11.1 In all Complexes including Residential Complexes, Hotels, restaurants and Lodges, business buildings, commercial buildings, Institutional buildings like hospitals, Educational buildings like schools and colleges, multi-storied buildings/Complexes, etc and all other non-residential activities provision shall be made for parking spaces as per the following requirements:
TABLE VI
Category of building/activity
Parking area to be provided as percentage of total built up area
In MCH Area
In Municipalities and rest of Development Authorities areas
Shopping Malls with Multiplexes, Multiplex Complexes, Information Technology Enabling Services Complexes
60 %
50 %
Hotels, restaurants, lodges, Cinema halls, business buildings, other commercial buildings, Kalyana Mandapams, Offices, & high-rise buildings / Complexes
11.2 The parking spaces may be provided in (for all Schemes) :
(a) basements or cellars (one or more)/multi-level (allowed for plots 750 sq m and above only); or
(b) on stilt floor or in upper parking floors (at any level)
(c) in the open space over / setbacks (except the front setback) to be left around the building with adequate vehicular access, aisle, drives, ramps required for maneuvering of vehicles, or
(d) common pool parking area (in the case of Group Housing Scheme/Residential enclave/Cluster housing/Row housing schemes) or
(e) a combination of any or all the above
11.3 The other aspects for providing parking spaces are:
(i) Common and Continuous cellar parking floors between adjoining buildings would be allowed depending upon structural safety aspects, mutual agreement between owners, etc.
(ii) The parking spaces should be efficiently designed and clearly marked and provided with adequate access, aisle, drives and ramps required for maneuvering of vehicles.
(vii) Stilt floor /Cellar parking floor shall be used only for parking and not for any habitation purpose. Misuse of the area specified for parking of vehicles for any other use shall be summarily demolished / removed by the Enforcement Authority.
(viii) For parking spaces in basements and upper storeys of parking floors, at least two ramps of minimum 3.6 m width or one ramp of minimum 5.4 m width and adequate slope shall be provided. Such ramps may be permitted in the side and rear setbacks after leaving sufficient space for movement of fire-fighting vehicles. Access to these may also be accomplished through provisions of mechanical lifts.
(ix) Basement/cellar shall be set back at least 1.5 m from the property line.
(x) Up to 10% of cellar may be utilised for utilities and non-habitation purpose like A/C Plant room, Generator room, STP, Electrical installations, Laundry, etc,
(xi) Space over and above 6m in front setback may be considered as off-street parking space.
(xii) Visitors’ parking to be provided shall be 10 % of the area mentioned in Table VI, and may be accommodated in the mandatory setbacks other than the front setback, wherever such setbacks are more than 6m.The Visitors’ Parking facility shall be open to all visitors.
(xiii) In respect of Apartment Complexes / Building / Block, in sites up to 750 sq m the Parking requirement shall be deemed to be met if the entire stilt floor is left for parking. A WC/Toilet facility shall be provided for watch and ward in the stilt floor.
front – as per building line
setbacks on remaining sides – 50% of setbacks given in Table III
(d) No fees and other charges shall be charged by the Sanctioning Authority for the area/floors developed as Parking Complex / Parking lot;
(e) A moratorium on property tax for 5 years would be considered;
(f) For the next 5 years – Property tax shall be levied on the lowest slab of residential category.
Such parking facility enclaves may be permitted along or off main commercial roads, city center, close to Bus stations, Railway Stations and any public transport system so as to encourage use of public transport, etc. Access to these parking spaces in such Complexes may be accomplished through provision of mechanical lifts. Such areas may be identified by the sanctioning authority and notified to public every year by 1st April.
12. RESTRICTIONS ON PROJECTIONS ALLOWED IN MANDATORY OPEN SPACES:
Only the following Projections shall be allowed in the mandatory open spaces / setbacks / interior open spaces:
(i) No balcony projections or corridor shall be permitted beyond the setbacks i.e., projecting within the mandatory open spaces in case of non-high rise buildings. These, if provided for, shall be set back as per the minimum mandatory open spaces and the setback shall be clear from the edge of the balcony or corridor.
