be made.
Fees
Development Permission Revalidation Fees for revalidating a Development Permission shall be determined by the Competent Authority and are listed in Schedule 9.
For revalidating a lapsed Development Permission, penalty charges shall be applicable and are listed in Schedule 9.
Documents
Documents to be submitted along with Application for Revalidating a Development Permission shall be determined by the Competent Authority and are listed in Schedule 10. The format for submission of documents is specified in Schedule 5.
The Competent Authority shall undertake scrutiny of the Application for Revalidating a Development Permission, in context of proposals of Development Plan of development authorities,as per development control regulation for D8 & D9 and communicate queries pertaining to the application.
Acceptance or rejection of responses to queries shall be communicated to the applicant.
Grant or Refusal of a Revalidated Development Permission
A Revalidated Development Permission in the format prescribed in Form No. 7 shall be issued to the applicant when the Competent Authority is satisfied that the design and specification of the proposed development comply with the Development Regulations. Reasons for grant or refusal of Revalidating a Development Permission shall be communicated to the applicant.
In case of any change to the Building‐unit which affects the approved layout or building blocks, Development Permission may not be revalidated. New application for Development Permission shall have to be made.
Penalties for not complying with Regulation No. 4.3 are stipulated in Schedule 6.
4.4Common Protocol
For Facilitation to investor under Investment Facilitation Portal (IFP) following procedure must be adopted by competent authority where ever procedure is narrated in this document.
Competent Authority must made all procedure, protocols and checklist available online.
Application received online by competent authority and Investor Facilitation Portal
Compliance at any time shall be available online on competent authority website and Investor Facilitation Portal
Competent Authority must display the grant of permission or rejection or suspension online in public domain on Competent authority website and Investor Facilitation Portal at time new permission ,renewal and revalidation of application.
Inspected report of each time must be online on respective website and Investor Facilitation Portal by competent authority within 24hrs. of the inspection.
Competent authority allocates the inspector randomly and it must be on computerize.
Integrate the payment gateway online.
For any development permission, if site inspection is required for different purposes, all the officers or the inspectors required, to carry out inspections shall visit jointly on a prescribed date. The competent authority shall ensure that such date of joint inspection is communicated to applicant at least three days in advance and also ensure that the inspectors carry out the inspection on specified date.
Competent Authority shall design and develop an online development permission system with integrated application for all internal and external agencies require to provide applicable NOCs/Approvals.
Competent Authority shall develop the on line development permission system having e-intimation system for plinth level as well as further stage completion.
Competent Authority shall make provision for digitally signed certification.
Competent authority shall carried out a single ,joint site inspection by all such concern authorities such as Fire, Sewarage,, Electricity, Labour Water Department and internal department responsible for granting construction permit by authorizing the registered architect/engineers, who registered with the authorities for the purpose of inspecting the construction at different stage and competent authority will decide the wages for the concern inspector depending upon the quantum of work/inspection.
To authorize the registered architect/engineer, who are registered with the competent authorities, competent authorities shall prepare a form and inspection report and The authorized engineers/architects shall furnish the information as required in the inspection report in the prescribed timings
Authorized inspector as above have responsibility to inspect the site as per the prevailing and the regulation made hereunder within prescribed time and prescribed form.
If, any inspector authorize by the competent authorities fail to perform his/her duties of inspection as per provisions of the act will be punish as per the provisions of the act.
5.5Progress of Construction and Inspection ‐ Development Permission
Notice for Commencement of Construction
The Owner and the Architect on Record for the building shall notify the Competent Authority their intention to commence construction at least 7 working days prior to commencing construction by filing a Notice of Commencement of Construction, in the format prescribed in Form No. 10. Failure to notify the Competent Authority before commencing construction may result in lapse of the Development Permission.
A set of detailed working drawings including structural details based on approved building plans shall be submitted along with the Form. In the case of individual residential buildings up to G+2 on a plot not more than 500 sq.mt in size, the Competent Authority shall not enforce, on request of the owner/developer, to submit such details.
The Notice of Progress of Construction shall not be necessary in the following cases: i) Alteration in Building not involving the structural part of the building.
ii)Extension of existing residential building on the ground floor up to maximum area of 40 sq.mt.
On receipt of the Notice of Progress of Construction from the owner or developer, it shall be the duty of the Competent Authority, if found necessary, to check any deviation from the sanctioned plan and convey decision within 7 days to the owner or developer accordingly for compliance.
Development Permission may Lapse if Construction Not Commenced on Time
If the Competent Authority is not informed of commencement of work on a proposed building within twelve months of grant of Development Permission, the Development Permission shall lapse. Application for revalidation of Development Permission should be made within twelve months of grant of Development Permission. The extended period shall in no case exceed three years in the aggregate that is for a total period of four years. Procedure for obtaining a Revalidated Development Permission is specified in Regulation No.4.3.
Competent Authority to be Notified of Progress of Construction
The Owner or Developer and the Architect on Record or Engineer on Record shall be responsible for notifying the Competent Authority of progress of construction having been completed up to the stages stipulated in Schedule 13. Notice of Progress of Construction shall be made in the format prescribed in Form No. 11 and approved by the Persons on Record.
Risk Based Checks Inspections
The competent authority shall carryout the checking of the development permission application and the site inspection based on the consequence class specified.
Consequences Class.
Any development carried out by the owner or the developer attracts risk during the design and construction. Risk is defined, in the context of construction stages, as the likelihood of non-compliance with building regulations and the potential extent of harm to current and future users of building and the environment associated with non-compliance. The competent authority can, based on the extent carry out inspections based on the consequences class.
Principles of Risk Categorization
The different Consequences Classes is specified Table 5.5-1: Principles of Risk Categorization (Definition of Consequence Class) classification of the buildings & Control at the Design Stage (Design Supervision Levels, or DSL)
Based on the classification of the buildings specified in Table 5.5-2 the persons on record (POR) shall carryout the design supervision and the checks as specified in Table 5.5-2: Control at the Design Stage (Design Supervision Levels, or DSL)
Design Supervision Levels, or DSL
The competent authority shall as carryout the inspection and other requirements as specified in Table 5.5.2: Control at the Design Stage (Design Supervision Levels, or DSL)
Table- 5.5.1 : Principles of Risk Categorization (Definition of Consequence Class)
Sr. No.
Consequences Classes
Description
Use and Building type
(1)
(2)
(3)
(4)
1
CC1
Low consequence for loss of human life; small or negligible economic, social, or environmental consequences, developed, owned and maintained by single owner
For the following development carried out in all areas other than Seismic Zone 5: o Detached dwelling unit (excluding multiple units), Farm House (excluding multiple units) o Agricultural buildings people do not normally enter (e.g., storage buildings), greenhouses
2
CC2
Low consequence for loss of human life; small or negligible economic, social, or environmental consequences, but the developer, owner or the person who may maintain may not the same person.
For the following development where the building height does not exceed 13.5 mt: o Tenement, Semi-detached Dwelling unit, Chawls, Row House, Pre -School, Cottage Industry, o Shop, Stall, Light Home work shop
3
CC3
Medium consequence for loss of human life; considerable economic, social, or environmental consequences
For the following development where the building height does not exceed 25 mt: o Dharamshala, Apartment, Hostel, Flat, EWS Housing, Low cost housing, o Dimond Industry, Godown (non-inflammable), Whole sale Market and their ancillary uses, o Restaurant, Shopping Centre, Shopping Mall, Indoor Hospital, Service Establishment, Offices for Individuals, Corporate Offices o Garden Restaurant, Garden, Party Plot.
(1)
(2)
(3)
(4)
4
CC4 H
igh consequence for loss of human life; High consequences for economic, social, or environmental consequences
For the following development where the building height exceeding 25 mt but up to 45 mt: o Bed and Breakfast, Dharamshala, Apartment, Hostel, Flat, EWS Housing, Low cost housing, o Guest House, Lodging and boarding, Motel, Serviced Apartment, Motel, o Dimond Industry, For the following development where the building height exceeding 13.5 mtbut up to 45 mt: o Godown (non-inflammable), Small Factories, Auto Repair, Workshop/ Warehouses, Wood Workshop, Fabrication, Workshop, Public - Garage, Light/ Service Industries; o Restaurant, Shopping centre, Shopping Mall, Indoor Hospital, Service Establishment, Offices, Corporate Offices, Call centres, o Training /Fitness Centre, Research Centers, Clinic, Retail Shop For the following development having up to 45 mt: o Nursing Home, Maternity Home, Pathology Laboratory, Hospital, Surgical Hospital, Hospital and contigeneous deseses, Mental Hospital o Primary/ Secondary / Higher Secondary Schools, College, Polytechnic, University o Exhibition / Town / Community / Banquet Hall/ Hall, Hall, Wadi,
(1)
(2)
(3)
(4)
Video Hall Shooting Range, Drive-in Cinema, Golf o Convention Centre, Auditorium, Planetarium, Stadium, Museum, Exhibition Halls/ Ground, Drive-In Cinema, Clubs, Golf Course, Cinema, Facility For Water Sports, Theme/ Amusement Park, Aquarium, Zoo, Botanical Garden, Sports Complex, Swimming Pool, Playfield, Camping/ Mela Ground, Cinema/ Motion Picture Hall, Theatre, Gardens, Parks, Nursery, Botanical Garden, Green House, Play Fields, Forest; Natural Reserve and Sanctuary,race track,Shooting Range,Zoo o Temples, Church, Mosque, Gurudwara, Synagogue, Upashraya, Sant Niwas o Newspaper Printing Press, Concrete Batching Plant, Stone Cutting And Polishing; Poultry Farm, Dairy, Assembly Plant, o Godown (If Inflammable), LPG Cylinder, Kerosene Depot, o Junk Yard, Warehouse, Godown, Cold Storage, Timber Mart, Steel Stockyard,Ice Factory All Industries both Hazardous/ Non-Hazardous, Textile Units, Ice Factory; o Quarrying of Stone, Quarrying of Gravel , Quarrying of Clay; Dumping of Solid Waste, o Slaughter House, Meat Processing Units, Leather Processing Units, Cold Storage
(1)
(2)
(3)
(4)
o Fuel Storage, Storage of inflammable materials, Thermal Power Plant, Power Plant, Gas Plant, Storage of Hazardous Materials,Hazardous Industries, Chemical Industries. Obnoxious and Hazardous Uses, Dying House Truck Terminal, Bus Terminal (by private enterprise), Transport Terminal for Goods and Passengers o Horticulture, Repair and Sale of agricultural equipment, Brick Kiln,Dairy Development, Fisheries,Animal Rearing and Breeding, Natural Resource and Sanctuary, Tannery, Concrete BatchingPlant, Cemetery, Burial Ground, Regional Park, Way-side Shop, Agricultural Vocational Training Centre, Panjarapole,Roofing Tiles and Cement Pipes o Dumping of Solid Waste, o Course, Ship Building or Ship Breaking, Fishing ,aqua culture Processing of fish and industry based on it port, harbour ferry hovercraft service marine transport ,Telephone microwave or other means of communication facilities, salt pans and non-polluting salt processing activity,Any Type activity not permissible as per the provision of the Environment Protection Act.1968 and Environment (Projection Rules-1968) o PoultryFarm, Agro-based Godowns
(1)
(2)
(3)
(4)
o Fair, Circus, Exhibition, Mela, Pandal o Drainage, Sanitation, Domestic Garbage Disposal Collection, Solid Waste Transfer Station; Pumping Station, Electricity, Purification Plant, Fire Stations. or any development activity carried out by appropriate authority for public purpose, Petrol Pump with or without service station o Public assembly, Public facilities and amenities like Health Public facilities and amenities like Transport and Communication,Public facilities and amenities like public security, Public facilities and amenities like social welfare Recreation of any Type o Indoor Hospital, Nursing Home o All others not specified.
5
CC5
Very High consequence for loss of human life;Very High consequences for economic, social, or environmental consequences
All buildings taller than 45 mt. Irrespective of use.
Table 5.5.2Control at the Design and Inspection Stage (SL)
Design Supervision
Design and Inspection Levels Characteristics
Minimum recommended requirements for checking of calculations, drawings and specifications.
Minimum requirements for Inspection of implementations and the insurance requirements.
(1)
(2)
(3)
(4)
SL1 Relating to CC1
Supervision by the owner and POR
Self-checking: Checking performed by the person who has prepared the design. Self-certification of design by the architect and the structural engineer appointed by the owner.
Self-certification by the architect and the structural engineer appointed by the owner for carrying out the construction as per drawings and specifications and for which the plans are approved. The POR shall for all levels submit the reports and submission of completion plan. No inspection to be carried out by the Inspector of the competent authority and shall issue the building use permission based on the documents supplied by the owner and POR The competent authority shall not insist on the insurance for the building.
SL2 Relating to CC2
Normal supervision by POR and the Competent Authority
Self-checking: Checking performed by the person who has prepared the design. Self-certification of design by the architect and the structural
Self-certification by the architect and the structural engineer appointed by the owner for carrying out the construction as per drawings and specifications and for which the plans are approved. The POR shall for all levels submit the reports and submission of completion plan. Inspection to be carried out by the Inspector of the competent authority at the plinth level and at time when the owner makes an application for getting
engineer appointed by the owner.
building use permission. The building use permission shall issue based on the inspection report and the documents supplied by the owner and POR. The competent authority shall not insist on the insurance for the building.
SL3 Relating to CC3
Normal supervision by POR and the Competent Authority
Checking by different persons in accordance with the procedure prescribed in these regulation no 4, 5 and 6 of these regulations Plinth and occupancy inspection and certification by structure designer.
Certification by the architect and the structural engineer appointed by the owner for carrying out the construction as per drawings and specifications and for which the plans are approved. The POR shall for all levels submit the reports and submission of completion plan. Inspection to be carried out by the Inspector of the competent authority at the at all levels as required in regulation no 4, 5 and 6. The building use permission shall issue based on the inspection reports and the documents supplied by the owner and POR. The competent authority shall ask the owner to seek insurance coverage for the building for minimum 5 years and then only issue the building use permission.
4.5Conflict Resolution Mechanism
If any applicant has any grievance for decision taken by competent authority with respect to development permission / building use permission as per the provisions of General Development Control Regulation for D1 to D7(A) and D7(B) category, applicant can make an application before Appeal Committee as constituted below, after making a appeal fee equal to the amount paid as scrutiny fee, subject to maximum amount as Rs. 50,000/- to Development Authority.
APPEAL COMMITTEE
Sr, No.
Designation of Competent Authority
Designation of Committee
(1)
(2)
(3)
1
Municipal Commissioner of municipal Corporation / Chairman of UDA / ADA/ President of Municipality
Chairman
2
Director of Town Planner / Senior Town Planner / Chief Executive Authority / Chief Officer
Member Secretary
3
District Town Planner of State Government or his Representative as per Ex-officio
Member
This Committee shall only function for any dispute arising for interpretation of the Development Control Regulation.
Under the provisions of The Gujarat Town Planning and Urban Development Act-1976 and General Development Control Regulation, Appropriate Urban Development Authority and Area Development Authority give/issue development permission and building use permission. In case of any grievence for development permission/building use permission as per provisions of these regulation and the person has approach the appeal-committee and again applicant is dissatisfied with the decision of appel-committee for D1 to D7(A) and D7(B) category, applicant can make representation before seceratry, Urban Development and Urban Housing Department of Government.
Under the Provisions of The Gujarat Municipalities Act-1963, Appropriate Municipalities authorize person under the relevant provision of the local act give/issue development permission/building use permission. If any applicant has any grievence for development permission/building use permission as per provisions of these regulation for D8 category,applicant can make representation before Deputy Secretary of Nagarpalika,Urban Development and Urban Housing Department; The said deputy secretry can give their opinion to the appropriate authority to redress the grievance as per provisions of General Development Control Regulation.
Under the provisions of the GIDC Act-1962,authorized person of GIDC give/issue development permission /building use permission.If any applicant has any grievence for development permission/building use permission as per provision of these regulation for D9 category,applicant can make representation before managing director of GIDC,Industrial Development Corporation of Gujarat;The managing director can give their opinion to the appropriate authority to redress the grievance as per provisions of General Development Control Regulation.
Procedure During Construction
Inspection of Construction
Inspection of Construction at Any Time
All buildings for which Development Permission is required are subject to inspection by the Competent Authority and the Competent Authority reserves the right to inspect such buildings at any time during the Period of Construction without giving prior notice of its intention to do so. Owner of the Building‐unit and/or any person undertaking construction shall Permit authorized officers of the Competent Authority to enter the Building‐unit and inspect the building for the purpose of enforcing these Regulations.
Inspection where Development Permission is Granted
All buildings for which Development Permission has been granted shall be subject to periodic inspection by the Competent Authority during construction. It shall be the responsibility of the Owner, the Architect on Record or Engineer on Record, and the Clerk of Works on Record for the building to report commencement, progress at various stages, and completion of construction to the Competent Authority as specified in Regulation No. 5.5.
Inspection for Fire Safety and Protection of Building under Construction
For buildings listed in Schedule 23, the Chief Fire Officer (CFO) shall carry out inspections at appropriate intervals, to ensure that the fire protection requirements and measures for such building under construction are adequate and operational. CFO shall also satisfy himself that all elevators including fire lifts are duly tested and their test certificates are submitted to his satisfaction. If the above work is entrusted to a registered Fire Protection Consultant on Record, his reports shall be countersigned by the Chief Fire Officer.
In case of inadequacy of these Regulations, he shall issue a notice to the owner or occupier of such building directing him to rectify the shortcomings/ contraventions within a specified period. Copies of all such notices shall be endorsed by the Competent Authority also.
Information to be Prominently Displayed on Site
It shall be the responsibility of the Clerk of Works on Record and the Owner to erect a notice board on the Building‐unit displaying key information pertaining to the building. The notice board should be prominently visible, easily reble and should be located next to the primary access to the plot. The notice board/s should be maintained for the entire Period of Construction up to issue or grant of Building Use Permission. Failure to comply with this Regulation may result in revocation of the Development Permission. The information to be displayed is specified in Schedule 11.
Documents and Drawings to be Maintained on Site
Procedure for Obtaining a Building Use Permission
Obtaining Building Use Permission
Notice of Completion of Construction and Building Use Permission
The Owner and the Architect/ Engineer on Record for the building shall be responsible for notifying the Competent Authority of completion of construction and for certifying that the construction complies with the sanctioned design and specifications. Notice of Completion of Construction and Compliance Certification shall be made in the format prescribed in Form No. 12, and shall be accompanied by documents and drawings as prescribed by the Competent Authority in Schedule 14. The format for submission of drawings, specifications and documents is specified in Schedule 5.
Subsequent to notifying the Competent Authority about the completion of construction in compliance to the regulations, application for Building Use Permission may be made to the Competent Authority in the format stipulated in Form No. 13.
Fees
Building Use Permission Fees shall be determined by the Competent Authority and are listed in Schedule 15. It shall be the responsibility of the Owner to deposit Building Use Permission Fees with the Competent Authority along with the Application for Obtaining a Building Use Permission.
Final Inspection
Following receipt of the Notice of Completion of Construction and Compliance Certification, the Competent Authority shall undertake final inspection of construction for ensuring compliance to sanctioned design, specifications and other aspects of the building as stated in Schedule 22. The Competent Authority shall inform the applicant within 21 days of receipt of Notice of Completion of Construction.
If, on inspection, the Competent Authority is satisfied that the construction of the building complies with the sanctioned design and specifications, it shall grant a Building Use Permission.
If the construction is found not to comply with sanctioned design and specifications, the Competent Authority shall communicate queries regarding the construction and/or directions to ensure compliance to the Owner and the Architect on Record or Engineer on Record. Failure to comply with directions, as may be issued by the Competent Authority, may result in revocation of the Development Permission. The Architect on Record or Engineer on Record shall respond to queries and notify the Competent Authority of having undertaken compliant modifications.
6.2.3Fees
Fees and other charges for obtaining Permission to Change Sanctioned Use of Building are listed in Schedule 15.
The Competent Authority shall undertake scrutiny of the Application to Change Sanctioned Use of Building. Lack of compliance with Development Regulations and/or queries pertaining to the application shall be communicated. Acceptance or rejection of compliant modifications in the application and responses to queries shall be communicated.
Grant / Refusal of Permission to Change Sanctioned Use of Building
A permission to Change Sanctioned Use of Building shall be issued to the applicant when the Competent Authority is satisfied that the proposed change of use of the building complies with these Regulations. Reasons for rejection of application shall be communicated.
Penalties for not complying with Regulations No. 6.2 are stipulated in Schedule 16.
Authorizing Private Inspector For Inspection
For the purpose of inspecting the construction at different stages, the competent authority may hire the services of the architects/engineers who are registered.
The competent authority while hiring an architects/engineers, shall see that for different risk levels, the engineer or the architect hired is experienced. Following table shows the experience required for different Risk levels. The competent authority shall for each site visit and the report decide the fees. For this the competent authority shall, for the subsequent financial year, latest by 15 March every year publish the fees and invite the applications of architects and engineers who would be willing to work as inspection architect / engineer. On receipt of the applications, the competent authority shall make a panel of approved engineer / architect.
The competent authority shall make an contract agreement with all the engineers / architect included in the panel. The agreement shall include the scope of work, the reporting systems and the protocols (including penalty clauses, mode of payments and reporting systems – both online and in hard copies) for smooth functioning of inspections.
Table 5.5.3Supervisor Requirment
Sr.No.
Consequences of Class
Design Supervision
Supervisor
Minimum Experience required
(1)
(2)
(3)
(4)
(5)
1.
CC1
SL1 Relating to CC1
Supervision by the owner and POR
As per reulation no. AOR,EOR and SEOR registration
2.
CC2
SL2 Relating to CC2
Normal supervision by POR and the Competent Authority
One year after registration as AOR,EOR,SEOR for respective task.
3.
CC3
SL3 Relating to CC3
Normal supervision by POR and the Competent Authority
Two year after registration as AOR for respective task
4.
CC4
SL4 Relating to CC4
Extended supervision
Zone Classification
Different zones and uses prescribed in the development plans as grouped below are conceptulised as per table 7.1.1. below.
Table No. 7.1.1.
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
As mentioned
As mentioned
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
Conceptulised Use Zone
Code
(1)
(2)
(3)
(4)
1
Core Walled City
Core Walled City
CW
2
Walled City, City Area A ( JADA, BADA, RUDA), City area B (RUDA), Nucleus Vistar 1, Nucleus Vistar 2, Existing Nucleus Node, Residential area A (Alang), Bhavanath (Junagadh), Gamtal, Gauthan, Village and Gamtal
Gamtal
GM
3
Village Extension, Gamtal Extension, Natural Growth of Village, Buffer zone of gamtal
Gamtal Extension
GME
4
Residential Zone, Residential Zone -1 (other than GUDA), Residential Zone -2, 3, 4, 5 (GUDA), City Area B (JADA, BADA), City Area C (JADA, BADA, RUDA), City Area E (BADA), Residential Area B (Alang), N. A. Residential Zone (Kalavad), Mix Use
Residential 1
R1
5
Residential Zone R2 (other than GUDA), Resudential Zone III ( VUDA ) City Area E (BADA)
Residential 2
R2
6
Residential Zone R3 (other than GUDA & VUDA), Recreation Zone (GUDA)
Residential 3
R3
7
Residential Zone R1 GUDA
Residential 4
R4
8
Residential Renewal Zone (GUDA)
Residential 5
R5
9
Residential Affordable Housing Zone - 1, Residential Affordable Housing Zone
Residential Affordable Housing
RAH
10
Restricted Residential Zone, Restricted Area, Flood Prone Area / Zone, Restriction Zone RZ1, RZ2, RZ3, RZ4 of VUDA, Hazard Prone Area, Defense Zone,
Restricted Zone
RZ
Knowledge and Institutional Zone –1, 2 (KZ1, KZ2)
This zone is proposed to be developed with large scale educational and institutional facilities promoting the city as an educational hub supported by some residential and basic commercial facilities. Under this zone, uses such as small and large schools, colleges, research institutions, etc are permitted. This zone is also Intended for activities related to I. T. , technology and Bio -Tech Park, bio-tech industries, R & D centre and its allied activities along with other residential, commercial, entertainment and recreational activities. The zone is also Intended for activities related to Medical, Centre and its related activities excluding infectious and contagious diseases & mental hospitals. along with other residential, commercial, entertainment, tourism and recreational activities.
The residential and Commercial use shall also be permitted if the plot is proposed for development for other than knowledge use.
Public Purpose Zone -1 (PPZ1)
This Zone is Intended and demarcated for activities related to public purpose.
Public Purpose Zone -2 (PPZ2)
This Zone is Intended and demarcated for activities related to public purpose with specified uses permissible as mentioned.
Recreation zone (REZ)
This zone is primarily meant for green open spaces such as parks and gardens in the city with minimal development with limited FSI and height.
Parks, Gardens and Open Space – PGO (P)
This zone is also primarily meant for green open spaces such as parks and gardens in the city with minimal development with minimal development with limited FSI and height.
Agricultural-1, 3 (AG1, AG3)
Under this zone, the agricultural character of rural areas of Development Authority is demarcated. This zone has traditional agricultural activities practiced along with some allied activities.
Agricultural-2(AG2):
Under this zone, the agricultural character of rural areas is demarcated. This zone allows only traditional agricultural activities.
Agricultural-4 (AG4)
Under this zone, the agricultural character of rural areas of Development Authority is demarcated. This zone has traditional agricultural activities and only temporary use may be permitted.
Use Zone and Permissible Uses
The general planning and development regulations shall apply to any development in any area, as applicable. Development on any land shall be as per the zone for D1 to D7 (A) and D7(B) category and as per use conformity with the existing and proposed development as envisaged by D8 category Municipalities or as per purpose for which plot is allotted by GIDC to the owner . Within each zone of D1 to D7 (A) & D7(B) category the permissible use categories is shown in the use zone table No. 7.3.1, for D8 category area the permissible use categorises is shown in table No.7.3.2 and for D9 category permissible use is shown in table No.7.3.3 below.
Table 7.3.1USE ZONE AND PERMISSIBLE USES FOR D1 to D7 (A) & D7(B) category
Those permissible in CW/ GM, Educational-2, Health-1 & 2
4
Residential 1
R1
All uses except Industrial- 1,2,3 , 4 and Agriculture- !,2 , 3
5
Residential 2
R2
All uses except Industrial- 1,2,3 , 4 and Agriculture- !,2 , 3
6
Residential 3
R3
Dwelling-1, Religious, Educational-1 & 2, Assembly-4, Recreation, Public Utility, Public Institutional, Hospitality - 3, Health-1 & 2 - in case of Plots folling within 200 mtrs. of Trazict Corridor uses permisable R2.
7
Residential 4
R4
All uses except Industrial- 1,2,3 , 4 and Agriculture- !, 2 , 3 FSI,
Use Classification
The type of use of bulidings are grouped so as to have a classified use. The said use classification with common uses are as Table No. 7.4.1:
Table 7.4USE PERMITTED IN EACH CATEGORY
Sr. No.
Use Classification
Common Uses
(1)
(2)
(3)
1
Dwelling-1
Detached dwelling unit
2
Dwelling-2
Semi-detached dwelling unit, Row House, Tenement, Chawls, Farm House, Cottage Industry(cottage industries not involving the use of or installation of any kind and which do not create noise, vibration, fume dust etc. Home occupant and cottage industry shall not be permitted in tenement dwelling or flats, Playfield, Garden, Gymnasium), Part of Residential building may be permitted to use as office in case of professional requirement such as advocate, doctors, arch. Engg. C.A.
3
Dwelling-3
Apartment, Hostel, Dharamshala, Cottage Industry, Pre-school and Affordable Housing
4
Mercantile-1
Shop, Business, Restaurant, Shopping Centre, Light Home Workshop, LPG Cylinder Godown, Service Establishment , Clinic, Fitness Centre
5
Mercantile-2
Shopping Mall, Laboratory, Nursing Home Maternity Home, Kerosene Depot, Corporate Offices, Call centres, Training Centres.
6
Mercantile-3
Whole sale Market, Indoor Hospital, Diamond Industry, Wholesale Market and their ancillary uses, Activity Related to I.T.
No development shall be permitted in area designated for water body, pond and talav in Development Plan. Margins to be maintained from a designated water body shall be as prescribed in these regulations. Provided that such restrictions shall not apply in case of if, it is covered under special development regulations.
Any land designated under any legislation, for public purposes, the uses shall be permissible as per the requirements of concerned department.
For land/plot allotted to Appropriate Authority under T.P. Scheme for Public Purpose shall be utilized for uses under 'Public Purpose' irrespective of the applicable Zone or road widths.
If there are conditions where the prevailing uses are in non-conformity with the notification of the prevailing Development Plan, but In conformity with the previous Development Plan, such uses shall be permitted until the useful life of the building. Extensions with relevant approvals, repairing, structural strengthening and retrofitting shall be permitted within the building-unit. However, no further amalgamation shall be permitted.
For all Zones, except Transit Oriented Zone and Residential Affordable Housing Zone, if the line of a Zone divides a Building unit, the maximum permissible FSI available on either parts of such Building-unit shall be as per the respective Zones. Such a Building-unit may be developed separately as per the regulations of the Respective Zones or as a contiguous development utilizing the combined maximum permissible FSI in the part of the building unit which lies in the Zone with higher FSI.
Fueling Stations, Public-Institutional and Public Utility shall be permitted in any Zone.
Different uses permissible on a Building-unit shall be regulated according to the width of the road on which it abuts.
The specific type of building uses permissible on a Building-unit shall be on the basis of the respective zone and regulated by the road width it abuts on and the area of the Building-unit.
In case of D8 category area, road line is demarcated by the copmpetent municipalities or any area acquired for public purpose or for the work to be perform by the municipalities,in such land no other use than purpose for which land is aquired shall be permitted by the competent authority.
In D9 category area, other use than plot allotted by GIDC.
Permissible Uses with respect to road width.
The types of uses permissible in a Building-unit shall be regulated according to the width of the road on which it abuts as shown in table no 7.6.1, subject to other regulations.
Table 7.6.1Road Width and Permissible Uses
Sr.No.
Road Width
Building Uses Permissible
(1)
(2)
(3)
1
less than 9 mt
Dwelling-1&2, Religious (in RUDA Dwelling - 3 (LR), Mercentile 1, and Mercantile - 2)
Dwelling-1,2&3, Mercantile-1 ,Mercantile - 2, Educational-1, Assembly-1, Temporary Use, Public-Institutional, Religious (In RUDA Mercentile - 3, Hospitality -1, Institutional - 1, Pubilc Utility, Sports and leisure, Recreation, Industrial - 1 , Service Establishemt, Mercantile-2, Educational-2, Assembly-3,4)
4
18 mt and less than 24 mt
Dwelling-1,2&3, Mercantile - 2, Religious, Educational-1&2, Institutional, Hospitality, Assembly-1 & 4, Service Establishment, Temporary Use, Recreation, Public-Institutional, Mercantile-1 (Including Multiplex/Cinema theatre up to total combind seating capacity of 250 seats)
5
24 mt and less than 30 mt
Dwelling-1,2&3, Mercantile - 2, Religious, Educational-2, Institutional, Hospitality, Assembly-1, 4, Service Establishment, Temporary Use, Recreation, Public-Institutional, Mercantile-1(Including Multiplex /Cinema theatre up to total combind seating capacity of 300 seats)
Note: Industrial uses and Public Utility shall not be regulated on the basis of Road Width. The extent of commercial (mercantile-1 and Mercantile - 2) uses permissible in a Building-unit in all Zones of D1 to D7 (A) and D7(B) category except Commercial Zone shall be regulated according to the width of the road on which it abuts as under:
Floor Space Index (F.S.I) for different categories:
The maximum permissible FSI, the chargeable FSI on a Building-unit for different categories shall be regulated as per the tables 7.7.1 to 7.7.15, below in which use zones are narrated as per competent authority development plan and code is narrated as per table no.7.1.1. FSI for agriculture zone shall be regulated as per table 7.7.16 and other zones not mentioned in table below are specified in their respective chapters regulations.
*In case of Chargeable FSI Rates for affordable housing shall be applicable as per residential affordable housing chapter.
7.7.1. Use Zone and F.S.I. : Category D1 AUDA.
Sr. No.
Use Zone
Code
FSI Permissible
FSI Permissible
FSI Permissible
Sr. No.
Use Zone
Code
Base (Free)
Chargable (40% of the jantri rate)
Maximum
(1)
(2)
(3)
(4)
(5)
(6)
1
Core Walled City
CW
2.0
Nil
2.0
2
Gamtal
GM
2.0
Nil
2.0
3
Gamtal Extension
GME
1.2
Nil
1.2
4
Residential Zone I
R1
1.8
0.9
2.7
5
Residential Zone II
R2
1.2
0.6
1.8
6
Residential Zone III
R3
0.3
Nil
0.3
7
Commercial Zone
C2
1.8
0.9
2.7
8
Logistics Zone
LZ
1
0.5
1.5
9
Industrial Zone - General
IZ1
1.0
0.8 for commercial use
1.8
10
SL4 Relating to CC4
Extended supervision
Checking by different persons in accordance with the procedure prescribed in these regulation no 4, 5 and 6 of these regulations
Certification by the architect and the structural engineer appointed by the owner for carrying out the construction as per drawings and specifications and for which the plans are approved. The POR shall for all levels submit the reports and submission of completion plan. In spection to be carried out by the Inspector of the competent authority at the at all levels as
Plinth and occupancy inspection and certification by structure designer.
required in regulation no 4, 5 and 6. The building use permission shall issue based on the inspection reports and the documents supplied by the owner and PORThe competent authority shall ask the owner to seek insurance coverage for the building for minimum 15 years and then only issue the building use permission.
SL5 Relating to CC5
Checking by different persons in accordance with the procedure prescribed in these regulation no 4, 5 and 6 of these regulations.Third party inspection as per regulation no 3.8-Checking performed by authorized person different from that which prepared the designPlinth and occupancy inspection and certification by POR as
Certification by the architect and the structural engineer appointed by the owner for carrying out the construction as per drawings and specifications and for which the plans are approved. The POR shall for all levels submit the reports which shall be checked by the Third Party as specified in regulation no 4.8 and along with the report of the third party submit the completion plan to the competent authority.Inspection to be carried out by the Inspector of the competent authority at the at all levels as required in regulation no 4, 5 and 6. But the competent authority shall take into consideration the report of the Third party under regulation 3.8 and only than after the approval by the committee issue building use permission.The competent authority shall ask the owner to seek insurance coverage for the building for minimum 15 years and for any other matter the committee recommends and then only
specified in regulation no 4,5,6 and third party checks as specified in regulation no 3.8
issue the building use permission.
It shall be the responsibility of the Clerk of Works on Record and the Owner for the building to keep all the documents and drawings listed in Schedule 12 on the site, at all times after issuing Notice of Commencement of Construction to the Competent Authority
up to the issue or grant of Building Use Permission. These documents should be made available to any authorised officer of the Competent Authority inspecting the site for the purpose of enforcing these Regulations. Failure to comply with this Regulation may result in revocation of the Development Permission.
Reducing Inconvenience and Ensuring Safety during Construction
Stacking, Storing and Disposal of Building Material
It shall be the responsibility of the Clerk of Works on Record for the Building and the Owner or Developer to ensure that no building material, building equipment or building debris is stacked, stored, left or disposed off outside the Building‐unit for which Development Permission has been granted, on any public street or space.
It shall be the responsibility of the Architect on Record or Engineer on Record and Clerk of Works on Record to convince the Competent Authority of adequacy of additional barricading and safety measures that shall be taken to ensure public safety and reduce public inconvenience.
No Damage or Undue Inconvenience during Construction
It shall be the responsibility of the Clerk of Works on Record and the Owner or Developer to undertake all necessary measures to ensure that no damage is caused to adjoining properties due to construction. It shall also be the responsibility of the Clerk of Works on Record and the Owner or Developer to undertake all necessary measures to ensure that no undue inconvenience is caused to the public, due to factors such as noise, dust, smell or vibrations. It shall also be the responsibility of the Clerk of Works on Record and the Owner or Developer to undertake all necessary measures to ensure that traffic is not disrupted due to construction.
Liability for Ensuring Safety during Construction
The Owner or Developer and the Clerk of Works on Record shall be responsible for ensuring that all necessary measures for safety for all are taken on site. Grant of Development Permission, grant of Building Use Permission for part of a building, or issuing of any instructions to ensure public safety or reduce inconvenience, does not render the Competent Authority liable for any injury, damage or loss whatsoever that may be caused to any one in or around the area during the Period of Construction.
Grant / Refusal of Building Use Permission
The final inspection of the work and communication of the decision about the grant of the Building Use Permission shall be made by the concerned Competent Authority within 21days from the date of receipt of Notice of Completion of Construction and Compliance Certification. If the Competent Authority is satisfied that the construction of the building complies with the sanctioned design and specifications and other requirements as per Schedule 22, it shall grant a Building Use Permission in the format stipulated in Form No.
Reasons for grant/refusal of Building Use Permission shall be communicated to the applicant.
In cases where the building construction is as per regulations but the Owner of the adjoining Building or Chairman/Secretary of the Cooperative Society are not giving consent at the time of Building Use permission, the Competent Authority may issue permission after giving opportunity of hearing to the Owner of the adjoining Building or Chairman/Secretary of the Cooperative Society considering the merits and demerits of individual case.
Penalties for not complying with Regulation No. 6.1 are stipulated in Schedule 16.
Obtaining Permission to Change Sanctioned Use of Building
Application for obtaining Permission to Change Sanctioned Use of Building shall be made by the Owner, for which a change in use is proposed and the Persons on Record, in the format prescribed in Form No. 13.
Drawings, Specifications and Documents
Drawings, specifications and documents to be submitted along with Application for Permission to Change Sanctioned Use of Building are listed in Schedule 14. The format for submission of drawings, specifications and documents is specified in Schedule 5 and Schedule 22.
Three year after registration as AOR for respective task.
5.
CC5
SL5 Relating to CC5
Extended supervision
Four year after registration as AOR for respective task.
Section C:
Planning Regulations
General Planning and Development Regulations
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
As mentioned
As mentioned
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
Conceptulised Use Zone
Code
(1)
(2)
(3)
(4)
11
Local Commercial Zone, Commercial Zone excluding of UDA.
Commercial 1
C1
12
Commercial Zone of UDA, Commercial Zone-I, Commercial Zone - II, Commercial Zone- III (other than GUDA), Commercial Zone IV (other than GUDA)
Commercial 2
C2
13
Commercial Zone III & IV of GUDA
Commercial - 3
C3
14
General Commercial Zone (GCZ)
Commercial - 4
C4
15
Central Business District
Commercial - 5
C5
16
Industrial Zone General, Industrial Zone, Non Obnoxious & Non Hazardous Industrial Zone, Light Industrial Zone, Industrial-A, GIDC.
Industrial Zone- 1
IZ1
17
Industrial Buffer Zone
Industrial Zone - 2
IZ2
18
GIDC Estate 1
Industrial Zone - 3
IZ3
19
GIDC Estate 2
Industrial Zone - 4
IZ4
20
Heavy Industrial Zone, Industrial Zone- Special, Obnoxious & Hazardous Industrial Zone
Industrial Zone - 5
IZ5
21
Industrial-B
Industrial Zone - 6
IZ6
22
Mix Industrial Use
Industrial Zone - 7
IZ7
23
Education Zone, Educational Purpose, Education, Religious & other Facilities, Service & Institutional Purpose, Institutional, Knowledge Precinct Institutional Zone II, Institutional Zone III, Institutional Zone IV (other than GUDA) Special Node I (I.T., Finance Services and Related Activities), Special Node 1 Special Node 2 (Technology and Bio tech Park), Special Node 2, Health Node,
Knowledge and Institutional Zone - 1
KZ1
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
As mentioned
As mentioned
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
Conceptulised Use Zone
Code
(1)
(2)
(3)
(4)
Knowledge Township (VUDA)
24
Institutional Zone -IV (GUDA)
Knowledge and Institutional Zone - 2
KZ2
25
Essential Public Purpose, Public Service, Necessary Public Service, Public Purpose (other than RUDA), Public & Semi-Public Purpose, Public Utility, Public Utility & Services, Neighbourhood Centre & Town Centre, Public Purpose Building, Existing Pubic Purpose, Public / Semi-public, Parking, Public Use
Public Purpose Zone - 1
PPZ1
26
Public Purpose (RUDA)
Public Purpose Zone - 2
PPZ2
27
Recreational, Recreational Zone 1, Recreational Zone 2, Green Institutional Zone-GI 1
Recreation Zone
REZ
28
Parks, Gardens and Open Space
PGO
P
29
Agriculture Zone, Agriculture, General Agriculture Zone
Logistics Zone, Logistic Park, Transport Node, Transport & Communication, Public Purpose (ST).
Logistics Zone
LZ
34
Special Plan Development Zone of GIFT
Special Plan Development Zone - 1
SPD1
35
Special Plan Development Zone of Sabarmati Riverfront Development
Special Plan Development Zone - 2
SPD2
36
SPD- Science Park
Special Plan Development Zone - 3
SPD3
37
SPD-Gandhi Ashram Special Development Area
Special Plan Development Zone - 4
SPD4
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
As mentioned
As mentioned
Sr. No
Use Zone / Use as per Development Plan of Competent Authority
Conceptulised Use Zone
Code
(1)
(2)
(3)
(4)
38
Transport Oriented Zone, Smart City Node/ Transport Node, Highdensity zone available in both the sides of 200 mtr. from the edge of the road.
Smart City & TOZ
SPD5
39
Closed Textile Mill Zone
CZ
CZ
40
Forest Land
Forest Zone
FZ
41
Fishing Beach Zone
Special Zone 1
SZ1
42
Buffer Zone
Special Zone 2
SZ2
43
Hilly Area
Special Zone 3
SZ3
44
Heritage Zone
Special Zone 4
SZ4
45
Residential Tourist Accommodation Zone
Special Zone 5
SZ5
46
Special Tourism Project Area
Special Zone 6
SZ6
47
Vacant Land
Vacant Land
VL
Concept of zones
Core Walled City (CW)
This zone has been exclusively identified for promoting conservation of heritage structures and the urban fabric within the walled city.
Gamtal (GM)
This zone constitutes of gamtals having a traditional, organic character and compact development. This zone is identified to conserve this traditional character.
Gamtal Extension (GME)
This zone acts as a buffer zone for gamtals to allow their natural growth.
Residential Zone – 1, 2, 3, 4 (R1, R2, R3, R4)
This is the main zone of the Development area covering normally the largest area and includes residential, commercial and mixed land uses as per permissible uses and intended for a low to moderate to high density.
Residential Renewal zone (R5)
This is an overlay zone consisting of existing dilapidated government houses of sectors within the Gandhinagar Municipal Corporation area. It overlies the base Residential Zone 3.
Residential‐ Affordable Housing Zone and Use (RAH)
This zone is an overlay Zone that permits predominantly residential development for providing Affordable Housing along with ancillary commercial uses Affordable Housing as a use is permitted in all zones except all types of industrial Zones, Restricted Zone, Residential 3 and agriculture Zone. It shall also be permitted as a use in all other categories.
Restricted Zone (RZ)
This zone is intended for a limited residential use and as restricted subject to relevant regulations.
This zone is intended for the development of all types of light industries that include small scale factories, transport terminals, etc. except hazardous industries. Other non‐hazardous uses like residential buildings for industrial workers, commercial and institutional buildings supporting the existing industries are also permitted subject to relevant regulations.
Industrial Zone – 5, 6 (IZ5, IZ6)
This zone is intended for the development of obnoxious and high hazard industries including storage of inflammable goods and petrol, LPG, CNG and eco‐friendly fuel Fuelling stations. The residential dwellings in this zone are only for industrial workers having maximum built up area up to 50 sq.mts per dwelling unit up to a maximum of 20% of the total utilised FSI of the plot area or subject to the relevant regulations. Dumping of solid industrial wastes is permitted subject to N.O.C. and conditions laid down by Pollution Control Board.
Logistics Zone (L)
This is the main logistics zone in the city. It includes the areas of the city with land use predominantly for freight transportation, storage and distribution.
This zone permits residential dwelling units only for workers and other public utility service staff working within the logistics premises, having maximum built up area per unit of 66 sq.mts, using a maximum of 20% of total utilised FSI of the plot area.
Special Planned Area Development Zone-1 of GIFT(SPD‐1)
This zone can be classified as a special area that is planned and development with in the GUDA area. GIFT city aspires to cater India’s largest financial services by integrated township
and multi specially Special Economic Zone(SEZ). This zone is 8Km away from the Gandhinagar city along Sabarmati River having 423 Ha. of Land.
Special Planned Development Zone-2 Sabarmati Riverfront (SPD‐2)
This zone can be classified as a special area that is planned and developed within the city that contains various uses along with adequate provision of open spaces, parks and gardens. This zone is located in 11.5kms of stretch along River Sabarmati covering about 200 Ha of land.
Special Planned Development Zone-3 Science Park (SPD‐3)
This zone can be classified as a special area that is planned and developed besides Science City in the area beyond S.G. highway to promote science and technology related educational and institutional facilities.
Special Planned Development Zone-4 Gandhi Ashram (SPD‐4)
This zone can be classified as zoning special area that is planned and developed near Gandhi Ashram and would promote the cultural and heritage value in the city.
Smart City & TOZ (SPD-5)
TOZ is an overlay zone which provides opportunity for mixed use and high density development along the Bus Rapid Transit (BRT) corridor and Metro Rail Transit (MRT) corridor except in Crore Walled City, Industrial Zone – General, Industrial Zone – Special, SPD-2 Science Park and on GIDC Estates. High density development permissible in area falling within 200 mtrs. on both sides on transit corridor in case of AUDA and RUDA and in case of smart city node.
Closed Textile Mill Zone (CZ)
This zone is primarily meant for redevelopment of closed textile mill lands
Forest Zone (FZ)
This zone is primarily Intended to preserve the lands designated for forest. Uses may be permitted with permission of the competent Authority.
Special Zone-1(SZ1)
This zone is primarily Intended for activities related to Fishing and allied temporary use, which is made from wooden and cloth material subject to relevant regulations.
Special Zone- 2(SZ2)
This zone is primarily Intended as a Buffer of Industrial and Highly Dense Residential use. This zone includes permissible uses for Industrial-1, Religious & Rituals, Parks, Service Establishment, Transport, Temporary Use, Public Amenities and Public-Institutional.
Special Zone-3(SZ3)
This zone is primarily Intended to preserve the lands designated for Hilly area. In this zone Mining and quarrying activities are permissible with subject to NOC from Forest an Environment Department. At the foot of hills residencies and recreation uses shall be permitted with consent of Forest an Environment Department.
Special Zone-4(SZ4)
This zone is primarily Intended to preserve and maintain the Heritage Core Area means the area consisting of critical mass of building having strangest architectural features of the original dwelling units and heritage streetscape. Heritage Building shall be defined by Competent Authority.
Special Zone-5 (SZ5)
This zone is primarily Intended to Residential Tourist Accommodation use.
Special Zone-6 (SZ6)
This zone is primarily Intended to promote tourism and allied activities.
Vacant Land(VL)
No development activities shall be permitted in area designated as vacant land in the development plan.
8
Residential 5
R5
Dwelling - 3, Public Utility, Public Institutional
9
Residential Affordable Housing
RAH
Dwelling-3, Mercantile-1, Mercantile - 2, Assembly-1, Service Establishment- up to max. 10% of total utilised FSI], Public Utility, Public Institutional, Health-1 & 2 Educational-1&2, Institutional &Temporary Use
10
Restricted Zone
RZ
Those permissible in R1 subject to the condition narrated in the Regulation of Restricted Zone , Health-1 & 2
11
Commercial 1
C1
Those permissible in CW, and Mercantile 2&3, Hospitality 2, Assembly 2,3&4. Service Establishment, Storage. Educational-2, Health-1, 2 & 3
12
Commercial 2
C2
Dwelling - 3, Mercantile - 1,2&3, Mercantile - 2, Religious, Institutional, Hospitality - 1,2&3, Assembly- 1,2,3&4, Park, Sports and Leisure, Storage, Temporary Use, Public Utility and Public Institutional, Health-1, 2 & 3
13
Commercial -3
C3
Dwelling - 3, Mercantile - 1,2&3, Mercantile - 2, Education - 2, Religious, Institutional, Hospitality - 1,2&3, Assembly-2,3&4, Park, Service Establishment, Storage, Temporary Use, Public Utility and Public Institutional, Health-1 & 2
Those permissible in C1, Industrial- 1&2, Dwelling-2&3- up to max. of 20% of utilized FSI with units of built-up area of 66sq.mt, Mercantile 1, Health-1 & 2
Sr. No.