(ii) Cornice, Chajjas / weather shades only of width not exceeding 60cm shall be allowed in the mandatory setbacks.
11.4Encouragement for provision of Parking Complexes
To encourage parking complexes, Parking lots and enclaves, owners who develop parking complexes / Parking lots, the following incentives would be considered:
(a) equivalent built up area of such Parking Complex / or area of Parking lot as the case may be would be considered as Transferable Development right by the sanctioning authority.
(b) In an existing area/locality where an owner or two or more owners come together and develop combined or common parking Complex, pedestrian plaza/ subway, or improve/facilitate additional access by linking with surrounding roads etc for public usage are provided, as part of their premises / land development/improving the urban design aspects, additional bonus built up area /TDR would be considered by the sanctioning authority.
(c) The setbacks for Parking Complexes shall be as follows:
(iii) In case of plots more than 300 sq m:
a. Sump, septic tank, well may be allowed in the rear and side open spaces. These shall need to be setback at least 1.5 m from the property or boundary line of the plot.
b. Parking sheds, generator room may be allowed in the rear and side open spaces.
c. In the front setback only a security guard booth of 2 sqm
The height of these accessory buildings shall not be more than 2.50 m and shall not occupy more than 1/4th of the plot width.
13. URBAN DESIGN AND ARCHITECTURAL CONTROL
For certain areas as well as sites abutting major roads of 30 mt and above, the Sanctioning Authority may enforce urban design and architectural control. These shall be detailed out keeping in view the development conditionalities and requirements given in these Regulations and the National Building Code norms. For this purpose, urban design and architectural control sheets/Plans approved by the Sanctioning Authority shall be complied with.
Obligations of the owner and licenced developer/builder / licenced technical personnel to implement and develop the Master Plan/Statutory Plan circulation network and specific land uses:
(1) Where any land or site or premises for building is affected in the statutory plan/ Master Plan road or circulation network or an road required to be widened as per a Road Development Plan, such area so affected in the road or circulation network shall be surrendered to the Sanctioning Authority by the owner of land. No development permission shall be given unless this condition is complied with.
(2) Upon surrendering such affected area,
the owner of the site would be entitled to a Transferable Development Right (TDR) as given in Rule 15 below.
C) Constitution of Building Ombudsman:
The Government may constitute a Building Ombudsman for dealing with all complaints of building violations, shortfall in building standards, services and specifications and safety aspects. The Government shall separately work out the procedure, role and details of the functioning of the Building Ombudsman.
23. LIMITATIONS OF BUILDING SANCTION:
Sanction of building permission by the Sanctioning Authority shall not mean responsibility or clearance of the following aspects:
(i) Title or ownership of the site or building
(ii) Easement Rights
(iii) Variation in area from recorded areas of plot or a building or on ground
(iv) Structural Reports, Structural Drawings and structural aspects
(v) Workmanship, soundness of structure and materials used,
(vi) Quality of building services and amenities in the construction of building
(vii) The site/area liable to flooding as a result of not taking proper drainage arrangements as per natural lay of the land, etc.
(viii) Other requirements or licences or clearances required for the site/ premises or activity under various other laws.
24. LICENSING OF REAL ESTATE COMPANIES, DEVELOPERS, BUILDERS, TOWN PLANNERS, ENGINEERS & OTHER TECHNICAL PERSONNEL MANDATORY:
(a) No developer/builder/real estate firm or company/engineer/town planner/other technical personnel shall be allowed to undertake development/do business/ practise in a Municipal Corporation/ UDA/ Municipal area unless they are licenced with the sanctioning authority of the respective area. Architects shall be required to be registered with the Council of Architecture.
(b) The engaging of the services of a licenced developer/builder shall be mandatory for Apartment Buildings, Group Housing Schemes, all types of gated developments mentioned in Rule 10, all High-Rise Buildings, and all commercial complexes.
Developments undertaken for construction of individual residential houses, normal educational/institutional/industrial buildings and developments undertaken by public agencies are exempted from the above condition.