Conceptulized Use Zone
Code
Permissible Uses
(1)
(2)
(3)
(4)
18
Industrial Zone - 2
IZ2
Those permissible in IG, Industrial- 3&4.
19
Industrial Zone - 3
IZ3
Mercantile 1, Mercantile - 2, Service Establishment Industrial 1& 3
20
Industrial Zone - 4
IZ4
Those permissible in GIDC1, Extra Storage, Industrial- 2 &3
21
Industrial Zone- 5 Industrial Zone- 6
IZ5IZ6
Religious, Service Establishment, Industrial 3&4, storage, Transportation, Public Utility, Public Institution, (Dwelling-2&3- up to max. of 20% of utilized FSI with units of built-up area of 50 sq.mt)
22
Knowledge and Institutional Zone - 1
KZ1
Education- 1 & 2, Assembly-2, Religious, Institutional, Sports & leisure, Recreation, Temporary use, Public Utility , Public Institution, Dwelling1, 2, 3, Mercantile-1, Mercantile - 2, Hospitality.
23
Knowledge and Institutional Zone - 2
KZ2
Dwelling1,2,3, Mercantile-1, Mercantile - 2, Religious, Education -1 & 2, Institutional, Assembly - 2, Sports & Leisure, Recreation, Temporary Use, Public Utility, Public Institutional. Hospitality.
24
Public Purpose Zone - 1
PPZ1
Public Purpose Public Utility and Public Institutional.
25
Public Purpose Zone - 2
PPZ2
Dwelling-1, Agriculture-1&2,Sports and Leisure, Recreation, Assembly-4, Religious, Education-1 & 2, Institutional, Agricultre-3, Storage, Public Utility and Public Institutional.
26
Recreation Zone
REZ
Dwelling 1, Temporary use, Religious & Rituals, Club, Aquarium, Natural Reserve and Sentury Race Track, Shooting Range, Zoo, Nursery, Stadium, Botanical Garden. Recreation, Sports & Leisure, Public Utility, Public Institutional.
27
Recreation, Gardensand Open Space
P
Recreation, Sports & Leisure, Religious, Public Utility, Public Institutional.
28
Agriculture -1
AG1
Dweling 1, Hospitality, Religious, Studio, Educational-1&2, Assembly- 4, Institutional, lndustrial-3, Transport, Storage, Agriculture-1,2 & 3, Farm Houses, Sports & Leisure, Recreation, Public Utility, Public Institutional, Temporary Use
29
Agriculture - 2
AG2
Education 1&2, Agriculture- 1&3, Farm Houses. Public Utility, Public Institutional(Provided that,Service apartment,bread and breakfast,guest house, hotel, motel, lodging and boarding shall not be permitted)
30
Agriculture - 3
AG3
Zoo and Botanical Garden and Any activity under taken by Government for infrastructure
31
Agriculture - 4
AG4
Agriculture - 1 & Temporary Use (Provided that, Service apartment, bread and breakfast, guest house, hotel, motel, lodging and boarding shall not be permitted)
32
Logistics Zone
LZ
Dwelling-2&3- up to max. of 20% of utilised FSI with units of built-up area of 66sq.mts for industrial workers]; Mercantile-1, Mercantile-2, Religious, Institutional, Hospitality, Assembly-1, Service Establishment, Industrial-1&2, Storage, Transport, Public Utility, Public Institutional, Mercantile-2 & 3 and Assembly-3. Health-1
Sr. No.
Conceptulized Use Zone
Code
Permissible Uses
(1)
(2)
(3)
(4)
33
Special Plan Development Zone - 1
SPD1
As per GIFT Master Plan.
34
Special Plan Development Zone - 2
SPD2
As per SRFDCL Master Plan.
35
Special Plan Development Zone - 3
SPD3
Those permissible in R1.
36
Special Plan Development Zone - 4
SPD4
Those permissible in R1.
37
Smart City & TOZ
SPD5
Those permissible in R1,C1,REZ.
38
Closed Textile Mills
CZ
Those permissible in KZ1, RAH.
39
Forest Zone
FZ
As per the permission of competent authority and subject to Defense and Central Govt. Regulation.
40
Special Zone 1
SZ1
As per Environment Protection and CRZ criteria only Temporary use from wooden and cloth made materials for fishing purpose activity.
41
Special Zone 2
SZ2
As per IZ1
42
Special Zone 3
SZ3
AS per Environment Regulation
43
Special Zone 4
SZ4
Subject to Heritage Regulations
44
Special Zone 5
SZ5
Dwelling 3, Mercantile 2 & 3, Recreation, Tourism Sponsored
45
Special Zone 6
SZ6
Dwelling 3, Mercantile 2 & 3, Recreation, Tourism Sponsored
46
Vacant Land
VL
No development permission
Table 7.3.2PERMISSIBLE USES FOR D8 CATEGORY DEVELOPMENT AREA.
Sr.No.
Development Area within Revnue Limit
Code
Permissible Uses.
(1)
(2)
(3)
(4)
1
Gamtal Area.
GMD8
Dwelling-1,2&3, Mercantile- 1, Mercantile - 2, Religious, Educational-I, Institutional, Hospitality,Assembly-1, Sports & Leisure, Recreation, Temporary Use, Public Utility, Public Institutional
2
Outside the Gamtal Area but within and upto 500m. Periphery of Gamtal boundry.
RMD8
Those permissible in GMD8, Educational-2, Mercantile- 2, Hospitality- 2, Assembly-2,3 & 4, Service Establishment.
3
Outside the Gamtal Area but greater than 500m. along the Periphery of Gamtal boundry
RMD9
Those permissible in CW, and Mercantile 2 &3,Hospitality 2,Assembly 2,3&4. Service Establishment, Storage., Industrial- 1, 2, 3& 4.
TABLE 7.3.3PERMISSIBLE USES FOR D9 CATEGORY DEVELOPMENT AREA
Sr.No.
Development Area within Revnue Limit
Code
Permissible Uses.
(1)
(2)
(3)
(4)
1
GIDC
GIDC
As specified by GIDC
13
Assembly-4
Party Plot, Garden Restaurants
14
Institutional
Research Centres, Hospital. Dwelling-1,2 &3, Retail Shop and Restaurants as a part of Educational Institute up to (20% of Utilised FSI)
15
Religious
Temples, Church, Mosque, Gurudwara, Synagogue, Upashraya, Sant Niwas or any Religious Structure.
16
Hospitality
Bed and Breakfast, Guest House, Lodging and Boarding, Hotel, Motel, Serviced Apartment
20
Service Establishment
Auto Repair, Workshop, Wood Workshop, Fabrication, Workshop, Public-Garage
21
Industrial-1
All type of Light, Service Industries, Small Factories, Warehouses, Newspaper Printing Press, Concrete Batching Plant, stone cutting and polishing; Poultry Farm, Dairy, Assembly Plant, Shipping Recycling Unit,Scrape Processing/Cutting Unit,Scrap Shorting Yard
22
Industrial-2
All Industries except Obnoxious and Hazardous Industries, Junk Yard, Textile Units, Ice Factory, Quarrying of Stone, Quarrying of Gravel , Quarrying of Clay, Dumping of Solid Waste, Steel re-rolling, Metal Manufacturing/sorting etc.,Oil Processing/ Storage.
Fuel Storage, Storage of inflammable materials, Thermal Power Plant, Power Plant, Gas Plant, Storage of Hazardous Materials, Obnoxious and Hazardous Industries, Chemical Industries, Obnoxious and Hazardous Uses, Dying House
Truck Terminal, Bus Terminal (by private enterprise), Transport Terminal for Goods and Passengers
27
Agriculture-1
Horticulture, Repair and Sale of agricultural equipment, Saw Mill, Brick Kiln, Dairy Development, Fisheries, Animal Rearing and Breeding, Natural Resource and Sanctuary, Tannery, Concrete Batching Plant, Cemetery, Burial Ground, Regional Park, Way-side Shop, Agricultural Vocational Training Centre, Panjarapole, Roofing Tiles and Cement Pipes,Studio
(1)
(2)
(3)
28
Agriculture-2
Agricultural Vocational Training, Mining and Quarrying, Dumping of Solid Waste, Shooting Range, Drive-in Cinema, Golf Course, Ship Building or Ship Breaking, Fishing ,aqua culture Processing of fish and industry based on it port, harbor ferry hovercraft service marine transport ,Telephone microwave or other means of communication facilities, salt pans and non-polluting salt processing activity Any Type activity permissible as per the provision of the Environment Protection Act.1968 and Environment (Projection Rules-1968)
29
Agriculture-3
Poultry Farm, Agro-based Godowns
30
Temporary Use
Fair, Circus, Exhibition, Mela, Pandal, Fisheries related activities
31
Public Utility
Sub-station, Bus Station and Terminals, Fuelling Station and Storage with and without Service Station, Parking, Multi-level Parking; Infrastructure for Water Supply, Purification Plant, Pumping Station, Electricity Sub-station; Drainage, Sanitation, Domestic Garbage Disposal Collection, Solid Waste Transfer Station; Pumping Station, Electricity, Purification Plant, Fire Stations, or any development activity carried out by appropriate authority for public purpose
32
Public-Institutional
Any offices for appropriate authority, government and semi government, Public assembly, Public facilities and amenities like Health Public facilities and amenities like Transport and Communication, Public facilities and amenities like public security, Public facilities and amenities like social welfare Recreation of any Type, Post Office, Police -Chawki, ward office
33
Health-1
PHC, Clinic, Dispensary
34
Health-2
Indoor Hospital up to 20 Bed, Surgical Hospital, Nursing Home
35
Health-3
Civil Hospital, Medical College and Research Centre, Hospital of more than 20 Bed,
36
Health-4
Hospital for infectious diseases, Mental Hospital
37
Tourism Services
Tourism Sponsored activity
38
Recreation Use
Natural Reserve and Sanctuary, race track, Shooting Range, Zoo, Gardens, Recreation, Nursery, Botanical Garden, Green House, Play Fields, Forest
39
Sports and Leisure
Sports Complex, Swimming Pool, Playfield, Camping Ground, Facility for water sports, Theme/ Amusement Park, Aquarium, Zoo ,Botanical Garden, Exhibition and Mela, motion picture hall
Regulation identified for Local Area Plan (LAP), when prepared for an area, shall prevail over these regulations.
For Eco-Sentitive Zone/Area shall also confirm the notification published by the “Ministry of Environment and Forest”, Notification no. S.O..1260 (E), Dated, 31st May 2012” and amended from time to time.
Table 7-6.2Road Width and Commercial Use Permissible
Sr.No.
Road Width
Floors on which Commercial Use Is Permissible
(1)
(2)
(3)
1
9 mt and less than 12 mt
Ground Floor Only
2
12 mt and less than 18 mt
Ground and First Floor Only. All floors, if hollow plinth is kept open for parking in case of RUDA
3
18 mt and Above
All Floors
All permissible non-residential uses in residential zones of whatever category may be permitted on the ground floor or any other floor in a residential dwelling if provided with separate means of access/staircase.
A part of residential building may be permitted for use as office in case of professional requirements such as for advocates, doctors, architects, engineers, chartered accountants etc. This is subject to a maximum 50 sq.mt and parking for this purpose shall be provided as per commercial basis.
Industrial Zone - Special
IZ5
1.0
Nil
1.0
Sr. No.
Use Zone
Code
FSI Permissible
FSI Permissible
FSI Permissible
Sr. No.
Use Zone
Code
Base (Free)
Chargable (40% of the jantri rate)
Maximum
(1)
(2)
(3)
(4)
(5)
(6)
12
Knowledge and Institutional Zone
KZ1
1.8
Nil
1.8
13
Residential Affordable Housing Zone
RAH
As per base zone/ 1.8
0.9 (for RAH-1 only)
2.7
13
Affordable Housing Zone-1
RAH
1.8(for RAH1 use only)
0.9 (for RAH-1 only)
2.7
14
Recreation, Gardens and open space
P
0.15
Nil
0.15
14
Central Business District
C5
1.8
3.6
5.4
15
General Agricultural Zone
AG1
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
16
Prime Agricultural Zone
AG2
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
17
Special plan development (SPD) zone - SRFDCL
SPD2
As per SRFDCL master plan.
As per SRFDCL master plan.
As per SRFDCL master plan.
18
SPD - Science Park
SPD3
1.8
0.9
2.7
19
SPD - Gandhi Ashram Special Development Area.
SPD4
As applicable
Nil
As applicable
20
Ristricted Agriculture Zone
AG3
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
22
Transit Oriented Zone
TOZ
As Per Base Zone
As applicable
4.0
Note : Ristricted Agriculture Zone - A3 means the lands bearing survey number as mentioned in the Gazzate of India Extraordinary No. 2439 part II section 3 -Sub -section (ii) publishd on dated 18-10-2013 by Ministry of Environment and Forest (MoEF) Government of India.
Note : Ristricted Agriculture Zone - A3 means the lands bearing survey number as mentioned in the Gazzate of India Extraordinary No. 2439 part II section 3 -Sub -section (ii) publishd on dated 18-10-2013 by Ministry of Environment and Forest (MoEF) Government of India.
Note : Ristricted Agriculture Zone - A3 means the lands bearing survey number as mentioned in the Gazzate of India Extraordinary No. 2439 part II section 3 -Sub -section (ii) publishd on dated 18-10-2013 by Ministry of Environment and Forest (MoEF) Government of India.
Note : Ristricted Agriculture Zone - A3 means the lands bearing survey number as mentioned in the Gazzate of India Extraordinary No. 2439 part II section 3 -Sub -section (ii) publishd on dated 18-10-2013 by Ministry of Environment and Forest (MoEF) Government of India.
Note : Ristricted Agriculture Zone - A3 means the lands bearing survey number as mentioned in the Gazzate of India Extraordinary No. 2439 part II section 3 -Sub -section (ii) publishd on dated 18-10-2013 by Ministry of Environment and Forest (MoEF) Government of India.
Note : Ristricted Agriculture Zone - A3 means the lands bearing survey number as mentioned in the Gazzate of India Extraordinary No. 2439 part II section 3 -Sub -section (ii) publishd on dated 18-10-2013 by Ministry of Environment and Forest (MoEF) Government of India.
7.7.2. Use Zone and F.S.I. : Category D1 GUDA(for GMC Area)
Sr. No.
Use Zone
Code
FSI-Maximum Permissible
Plot Size (Sq. Mt.)
Maximum Permissible Building Height(Mt.)
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
1
Residential Zone I
R4
Not Aplicable
50 - 135(w/o HP)
10.5
1
Residential Zone I
R4
Not Aplicable
> 135 -540(w/o HP)
13.0
1
Residential Zone I
R4
Not Aplicable
> 135 -540(With HP)
16.0
2
Residential Zone II
R1
Not Aplicable
All Plot Size
13 mt or G+2 with HP
3
Residential Zone III
R3
Not Aplicable
<330(w/o HP)
13.0
3
Residential Zone III
R3
Not Aplicable
≥330(w/o HP)
13.0
3
Residential Zone III
R3
Not Aplicable
≥330(WithHP)
16.0
4
Residential Renewal Zone - 1
R5
2.5
25.0
5
Commercial Zone I(Regulation 10.4)
C2
Not Aplicable
≥1000
25.0
For Sector: 6, 11, 12, 16 and23.
5
Commercial Zone I(Regulation 10.4)
C2
Not Aplicable
<1000
15.0
For Sector: 6, 11, 12, 16 and23.
5
Commercial Zone I(Regulation 10.4)
C2
Not Aplicable
10.0
For Sector 5, 21, 24.
5
Commercial Zone I(Regulation 10.4)
C2
Not Aplicable
≥1000
35.0
Sector: 11 for plots auctioned by Government for
Sr. No.
Use Zone
Code
FSI-Maximum Permissible
Plot Size (Sq. Mt.)
Maximum Permissible Building Height(Mt.)
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
commercial use
6
Green Institutional Zone
REZ
Not Applicable
Maximu ground coverage shall be 40 %
7
Institutional Zone II
KZ1
Not Applicable
All Plot Size
15.0
8
Institutional Zone III
KZ1
1.5
All Plot Size
30.0
9
GIDC Estate
IZ3
2.0
All Plot Size
25.0
10
GIDC Estate
IZ4
1.0
All Plot Size
25.0
12
Recreational Zone II
R3
0.3
All Plot Size
8.0
Table 7.7.3Use Zone and F.S.I. : Category D1 GUDA.
Sr. No.
Use Zone
Code
FSI-Permissible (Base)
FSI-Charge-able
FSI-Maximum Permissible
(1)
(2)
(3)
(4)
(5)
(6)
1
Residential Zone IV
R1
1.8
0.45
2.25
2
Residential Zone V
R1
1.5
0.75
2.25
4
Commercial Zone II
C1
1.8
2.2
4.0
4A
Commercial Zone III
C3
1.25
2.75
4.0
5
Institutional Zone IV
KZ2
1.2
0.30
1.5
6
Gamtal
GM
2.0
Nil
2.0
7
Natural Growth of Gamtal
GME
1.25
Nil
1.25
8
Residential Affordable Housing Zone
RAH
As per Base Zone
Nil
As per Base Zone
8
Residential Affordable Housing Zone
RAH
1.8(for RAH use
0.9 (For RAH only)
2.7
Sr. No.
Use Zone
Code
FSI-Permissible (Base)
FSI-Charge-able
FSI-Maximum Permissible
(1)
(2)
(3)
(4)
(5)
(6)
only)
Nil
1.8
9
Agricultural Zone
AG2
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
10
Hi Tech Agriculture Use
AG2
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
11
Defence Zone
RZ
-
-
-
12
Special Planned Development (SPD) Zone- Gujarat International Finance Tech City
SPD1
As applicable
Nil
As Applicable
13
Recreational Zone I
R3
0.3
Nil
0.3
Table 7.7.4Use Zone and F.S.I. : Category D1 SUDA.
Sr.No.
Zone
Code
Permissible FSI
Permissible FSI
Permissible FSI
Sr.No.
Zone
Code
Base (Free)
Chargeable (at 40% of Jantri rate)
Maximum
(1)
(2)
(3)
(4)
(5)
(6)
1
Gamtal
GM
2.0
Nil
2.0
2
Natural Growth of Village
GME
1.2
Nil
1.2
3
Residential/Commercial
R1/C2
1.8
0.9
2.7
3
Residential/Commercial
R1/C2
1.8
1.8
3.6**(200mt. on both the sides of 36.0mt.wideroad)
3
Residential/Commercial
R1/C2
1.8
2.2
4.0**( for area falling within 200mt. on both the sides of 45.0mt.wideroad)
4
Industrial
IZ1 & IZ5
1.0
0.8 for commercial use.
1.8
5
Agriculture
AG1
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
6
Recreational zone
REZ
0.25
Nil
0.25
7
Educational Purpose
KZ
1.2
Nil
1.2
8
Residential Zone*
SPD5
0.6
3.4
4.0
Note: *500 mt on both the sides of 90 mt by ring road. **If the line of 200 mt. on both sides of road 36 mt or 45 mt, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: *500 mt on both the sides of 90 mt by ring road. **If the line of 200 mt. on both sides of road 36 mt or 45 mt, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: *500 mt on both the sides of 90 mt by ring road. **If the line of 200 mt. on both sides of road 36 mt or 45 mt, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: *500 mt on both the sides of 90 mt by ring road. **If the line of 200 mt. on both sides of road 36 mt or 45 mt, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: *500 mt on both the sides of 90 mt by ring road. **If the line of 200 mt. on both sides of road 36 mt or 45 mt, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: *500 mt on both the sides of 90 mt by ring road. **If the line of 200 mt. on both sides of road 36 mt or 45 mt, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Table 7.7.5Use Zone and F.S.I. : Category D1 VUDA
Sr. No
Use Zone
Code
FSI Permissible
FSI Permissible
FSI Permissible
Sr. No
Use Zone
Code
Base (Free)
Chargeable (at 40% of Jantri rate)
Maximum
(1)
(2)
(3)
(4)
(5)
(6)
1
Existing Nucleus / Gamtal
GM
2.0
NIL
2.0
2
Residential Zone 1, Commercial Zone 1
R1/C2
1.8
0.9
2.7
2
Residential Zone 1, Commercial Zone 1
R1/C2
1.8
1.8
3.6**(200mt. on both the sides of 36.0mt.wide road)
2
Residential Zone 2
R2
1.2
1.3
2.5
2
Residential Zone 2
R2
1.2
2.4
3.6**(200mt. on both the sides of 36.0mt.wide road)
3
Residential Zone 3
R3
0.75
1.75
2.5
4
Restricted Residential Zone
RZ
1.8
0.3
2.1
5
Natural growth of village
GME
1.6
NIL
1.6
6
Industrial Zone
IZ1 & IZ5
1.0
NIL
1.0
7
Special Node1, Special Node 2, Knowledge Township, Health Node
KZ1
1.2
1.3
2.5
8
Agricultural Zone
AG1
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
9
Recreation
REZ
0.25
Nil
0.25
10
Restricted Area (RA)
RZ
0.3
Nil
0.3
Sr. No
Use Zone
Code
FSI Permissible
FSI Permissible
FSI Permissible
Sr. No
Use Zone
Code
Base (Free)
Chargeable (at 40% of Jantri rate)
Maximum
(1)
(2)
(3)
(4)
(5)
(6)
11
Restricted Zone RZ - 1, RZ-2.
RZ
0.3
Nil
0.3
12
Restricted Zone RZ - 3, RZ - 4
RZ
Nil
Nil
Nil
13
Public / Semi Public
PPZ1
1.0
Nil
1.0
Note: ** If the line of 200 mt. on both sides of road 36 mt and above, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: ** If the line of 200 mt. on both sides of road 36 mt and above, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: ** If the line of 200 mt. on both sides of road 36 mt and above, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: ** If the line of 200 mt. on both sides of road 36 mt and above, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: ** If the line of 200 mt. on both sides of road 36 mt and above, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Note: ** If the line of 200 mt. on both sides of road 36 mt and above, divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this area after the date of publication of the this notification.
Table 7.7.6Use Zone and F.S.I. : Category D1 RUDA.
Sr.No.
Zone
Code
Base F.S.I
Chargeable F.S.I
Maximum Permissible F.S.I
(1)
(2)
(3)
(5)
(6)
(7)
1
City Area - A
GM
2.25
-
2.25
2
City Area - B
GM
2.00
0.5
2.5
3
Gamtal
GM
2.25
-
2.25
4
Gamtal Extension
GME
1.5
-
1.5
5
TOZ
SPD5
1.8
2.2
4.0
6
Residential
R1
1.8
0.9
2.7
7
Commercial
C2
1.5
0.7
2.2
8
Recreational
REZ
0.15
-
0.15
9
Industrial
IZ1
1.2
0.3
1.5
10
Obnoxious & Hazardous
IZ5
1.2
0.3
1.5
11
Special Industrial
IZ5
1.2
0.3
1.5
12
Agriculture
AG1
As per table 7.7.16
Table 7.7.7Use Zone and F.S.I. : Category D2 – JADA
Sr. No.
Use Zone
Code
Base FSI (Free)
Chargeable FSI (at 40% of jantri rate)
Maximum FSI
(1)
(2)
(3)
(5)
(6)
(7)
1
Residential Zone
GM
2.0
Nil
2.0
(1)
(2)
(3)
(5)
(6)
(7)
(City Area A)
2
Residential Zone (City Area B), Commercial Zone (City Area B)
R1
1.8
0.9
2.7
3
Residential Zone (City Area c), Commercial Zone(City Area C)
R1
1.8
0.9
2.7
6
Industrial Zone
IZ1 & IZ5
1.0
NIL
1.0
7
Public Purpose Zone
PPZ1
1.5
NIL
1.5
8
Agriculture Zone
AG1
As per table 7.7.16
As per table 7.7.16
As per table 7.7.16
Table 7.7.8Use Zone and F.S.I. :Category D2 BADA
Sr.No.