(c) Any developer/builder undertaking development or any firm doing property business in any Municipal Corporation/UDA/Municipality or soliciting property sale/transactions or advertising as such in case of above, shall necessarily mention the details of it’s licence number, licence number of the licenced developer to whom the approval is given by the said Municipal Corporation / UDA / Municipality, together with the permit number and it’s validity for information and verification of public/prospective buyers.
(d) Absence of the above or suppressing of the above facts or in the case of other licences and other technical personnel who violate the conditions would invite penal action including debarring of the real estate firm/development firm / company from practice in the local authority area for 5 years besides prosecution under the relevant laws / code of conduct by the sanctioning authority.
(e) Any licenced developer / builder / other technical personnel who undertake construction in violation of the sanctioned plans shall be warned in the first instance and in the second instance, this would entail cancellation of their licence besides being prosecuted under the relevant laws / code of conduct.
(f) The format for application forms for licencing of developers / builders, real estate firms, town planners, architects, engineers, other personnel, and other conditions shall be as prescribed.
(by Order and in the Name of the Governor of Andhra Pradesh)
S.P. Singh, Secretary to Government.
To
The Commissioner, Printing, Stationary and Stores Purchase, Hyderabad. (with a request to public in the extraordinary Gazette of AP on 04.03.2006 and furnish 1000 copies to Government)
The Commissioner, Municipal Corporation of Hyderabad, Hyderabad.
The Vice-Chairman, Hyderabad Urban Development Authority, Hyderabad.
The Vice-Chairman, Cyberabad Development Authority, Hyderabad.
The Vice-Chairman, Hyderabad Airport Development Authority, Hyderabad.
The Vice-Chairman, Buddha Purnima Project Authority, Hyderabad.
The Director of Town and Country Planning, Hyderabad.
All Departments of Secretariat,
All Heads of Departments.
The Director General, Fire Services, Hyderabad.
The Chairman and Managing Director, APTRANSCO., Hyderabad.
The Managing Director, H.M.W.S. & S.Board, Hyderabad.
The Commissioner and I.G. of Registration and Stamps, Hyderabad
The Managing Director, A.P.Housing Board, Hyderabad.
The District Collector, Hyderabad District, Hyderabad.
The District Collector, Ranga Reddy District, Hyderabad.
The District Collector, Medak District, Sangareddy.
Copy to:
The Special Secretary to Hon’ble Chief Minister.
The P.S. to M ( M A & UD).
The P.S. to Secretary to Government, MA&UD.
Sf/Sc.
OR
the owner shall be allowed to construct an extra floor with an equivalent built up area for the area surrendered, subject to mandated public safety requirements.
15. GRANT OF TRANSFERABLE DEVELOPMENT RIGHT:
Grant of Transferable Development Right (TDR) may be considered by the Competent Authority for the following areas subject to the owner complying with the conditions of development above, as per the following norms:
(a) For the Master Plan road network undertaken and developed: equivalent to 100% of built up area of such area surrendered.
(b) For conservation and development of lakes / water bodies / nalas foreshores & Recreational buffer development with greenery, etc: equivalent to 50 % of built up area of such recreational buffer area developed at his cost.
(c) For Heritage buildings and heritage precincts maintained with adaptive reuse: equivalent to 50 % of built up area of such site area.
The TDR may be arrived at on the basis of relative land value and equivalent amount in both export and import areas, as per the Registration Department records. The Competent authority shall have the discretion in the matter of applicability of TDR. The TDR shall not be allowed in unauthorized buildings/structures/constructions. The TDR Certificate would be issued by the Competent authority would be valid or utilized/ disposed only within the concerned local body area and as per guidelines and conditions prescribed by the Competent Authority.
16. LEVY OF SPECIAL FEES AND OTHER PROVISIONS FOR CERTAIN AREAS:
The Sanctioning Authority with the specific approval of the Government may, when implementing such Projects, levy Special fees and other fees / charges for lands / sites / premises abutting or in the vicinity of the Ring Road or other highways / major roads or the Mass Rail Transit System / Light Rail Transit / MMTS route indicated in the Master Plan, at the rates and procedure prescribed by the Government.