Zone
Code
Base FSI (Free)
Chargeable FSI (at 40% of jantri rate)
Maximum FSI
(1)
(2)
(3)
(5)
(6)
(7)
1
Gamtal
GM
2.0
Nil
2.0
2
Village Extension (villages Gamtal falling within agriculture Zone only for natural growth of village)
GME
1.6
Nil
1.6
3
Residential Zone (R-1)
R1
2.0
0.7
2.7
4
Residential Zone (R-2)
R2
1.6
0.6
2.2
5
Commercial Zone
C2
1.6
0.6
2.2
6
Industrial Zone
IZ1 & IZ5
1.0
Nil
1.0
7
Public Purpose Zone
PPZ1
1.5
Nil
1.5
8
Recreational
REZ
0.15
-
0.15
9
Agriculture Zone
AG1
As per table 7.7.16
10
Agriculture (SP) Zone
AG2
As per table 7.7.16
11
Transport and Communication
LZ
1.0
0.5
1.5
Note :- For city area E Government order No: NRY-232017-6573-L Dt:9/10/2017. Notwithstanding anything contained in the present GDCR the aforesaid variations and modifications with notifications mentioned in the said order shall stand valid and continue so far
as approval of layout plan and building plan for "city area E" is concerned. The concern authority shall have power and authority to proceed for necessary approval on the basis of afore mentioned variations under prevailing GDCR at the relevant time for Bhavnagar Area Development Authority.
Table 7.7.9Use Zone and F.S.I. :Category D2 JUDA
Sr. No.
Use Zone
Code
F.S.I. Permissible (Base)
F.S.I. Chargeable (at 40% of jantri rate)
F.S.I. Maximum Permissible
(1)
(2)
(3)
(4)
(5)
(6)
1
Bhavanath Area.
GM
2.25
NIL
2.25
2
Gamtal Area (Walled City of Junagadh)
GM
2.25
0.75
3.0
3
Gamtal (Other than Walled City of Junagadh)
GME
1.5
0.3
1.8
4
Residential Zone
R1
1.8
0.9
2.7
5
Industrial Zone
IZ1 & IZ5
1.2
0.3
1.5
6
Recreational Zone
REZ
0.15
NIL
0.15
7
Public Purpose Zone
PPZ1
1.0
NIL
1.0
8
Agriculture Zone
AG1
As per table 7.7.16
Note:- The development permission for Eco SensAppendix itive Area shall also confirm the notification published by "Ministry of Environment and Forest, Notification No. S.O. 1260 (E), Dated, 31st May 2012" attached in Appendix. As per the said notification authority has to prepared zonal master plan for "Girnar Eco-Sensitive Area" The F.S.I. and built-up area under these Regulations shall prevail over the FSI and built-up area prescribed in T.P. Schemes within and outside Gamtal and walled city area if any. In case of new construction according to the provision of sanctioned revised development plan, where permissible height is not achieved even after consumption of permissible FSI. Chargable FSI may be permitted subject to other provision of the regulation provided that the building unit shall be abut on min. 12.0 Mt. road. Provided for such construction stability report shall be furnished for the existing and new construction by Authorized structural Engineer Above additional FSI may be permitted on payment of an amount towards additional infrastructure charge at the rate decided by appropriate authority from time to time. Provided that, in Gamtal area chargeable FSI can be allowed on road having width of 12.0 Mt. or more.
Table 7.7.10Use Zone and F.S.I. :Category D2 BAUDA
Sr. No.
Use Zone
Code
F.S.I. Permissible (Base)
F.S.I. Chargeable (at 40% of jantri rate)*
F.S.I. Maximum Permissible
(1)
(2)
(3)
(4)
(5)
(6)
1
Core area
GM
2.5
Nil
2.5
2
Gamtal other than Bharuch and Ankleshwar
GM
1.5
Nil
1.5
3
Gamtal Extension
GME
1.2
Nil
1.2
4
Residential Zone 1
R1
1.8
0.9
2.7
5
Residential Zone 2
R2
1.5
0.6
2.1
7
Industrial Zone
IZ1
1.0
Nil
1.0
8
Industrial Buffer
IZ2
1.0
Nil
1.0
9
Institutional Zone
KZ1
1.8
Nil
1.8
10
Recreational Zone
REZ
0.15
Nil
0.15
11
Logistic Park
LZ
1
Nil
1
12
Restricted Agricultural Zone (High Flood Zone)
RZ
0.15
Nil
0.15
13
Agricultural Zone
AG1
As per table 7.7.16
14
Public Utility Zone
PPZ1
1
Nil
1
Table 7.7.11Use and F.S.I. D3 and D6 Category
Sr No.
Conceptual Zone
Code
Permissible FSI.
(1)
(2)
(3)
(4)
1
Gamtal
GM
2.0
2
Residential 1
R1
1.2
3
Commercial 1
C1
1.2
4
Industrial 1
IZ1
1.0
5
Agriculture 1
AG1
As per table 7.7.16
6
Public Purpose
PPZ1
1.0
7
Recreation
REZ
0.15
8
Logistic Zone
LZ
1.0
Table 7.7.12Use and F.S.I. Category D4,D5,D7A
No.
Conceptual Zone
Code
Permissible FSI.
F.S.I. Chargeable (at 40% of jantri rate)*
F.S.I. Maximum Permissible
(1)
(2)
(3)
(4)
(5)
(6)
1
Gamtal
GM
2.0
Nil
2.0
2
Residential 1
R1
1.8
0.6
2.4
3
Commercial 1
C1
1.8
0.6
2.4
4
Industrial 1
IZ1
1.0
Nil
1.0
5
Industrial 6
IZ6
1
0.5
1.5
6
Industrial 7
IZ7
1.5
0.5
2.0
7
Agriculture 1
AG1
As per table 7.7.16
8
Public Purpose
PPZ1
1.0
Nil
1.0
9
Recreation
REZ
0.15
Nil
0.15
10
Logistic Zone
LZ
1.0
Nil
1.0
11
Special Zone 1
SZ1
0.3
Nil
0.3
12
Special Zone 2
SZ2
1.0
Nil
1.0
13
Special Zone 5
SZ5
1.2
0.3
1.5
14
Special Zone 6
SZ6
0.8
0.2
1.0
Table 7.7.13Use and F.S.I.: Category D7(B)
No.
Zone
Code
Permissible FSI.
Chargeble F.S.I.
Maximum F.S.I.
(1)
(2)
(3)
(4)
(5)
(6)
1
Gamtal
GM
2.0
Nil
2.0
2
Residential1
RZ1
1.8
Nil
1.8
3
Commercial 1
C1
4
Industrial 1
IZ1
1.0
Nil
1.0
5
Agriculture 1
AG
As per table 7.7.16
6
Agriculture 2
7
Special Zone 1
SZ1
0.3
Nil
0.3
8
Special Zone 2
SZ1
1.0
Nil
1.0
9
Special Zone 6
SZ6
1.2
Nil
1.2
10
Public Purpose
PPZ
1.0
Nil
1.0
11
Recreation
REC
0.15
Nil
0.15
12
Logistic Zone
LZ
1.0
Nil
1.0
Table 7.7.14Use and F.S.I. : Category D8
No.
Use
Permissible FSI.
(1)
(2)
(3)
1
Any use in Gamtal
2.0
2
Residential- Commercial use
1.2
3
Industrial use
1.0
4
Agriculture
0.3
Table 7.7.15Use and F.S.I. : Category D9
No.
Use
FSI
Maximum Built up
Maximum Height
(1)
(2)
(3)
(4)
(5)
1
Residential
1.6
40%
13.00 mt
2
Commercial
1.6
40%
13.00 mt
3
Industrial
1.6
50%
13.00 mt (Additional height as required for industrial purpose as approved by Factory Inspector.)
Table 7.7.16Use and Maximum Permissible F.S.I. for Agriculture Zone Categories D1 to D7(B)
No.
Permissible Use
FSI
Ground Coverage
Maximum Permissible Building Height
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
1.
Dwelling-1
0.1
5%
8mts
1.Only one farmhouse per Building-unit shall be permitted. 2.No subdivision of the land shall be permissible. 3.Common Plot not required. 4.Minimum Area of any block no./ survey no./Hissa no./FP no. shall be 4000 sq .mts, except Public utility & public Institutions. 5.For Udwada ADA minimum Area of any block no./survey no./Hissa no./FP no. shall be 2000 sq .mts, except Public utility & public Institutions. 6.Road Side Margin shall be 30.00 mts.
Religious,Educational1&2,Institutional,Agriculture-3, Industrial 3, Transport, Storage, Public Utility, Public-Institutional
0.45
15%
15mts
8.4.6Margin for D9 Category.
D9 Category margins, maximum permissible builtup area shown in Table no. 8.4.5 and 8.4.6
Table 8.4.5Minimum Road Side Margins : Category D9
Residential Development:
Width of road (in M)
Minimum road side margins (In mt.)
Up to 7.5 mt.
1.5
More than 7.5 mt. & up to 12 mt
3.0
More than 12 mt. &up to 20 mt.
4.5
More than 20 mt. &up to 30 mt.
6.0
More than 30 mt.
7.5
Note: No road side margin is required for plots admeasuring 25 sq. mt. Provided they are situated on roads up to 7.5 mt width.
Industrial Development and Commercial Development :
Plot Size
Front margin (In Mt.)
50 sq. mt. to 100 sq. mt.
3.0
101 sq. mt. to 200 sq. mt.
4.5
201 sq. mt. to 300 sq. mt.
4.5
301 sq. mt. to 500 sq. mt.
4.5
501 sq. mt. to 10,000 sq. mt.
6.0
10,001 sq. mt. to 50,000 sq. mt.
7.5
50,001 sq. mt. and Above
9.0
Public Uses: There shall be provided minimum margin of 9 mt from road side on any plot development for public uses.
Table 8.4.6Minimum Side & Rear Margins for Category D9 of Development Area
Residential Development
Plot size in (sq. mt.)
Margin in Mt.
Maximum built up area.
25
Nil
75%
2 (on one side)
70%
More than 50& up to 100
2 (on one side or in the rear side)
65%
More than 100 &up to 250
2 (On one side)
60%
More than 250 & and up to 400
2.50 (on one side)
50%
More Than 400
3 on 2 side & rear.
40%
Industrial and Commercial Development
Plot size
Rear margin (M)
Side Margin (M)
I
II
Up to 100 sq. mt.
Nil
Nil
Nil
101 to 200 sq. mt.
1.5
-
1.5
201 to 300 sq. intr.
2.0
-
2.5
301 to 500 sq. intr.
3.0
-
3.0
501 to 1000 sq. mt.
3.0
3.0
3.0
10001 to 10,000 sq. mt.
4.5
4.5
4.5
10,001 to 50,000 sq. mt
9.0
4.5
4.5
Above 50,000 sq. mt.
9.0
9.0
9.0
Restriction on Development in Margin
The required marginal open spaces except permissible uses as per Regulation no. 8.4.7 shall be kept permanently open to sky.
This space shall not be used for stocking materials or loose articles for the purpose of trade or otherwise, putting up fixed or movable platforms.
Parking shall be allowed in the rear and side marginal space after keeping minimum required margin in the case of building height more than 25.0mt.
Vehicular ramp leading to parking in floors above ground level shall not be permitted in the margin.
Pedestrian ramps connecting ground floor with upper floors shall not be permitted in the marginal spaces.
The sunk in lower ground floor or basement provided for the purpose of light/ ventilation shall not be permitted in the marginal open space.
No difference shall be permitted in the ground level of the marginal space of the building (in cases where the permitted margin of the basement is lesser then the permitted margin of the super structure)
Floor space index (FSI)
The Base FSI,the chargeable FSI, maximum permissible FSI etc. on a Building-unit in different categories shall be regulated as per the chapter no. 7.
Permissible uses in Margin
For dwelling 1 , 2 &3 (Except Row house, cottage industries and pre-schools):
a. Ancillary uses such as parking garage, servant quarter, w.c. and bathroom shall be permitted at any zone, in side or rear marginal space but in no case in Road-side margins; with maximum permissible ground coverage of 16.5 sq.mt. and maximum permissible height of 3.0 mt..
b. Surface water tank up to 1.5 mts in height.
Open staircase, cantilever staircase with maximum width of 1.00 mts and landing space of maximum 2.00mts at floor level shall be permitted in side or rear margins except on road side margin.
Doors, windows or projections shall not be permitted along the common wall of the adjoining property. No rainwater from the roof shall be drained in the adjoining property.
e. Partition wall shall be allowed along the Building Unit boundary on common boundary of semidetached building and on marginal space between two structures up to a maximum height of 1.5mt.
f. Underground water tank, percolation well, bore well and pump room with a maximum size of 2 mts X 2 mts and with a maximum height of 2 mts.
Building-units of all uses other than Industrial and Institutional: A structure(only pre-fab) for security cabin including toilet with maximum dimensions of 2 mts X 4 mts with maximum ground coverage of 16.5 sq.mts ,with maximum height of 3.0mts shall be permitted in the Road-side margin.
For Industrial and Institutional use: a security cabin structure up to a maximum ground coverage of 16.5sq.mts with maximum height of 3.0mts shall be permitted in the road-side margin. Such a structure shall be at a minimum distance of 4.5mts from the Building.
Pedestrian access path and stepped approach as per regulation no. 21.1.5 shall be permissible in the marginal space
Common plot shall be permitted in the marginal space.
Vehicular Ramp: Connecting ground level with basement level-1 shall be permitted in side and rear margin for:
Building unit with area up to 2000 sq.mts or
Building unit with building less than 25.0mts in height.
For a building unit using marginal space for providing electrical infrastructure such as substation (as per regulation Permissible uses in Margin in 8.4.7(9) ), underground water tank (as per regulation 25.4 and others) these permissible uses shall be allowed only one marginal side except road side margin. The other marginal spaces shall be kept clear and accessible at ground level as illustrated above.
Electrical Infrastructure: Electrical Sub-station, Transformer room, Box-type transformer, Section Feeder Pillar, Auxiliary Power Back-up System and meter room according to the norms of the Competent Electric Company shall be permitted in marginal space except road side margin of the building unit. The area of such construction shall not be counted towards FSI.
Refuge Area for Building with height more than 45mts: Cantilever Refuge area required as per Regulations No. 23 may be permitted.
Fire Escape Staircase for Building with height more than 45mts: Fire Escape Staircase required as Planning Regulations No.22 shall be permitted in marginal space except roadside margin.
Pedestrian Ramp: as per Regulation 21.1.15 shall be permissible in marginal space.
Parking shall be permitted in margins except in access path from gate to stair-case as illustrated below and as per regulation 8.13.1 (7) and 8.13.1 (8) if contiguous with parking in hollow-plinth, provided with a minimum dimension of 6mts, or contiguous with over all parking layout.
Basement provided as per Regulation 8.7 shall be permitted within side and rear margins after leaving 3.0mt margin from the boundry of the building unit
In any marginal open space, weather sheds sun breakers horizontal or vertical projections shall be permitted up to 0.60mts. These projections may also be part of the façade articulation at various levels, but shall in no cases they become a part of the habitable space. Such projections shall be allowed above a minimum height of 2.4mts from the ground level.
For any building units with following uses- Dwelling 1, Assembly 1,2; Education 1&2, Institutional, Public Institutional; the building unit level may be permitted to be raised up to plinth level.
General Development Requirements
The General Development Requirements for all the Zones and categories are as enumerated below. However any specific regulations given for the relevant zone in the respective chapter shall be consider.
Road, Approach and Access
The various widths of Road as per Town Planning Scheme, Development Plan or any other govt. notifications (in meters) shall be considered as the table 8.1.1.
Table 8.1.1Road Width Conversion
No.
Width of Road as per Town Planning Scheme, Development Plan or any other govt. notifications (in meters)
Width of Road considered for Development Regulations. (in meters)
For conversion of road widths from F.P.S.to M.K.S., refer Schedule 24.
For Building-units along over-bridge or under-bridge, the total width of the DP/TP Road shall be considered for regulating permissible uses, margins and height for proposed buildings.
Road widths for considering permissible uses, margins and height for proposed buildings shall be as per the table 8.1.1.
Land-Locked Building-Unit and Required road width.
In the case of a land-locked plot, which Is surrounded on all sides by other plots with no access to any street or road, access of minimum 12mts shall be required through any adjoining plots or plot which shall be nearest to the street or roads to the land locked plots, at the cost of owner of the land lock plot and such other condition as may be prescribed by the Competent Authority In case of land locked plot behind the existing construction and where 12.0mt. wide approach is not feasible, building upto height of
10.0mt. shall be permissible on the road of 9.0mt. width and only individual bunglows/semi-detached/ row-houses shall be permissible on the road of 7.50mt.width. only where the land has received non-agriculture permission prior to the publication of the preliminary notification of the comprehensive GDCR. For non-agriculture permission granted after publication of CGDCR,12.omt. wide road shall be insisted and development permission shall be granted accordingly.
Where there is no town planning scheme, for a building unit/plot abutting on a Government Nalla Road, the right of way/plot boundary shall be considered as minimum 9.0mts from the centre line of such Nalia Road. Road-side margin shall be considered from this imaginary plot boundary thus established.
In Non-T.P.Area and Agricultural Zone, the Development Permission shall be regulated as per the road network proposed by the Appropriate Authority.
For plots in Non-T.P. Areas, the applicableZone, permissible uses and regulations shall beas per the originalSurvey No.of the owner.
Building Height
The height of a Building shall be measured from the established Ground level to the top of the building inall cases.
Height for the following shall not be taken in to consideration in determining the total height of the building:
a. Parapet,
b. Stair-casecabin
c. Water storage tank,
d. Lift well, lift cabin with machine room above.
e. Hollow Plinth provided for only for parking at Ground level, in case of buildings up to 25.0mt. height.
For height more than 25 mt. regulations of Strucural, fire and Airport shall be followed.
Road Width and Building Height
The maximum permissible building height shall be regulated according to the width of the road on which it abuts within permissible FSI as table No. 8.3.1.
Table 8.3.1.Road width and Building Height.
Category of Authority / ULB
Width of Road (mts)
Upto 9 Mts
9 mts and less than 12 mts
12 mts and less than 18 mts
18 mts and less than 36 mts
36 mts and above.
Building Height (mts)
D1 except GMC* AREA
10
15
25
45
70
D1-RUDA,D2
15
25
45
70
D3, D6
10
10
10
10
10
D4, D5, D7(A)
10
15
25
25
45
D7(B), D8
10
15
25
25
25
*GMC : Gandhinagar Municipal Corporation.
Road Side, Rear side and side Margins
Road Side Margin in a Building-unit shall be regulated by the Road width it abuts on as mentioned in the table no. 8.4.1.
For Building-units with two or more abutting roads, the Road-side margin shall be applicable on all such abutting sides as illustrated below:
Road side margin as per the road width or margin as per building height whichever is higher shall be applicable.
Build-to-Line
The Build-to-Line shall be considered as the imaginary line formed after leaving the Road Side margin and the required side margins.
This Regulation shall be applicable for all Building-units as mentioned in Local Area Plans.
Road Side Margins for different categories.
Table 8.4.1.Road Side Margin : All Category except GMC and D9
Road Width (mt.)
Up to9.0mt.
Above 9.0 mt. and less than 15.0 mt.
15.0 mt. and less than 18.0 mt.
18.0 mt. and less than 30.0 mt.
30.0 mt. and less than 36.0 mt
36.0 mt. and above
Category
D1, D2 except GMC
2.5
3.0
4.5
6.0
7.5
9.0
D3, D6
2.5
3.0
4.5
6.0
6.0
6.0
D4, D5, D7(A)
2.5
3.0
4.5
6.0
6.0
6.0
D7(B),D8
2.5
3.0
4.5
4.5
4.5
4.5
Note: For Special buildings, Road side Margin shall be 12.0mt. and Rear & Side margins shall be 6.0 mt.
8.4.3 Margins other then road side and side margins for different categories.
Table 8.4.2: Margin between two buildings and margin from common plot : All Category except GMC and D9
Building Height upto (mt)
10
15
25
45
70
Margin between two building(mt.) Category wise
D1 except GMC
2.5
4.5
6.0
9.0
12.0
D1-RUDA,D2
2.5
4.5
6.0
9.0
12.0
D3, D6
2.0
3.0
---
---
---
D4, D5, D7(A)
2.5
3.0
4.5
6.0
---
D7(B), D8
2.5
3.0
4.5
---
---
Margin from Common Plot(mt.) Categorywise
D1 except GMC
3.0
3.0
3.0
6.0
6.0
D1-RUDA,D2
3.0
3.0
3.0
6.0
6.0
D3, D6
Re-Development work on road having width less than 9.0 m
For dilapidated residential buildings over age of the building 35 years, type development shall be permitted with following conditions:-
Construction shall be on Hollow Plinth looking to the parking requirements.
Total height shall be permitted up to existing height of the structure on site or maximum 15 m which ever is less
Parking requirement may be relaxed by the concern sanctioning authority subject to new construction shall be on full hollow plinth(Stilts)
No other relaxation except existing approved projection in the margin shall be allowed and new construction shall be done as per provision of prevailing GDCR
No extra dwelling (Apartment) shall be permitted other than the existing authorized units
members only.
No amalgamation of such buiding units shall be permitted with other buiding unit/units.
Areas not counted towards computation of FSI:
All interior open‐to‐sky spaces such as courtyards and chowk, utility ducts in any form, shape and size required by Regulations.
Area used for parking at basement or hollow‐plinth or parking at any level.
Basement exclusively used for parking shall have minimum clear height of 2.8 mt and maximum height of 4.5 mt. In case of mechanized parking there is no restriction on maximum height or number of level of basement floors used for parking subject to structural stability.
basement provided exclusively for parking, other permissible uses shall be permitted up to a maximum area of 25% of the total built‐up area of the basement floor. This nonparking area shall be calculated towards the computation of FSI.
Hollow plinth provided for parking with the following conditions:
a. Such hollow plinth shall be provided within the building‐unit except on roadside facade.
b. Hollow plinth provided for the purpose of parking shall have maximum clear height of 3.5mts.
c. Hollow Plinth can have provision for electric meter room, room for telephone distribution board, common toilet for both the genders, water room, servant room, and security cabin and entrance foyer if the total area does not exceed 16.5 sqm. This area shall not be considered towards computation of FSI.
Loft provided as per Regulation no 21.1.10 up to a maximum of 30% of the enclosing space.
Staircase, intermediate landing and stair cabin provided as per Regulation no 21.1 with the following conditions :
a. Maximum landing width at floor level shall be three times the width of stair (x mts) including additional space (0.5x mts) provided at either side of the stair landing as common area (illustrated across).
Lift, lift well with lift cabin, stair cabin, lift
landing of lift well and water tank, including the walls provided as per Regulation no 21.1.14 with the following conditions:
a. The width of the lift landing shall be considered equal to the maximum width of the lift well including walls (x mts) with an additional space (0.5x mts) at either side of the lift provided as common area as illustrated across.
b. The depth of the lift landing shall be two times the maximum width of the lift well including walls (x mts) as illustrated across.
The width of the lift landing shall be
considered twice the width of the lift well including walls including additional space provided at either side of the landing, and the depth shall be of twice the width of the lift well as illustrated across.
Vehicular ramps and pedestrian ramps provided as per Regulation 21.1.15
Electric room and electric substation as specified by Competent Electric Company.
Open‐to‐sky space used for solar‐water heating system, outdoor units for air‐conditioners or mechanical ventilation shall be exempt from FSI.
Any common amenities construction allowable in the common plot having built up area upto 50.00sq.mt.
Pergolas as defined in regulation no 30.104
Skip Floor, refuge area required as per fire prevention and life safety mesures regulation.
Relaxation in Floor Space Index (FSI)
In case of Building-units affected by road widening or construction of new road, the owner may claim compensation or FSI from the Competent Authority for the surrendered land. In case of FSI, the Competent Authority shall permit the FSI of any such land / plot or Buildingunit on the basis of the original boundary of the Building Unit. This is subject to conformity with all other requirements mentioned in these Regulations as per the new boundary. Before securing Development Permission on any such Building-units, owner shall have to surrender the affected land.
Development Work to be in Conformity with the Regulations
All development work shall conform tothe Development Plan proposals and the provisions made under these regulations. If there is a conflict between the requirements of these Regulations and Regulations for Town Planning Schemes, the requirements of these DevelopmentRegulationsshall prevailexceptforthefollowing conditions:
Any relaxation or special provisions mentioned against respective final plots shall prevail above these regulations.
For any proposed road network, the proposed roads as per Town Planning Scheme shall prevail.
Minimum area of building unit for different uses.
Generally minimum area of a Building-unit shall be 18sq.mt with no side less than 3.0mts in width. However to ensure that the purpose for which the building unit is put to uses meets the requirements of minimum land size, the areas required for each building unit with reference to the use is shown here under:-
Table 8.8.1Use and Minimum Building Unit Requirement
Use
Minimum Area of Building unit in sq mt.
Use
Minimum Area of Building unit in sq mt.
Mercantile-2
500
Fuelling station w/o service station
1000
500 (for category D7(B) and D8)
Education-1, 2
1000
Fuelling station with service station
2000
Education-2
3500 (for AUDA Only)
1000 (for category D7(B) and D8)
Assembly-1,2,3,4
1500
Assembly 1,2,3 & 4, Institutional
3500 (for AUDA Only)
Institutional
750
Hospitality
1000
Development of Land
Internal Road and Approach to Building and Common Plot
Internal road width shall be measured from its origin to the next wider road it meets.
In case of single building the width of approach/ internal road shall be measured based on the distance from the TP or DP road up to the edge of the building in case of hollow plinth, or location of the farthest entrance of a building in case of solid plinth
In case of buildings connected internally or externally the length of internal road shall be considered up to the edge of the hollow plinth of
the farthest building (in case of building with hollow plinth) and up to the location
of the farthest entrance of the building in case of solid plinth.
In case of layout with two or more buildings of Dwelling-3 type dwelling units, commercial units or independent establishments, the width of Internal Road on which the building abuts shall be as applicable for a length of above 45m category (Refer sketch in schedule 28). In case of more than two buildings including Dwelling-1and/or Dwelling-2 type, approach of as applicable width shall be allowed up to the second dwelling unit only of Dwelling-1or Dwelling-2 type as per table below.
The width of the Internal or Approach Road shall be based on the length and use of the Building-unit as under:
Table 8.9.1Widthof the Internal Road based on the length of Road
No.
Length of road in mt
Width of road for residential use in mt
Width of road for non residential use in mt.
1
Up to 15 mt or less (Approach)
3.0
4.5
2
Above 15 mt and up to to 45 mt (Approach)
4.5
6.0
3
Above 45 mts and up to 150mts
7.5
9.0
4
Above 150mts and up to 450mts
9.0
12.0
5
Above 450mts
12.0
18.0
Note: If margin required is bigger than width of Approach Road or Internal Road whichever is higher shall be applicable.
Layout for Amalgamation and /or Subdivision of Building-unit
In case of subdivision or amalgamation, the depth of Building-unit shall not exceed thrice the width of the proposed Building-unit fronting on the road. However, this condition of ratio will not be applicable if the length of the smaller side of the subdivided Building-unit is equal or more than 10.50mts.In case of Sub-division or amalgamation,Length to depth ratio shall not be applicable for the building unit less than 100 sq.mt.
Amalgamation of Building-unit abutting on a road with width equal or more than 18.00 mt, shall be permitted if depth of the Building-unit shall not exceed three times the frontage of the Building-unit abutting on road.
No side of the sub-divided plot shall be less than 9mts.
It is Provided that Provisional sub division of the Building Unit with Existing Structures can be approved but construction/Development/Redevelopment Permission for such newly created sub divisions shall be approved after the sanctioning of the final sub divisions of such building unites with compliance of prevailing relevant provision of this GDCR
General Requirements for Internal Roads
The Internal Road shall be provided up to each individual building.
Internal road width shall be measured in length from the farthest point of its origin to the next wider road it meets.
In cases where the road is in continuation with any private road in the adjoining estate or any public road continuous to the estate, the length of the adjoining road of the public road shall be added to the length of the internal road for the purpose of determining the width of such road.
Curves at the junction: The curves shall be provided at the junction of roads as prescribed below:
Table 8.9.2Radius of road curvature based on Width of the road
No.
Width of the road in meters
Radius of road curvature (meters)
1
Up to 6
3.0
2
More than 6.0 and up to 9
4.5
3
More than 9 upto 18
Half the width of the wider road whichever is higher, maximum 7.5
4
More than 18
9.0
Note: The width of the wider road shall be taken into consideration in determining the radius of the curvature at the junction of roads of different widths.
The shape of the plots and the junction of the roads, at the corners shall be designed as directed by the Competent Authority.
The alignment of the internal road or roads shall be regulated to be In continuation of the public or private roads continuous to the applicant's Building Unit; but in case of termination of an internal road or roads; a turning circle with diameter of 13.5mts or 12mts. x 6 mt. turning "T" shall be required at the cul-de-sac. This requirement may be waived for such road with width of 7.5mts if the length does not exceed 110mts.
The Development Permission shall be regulated as per the proposed road network by the competent authority.
For development area in non-T.P. area, the width of one road shall be decided by the Competent Authority.
AmalgamationandSubdivision of Building-unit
The owner or developer shall be required to get the land reconstituted by the Competent Authority as 'Building-unit' or 'Building-units' before amalgamation or subdivision of the land.
Amalgamation and Subdivision of Building-unit with Existing Structures
Road
In the case of Building-units with existing buildings, its sub-division or amalgamation shall not be approved unless it fulfils the requirements as per regulation no.8.2.5
Regulation based on Building Dimensions:
For any Building having depth of 9.0mts or more from its front open space, an opento‐sky space with area of 5.6sq.mts with no side less than 1.8mts at plinth level shall be provided for every 9mts depth. If the width of the Building is up to 4.5mts, then the size of this open to sky space shall be 3.0sq.mts with no side less than 1.5mts.
If the depth of the Building does not exceed 18mts and has openings at least on two sides over a street or open to sky space of 2.4mts or more in width, then above provision shall not be applicable.
Open to sky required scenario 1: 5.6 sq.mts open to sky space
Open to sky required scenario 2: 3 sq.mts open to sky space
Open to sky required scenario 3: no open to sky space
In case additional open‐to‐sky space is provided beyond the minimum requirements, it shall be counted towards the computation of the FSI.
The minimum width of any interior open to sky space used for light or ventilation of the rooms shall be regulated based on the smaller side of this open to sky space as follows:
Table 8.10.1Minimum dimension of OTS based on building height
Sr.No.
Building Height
Minimum dimension of the smaller size in mt.
Gamtal
other than gamtal
1.
Upto 15 mt
2.0
1.5
2.
Above 15 mt and upto 25 mt
3.0
2.5
3.
Above 25 mt and upto 45 mt
NIL
3.0
4.
Above 45 mt
NIL
6.0
General Requirement for Open‐to‐Sky space
Every exterior or interior, open space shall be kept free from any erection thereon and shall be kept open to sky with suitable and sufficient access.
No open drain except for rain water shall be constructed in any open space required by these Regulations.
Every such interior or exterior open air space, unless the latter is a street, shall be maintained for the benefit of such building exclusively and shall be entirely within the owner's own premises.
No construction work on a building shall be allowed if such work operates to reduce an open air space of any other adjoining building belonging to the same owner to an extent less than what is prescribed by any of these Regulations in force at the time of the proposed work to further reduce such open space if it is already less than what is prescribed.
Every open space, whether exterior or interior, provided in pursuance of any Regulation, or under an agreement lodged with the Authority shall be paved and be always kept free from any erection thereon and open to the sky, except 23cms cornice or 30cms eave or grill with opening not less than 8cms X 8cms.No weather shade or other protection shall overhang or project over the said open space or over a side set‐back so as to reduce the width to less than the minimum provided under these Regulations. No open drain except for rain‐water shall be free structure in any open space required by these Regulations.
Opening for ventilation shall open into an open to sky space with minimum dimension of 0.9mts X 0.9mts.
Common plot is required for building unit of area 2000sq.mt or above in all zones other than agriculture zone as per following regulations:
Table 8.11.1Minimum common plot
Sr.No
Use
Area of the Building-unit/plot Size
Minimum Required Area of Common Plot
1
Other than use mentioned in Sr.No. 2 &3
2000Sq.mt or more
10% of the area of Building-unit
2
Industrial
Up to 5,000 Sq.mt.
Nil
Above 5,000 Sq.mt. and Up to 20,000Sq.Mt
8% of the area of Building-unit
20,000Sq.Mt and above
1600Sq.mt + 5% of the area exceeding of 20000Sq.mt
3
Religious, Educational-1&2, Institutional, Assembly, Public Institutional
2000 Sq.mts or more
20% of the building area
4
For All Uses
10,000 Sq.mts or more
Additional 6% as per Planning Regulation no. 8.12.1(9).
Note For (Table No.11.1) : For building units with area less than 2000Sq.Mt. and having buildings with height more than 25mts, a common plot shall be provided of 10% of the area of building unit or 200Sq.Mts, whichever is more.
General Requirmentfor Common Plot
The Common Plot area shall be exclusive of approaches.
The area of the Common Plot may be sub divided such that the minimum area of the Common Plot shall be 200 sq.mts with no sides less than 10.0mts
Angle between adjacent sides of the Common Plot shall be 60 degrees or more.
No construction shall be permissible in the Common Plot except Electric substation, Transformer room, Auxiliary power generator, Box-type transformer, section feeder pillar, meter room, over and underground water tank and pump room, security cabin, Community/ Society common amenities shall be allowed to be constructed in the Common Plot subject to the following requirements:
a. Maximum Ground Coverage of 15 % of the respective Common Plot.
b. Maximum Height of construction shall be 7.5 mts from the level of the Building Unit except in the case of overhead water tank,where more height may be permitted.
c. Community/ Society common facility shall be permitted on a Common Plot. The area of this Community/Society common facility having built up area only upto 50.00sq.mt. shall not be considered towards computation of FSI of the Building Unit.
d. Such a building shall be required to maintain the minimum margin requirements between buildings with respect to the adjacent buildings and Road Side Margin as per Regulation 8.3.1.
In case of Residential Use,50% of the Common Plot may be allowed to be used as parking space including drive way and aisles. Parking in common plot shall be permitted in road- side margin after leaving minimum 1..5mts from the Building unit boundary. This minimum 1..5m shall be utilised for shade giving trees and plantation purpose.
In case of 'all other uses except Residential Used, complete area of the Common Plot may be allowed to be used as parking space including driveway and aisles. Such parking shall be permitted in road-side margin after leaving minimum 1.5mts from the building-unit boundary. This minimum 1.5m shall be utilised for shade giving trees and plantation purpose.
In cases where layout or subdivision of Building Unit is sanctioned with provision of required Common Plot, Common Plot shall not be insisted in case of sub-division of such sub-divided new Building-unit and I or amalgamation of such sub-plots and I or further development of such sub-divided new Building-unit irrespective of its area.
The Owner shall be required to give an undertaking that the Common Plot shall be used exclusively for the residents I occupants of the Building-unit. On sanction of the Development Permission, the Common Plot shall deem to have vested in the society/association of the residents/ occupants. The Common Plot shall not be sold to any other person.
For a Building-unit having area of 10,000 sq.mts or more an additional 6% area of the Building-unit shall be provided for thick plantation. This area shall be exclusive of the required minimum margins and Common Plot. The area demarcated for this shall have a minimum dimension of 1.5mts. The types of trees shall be selected such that they are shade-giving trees as mentioned in Schedule 24.
Common Plot shall not be allowed within Atrium or any covered space.
Parking spaces for vehicles shall be provided within the Building-unit for every new Building and /or extension in existing building constructed for the first use and /or when the use of old building is changed to any of the uses mentioned in the table below:
Table 8.12.1Parking requirement
No.
Type of Use
Minimum Parking Required
Visitor's Parking and Remarks
(1)
(2)
(3)
(4)
1
Dwelling-1,Dwelling-2
1car parking - for more than 80 sq.mt and up to 300 sq.mt of plinth area per unit. Additional 1car parking for every 100.00sq.mt additional plinth area per unit. This shall be permitted within the marginal space
Nil
1
Dwelling-3
20% of Total Utilised FSI
10%, of the required parking space shall be provided as visitors parking
2
Mixed Use (Residential+Commercial) Mercantile, Religious, Hospitality, Transport
(a)For respective Residential use, parking shall be provided as Dwelling-1,2 or 3, as the case may be. 30% of utilized F.S.I. for building unit up to 750 sq.mts. 40% of utilized F.S.I. for building unit above 750 to 2000sq.mt. 50% of utilized F.S.I. More than 2000sq.mt.
10% of Residential parking requirement (a); and 20% of the Commercial parking in (b) shall be provided as visitors parking.
3
Assembly-1,2&3
50% of Total Utilised FSI
20% of the required parking shall be provided as visitors parking
3a
Assembly-4
50% of Building-unit Area
3b
Assembly- Stadium l
1.25sq.mt of parking area per person of the Total stadium capacity
In case of Hospitals and nursing homes, additional parking of Ambulance shall be provided at the ground level.
5
lndustrial-1,2,3&4;Storage,
10% of the Total Utilised FSI
Nil
6
Educational (b) (c)
(a) Primary & Pre schools- 25% of
Facility for drop-off and
6
Educational (b) (c)
the Total Utilised FSI Secondary & Higher Secondary Schools - 40% of the Total Utilised FSI Colleges and coaching classes -40% of the Total Utilised FSI
pick-up shall be provided withinthe premise. 10% of the required parking shall be provided as visitors parking
7
Sports & Leisure
25% of Building-unit Area
8
Recreation
10% of Building-unit Area
Note:-50% of the visitor parking shall be provided at ground level.
General Requirements for Parking
Parking requirement for a Mixed-Use development shall be calculated on prorate basis of the FSI consumed specific to the different uses.
Parking is permitted at any floor level above ground and at more levels of basement as per required parking, with provision of vehicular ramp.
50% of the required visitors parking shall be provided at the ground level.
50% of all required parking shall be provided for cars.
Parking area includes parking space, driveway and aisles but excludes approach road, vehicular lift and vehicular ramps.
Parking layouts with minimum size requirements for parking space, driveways and access lanes shall be provided as prescribed in Section D: Performance Regulation No. 21.2 and Regulation No. 21.1.15.
Parking shall be permitted in side or rear margins except in Approach Road as per Regulation 8.4.7.
Parking shall also be permitted in road-side margin after leaving clear margin of 4.Smts from the building-unit boundary towards road-side. In case of building unit abutting more than one road and having area up to 1000 sq. mt shall be permitted to utilise narrow road side margin for parking. Provided that, parking shall be allowed in any road side margin having building unit area up to 750 sq.mts.
Parking area should be retained as effective parking space and shall be maintained with light and ventilation system if provided in an enclosed area
In cases where misuse of parking space is noticed, the use of the entire building shall be discontinued by the Competent Authority. Building use shall be permitted only after the required parking spaces are provided. High penalty shall be levied considering the period of misuse of the parking space and the benefit derived out of misuse as decided by the Competent Authority from time to time.
For multi-level parking, a vehicular ramp shall be necessary.
If parking is provided on a terrace with vehicular elevator, vehicular ramp is not necessary if parking space is provided with provision of floor sprinklers.
Parking shall not be permitted within an Atrium.
In case the maximum permissible FSI is not utilised, for any extension or additions in the future, additional parking as per regulation shall have to be provided as required for this additional utilised FSI.
Basement in a Building-unit,
The Basement shall be permitted on the following conditions.
Contribution of Land for any development in Non-TP Areas
For any development in confirmation with zoning or use, where the Town Planning Scheme is not declared except Agriculture Zone or use and Gamtal, Competent Authority of D1 to D8 category shall enforce owners/applicant to contribute the land admeasuring up to
a. 40% of land in category D1 and D2.
b. 25% of land in category D3,D4, D5, D6 and D7(A).
c. Land required for providing road in category D7(B) and D8.
In aggregate of its plot/Building-unit to the Competent Authority for providing roads, public purpose and multipurpose activities:
The competent authority shall plan for proper access, circulation and mobility in the area, prepare a road network plan, which shall synchronize with any, existing road or development plan.
The above contributed land shall be adjusted by preparing TPS.
The use of Public Purpose Land shall be applicable irrespective of the zones or road width.
Provided that in cases where building permission has been granted earlier or where any plot having area less than 500 sq.mt. and is a part of sanctioned lay out plan, where partial and scattered development has taken place, the aforesaid provision of contribution of land for amenities shall not apply. Newerthless, the competent authority while granting such relaxation, shall record the reasons in writing.
Development on kabrastan, burial ground etc.
The land occupied by the graveyards, kabrastans, burial grounds, crematoria and allied actions in the Development Plan shall be kept permanently open. Competent Authority may permit structures to be built for specific purpose.
Development on Open Space Plots
20% of the area of the "Open Space Plots" provided under TP Schemes may be utilised for the construction with required margins for the common/institutional/community uses. Such construction shall be permitted with basement, ground floor or a floor on hollow plinth.
In case the building is on hollow plinth in addition to the stair cabins and ramps,5% of the total permissible built-up area of this plot shall be allowed to be built-upon for the construction for store room, security cabin, toilet etc. at the ground level. The rest of the "Open Space Plot" shall be left to open to sky.
Discrepancy Removal
Any discrepancy found in the text of revenue survey no./block no. / final plot no.in Development Plan, the Concern Competent Authority after following the prescribed procedure of verification with each appropriate authority with authorized revenue records/Final T.P.S. Records can take appropriate decision for correction of the the said discrepancy in revenue survey no./block no. / final plot no.in Development Plan and Competent Authority while sanctioning the Development Permission accordingly.
Open-to-Sky Space:
Open‐to‐sky space shall be provided for natural light and ventilation in conformity with the following Regulations. The location and dimensions of the open space shall be based on the
dimensions of the Building‐unit and the proposed building height, whichever is higher shall be applicable.
Margins
No Basement shall be permitted in the required Road side marginal space.
The side and rear side margins for the basement shall be 3.0mt from the Building-unit/Plot
boundary. A combined shared basement parking. shall be permitted using full marginal space other than road side margin of building unit with the consent of the adjoining building unit owner for new development.
For building-units with area less than 500 sq.mt, basement shall be permitted with margins as per Regulation 8.4.7. However, minimum margin of 3.0m is required
Basement shall be permitted under common plot, internal road and internal marginal space for exclusive use of parking only.
Extent of Basement
Basement shall be allowed for the purpose of parking for Building-units with area 250 sq.mts or more
Basement is permitted, irrespective of size, for all other permissible uses other than parking at only one level and basement may be permitted at more levels as per required parking.
Height of Basement
Maximum clear Height of the Basement shall be 4.5mts and minimum clear height shall be 2.8mts from finished basement to the bottom most soffit of beam/slab, whichever is applicable.
Development in Existing Chawls
Subject to the following conditions and provision of structural safety as per Regulation 24, owners of individual rooms of existing authorized chawls may be permitted to make alterations or to construct additional floors:
Additional Ground coverage area on ground floor shall not be permitted
floors over the ground floor.
While permitting first floor or the second floor, no objection shall be taken regarding F.S.I., built-up area and number of tenements in regard to the existing ground floor constructions. Individual owners shall have to provide water closet and bathrooms.
Development in Core Walled City and Gamtal by steel structure for maintainance purpose.
Repairing and maintenance shall be commence by the owner of the building using steel structure as a component of load bearing structure, while strengthening mud / clay / brick masonary wall and slab shall be casted using stone material as slab on following conditions.
Owner shall produce affidevit as mentioned in regulation no. 3.3.1 and owner has to appoint register as structural engineer and clerk of works.
Owner must take care that no harm could be occur to the surrounding existing construction as well as lives.
It shall not be permitted to change the use, height of the building, increase in total no. of floor , built up , FSI etc.
No change in the area of building unit is permissible, However, in case of road line demarcated by competent authority on the existing building, in such cases reduced building unit area shall be permissible.
. Owner shall produced sketch plan including built up area calculated by registered engineer /architect and with photographs .
Owner shall complete repairing/maintanace work within six months time limit, however, if in any circumstances owner shall not complete repairing/maintanace work within
specified time limit, competent authority shall increase time limit for a maximum one year.
Owners shall inform the competent authority within 21 days after completion of work.
Maintenance shall be carry out in such a manner that shall not disturbe heritage precints/structure.
Applicant has to pay scrutinity fee with the application as table.8.17.1.
Table 8.17.1Scrutinity Charges for Steel Structure for maintainance purpose in Gamtal and Core Walled City
Use of building
Built-up Area(Sqmt)
Rate (Rs.)
(1)
(2)
(3)
Dwelling 1, 2 &3 for Residential purpose only
Upto 25
1000/-
Above 25 to upto 60
1000/-+ Rs.100 per Sqmt( for additional built up area more than 25 sqmt)
Above 60
4500/-+ Rs.150 per Sqmt( for additional built up area more than 60 sqmt)
Non Residance building
All
Rs.500 per Sqmt, but minimum Rs.10000 per unit.
Note :- in case of repairing started before grant of permission in such cases above charges shall be two times of respective categories.
Provided that reparing and restoration shall be permitted as per provision of regulations of CGDCR. Uses and FSI Utilised prior to 05/06/2017 shall be permitted without considering the road width. Such work shall be permitted only on the bases of structural report of registered structural engineer category – 1.
Any repairing and restoration work shall be carried out under the supervision of registered structure engineer category – 1 with experience of minimum 10 years.
Hospitality uses shall be permitted on all floors without considering road width.
Core Walled City (CW)
The Following specific Regulations shall be applicable in addition to other regulations specified in the respective chapter no.7 & 8.
Heritage Conservation Plan
Structures, Buildings and Precincts in the Core Walled City shall be notified under ‘Heritage Areas’ by the Competent Authority as identified in the Heritage Conservation Plan prepared by the Competent Authority with the help of Heritage Committee. The list of the Heritage Areas shall be made available to the applicant on request. The remaining areas shall be referred to as ‘Other Areas of Core Walled City’ in this Regulation.
Permissible Uses
The Permissible Uses for the Heritage Areas are: Dwellings‐1,2&3; Mercantile - 1 & 2 and Hospitality.
The owners of these heritage structures and buildings shall be required to conserve the following original aspects of their Buildings:
a. All Façades
b. Building Footprint
c. Character of Open Spaces such as courtyards, khadki, streets, etc.
For Other Areas of Core Walled City
The Permissible Uses in Other Areas are as per Table no. 7.3.1 for D1 to D7 category and Table No.- 7.3.2 for D8 category and these are regulated on the basis of the width of the abutting road as mentioned in Table no.9.2.1.
The extent of Commercial (Mercantile‐1 & Mercantile - 2) uses permissible in a Buildingunit shall be regulated according to the width of the road on which it abuts and as under:
Table 9.2.2Road Width and Commercial Use Permissible
No.
Road Width
Floors on which Commercial Use Permissible
(1)
(2)
(3)
1
9mts and less than 12mts
Ground Floor Only
2
12mts and Above
All Floors
Permissible uses in basement
Permitted uses in Basement are: parking, safe deposit vault, A.C. Plant, Grey water treatment plant, Sewage treatment plant, Water tank, storage other than inflammable material.
No habitable use shall be permitted in the basement.
Permitted uses in Basement of a Hospital Building: Radiation-producing device, Radiation Therapy Room, MRI or X-Ray room.
For basements exclusively for parking, any other permissible use is permitted only in basement level-1 up to a maximum area of 25% of the total built-up-area of the basement floor. This non-parking area shall be calculated towards the computation of FSI.
Services
No water connection or drainage connection shall be permitted in the Basement. In no case shall a connection with normal drainage line be provided in the Basement.
Addition to existing structure
The addition shall comply with the Regulations for construction of a new building.