17. CITY LEVEL INFRASTRUCTURE IMPACT FEES APPLICABLE IN CERTAIN CASES:
(1) With a view to ensuring development of City Level Infrastructure facilities and levy of Impact Fees, buildings are categorized as follows:
Type I : Buildings up to height 15 m excluding stilt parking floor
Type II : Buildings of height above 15 m (excluding stilt floor)
The City level Infrastructure Impact Fees would be levied for Buildings under Type II above as follows:
First 15 m or 5 floors (whichever is less): No levy of Impact fee
For any additional floors or part thereof: at differential rates specified in Table below:
Occupancy / Use
Height of Building (in metres) and rate in Rs. per sq m of built up area
(2) Alternatively, the owner may be allowed to utilize TDR given in Rule 14 above, for such built up area to the extent permissible wholly or use the same in combination of both TDR and the differential impact fee for the proposed additional built up area that is permissible under these Rules / Provisions. The Government may revise the above rates from time to time.
(3) The above rates shall not be applicable for Government Departments and public agencies like Urban Development Authority, APIIC, local bodies and HMWSSB.
(4) The amount levied and collected under above Rule shall be credited and maintained in a separate escrow account by the concerned sanctioning authority and 50% utilised for development of infrastructure in the same area and balance utilised towards improvement of city level capital infrastructure in the area. An Infrastructure Plan and Action Plan for implementation is required to be undertaken by the Competent authority and the said Fund utilised accordingly.
(5) The Premium on F.A.R. charges leviable in CDA area and the impact fees being levied in MCH area are dispensed with.
18. INCENTIVES FOR OWNERS LEAVING MORE SETBACKS / INSTALLING SOLAR HEATING SYSTEM / LIGHTING / RAIN WATER HARVESTING / RECYCLING OF WASTE WATER:
The following incentives in terms of rebate in Property tax will be given by the local authority for owners or their successors-in-interest who:
(a) Construct the building /blocks by leaving more setbacks than the minimal stipulated in these Rules:
Leaving 1.5 times the minimum setbacks in all sides: 10 % rebate*
Leaving 2.0 times the minimum setbacks on all sides : 20 % rebate*
* The setbacks has to be on all sides to qualify for the rebate. Leaving more on one side and the minimum on other sides would not qualify for such rebate.
(b) Install and use solar heating and lighting system : 10 % rebate.
(c) Undertake both recycling of waste water and rain water harvesting structures: 10 % rebate
d) Where owners provide at least 25% additional parking space over and above the minimum specified in Rule 11, they would be allowed for a rebate of 10 % in property tax.
19. BUILDING PERMIT/LICENSE FEES & UNDERTAKING:
a) The Sanctioning Authority shall along with the Building Application levy and collect 2% of the Building Permit / License fees, subject to a maximum of Rs.10,000 as initial fees. The balance building permit / License Fees together with other fees and Charges shall be levied and collected before the issue of permission/sanction. In case of rejection of application, the above initial fees would be forfeited.
b) No fees and charges would be levied for parking spaces provided in stilt/cellar floors.
20. COMPLIANCE BY OWNER FOR ENSURING CONSTRUCTION IS UNDERTAKEN AS PER SANCTIONED PLAN:
a) The owner and builder/developer shall give an Affidavit duly notarized to the effect that in the case of any violation from the sanctioned building plan, the Enforcement Authority can summarily demolish the violated portion. In respect of Apartment Buildings, the owner or builder shall give a Declaration duly specifying the number of floors permitted, the number of flats/apartments in each floor along with the extent of each flat. In case of any violation with regard to the Declaration, the Enforcement Authority can demolish the violations.
b) Before the release of the building sanction by the sanctioning authority, the owner of the plot/site is not only required to produce the original Sale Deed, registered under the provisions of the Indian Registration Act, 1908 for the perusal of the sanctioning authority and cross verification with the attested copy submitted with the building application.
c) The owner is required to hand over the ground floor area or first floor or the second floor area, as the case may be, to the sanctioning authority by way of a Notarised Affidavit and after the setbacks and open spaces are demarcated on the site. The Notarised Affidavit shall be got entered by the sanctioning authority in the Prohibitory Property Watch Register of the Registration Department. Then only the Building sanction will be released and the owner shall be allowed to commence the construction.