For approved, individual, existing, detached and semi-detached dwelling units, permissible upper floors may be permitted as per sanctioned margins, staircase and projections.
Addition in building units with existing Buildings
For Building-units with approved existing buildings, additional buildings shall be permitted with compliance to Regulations for construction of a new building.
The additional buildings shall be permitted as per remaining FSI (i.e. after deducting the utilised FSI of the approved existing building from the maximum permissible FSI of the entire building-unit) with compliance to respective margins, permissible height, uses and all other applicable regulations.
Tradable Development Right (TDR)
Tradable Floor Space shall be provided for a Building‐unit with Heritage Structures or Building, or for Building‐units within a Heritage Precinct notified by the Competent Authority in the Heritage Conservation Plan.
Such Heritage Buildings shall be classified on the basis of their respective heritage value as per Heritage Conservation Plan. The Tradable Floor Space shall be provided as an incentive for Heritage Buildings for these categories as stated in the table below on the basis of the respective utilized FSI, irrespective of the area of Buildingunit:
Table 9.2.3Heritage Structure & Tradable FSI
No.
Heritage Structure
Tradable FSI
(1)
(2)
(3)
1
Highest Heritage Value
50% of total utilised FSI
2
High and Moderate Heritage Value
30% of total utilised FSI
3
Non-Listed
Nil
The Competent Authority shall issue Tradable Right Certificate (TRC) identifying the amount of Tradable Floor Space for the Building.
Maximum 10% of this Floor Space may be used for extensions or alterations to the existing notified Heritage Building within the limit of maximum permissible FSI. The
rest may be utilized through TDR mechanism in other zones where chargeable FSI is permissible.
A transparent mechanism based on e‐governance shall be prepared by the Competent Authority for monitoring the trading of TRC.
For Building‐units with area 500 sq.mts or less
In case of open or partially built plot, the ground coverage shall be the entire area of the Building‐unit after keeping require margin,common plot,setback, parking as per these regulation.
For Building‐units with area more than 500sq.mts and up to 1500 sq. mts
The permissible ground coverage shall be up to maximum 75% of the entire building‐unit area.
For Building‐units with area more than 1500sq.mts
The permissible ground coverage shall be up to maximum 65% of the entire building‐unit area.
Parking:
For Heritage Structures, Buildings and Precincts identified in the Heritage Conservation Plan, parking requirements shall not be required if the proposed uses are hospitality and/or sympathetic adaptive re‐use to residential.
For Other Areas in Core Walled City
Parking spaces for vehicles shall be provided within the Building‐unit for every new Building and /or extension in existing building constructed for the first use and /or when the use of old building is changed to any of the uses mentioned in Planning Regulation 8.12
For Building‐unit with area less than 100sq.mts for residential use, parking shall not be required. For Building‐units with area more than 100sq.mts, parking shall be provided as per Planning Regulation 8.12.
For Building‐unit with area less than 60sq.mts for non‐residential use, parking shall not be required. For Building‐units with area more than 60sq.mts, parking shall be provided as per Planning Regulation 8.12.
In case it is not feasible to provide the required parking as per Regulations due to any constraint, the Competent Authority may recover fees for deficit parking. This fee shall be decided by the Competent Authority and revised from time to time.
9.6Basement:
No basement shall be permitted within required set back ar
All-round margin of 1.00 m shall have to be kept from adjoining property for construction of basement
Basement may be provided with adequate structural safety during construction such as shoring and strutting and as per Performance Regulation no. 8.4.3
Road‐side margin of 4.5mts shall be provided.
For margins except Road‐side margin, space of 3.0mts shall have to be kept from adjoining building‐unit boundary for construction of basement.
Basement shall be allowed for parking if the area of Building‐unit is more than 300sq.mts.
For Building‐units with area more than 1500sq.mts, basement shall be allowed for parking at two levels.
Use of Basement
Permitted uses in Basement are: parking, safe deposit vault, A.C. Plant, storage other than inflammable material.
No habitable use shall be permitted in the basement.
Permitted uses in Basement of a Hospital Building: Radiation‐producing device, Radiation Therapy Room, MRI or X‐Ray room.
For basements exclusively for parking, any other permissible use is permitted only in basement level‐1 up to a maximum area of 25% of the total built‐up‐area of the basement floor. This non‐parking area shall be calculated towards the computation of FSI.
Addition or Extensions to Existing Structure:
Additions and/or alterations shall have to be carried out based on the guidelines provided in the Heritage Conservation Plan without compromising the original character of the buildings.
For Other Areas in Core Walled City
The addition shall comply with all Regulations for construction of a new building.
No addition or extension to a building shall be allowed unless the addition or extension is such as would be permissible if the whole building were reconstructed from the plinth with the open spaces required under the Regulations applicable to the site of the building at the time of the proposed addition or extension.
No addition or extension to a building shall be allowed which would diminish the minimum extent of open air space which is required by the Regulations applicable to the site of the building at the time of the proposed addition or extension
Set Back
The Set back of 3.00 m from central line of existing street shall be provided where regular line of street is not prescribed.
Note
The land left open as set back shall be deemed to be part of the street.
2.The competent authority shall permit the F.S.I. and Built-up of any plot or a building unit on the basis of its original area, if the owner of such a land is prepared to release the effected land by road widening or for construction of new road without claiming any compensation thereof.
Setback is not applicable to dead end streets and service lanes.
Setback should also be provided where prescribed line of street is less than 6.0 mt. But the land so left shall be allowed to cover from first floor onwards at a minimum clear height of 3.60 mt from ground level.
9.9Building Height
The maximum permissible building height shall be regulated according to the width of the road on which it abuts and as prescribed below table 9.9.1:
For Building-units abutting a khadki, chowk, fadia, alley or cul‐de‐sac, the maximum permissible Building Height shall be regulated as per the width of the road leading to such khadki, chowk, fadia, alley or cul-de-sac as mentioned in table 9.9.1:
Table 9.9.1Maximum Permissible Building Height In Gamtal for D1 to D8 Category
Sr. No.
Road Width (mt.)
Maximum Permissible Building Height (mt.)
(1)
(2)
(3)
1
Up to 7.50 m
Twice the widthof the abutting road or open space
2
Above 7.50 m and up to 12.00
15.00
3
12m.00 m and above
25.00
Note : For D3 and D6 Category maximum permissible building height shall be 10 mts.
Open to SKY Space
Open to sky space shall be provided for natural light and ventilation in conformity with the following Regulations. The location and dimensions of the open space shall be based on the dimensions of the Building-unit and the proposed building height, whichever is higher shall be applicable.
Regulation Based on Building Dimensions
For any Building having depth of 9.00 m or more from its front open space, an open-to-sky space with area of 5.60 sq.m. with no side less than 1.80 m at plinth level shall be provided for every 9.00 m depth. If the width of the Building is up to 4.50 m, then the size of this open to sky space shall be 3 sq.m. with no side less than 1.50 m.
If the depth of the Building does not exceed 18.00 m and has openings at least on two sides over a street or open to sky space of 2.40 m or more in width, then above provision shall not be applicable.
Regulation Based on Building Height
Minimum width of any interior open‐to‐sky space, which is used for light and ventilation of the room, shall be regulated on the basis of the building height as per as per table below:
Table 9.10.1Minimum Width Of Interior Open‐To‐Sky Space In Gamtal
Sr. No.
Building Height (mt.)
Minimum Width (mt.)
(1)
(2)
(3)
1
Up to10.00 m
1.20
2
Above 10.00 m and up to 15.00 m
1.80
3
Above 15.00 m
3.00
This open‐to‐sky space shall be provided at the level at which the light or ventilation is borrowed.
For the purpose of the above Regulations, the depth of the room shall not be more than three times the width of the room which abuts on the air space.
If the width of Building is upto 4.50 mt., then for Building with height more than 10.50 mt., the size of this open to sky space shall be 3.00 mt. with no side less than 1.50 mt.
General Requirement for Open‐to‐sky Space
Every exterior or interior, open space shall be kept free from any erection thereon and shall be kept open to sky with suitable and sufficient access.
No open drain except for rain water shall be constructed in any open space required by these Regutions.
Every such interior or exterior open air space, unless the latter is a street, shall be maintained for the benefit of such building exclusively and shall be entirely within the owner's own premises.
No construction work on a building shall be allowed if such work operates to reduce an open air space of any other adjoining building belonging to the same owner to an extent less than what is prescribed by any of these Regulations in force at the time of the proposed work to further reduce such open space if it is already less than what is prescribed.
Every open space, whether exterior or interior, provided in pursuance of any Regulation, or under an agreement lodged with the Authority shall be paved and be always kept free from any erection thereon and open to the sky, except 23.00 cm cornice or 30.00 cm eave or grill with opening not less than 8.00 cm X 8.00 cm. No weather shade or other protection shall overhang or project over the said open space or over a side set‐back so as to reduce the width to less than the minimum provided under these Regulations. No open drain except for rain‐water shall be free structure in any open space required by these Regulations.
Opening for ventilation shall open into an open to sky space with minimum dimension of 0.90 m X 0.90 m.
General Requirement for Open‐to‐sky Space
Every exterior or interior, open space shall be kept free from any erection thereon and shall be kept open to sky with suitable and sufficient access.
No open drain except for rain water shall be constructed in any open space required by these Regutions.
Every such interior or exterior open air space, unless the latter is a street, shall be maintained for the benefit of such building exclusively and shall be entirely within the owner's own premises.
No construction work on a building shall be allowed if such work operates to reduce an open air space of any other adjoining building belonging to the same owner to an extent less than what is prescribed by any of these Regulations in force at the time of the proposed work to further reduce such open space if it is already less than what is prescribed.
Every open space, whether exterior or interior, provided in pursuance of any Regulation, or under an agreement lodged with the Authority shall be paved and be always kept free from any erection thereon and open to the sky, except 23.00 cm cornice or 30.00 cm eave or grill with opening not less than 8.00 cm X 8.00 cm. No weather shade or other protection shall overhang or project over the said open space or over a side set‐back so as to reduce the width to less than the minimum provided under these Regulations. No open drain except for rain‐water shall be free structure in any open space required by these Regulations.
Opening for ventilation shall open into an open to sky space with minimum dimension of 0.90 m X 0.90 m.
Chowk
No person shall erect, construct or reconstruct from foundation or plinth a building more than 9 Mts. in depth from its front without providing an open space or chowk open to sky from plinth level for every 9 meters depth of the building, of at least 5.6 Sq.Mts. which may be reduced to a minimum of 3.0 Sq.Mts. with no side less than 1.5 Mts. case if the width of the property to be developed is 4.5 meters or less.This shall not be applicable to a building having doors and windows opening at least on two sides over streets or open compound not less than 2.4 meters wide provided the depth does not exceed 18 meters.
Common plot shall be required for building units of area 2000 sq.m. or more at the rate of 8% of the area of building unit. General requirements for common plot shall be as provided in regulation no 8.11.
Function of HCC:
(a) Heritage Conservation Committee will control and regulate the use and development of land within the HCA, including impositions of conditions and restrictions in regard to the open space to be maintained for buildings, the percentage of building area for a plot, the locations, number,size,height,number of story’s and architectural character of building and density of built up area allowed in specified area, the use and purpose to which a building or specified area of land may or may not be appropriated, the subdivision of plots, the discontinuance of objectionable uses of land , in any area in any specified periods parkimg spaces,loading and unloading spaces for any building and the sizes of projection and advertisement of the conservation plan, as per the guidelines specified to them time to time.
(b) Nothing mentioned in this regulation should be deemed to confer a right on the owner/occupier of the plot to demolish and/or reconstruct and/or make alterations to this heritage building/buildings in a HCA if in the opinion of the heritage conservation committee such demolition/reconstruction/alteration is undesirable.
(c) So as to preserve the beauty of the region, the heritage conservation committee shall have the power to direct especially in, areas designated by them, that the exterior design and height of buildings should have their prior approval.
(d) The size and shape of every plot shall be determined so far as may be to render it suitable for building purpose and where the plot is already built upon to ensure that the building complies with the provisions of the conservation from the heritage conservation committee for any alteration of boundaries of plots of individuals and joint ownership.
Regulation for Heritage Core Area: (Udawada Nagarpalika)
Definition:
(A) Heritage Core Area(HCA): Heritage Core Area means the area consisting of critical mass of building having strangest architectural features of the original dwelling units and heritage streetscape as shown in the plan with brown verge.
(B) Heritage Conservation Committee (HCC): is a Committee nominated by the state government for the purpose of implementation of the following with respect to the HCA
Members of Heritage Conservation Committee (HCC):
Sr. No.
Name of Member
Designation in committee
(1)
(2)
(3)
1
Prant officer, Valsad
Chairman
2
Sarpanch
Member
3
Town Planner, Valsad (Class-I)
Member
4
Representative of Udavada Samast Anjuman
Member
5
Architect Cum Heritage Expert- To be appointed by Udavada Samast Anjuman
Member
6
Junior Town Planner, Valsad Branch, Valsad (Class-II)
Member Secretary
Terms of References of the HCC:
(1) To advise the Competent Authority whether development permission should be granted and the condition of such permissions.
(2) To prepare a supplementary list of building,artifacts,structures, areas precincts of historic, aesthetic,architectural,cultural of environmental significance and a supplement list of natural features of environmental significance or scenic beauty including sacred groves,kills,hillocks,water bodies (and the areas adjoining the same,open areas,wooded areas,etc, to which this regulation shall apply
(3) To advise whether any relaxation, modification,alteration, or variance of any of the general Development Control Regulation is called for
(4) To advise the Competent Authory in framing special regulation for HCA.
(5) To advise the Competent Authory on applicability of Development proposal affecting listed heritage buildings in HCA and on moving the Government to modify the same.
(6) To prepare special design and guidelines/publications for listed heritage buildings,control of height and essential façade characteristics such as maintenance of special types of balconies and other heritage items of the buildings and to suggest suitable design adopting,appropriate material for replacements keeping the old form intact to the extent possible.
(7) To prepare guidelines relating to design elements and conversation principles to be adhered to and to prepare other guidelines for the purpose of this regulation.
(8) To advise the Competent Authority on evaluating the cost repairs to be given to owners to bring the existing buildings back to the original condition. For this purpose the Committee may also try to help the UADA to raise funds through private resources.
(9) To advise the Competent Authority on any other issues as may be required from time to time during the course of scrutiny of development permission and in overall interest of heritage/environmental conservation.
(10) To appear before the Government either independently of though or on behalf of the Competent Authority in cases of appeals related to listed heritage buildings in HCA.
Planning Regulation:-
(a) Amalgamation / Sub-division of the plots in the HCA shall not be allowed.
(b) No building(s)/structure(s) to its parts within the HCA shall be allowed to be demolished/ reconstructed /repaired without the prior permission of the Heritage Conservation Committee.
(c) Any change of use within the HCA may be permitted only after approval of the Heritage Conservation Committee.
(d) No road widening of the existing roads/paths/small lanes/gullies would be permitted in the HCA. The main Iranshah road shall be converted into a pedestrian road. The road widening in the buffer area shall not be allowed except in the specific area as approved by the Heritage Conservation committee.
(e) Position and placement of landmarks, shrines and wells within the precinct are to be retained. However in case of exigencies these can be shifted to a suitable within the precinct with prior permission of the Heritage Conservation Committee. No additional landmarks in the form of wayside shrines of crosses etc shall be permitted in the HCA.
(f) All the common open spaces and open spaces of the individual plots within the HCA shall be maintained without being built upon.
(g) Permissible FSI allowed to be consumed in this HCA shall not exceed the net F.S.I of the existing building.
(h) Basements shall not be permitted in any development or redevelopment in HCA.
(i) Existing street edge of the buildings shall be maintained. Existing buildings abutting a street shall not enclose the verandahs using any masonry or other opaque partitions.
(j) Construction of the compound wall in the front shall not be permitted in cases where their exists none originally. Whereas in cases where the compound wall already exists , the reconstruction of the same could be permitted with the permission of Heritage Conservation Committee and which shall be essentially transparent in nature having a height not more than 1.1 mts. above center line of the road. The design/section material etc. to be used for the construction of compound wall should match with the precinct character.
(k) Internal/ external staircases shall be maintained in its original form. In case where it has dilapidated it shall be restored to its original condition and form using the same material as it was originally made of .
No new additional staircases shall be permitted. In cases where the additional staircases are essential stability of the building and is not conspicuously visible from the access serving the plot with the prior permission of the Heritage Conservation Committee.
(l) No stilts shall be permitted in any development proposal within the HCA.
(m) Permissible height shall not be more than 9.0 m.
(n) Plinth shall be 0.6m to 1.2m from Ground level.
(o) Height of the floor shall not be less than 2.7m & more than 3.0m. The HCC shall give their opinion within 30 days of receiving the proposal from the Competent Authority.
Gamtal Area (GM)
The following regulations are applicable for Gamtal areas in addition to regulations specified in the chapter no.7 & 8.
Minimum Area of a Building-unit
Minimum area of a Building-unit shall be 18sq.mts with no side less than 3.0mts in width.
Amalgamation shall be permitted and in such cases 10% of the land shall be kept open on the road side.
Permissible Uses
The Permissible Uses are as per Table no. 7.3.1 for D1 to D7 category and Table No.- 7.3.2 for D8 category and these are regulated on the basis of the width of the abutting road
The types of uses permissible on a Building-unit shall be regulated according to the width of the road on which it abuts as mentioned below:
The extent of Commercial (Mercantile-1, Mercantile - 2 and Hospitality) uses permissible in a Building-unit shall be regulated according to the width of the road on which it abuts and as under:
Table 10.2.2Road Width and Permissible Uses
No.
Road Width
Floors on which Commercial Use is Permissible
1
9 mts and less than 12 mts
Ground Floor Only
2
12 mts and less than 18 mts
Ground and First Floor Only
3
18 mts and Above
All Floors
For Building‐units with area 500 sq.mts or less
In case of open or partially built plot, the ground coverage shall be the entire area of the Building‐unit after keeping require margin,common plot,setback, parking as per these regulation.
For Building‐units with area more than 500sq.mts and up to 1500 sq. mts
The permissible ground coverage shall be up to maximum 75% of the entire building‐unit area.
For Building‐units with area more than 1500sq.mts
The permissible ground coverage shall be up to maximum 65% of the entire building‐unit area.
For Other Areas in Core Walled City
The addition shall comply with all Regulations for construction of a new building.
No addition or extension to a building shall be allowed unless the addition or extension is such as would be permissible if the whole building were reconstructed from the plinth with the open spaces required under the Regulations applicable to the site of the building at the time of the proposed addition or extension.
No addition or extension to a building shall be allowed which would diminish the minimum extent of open air space which is required by the Regulations applicable to the site of the building at the time of the proposed addition or extension
Set Back
The Set back of 3.00 m from central line of existing street shall be provided where regular line of street is not prescribed.
Basement:
No basement shall be permitted within required set back ar
All-round margin of 1.00 m shall have to be kept from adjoining property for construction of basement
Basement may be provided with adequate structural safety during construction such as shoring and strutting and as per Performance Regulation no. 8.4.3
Road‐side margin of 4.5mts shall be provided.
For margins except Road‐side margin, space of 3.0mts shall have to be kept from adjoining building‐unit boundary for construction of basement.
Basement shall be allowed for parking if the area of Building‐unit is more than 300sq.mts.
For Building‐units with area more than 1500sq.mts, basement shall be allowed for parking at two levels.
Use of Basement
Permitted uses in Basement are: parking, safe deposit vault, A.C. Plant, storage other than inflammable material.
No habitable use shall be permitted in the basement.
Permitted uses in Basement of a Hospital Building: Radiation‐producing device, Radiation Therapy Room, MRI or X‐Ray room.
For basements exclusively for parking, any other permissible use is permitted only in basement level‐1 up to a maximum area of 25% of the total built‐up‐area of the basement floor. This non‐parking area shall be calculated towards the computation of FSI.
Addition or Extensions to Existing Structure:
Additions and/or alterations shall have to be carried out based on the guidelines provided in the Heritage Conservation Plan without compromising the original character of the buildings.
Note
The land left open as set back shall be deemed to be part of the street.
2.The competent authority shall permit the F.S.I. and Built-up of any plot or a building unit on the basis of its original area, if the owner of such a land is prepared to release the effected land by road widening or for construction of new road without claiming any compensation thereof.
Setback is not applicable to dead end streets and service lanes.
Setback should also be provided where prescribed line of street is less than 6.0 mt. But the land so left shall be allowed to cover from first floor onwards at a minimum clear height of 3.60 mt from ground level.
Regulation Based on Building Height
Minimum width of any interior open‐to‐sky space, which is used for light and ventilation of the room, shall be regulated on the basis of the building height as per as per table below:
Table 10.8.1Minimum Width Of Interior Open‐To‐Sky Space In Gamtal
Sr. No.
Building Height (mt.)
Minimum Width (mt.)
1
Up to10.00 m
1.20
2
Above 10.00 m and up to 15.00 m
1.80
3
Above 15.00 m
3.00
This open‐to‐sky space shall be provided at the level at which the light or ventilation is borrowed.
For the purpose of the above Regulations, the depth of the room shall not be more than three times the width of the room which abuts on the air space.
If the width of Building is upto 4.50 mt., then for Building with height more than 10.50 mt., the size of this open to sky space shall be 3.00 mt. with no side less than 1.50 mt.
Building Height
The maximum permissible building height shall be regulated according to the width of the road on which it abuts and as prescribed below in table 10.7.1:
For Building-units abutting a khadki, chowk, fadia, alley or cul‐de‐sac, the maximum permissible Building Height shall be regulated as per the width of the road leading to such khadki, chowk, fadia, alley or cul-de-sac as mentioned in table 10.7.1.
Table10 .7.1 : Maximum Permissible Building Height In Gamtal for D1 to D8 Category
Sr. No.
Road Width (m)
Maximum Permissible Building Height (m)
(1)
(2)
(3)
1
Up to 7.50 m
Twice the widthof the abutting road or open space
2
Above 7.50 m and up to 12.00
15.00
3
12m.00 m and above
25.00
Note : For D3 and D6 Category maximum permissible building height shall be 10 mts.
Open to SKY Space
Open to sky space shall be provided for natural light and ventilation in conformity with the following Regulations. The location and dimensions of the open space shall be based on the dimensions of the Building-unit and the proposed building height, whichever is higher shall be applicable.
Regulation Based on Building Dimensions
For any Building having depth of 9.00 m or more from its front open space, an open-to-sky space with area of 5.60 sq.m. with no side less than 1.80 m at plinth level shall be provided for every 9.00 m depth. If the width of the Building is up to 4.50 m, then the size of this open to sky space shall be 3 sq.m. with no side less than 1.50 m.
If the depth of the Building does not exceed 18.00 m and has openings at least on two sides over a street or open to sky space of 2.40 m or more in width, then above provision shall not be applicable.
Chowk
No person shall erect, construct or reconstruct from foundation or plinth a building more than 9 Mts. in depth from its front without providing an open space or chowk open to sky from plinth level for every 9 meters depth of the building, of at least 5.6 Sq.Mts. which may be reduced to a minimum of 3.0 Sq.Mts. with no side less than 1.5 Mts. case if the width of the property to be developed is 4.5 meters or less.This shall not be applicable to a building
having doors and windows opening at least on two sides over streets or open compound not less than 2.4 meters wide provided the depth does not exceed 18 meters.
Common plot shall be required for building units of area 2000 sq.m. or more at the rate of 8% of the area of building unit. General requirements for common plot shall be as provided in regulation no 8.11.
Gamtal Extension (GME)
The regulations, other than building height regulation are applicable for Gamtal Extension area as per regulation mentioned in chapter no.7 & 8 other than regulation for Industrial zone and Industrial uses.
Permissible Use:
The types of uses permissible in a Building unit shall be regulated according to the zoning table in planning regulation 7.3.1 for D1 to D7 category and table 7.3.2 for D8 category and as per width of the road and as mentioned in Planning Regulation 7 and 8 except Industrial Uses.
Building Height
The maximum permissible building height shall be regulated according to the width of the road on which it abuts and as prescribed below:
Table 11.2.1Maximum Permissible Building Height In Gamtal for D1 to D8 Category
Sr. No.
ROAD WIDTH (m)
MAXIMUM PERMISSIBLE BUILDING HEIGHT (m)
1
Up to 7.50 m
Twice the widthof the abutting road or open space
2
Above 7.50 m and up to 12.00
15.00
3
12m.00 m and above
25.00
For Building-units abutting a khadki, chowk, fadia, alley or cul‐de‐sac, the maximum permissible Building Height shall be regulated as per the width of the road leading to such khadki, chowk, fadia, alley or cul-de-sac as mentioned in table above.
Residential Affordable Housing (RAH)
In addition to the requirements specified under other Planning Regulations, the following Regulations shall also be applicable for the buildings in this zone.
(a) Affordable Housing is predominantly Residential development for providing Affordable Housing of dwelling units up to 80 sq.mts along with ancillary commercial use up to 10% of the total utilized FSI.
a. Regulations for all development in Building-units in RAH zone, that do not opt for providing Residential Affordable Housing, shall be as per respective base zones.
b. Affordable Housing as a use is permitted in all zones except all types of industrial Zones, Restricted Zone, Residential 3 and agriculture Zone. R1, R2, TOZ and on Closed Textile Mill Zone (CZ). It is also permitted in Gamtal Extension (GME) with subject to relevant regulations.
c. RAH is not permitted in Industrial Zone-General (IG), Industrial Zone-Special (IS), SPD-2 Science Park and GIDC Estates.
d. Minimum density for any proposed Residential Affordable Housing shall be 225 dwelling units per hectare and part thereof.
e. If the line of RAH Zone divides any Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development of Residential Affordable Housing, irrespective of the part of the Survey No./Block No./Final Plot No. that is not in RAH Zone. This incentive shall not be valid for Survey Numbers amalgamated after the date of publication of the Development Plan
Floor Space Index
Permissible Floor Space Index (FSI)
a. Projects under Residential Affordable Housing (RAH) shall utilize a minimum FSI of 1.8 and maximum 2.7 to avail the benefits of “RAH”.
b. Base FSI shall be available as per relevant GDCR. Additional FSI be charged by authority as under.
Table 12.2.1Chargeble FSI for RAH Dwelling
No.
Residential Dwelling units built up area ( sq.mts)
Additional FSI Charge
(1)
(2)
(3)
1
up to 50
10% of jantri Rates
2
more than 50 and up to 66
20% of jantri Rates
3
more than 66 and up to 80
30% of jantri Rates
c. For proposed development combining dwelling units of multiple range of areas (up to 50 sq.mts, more than 50 and up to 66 sq.mts, more than 66 and up to 80 sq.mts), the payment value for additional chargeable FSI shall be calculated as per Table-1 on prorate basis.
Maximum Permissible Building Height
If two buildings next to each other have different heights, required margin for taller building shall be applicable. For example- if one building is of 25mts and the adjacent building is of 45mts in height, the minimum margin between these two buildings shall be 9.0mts.
In case of required margin is not provided than the length of common wall between any two semi-detached buildings shall not be less than 25% of the maximum width of the building parallel to common wall joining together at every floor.
Entire Area available after providing for the required margins, Common plot and other Regulations may be utilized for construction of the super structure.
Minimum Requirements for Parking
Parking spaces shall be provided within the Building-unit as under:
Table 12.4.1Parking Requirement
No.
Type of Use
Minimum Parking Required
Visitor's Parking
(1)
(2)
(3)
(4)
1
Affordable Residential Apartments with dwelling units of built-up area up to 66 sq.mts.
10% of utilised FSI
An additional 10%, of the required parking space shall be provided as Visitors parking.
2
Affordable Residential Apartments with dwelling units of built-up area more than 66 sq.mts.
20% of utilised FSI
10% of the required parking space shall be provided as Visitors parking.
3
Commercial Use
50% of respective utilised FSI
20% of the required parking shall be provided as Visitors parking.
In case the maximum permissible FSI is not utilised, for any extension or additions in the future, additional parking shall have to be provided as required for this additional utilized FSI.
Parking requirements shall conform to provisions of Planning Regulation 8.12.
The owners/ applicant shall have an options to carry out development in under the affordable housing policy (Mukhyamantri Awas Yojana) of the state government also.
Advertising Display & Communication Infrastructure
Permission shall be required for any nature of outdoor Advertising Display Infrastructure or Communication Infrastructure Telecommunication infrastructure/ microwave communication tower as per Schedule 18 (other than sign boards for way-finding). This is applicable for but not limited to Billboards with Liquid Crystal Display Board (LCD) Light emitting diodes (LED), Kiosks, Wall Signs, Glass display, Vehicles (non-motorized and motorized etc.), floating balloons, digital display.
Advertising Display Infrastructure
Billboards I Hoardings in Marginal Space
One Billboard I Hoarding is permitted in the margin open space up to 500sq.mt area of the Building Unit. Up to a maximum of two Billboards per Building Unit shall be permitted in the marginal open space in Building Unit above 500 sq mt.
The Billboards/ Hoarding shall be permitted in the marginal space of the Building Unit as under:
Table 19.1.1Minimum marginal space
Location
Road Width (mt.)
Max.Billboard/ Hoarding Size (w x h) (mt. xmt.)
Min. Margin Road Side (mt.)
Min.Ground Clearance (mt.)
Max. Height (mt.)
(1)
(2)
(3)
(4)
(5)
(6)
Marginal Open Spaces
up to 60
9.0 x 4.5
0.6
3.0
15.0
Above 60
12.0 x 6.0
1.5
3.0
15.0
Lighting may extend beyond the stipulated maximum height of for the billboards erected on ground.
Table 19.1.2Billboards/ Hoardings on Roof tops I Terrace
Location
Road Width (mt.)
Max.Billboard / Hoarding Size (w x h) (mt. xmt.)
Max. no. of billboard/hording size
Min. Margin (mt.)
Max. Height from top of Terrace (mt.)
Road Side
Between two Biiiboards
(1)
(2)
(3)
(4)
(5)
(6)
(7)
On Roof Tops Terrace
up to60
12.0 x 6.0
2 (different facing directions
1.5mtfrom parapet
1.5
7.5
Above60
18.0 x 9.0
10.5
Notes:
On Roof Tops: Maximum permissible height of the Billboard/ Hoarding shall be considered over and above the permissible/ existing height of the Building.
No Roof top Billboards/ Hoardings shall extend beyond the Building line of the building on which it is erected, nor shall it extend beyond the roof in any direction.
Lighting may extend beyond the stipulated maximum height of for such billboards/ hoardings within the building-unit.
Billboards/ Hoardings on Public Roads
*[The Billboards/ Hoardings on Public Roads shall be permitted and shall be regulated as under:
Provided that, the competent authority shall decide with respect to the following for which it shall record reasons in writing
(2) Allow/Disallow the erection on specific locations considering the safety.]
Billboards in Urban Renewal Project Areas
These Billboards must confirm with these Regulations and with the Local Area Plan or special restrictions for the area, which may include additional Regulations or requirements.
Heritage Buildings and Precincts
The Competent Authority can deny the permission on the grounds of protecting the ambience of heritage buildings and precincts.
General Restrictions:
Billboards will be restricted in the following scenario:
Any Billboard which may obstruct the vision required for safe traffic movement
Any Billboard which in the opinion of the Competent Authority is likely to be confused with authorized traffic signs or signals
Any Billboard containing the word "Stop" ,"Look" ,"Danger" or other similar word that might mislead or confuse the travelers
Any Billboard that is attached to or printed on a rock or other natural objects*[Deleted ]
Any Billboard that is prohibited or restricted for the purpose of public appearance under local or state or national law.
Any Billboard with over hang over public property which obstructs access or egress from any building.
Any Billboard/ Hoarding containing unfair, vulgar matter or advertisement that is considered objectionable in Competent Authority's opinion shall not be permitted. Advertisements that are prohibited by the Government shall not be permitted.
Billboard/ Hoarding shall not project outside the boundary of the Building-unit.
The structure of the billboard/ hoarding or any lighting reflector shall not project outside the boundary of the Building-unit.
Communication Infrastructure Telecommunication infrastructure/ microwave communication tower
Provisions shall apply for Communication infrastructures such as Post &Telegraph, Telephone, Wireless, Broadcasting, Cellular Mobiles, Internet, 'V' Set, ATM, Channel Discs and Overhead lines (for telephone, digital connections for internet and channels and other similar forms of communication.
Location:
The communication Infrastructure shall be either placed on the building roof tops or terraces at a distance of minimum 1.5mts from the parapet, or on the ground or open space within the premises subject to other Regulations.
Special Regulations
Permissible Uses in Closed Textile Mills Zone (CZ)
Definition:
a) "Textile Operations" meansoperations like spinning,weaving,winding,warping, sizing, processingandgarmentmaking,yarns,fabricmaking.
b) "Closed Textiles Mill/s" means textile mills registered under the Companies Act or included in the list of textile mills which forms the part of Chief Justice Miyabhoy Committee report or those mills where the property records or the revenue or such other government records which certify that such mill is assessed as textile mill and had textile operations.
c) "Closed Textile Mill Land" means such land which as per revenue records/city survey records is used for closed textile mill.
Permissible Uses & FSI inClosed Textile Mill Zone (CZ) shall be as per:
a) Base Zone : Industrial - General Zone (IG), with its respective uses and FSI as specified in Regulation 7.7
b) Uses as per Knowledge and Industrial Zone (KZ) and Residential Affordable Housing (RAH) with respective permissible FSI specified as under:
No.
Proposed Use
BaseFSI
Additional Chargeable FSI @ 40% Of Jantry Rate
WithinTOZ
OutSideTOZ
1
Knowledge Zone (KZ) & Residential Affordable Housing (RAH)
1..8
2
0.9
a) In case of AUDA, for all closed textile mills, wherein the variation is made under section 19 vide different notifications published on different dates, before 11.02.2013 (the date of publishing under section 13),the use and FSI shall be applicable as sanctioned in relevant notifications, in any cases either the development permission has been granted or not.
When permissible uses- Dwelling-1,2&3 are allowed on Closed Textile Mill Zone (CZ) under KZ or RAH, certification shall be required from Gujarat Pollution Control Board.
In the land of closed textile mills, for the any development permission, any owners/applicants intending to develop such land for any purpose shall contribute to the competent authority, land admeasure an aggregate of 40% the portion of plot/ building unit/ final plot for which development permission is sought.
Regulations for Knowledge Precinct
Local Area Plans, including measures for street development, parking management and pedestrianization, shall be prepared for this precinct.
Regulations for Gandhi Ashram (AUDA) : Comprehensive Area Improvement Scheme (GACAIS)
Conservation of Building having Historic, Architectural & Archaeological Significance.
a) The buildings in this area owned by Trusts Related to Gandhi Ashram Activities (TRGA) area to be conserved retained and maintained in the original state.
b) The buildings above, if proposed for renewal or reconstruction by new building, these shall be reviewed by the Competent Authority.
Slum Rehabilitation: The slums existing within this area needs to be rehabilitated on available government/ municipal/ trust land within this area in due course of time for which M.G.F. Trust and TRGA shall assist AMC.
SpecialControl Regulations
For area except in (B) shall be considered as Residential zone-1.
For building-units/ plot abutting Ashram Road from Wadaj Circle to Subhash Circle owned by Govt, TRGA and AMC within GACAIS following control Regulations shall be applicable.
Only residential and institutional uses like educational,cultural,social health,etc public purposes, tourist support facilities like hotel restaurant sale shop/showroom for art gallery and handy craft,which shall be permitted.
Maximum permissible height shall be 10mts.
The colour of exterior portion of the building shall be aesthetically match with the ambiance of Gandhi Ashram. Only white light sheds shall be permitted.
Every property in this area in the open space shall plant as many trees as prescribed by the Competent Authority and maintain the same.
Minimum margins shall be provided as per Regulation No. 8.4
Regulations for SPD-2- Science Park
Local Area Plan shall be prepared by the Competent Authority that shall identify permissible uses and regulate density.
Uses and Planning regulation as per Residential 1 (R1) shall be permitted as per chapter no. 7 and chapter no.8.
Regulations for Sabarmati Riverfront Development
The Sabarmati Riverfront Development Corporation Ltd. (SRFDCL) has prepared special Regulations pertaining to ground coverage,margins, height of building, use of building etc. to regulate the development in the Sabarmati Riverfront Development Area. These Regulations prepared for the Sabarmati Riverfront Development Area will prevail over the General Development Regulations.
Section D: Performance Regulations
Buildings and Infrastructure
Architectural Elements
Boundary Wall/ Compound Wall For all Buildings other than Industrial:
The height of a boundary wall towards the road‐side shall not exceed 1.5mts from the crown of the adjacent road and 1.8mts from the crown of the adjacent road for all other sides of the building‐unit.
For building‐units at junction of roads, a grill fence shall be provided with the following provisions:
a. At least 50% perforation in the grill.
b. The base of the fence shall not exceed 0.8mts from the level of the crown of the adjacent road for a length of 9mts. from the corner of the building‐unit at the junction.
For Industrial Buildings:
The height of a boundary wall on all sides shallnot exceed 3mts from the crown of the adjacent road.
Transit Oriented Zone, Smart City Node and Transport Node (SPD4)
In addition to the requirements specified under other Planning Regulations, the specific following Regulations shall also be applicable for the buildings in this zone.
This zone is planned for high density development other than industrial use. The following regulations are applicable in addition to other general regulations.
a. Local Area Plans in case of AUDA only, including measures for Plot utilisation, road widening, parking management and pedestrianization, shall be prepared for this Zone. seek approval of such local area plan from the government.
b. Regulations identified for Local Area Plan shall prevail over these Regulations.
c. If the line of Transit Oriented Zone divides a Survey No./Block No./Final Plot No., the entire Maximum Permissible FSI shall be permissible for development, irrespective of the part of the Survey No./Block No./Final Plot No., that is not in TOZ. This incentive shall not be valid for Survey Numbers amalgamated with Survey Numbers outside this zone after the date of publication of the Development Plan.
Entire Area available after providing for the required margins, Common plot and other Regulations may be utilized for construction of the super structure.
Relaxation in Parking
For Building‐units within the Transit Oriented Zone with Commercial (Mercantile‐1) Use, the parking requirement shall be as under:
Type of Use
Minimum Parking Required
Visitor's Parking and Remarks
Mercantile-1
35% of Total Utilised FSI
20% of the required parking shall be provided as visitors parking
Note: In case the maximum permissible FSI is not utilised, for any extension/additions in the future, additional parking shall have to be provided as required for this additional utilised FSI.
In case of Metro Rail Transit (MRT) corridor the regulations of the Transit Oriented Zone shall be applicable only after finalization and notification of the MRT corridors by the
State Government of Gujarat. And any change in BRTS route shall be considered for TOZ development at the time of approval replacing earlier route.
2.The revenue generated from the sale of chargeable FSI for this zone shall be distributed between Concern Urban Local body and Development authority, MRT & Sardar Sarovar Narmada Nigam Limited etc. as the case may be as decided by the Competent Authority.
Restricted Zone (RZ)
In addition to the requirements specified under other Planning Regulations, the following Regulations shall also be applicable for the buildings in this zone.
This Zone includes Restricted Residential Zone (VUDA), Restricted Residential Zone (JADA), Flood Prone Area / Zone, Restriction Zone RZ1, RZ2, RZ3, RZ4 of VUDA, Hazard Prone Area, Defense Zone
Restricted Residential Zone (VUDA)
Residential Dwelling Units according to the regulations as Residential Affordable Housing. “50% of the plot/building unit shall be permitted to be used as per the regulations governing the Residential 1 (R1) and for the remaining area, only residential development with dwelling units in accordance, to the regulations as Residential Affordable Housing shall be permitted. Provided that such dwelling units shall not exceed 80 sqmts and 50% which shall have maximum builtup area of 40 sq.mts”.
Restricted Residential Zone (JADA)
All uses permitted mentioned Residential 1 (R1) Residential with height restriction up to 10 mts. Use may be permitted subject to NOC Residential 1 (R1) from defense authority in this zone. The General Development Requirements i.e. minimum building unit area, FSI, common plot, parking, basement and other shall be as per mentioned in regulations of Residential 1 (R1) is applicable.
Restriction Zone RZ1 :
All Structures / buildings or developments which are necessary to control floods/ prevent pollution of the river/ pond/lake and its vicinity land shall be permitted.
Restriction Zone RZ2
All Structures / buildings or developments which are necessary to control floods/ prevent pollution of the river/ pond/lake and its vicinity land shall be permitted. Also developments / constructions not exceeding 5% of the building unit with ground floors only, and which would preserve / conserve / enhance the natural scenery and landscape of the area shall be permitted.
Restriction Zone RZ3
No development shall be permitted in such areas.
Restriction Zone RZ4
All Structures / buildings or developments which would preserve features, structures or place as historical, natural, architectural or scientific interest and of educational value. (which are around Laxmi Vilas Palace, required to be kept open to preserve, conserve and development of the area for natural scenery and landscape)
Hazard Prone Area:
Any kind of development permission is subject to NOC and permission of Competent Authority
Defense Zone :
Permissible uses are permitted As per defense and Central Government Authorities Regulation.
Vacant Land
No development activity shall be allowed in this area / Zone.
Central Business District (C4)
In addition to the requirements specified under other Planning Regulations, the following Regulations shall also be applicable for the buildings in this zone.
Local Area Plan, including measures for plot utilisation, road widening, parking management and pedestrianization, shall be prepared for this Zone. Regulations identified for Local Area Plan shall prevail over these Regulations.
To ensure that, in CBD high density development is achieved in planned manner development permission for higher FSI shall only be granted if the land under consideration is a part of any local area plan prepared by Ahmedabad Urban Development Authority and appropriate authority seek approval of such local area plan from the government.
Maximum Permissible Height
There is no restriction on the Maximum Permissible Building Height subject to clearance from the Airport Authority and shall be counted as per Planning Regulation 8.3
Entire Area available after providing for the required margins, Common plot and other Regulations may be utilized for construction of the super structure.
Mining, Quarrying and Brick Kiln
The following Regulations shall govern Mining, Quarrying and Brick Kiln operations and shall form conditions for development permission:
Any mining, quarrying and brick kiln operations without any blasting shall be permitted within a distance of 75mts from the boundary of any public road, railway line, canal, transmission line or any other building.
No mining, quarrying and brick kiln operations which involves blasting shall not be permitted within a distance of 200mts from any public road, railway line, canal, transmission line or any other building.
No building operations shall be permitted on the plot on which mining and quarrying and brick kiln operations have been permitted, without the prior approval of the authority
The mining, quarrying and brick kiln shall be permitted for a stipulated period not exceeding three years from the date of development permission at a time and shall be so prescribed in the development permission.
in the vicinity.
The mining, quarrying and brick kiln operations below the average ground level shall be permitted only for the extraction.
For Brick Kiln, every manufacturer of clay bricks, tiles or blocks shall use at least 25% of fly ash
Special Buildings
In addition to the requirements specified under other Planning Regulations, the following Regulations shall also be applicable for the buildings classified as Special Buildings
Special Buildings
The following Buildings are classified as Special Buildings:
Cinema Theatre, Drive In‐Theatre, Assembly Hall Or Auditorium, Town Hall, Lecture Hall, Exhibition Hall, Theatre, Museum, Stadium, Convention Centre, Club, Golf course, Multiplex, Shopping Mall and Telephone Exchange.
Location:
The building for the above purpose shall be located directly on a road of 30mts or more in width.
The building for the above purpose shall be located directly on a road width as below.
Table 17.1.1Location of Special Building w.r.t. Road Width
Sr.no.
Category
Width of Road (mt)
(1)
(2)
(3)
1
D1
30
2
D2
24
3
D7 (A) & D7 (B)
18
Margins
Table 17.1.2
No.
Minimum Road Side Margin (meters)
Minimum Side & Rear Margin (meters)
1.
12.0
6.0
The Road side margin may be permitted to be covered up to 6mts. from the building line with a projected cantilever structure (porch) at a height of not less than 3.00mts from the ground level. This cantilever structure shall not be counted towards computation of FSI.
Parking shall be permitted in road‐side margin after leaving minimum 6.0mts from the Building unit boundary. This minimum 6.0m shall be utilised for shade giving trees and plantation purpose.
Fuelling Stations
Building‐units for use as Fuelling Stations shall comply with Petroleum Rules 1976 under the Petroleum Act 1934.
Area and Frontage
The minimum area and frontage of a Building‐unit for a Fuelling Station or Fuelling with Service Station shall be as follows:
Table 18-1Minimum margins
Sr.No.
Fuelling Station Type
Minimum Area of Building-unit
Minimum Frontage on Road Side
(1)
(2)
(3)
(4)
1
Fuelling Station(without Service Station)
1000(other than category D7(B) and D8)
30mts
500(for category D7(B) and D8)
2
Fuelling with Service Station
2000(other than category D7(B) and D8)
30mts
1000(for category D7(B) and D8)
Location
Fuelling Station shall be permitted only on Road width of 18mts and more in any Zone.
The location of Fuelling Station or Fuelling with Service Station shall be at a distance of 50mt, away from the junction of two or more roads. The minimum distance shall be computed from the boundary line of the Building‐unit to the edge of the road as indicated in the illustration.
In the case the Station is provided along a main road which has a service road or a marginal access road, the access to the Station should be provided from the service road or the marginal access road and not from the main road.
Maximum Permissible Ground Coverage
Maximum Permissible Ground Coverage for Fuelling Station and Fuelling with Service Stations shall be 45% of the Building‐unit including the area of the canopy.
Margins
For Fuelling Station:
Road side margin from canopy to the plot boundary shall be as per Planning Regulation 8.4 subject to minimum 6.0mts. On all other sides, margin from canopy to the plot boundary shall be 4.5mts and 6.0mts in the case of canopy having height up to 6.0mts and more than 6.0mts from ground level respectively.
Marginal distance form curb site (Fuelling Pedestal) to the plot boundary towards main road shall be minimum 9.0mts and for other sides of the plot, it shall be 6.0mts.
Administrative building for the petrol pump shall have minimum road side margin as per planning regulation 8.4; minimum side and rear margin of 3.0mts and as per Planning Regulation 8.4. Zero margins can be provided towards canopy but minimum 6.0mts clear drive way shall be provided to any curb site.
Minimum 6.0mts clear drive way shall be maintained between every curb site (fuelling pedestal).
Minimum width of access road shall be 6.0mts.
For Fuelling Station with Service Station:
Road side margin from canopy to the plot boundary shall be as per Planning Regulation no. 8.4 subject to minimum 6.0mts and all other sides shall be 6.0mts. Provision of above (2) and (4) in Planning Regulation 8.4 will remain the same.
While building of service station can have zero margins towards canopy, subject to minimum 6.0mts towards road side and 3.0mts towards other sides of the plot.
Clear 6.0mts drive way between curb site (Fuelling pedestal) and service station building shall be provided.
Minimum width of access road shall be 6.0mts.
Height
The maximum allowable height shall be 7.5mts.
Floor Space Index
Subject to other Regulations
Common Plot shall not be required
Every Fuelling Station and Fuelling with Service Station should provide minimum parking spaces
on the basis of the Building unit Area as stated in the table below:
Table 18-2Minimum parking
No
Fuelling station (area)
Minimum parking requirement
(1)
(2)
(3)
1
1000,(other than categoryD7(B) and D8)
3 cars and 5 two-wheelers
500(for categoryD7(B) and D8)
2
2000 (other than category D7(B) and D8)
For every 500 sq.mts more than 1000sq.mts, additional parking for 1car and 2 two-wheelers shall be required.
1000 (for category D7(B) and D8)
Basement
No basement shall be allowed
21.1.11Basement
Basement is allowed within a building‐unit as per Regulation no 8.13.
The area available after providing the required margins may be utilized for basement, as per Regulation no. 8.4.3
It may be provided at more levels, as per Regulation no. 8.13
Basement in a building shall have a minimum clear height of 2.8mts or as per Regulation no. 8.13and Regulation no.21.1.11
If basement is used for parking, vehicular ramps shall be provided as specified in Regulation no. 8.13and Regulation no.21.1.11
In cases where the permitted margin of the basement is lesser than the permitted margin of the super structure, no level difference shall be permitted in the marginal space of the building. Such marginal space shall be open to sky and motorable as per Fire Prevention and Life Safety Measures Regulation-2016 and amended from time to time, if specified in the competent authority GDCR.
During construction of basement, necessary shoring and strutting including sheet piling shall be required.
Provision for drainage or water supply shall not be permitted in the basement.
Material used for construction of basement shall be fire resistant. Wood or any other combustible material shall not be used as structural members of a basement.
No direct entry from the road shall be permitted to the basement. Access to the basement to be provided as per Fire Prevention and Life Safety Measures Regulation-2016 and amended from time to time.
Railings
A parapet/railing with a minimum height of 1.15mts from the finished floor level shall be provided to ensure safety at all accessible edges of a building such as roof edges, staircase, terrace, balcony, floor edges or any large openings and/ or fully glazed window.
Railing for staircase shall be as Fire Prevention and Life Safety Measures Regulation - 2016 and amended from time to time.
The maximum dimension of the railing/parapet perforations shall not exceed 0.15mts.. A
In buildings meant for predominant use by children, it will be necessary to suitably alter the height of the fixtures.
Hand – rail for any level difference shall be provided with a pipe of minimum diameter of 40 mm. and as illustrated across.
Fixing Detail of Handrail to the Wall
Terrace
Terrace of a building shall be accessible by a common staircase and be free from partitions.
Staircases
Staircase in a building and its specifications shall be determined as mentioned in the table below. The minimum width of the flight shall be exclusive of parapet and floor‐mounted railing.
Table 21-1.1staircase detail
No
Use
Height of Building (mt)
Staircase
Min. Flight Width (mt)
Min. Tread (mm)
Max. Riser (mm)
1
Residential Use
1.a
Dwelling-1&2
Three floor up to 12m
1.0
250
200
1.b
Dwelling-1&2
More than 12 up to
1.5
250
200
1c.
Dwelling-1&2
25m More than 25m
2.0
300
160
1d.
Dwelling-3
up to 12
1.2
250
180
1e.
Dwelling-3
More than 12 up to
1.5
250
180
1f.
Dwelling-3
More2th5man 25m
2.0
300
160
2
Non Residential Use except industrial and assembly Use
No
Use
Height of Building (mt)
Staircase
Min. Flight Width (mt)
Min. Tread (mm)
Max. Riser (mm)
2a
Use as per sr.no.2
Up to 25m
1.5
300
160
2b.
More than 25m
2.0
300
160
3
Assembly
For all heights
2.0
300
160
4
Industrial
For all heights
1.5
300
160
Note: It shall be permitted to provide two staircases of width 1.5mts as an alternative of one staircase of 2.0mts, two staircases of width 1.2mts as an alternative of one staircase of 1.5mts within the travel distance as specified in table 21.1.2 below.
Staircase for Basement:
a. The staircase to the basement shall have the same width as the regular staircase leading to upper floors.
b. Any staircase leading to the basement shall be as per Fire Prevention and Life Safety Measures Regulation-2016 and amended from time to time.
c. A staircase shall be provided from the lowest level of the basement as a means of access or exit at a travel distance mentioned in the table below:
Table 21.1.2Travel distance based on building use
Sr.No.
Building Use
Travel Distance (mt.)
1.
Residential Use
30
2.
Non residential Use, Mixed-Use
25
3.
Hazardous Use
20
Staircase for all Buildings other than detached and semi‐detached dwelling units: Separate staircase shall be provided if the ground floor or any other floor in a residential building is used for non‐residential purpose.
For all buildings, staircase shall be compliant with Fire Prevention and Life Safety Measures Regulation-2016 and amended from time to time.
Ramp
Ramp for Vehicular Access
a. Minimum width and radius for a ramp for two‐wheelers, cars and trucks, respectively are specified in the table below:
Table 21-3Minimum width of ramp and radius of inner curve based on type of vehicles
Vehicle
Minimum width of ramp (mt.)
Minimum radius of inner curve (mt.)
Two-wheeler
2.0
2.0
Car
3.0
3.0
Truck
6.0
4.0
b. The maximum slope of ramp shall be 1:7.
c. A level platform of width equal to ramp width and length of minimum 4.5mts. shall be provided at end of the ramp at ground level and basement level.
d. A minimum clear height of 2.6mts shall be maintained at all points on the ramp.
e. For parking in basement/s, the number and width of ramp shall be provided as specified below and as per 21.4(as applicable):
Table 21-4Ramp details based on area of parking in basement
Area of Parking in Basement
Number of Ramps
Width of Ramp
≤750 sq.mt
1
3.0 mt
> 750 sq.mt
1
6.0mts
2
3.25mts each
Ramp for Pedestrians: For Buildings exceeding 4mts height with following uses: Institutional, Assembly, Public Institutional, Educational‐2, Mercantile and Business; a pedestrian ramp shall be provided unless provision for a lift is made as per Regulation 2 1 . 1 2 . The ramp shall be provided with the following specifications:
a. The minimum width of the ramp shall be 1.2mts, 1.5mts and 1.8mts for the ramp length of 3.6mts, up to 9mts and more than 9mts respectively.
b. A landing shall be provided of 1.5mts depth for every 9 mts length of the ramp.
c. The slope of a ramp shall not exceed 1 in 12.
d. Surface of the ramp shall be slip‐resistant and the edge of the ramp shall be protected with a minimum height of 100mm.
e. Handrails on the ramps shall be on both sides at two levels; at 700mm and 900mm, both ends shall be rounded, grouted and extended 300mm beyond top and bottom of ramp.
f. Entrance landing shall be provided at the starting and ending level of the ramp with the minimum length equal to 1.8mts.
g. Ramps shall lead directly to outside open spaces at ground level or courtyards or other safe places.
Parking to be provided
In any building, provision for parking shall be made as per requirements specified in section:c, planning regulation or as per Schedule No.27.
Parking for people with disability shall be provided for all buildings and facilities other than dwelling ‐1&2 as per Performance Regulation 2 1 . 2 . 2 (5).
21.1.2Boundary Gate/ Compound Gate
Boundary gate shall not open outward and shall be provided with a means to prevent the gate from opening outward on the pavement or road.
The minimum width of a boundary gate for all uses except Dwelling‐1&2 shall be 6 mts.
For building‐units at junction of roads, the following shall be applicable:
a. A gate shall not be permitted on the curvature of the boundary wall.
b. If the adjacent road width is equal or more than 12mts, the opening in the boundary wall shall be located at a minimum distance of 15mts. from the corner of the buildingunit at the junction. If the length of the road side edge is less than 15mts, the opening in the boundary wall shall be provided at the farthest end from the junction.
Level of Building‐unit
The level of the Building shall be established with respect to the average ground level or High flood level, as may be applicable. This level shall in no cases be lower than the crown level of the adjacent road. For Building‐units with access from two or more roads, the level shall be considered from the wider road.
In the case of a building‐unit where the level of the land is lower than the crown of the road in front and which in the opinion of the Competent Authority, could be drained off in the storm water drainage and sewer, the Competent Authority may permit a suitable lower level.
Any difference between the building‐unit level and road level shall be accommodated within the building‐unit boundary.
Paving in Building unit
Maximum of 50% of the total open space including marginal open spaces and common plot of a building‐unit shall be paved. The remaining shall be permeable for rain water percolation.
Access Path
Access path from the building‐unit entry to the building entry or plinth shall have a minimum width of 1.8mts with an even surface and devoid of steps.
In case of a sloping access path, the gradient shall not be greater than 1:12.
Any difference between the road level and building‐unit level shall be accommodated within the building‐unit boundary. Selection of floor material shall be made suitably to attract or to guide visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons; hereinafter referred “o as "guiding floor material". Finishes shall have a non- slip surface with a texture traversable by a wheel chair. Kerbs wherever provided should blend to a common level.
For all Buildings (Except dwelling‐1&2):
Minimum one entrance shall be provided that is accessible by people with disability and accompanied by appropriate signages as per Regulation 21.7
Minimum width of this ramped access path shall be 1.2mts, 1.5mts and 1.8mts for the ramp length of 3.6mts, up to 9mts and more than 9.0mts respectively
The pedestrian ramp leading main entrance required as per these regulations may be provided in the margin.
In case of sloping access path or ramp:
a. The gradient shall not be greater than 1:12.
b. Minimum width of ramp shall be 1.2mts and the maximum continuous length shall be 9mts. Such ramp shall have 800mm high hand rail on both sides extending
300 mm beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.
c. Entrance landing shall be providing adjacent to ramp with the minimum dimension 1.2mts x 1.5mts.
d. The surface shall adequately visually impaired by using colour and material guide brightness that is different from the surrounding floor material or by using ‘guiding floor material’ that emits different sounds.
e. Finishes shall have a non‐slip surface with a texture traversable by a wheel chair.
f. Curbs, wherever provided, should blend to a common level.
For any additional stepped approach:
a. Minimum width shall be 1.35mts.
b. Size of tread shall not be less than 300mm. and maximum riser shall be 150mm.
c. The steps shall not have abrupt (square) nosing.
d. Maximum number of risers on a continuous flight without landing shall be limited to 12.
e. The stepped approach shall be provided with 800mm high hand rail on both sides. Hand rails shall extend 300mm on the top and bottom flight of the steps.
f. All steps edges shall have a contrasting colour band of 50mm width stretched entirely across the step width. The edges should also be non‐slippery.
Plinth
minimum height of 0.45mts from the established level of the building‐unit.
The building may be permitted on hollow plinth at the ground level with the following provisions:
a. Has maximum height of 3.5mts from finished ground level to finished floor level and minimum height shall be 3.0mts from finished ground level to finished floor level and is free of enclosures except for staircase and other permitted uses under this Regulation.
Entrance
For all buildings other than Dwelling‐1&2, Entrance with the shall be provided: following specifications
Minimum clear opening of the entrance door shall be 900mm and shall not be provided with a step that obstructs the passage of a wheelchair user.
Level difference at threshold shall not Exceed12mm
Manual doors should incorporate kick plates 300mm high to withstand impact of wheelchair footrest where doors are glazed.
Door handle and locks should be positioned between 900‐1000mm above floor and must enable the user to operate it with a single hand.
Minimum Clearance Height in Buildings
1 For Dwelling Units or Commercial Buildings:
a. All habitable spaces shall have minimum height of 2.9mtsbetween finished floor levels.
b. All circulation and service spaces such as verandah, bath room, washroom, toilet, passage, puja room, store room and stair cabin shall have a minimum clearance height of 2.1mts.
For Industrial Uses, all occupiable spaces shall have a minimum clearance height of 3.0mts.
In case of folded roof, minimum clearance height shall be 3.0mts (measured from the lowest point of the fold).
4.In case of sloping roof, minimum clearance height shall be 2.2mts (measured from the lowest point of the roof). The average height of the room shall not be less than the minimum clearance height as applicable according to the building use and stipulated above.
5.In case of trussed roof, minimum clearance height shall be measured from the floor level to the bottom of the tie beam and shall be 2.8mts.
6. For Hollow Plinth:from finished ground level
to finished provided for the purpose of parking shall have maximum clear height of 3.5mts.
For Basement: Basement exclusively used for parking shall have minimum clear height of 2.8mts, and maximum clear height of 4.5mts, In case of mechanical parking more height may permitted.
Mezzanine
Mezzanine floor shall have a minimum clear height of 2.1mts which may be allowed in a room at a minimum clear height of 2.1mts from the floor level if the area does not exceed 30% of the area of the enclosed space.
Loft
Loft of a maximum height of 1.2mts may be allowed in a room at a minimum clear height of 2.1mts from the floor level if the area does not exceed 30% of the area of the enclosed space.
Design of Parking for Cars
Parking layout for cars in all buildings shall conform to the following specifications:1. Minimum dimension of a space provided for parking a car shall be 2.5mts x 5.5mts.2. Each car parking space should be connected to the street providing access to the building‐unit by means of an access/exit lane.
Minimum width of the access/exit lane for single‐ sided parking shall be 3mts and for double‐sided parking layout, the minimum width of the access lane shall be 5.5mts.
A minimum clear height of 2.6mts shall be maintained at all points in the parking space and access/exit lanes.
Minimum provision of two accessible car parking space shall be provided for people with disability for every 25 car parking spaces or less. This accessible car parking space shall:
a. have a minimum bay width of 3.6mts.
b. have a 1.2mts side transfer bay. This can be shared by two successive parking bays.
c. be located within 30mts from the main entrance of the building
a. have appropriate signages indicating that the space is reserved for wheel chair that are conspicuously displayed as specified in Regulation 21.7
b. have guiding floor materials or have a device to guide
visually‐ impaired persons with audible signals or any other devices which serves the above purpose.
c. Minimum 50% of the parking reserved for visitors shall be provided at ground level.
Design of Parking for Two‐Wheelers
Parking layout for two‐wheelers in all buildings shall conform to the following specifications:
Minimum dimension of a space provided for parking a two‐wheeler shall be 0.90mts x 2.0mts.
Each two‐wheeler parking space should be connected to the street providing access to the building‐unit by means of an access/exit lane. Minimum width of the access/exit lane shall be 2.0mts.
A minimum clear height of 2.6mts shall be maintained at all points in the parking space and access/exit lanes.
Design of Parking for Trucks
Parking layout for trucks in all relevant buildings shall conform to the following specifications:
Minimum dimension of a space provided for parking a truck shall be 4.0mts. X 8.0mts.
Each truck parking space should be connected to the street providing access to the building‐unit by means of an access/exit lane. Minimum width of the access/exit lane shall be 6.0mts.
Specified Parking for loading and unloading
In case of building used for mercantile(commercial, Industrial and storage purpose, additional parking space of 5.0m.x10.0m. for loading and unloading activity shall be arranged at the rate of one such space for each 1000 sq.mt. of floor area or fraction thereof.
Lighting
Adequate natural and artificial lighting as published in the National Building Code of India, Part VIII – Building Services, Section I, shall be provided in all parts of a building to the satisfaction of the Competent Authority.
Ventilation
8.4.5Margins for GMC.
Margins for GMC as shown in table 8.4.4. A to 8.4.4.O
Table 8.4.4.AMinimum Road and other Side Margins : Residential zone 1 for GMC
Sr. No
Plot Size (in Sq. mt)
Margin (in mt)
Balcony and Projections (in mt.)
Along Town Roads
Along Interior Roads
Rear
Sides
Front
Side
Rear
Stair landing
May be covered
1
50
6.0
1.5
1.5
-
1.2 X 5
-
-
-
2
70
6.0
1.5
1.5
-
1.2 X 7
-
-
-
3
81 (Row)
6.0
1.5
2.0
-
0.45 X 4
-
0.45 X 4
-
81(Twin)
6.0
-
2.0
1 side2.0
-
0.45 X 4
0.45 X 4
-
4
90
6.0
-
2.0
1 side2.0
-
0.45 X 4
0.45 X 4
-
5
135
6.0
2.5
2.15
1 side2.0
1.20 X4
0.45 X 4
0.45 X 4
0.45 X 4
6
200
6.0
3.0
2.0
1 side2.5
No Balcony Allowed
7
250
6.0
3.0
2.0
1 side3.0
8
330
6.0
3.0
2.0
2.0
9
504 &above
6.0
4.0
3.0
2.0
Note: The end plots in different categories of plots with the area differing from its category the margins applicable shall be of the same category.
Table 8.4.4.B: Minimum Road and other Side Margins : Residential zone 2 for GMC
Sr No.
Plot Size (in sq.m)
Margins (in mt.)
Along Town Roads
In case of Interior Roads
Rear
Sides
(1)
(2)
(3)
(4)
(5)
(6)
1
330
6.0
5.0
3.0
2.75
2
504
6.0
6.0
4.0
3.0
3
750
6.0
7.0
5.0
4.0
4
900
6.0
8.0
6.0
4.5
5
1100
6.0
10.0
7.0
5.0
6
1650 & Above
6.0
12.0
8.0
6.0
Note: The end plots in different categories of plots with the area differing from its category the margins applicable shall be of the same category.
Table 8.4.4.CMinimum Road and other Side Margins : Residential zone 3 for GMC
Sr.No
Plot Size(in Sq.mt)
Margin (in mt)
Balcony and Projections (in mt.)
Along TownRoads
Along InteriorRoads
Rear
Sides
Front
Side
Rear
StairLanding
May be Covered
1
50
3.0
1.5
1.5
-
1.2 X 5
-
-
-
2
70
3.0
1.5
1.5
-
1.2 X 7
-
-
-
3
81 (Row)
3.0
1.5
2.0
-
0.45 X 4
-
0.45 X 4
-
81 (Twin)
3.0
-
2.0
1 side 2.0
-
0.45 X 4
0.45 X 4
-
4
90
3.0
-
2.0
1 side 2.0
-
0.45 X 4
0.45 X 4
-
5
135
3.0
2.5
2.15
1 side 2.0
1.20 X 4
0.45 X 4
0.45 X 4
0.45 X 4
6
200
3.0
4.0
2.0
1 side 2.5
No Balcony Allowed
7
250
3.0
4.0
2.0
1 side 3.0
8
330
3.0
3.0
2.0
2.0
9
504 & above
3.0
4.0
3.0
2.0
Note: The end plots in different categories of plots with the area differing from its categorythe margins applicable shall be of the same category.
Table 8.4.4.DRoad side margins for Residential Renewal Zone I (RR -1) for GMC
Road Width (mts)
Road side Margins (mts)
Up to 10
3.0
Above 10 and Up to 18
4.5
Above 18
6.0
Table 8.4.4.ESide and Rear margins for Residential Renewal Zone I (RR -1) for GMC
Building Height (mts)
side and rear Margins (mts)
Up to 15 mt height
3.0
Above 15 and Up to 25
4.0
Table 8.4.4.FRoad side margins For Commercial Zone I (C -1) for GMC
Road Width (mts)
Front Margins (mts)
Less than 12
4.5
12 mts and above
6.0
Table 8.4.4.GSide and Rear margins for Commercial Zone I (C -1) for GMC
Plot Size (sq. mts)
side and rear Margins (mts)
Less than 1000
3.0
1000 and above
4.5
Table 8.4.4.HMargins for Green Institutional Zone I (GI-1) for GMC
Plot Size(sq. mts)
Margins (mts)
Max Ground Coverage(%)
Front
Rear
Sides
50 x 50 (2500)
10.0
8.0
8.0
40.0
25 x 50 (1250)
8.0
6.0
6.0
40.0
25 X 40 (1000)
6.0
6.0
6.0
40.0
20 x 30 (600)
6.0
4.0
4.0
40.0
10 x 20 (200)
5.0
2.5
2.0
40.0
The end plots in different categories of plot with area differing from its category,the margin applicable shall be of the same category. The plot sizes shall be as per allotment by the government .
Table 8.4.4.IMargins for Institutional Zone III (I-3) for GMC
Road Width (mts)
Margins (mts)
Less than 24
4.5
24 mts and above width
6.0
Minimum margins on remaining Sides
4.5
Table 8.4.4.JMargins for Industrial Zone I and II (GIDC-1 and 2) forGMC
Road Width (mts)
Margins (mts)
Min road side margin for plots abutting 30mt. and above road
9.0
Min road side margin for plots abutting less than 30mt.
6.0
All side margins for all plots
3.0
Table 8.4.4.KMargins for Recreational Zone I (Re-1) for GMC
Road Width (mts)
Margins (mts)
Min road side margin for plots abutting "J" road
12.0
Min road side margin for plots other than abutting "J" road.
9.0
Minimum margin from river edge
30.0
All side margin for all plots
3.0
Table 8.4.4.LMargins for Industrial use for GMC
Road Width (mts)
Road side Margins (mts)
Required side and rear Margins (mts)
Plot Area (Sq.mt.)Upto 1000
Plot Area 1000Above 1000
Upto 12
As per side margin
4.5
6.0
Above 12 and upto 18
6.0
4.5
6.0
Above 18 and upto 30
7.5
4.5
6.0
Above 30
9.0
4.5
6.0
Table 8.4.4.Mminimum side and rear margins for all building units upto 500 sq.mts for Dwelling – 1 & 2 for GMC
Area of building unit (sq.mts)
Required rear margin
Required side margin
Upto 150
2.25 mts
Not required
Above 150 and upto 300
2.25 mts
1.5 mts (any one side)
Above 300 and upto 500
2.25 mts
3.0mts (both sides)
building unit area above 500 sq.mts and , the minimum side and rear margin other than Dwelling - 1 & 2
Area of building unit (sq.mts)
Building height
Required margins (mts)
Upto 750 sq.mts
Upto 25 mts
3.0
More than 750 sq.mts
Upto 15 mts
3.0
Above 15 mts and upto 25 mts
4.0
Above 25 mts and upto 45 mts
6.0
Table 8.4.4.NMinimum Rear & Side Margins in mt for Residential Zones GMC
Sr. No.
PS (sq.mt)
R1 Zone
R2 Zone
R3 Zone
Rear
One Side
Second Side
Rear
One Side
Second Side
Rear
One Side
Second Side
1
50
1.5
0
0
0
0
0
1.5
0
0
2
70
1.5
0
0
0
0
0
1.5
0
0
3
81-Row
2.0
0
0
0
0
0
2.0
0
0
4
81-Twin
2.0
2.0
0
0
0
0
2.0
2.0
0
5
90
2.0
2.0
0
0
0
0
2.0
2.0
0
6
135
2.0
2.0
0
0
0
0
2.0
2.0
0
7
200
2.0
3.0
0
0
0
0
2.0
3.0
0
8
250
2.0
3.5
0
0
0
0
2.0
3.5
0
9
330
2.0
3.5
2.0
2.0
3.5
2.0
2.0
3.5
2.0
10
504
2.0
3.5
2.0
2.0
3.5
2.0
2.0
3.5
2.0
11
750
2.0
3.5
2.0
3.0
3.5
3.0
2.0
3.5
2.0
12
900
2.0
3.5
2.0
3.0
4.5
3.5
2.0
3.5
2.0
13
Note of Table .7.4.4.NS
*The end plots in different categories of plots with the area differing from its category the margins applicable shall be of the same category.
*The margin regulations for plot sizes varying between above specified plot sizes shall follow the margin regulations with respect to the cluster it belongs to.
*The specified uses shall be permitted for plots facing town road only after providing the 6.0m wide service road. This service road shall have maximum three entries from the town roads.
Table 8.4.4.PPermissible Ground Coverage in GMC
Sr. No
Zone
Uses
Ground Coverage (%)
1
Institutional Zone II
Educational, Public Utilities and Facilities buildings
66%
Social sports and cultural buildings
33%
office and other buildings
40%
2
Institutional Zone III
30%
For Zones other than mentioned above Gound coverage shall be the area remaining after providing required margins
3.0
3.0
---
---
---
D4, D5, D7(A)
3.0
3.0
3.0
6.0
---
D7(B), D8
3.0
3.0
3.0
---
---
Note: 1. BH means "Building Height" 2. Special buildings margin between two buildings and common plot as stated above.
8.4.4. Rear Margins and side margins for different categories.
Table 8.4.3: Rear and Side Margins : All Category except GMC & D9
Sr.No.
Use
Area of Building Unit (PS) in Sq.mt.
Required Rear Margin in mt.
Required Side Margin in mt.
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
1
Dwelling 1-2
PS ≤ 150
2.25
Not Required
PS > 150 &≤ 300
2.25
1.5 (Any one side)
PS > 300 &≤ 500
2.25
3.0(bothside)
PS > 500
3.00
3.0(bothside)
2
Other than Dwelling1-2 & Industrial use
B.H. ≤ 15mt.
3.0
3.0 F
or PS ≤ 750.0 sq.mt., reuired margins shall be 3.0mt., for building height upto 25.0 mt.
B.H. > 15mt. & B.H.≤25mt.
4.0
4.0
B.H. > 25mt. & B.H.≤45mt.
6.0
6.0
B.H. > 45mt.
8.0
8.0
3
Industrial use
PS ≤ 500
3.0
3.0
PS > 500 &≤ 1000
4.5
4.5
PS > 1000
6.0
6.0
Note: B.H. means "Building Height" PS means " Plot Size"
Note:-50% of the visitor parking shall be provided at ground level.
Note:-50% of the visitor parking shall be provided at ground level.
Note:-50% of the visitor parking shall be provided at ground level.