The system of taking a Security Deposit is dispensed with.
(i) The sale or disposal of such built up area under the said Notarised Affidavit by way of sale, lease and registration of such buildings shall be allowed by the Registration Authority only after an Occupancy Certificate is obtained from the sanctioning authority.
(ii) In case of any violation of building construction onto the setbacks or open space or area to be left for any road widening, shall be removed by the owner within one week of issue of Notice by the Enforcement Authority.
(iii) Upon failure to comply with the above direction of the Enforcement Authority, the Sanctioning Authority may dispose the handed over portion of the building by public auction duly removing the violated portion.
(iv) The sanctioned plans giving other details along with sanction date, built up area permitted, area handed over to the sanctioning authority, and insurance policy details shall be displayed by the owner/builder on Board at the site.
(v) A comprehensive building compliance insurance policy has to be taken covering aspects of building services, fire safety, maintaining mandatory setbacks /open spaces, and landscaping of the site (the terms and conditions and other details of which would be separately worked out) before commencement of construction,
21. OCCUPANCY CERTIFICATE:
(i) Occupancy Certificate shall be mandatory for all buildings. No person shall occupy or allow any other person to occupy any building or part of a building for any purpose unless such building has been granted an Occupancy Certificate by the Sanctioning Authority.
(ii) The owner shall submit a notice of completion through the registered architect and licenced builder/developer along with prescribed documents and plans to the Sanctioning Authority. The Sanctioning Authority on receipt of such notice of completion shall undertake inspection with regard to the following aspects:
(a) Number of floors
(b) External setbacks
(c) Parking space provision
(d) Abutting road width
and shall communicate the approval or refusal of the Occupancy Certificate within 15 days or may issue the same after levying and collecting compounding fee, if any, as follows:
(iii) The sanctioning authority is empowered to compound the offence in relation to setbacks violations (other than the front setback) upto 10%, duly recording thereon the violations in writing. The rate of Compounding fee shall be a minimum rate of Rs.1000 per sq m of built up area on each floor in Municipal Corporation areas and at the rate of Rs.500 per sq m in case of other Municipal areas and UDA areas, and the Government may revise this rate from time to time. Compounding of such violation shall not be considered for buildings constructed without obtaining any sanctioned plan. This shall be maintained in a separate escrow account and utilised towards improvement of the roads and public open spaces development in the area.
(iv) For all high rise buildings, the work shall be subject to inspection by the Fire service Department and the Occupancy Certificate shall be issued only after clearance from the Fire Services Department with regard to Fire Safety and Protection requirements.
(v) The functional/line agencies dealing with electric power, water supply, drainage and sewerage shall not give regular connections to the building unless such Occupancy Certificate is produced, or alternatively may charge 3 times the rate in the absence of Occupation Certificate for such buildings. In addition to the above, the local body shall collect every year two times the property tax as penalty from the owner/occupier.
(vi) The Registration Authority shall register only the permitted built up area as per the sanctioned building plan and only upon producing and filing a copy of such sanctioned building plan. On the Registration Document it should be clearly mentioned that the registration is in accordance with the sanctioned building plan in respect of setbacks and number of floors.
(vii) The financial agencies/institutions shall extend loan facilities only to the permitted built up area as per the sanctioned building plan.
22. ENFORCEMENT
A) In addition to the enforcement powers and responsibilities given in the respective laws of the local authority, in respect of these Rules:
(i) The Enforcement Authority concerned shall be wholly and severally responsible for ensuring and maintaining the road right of way/width and building restrictions as given in these Rules. The Enforcement Authority shall particularly check all buildings/structures for any violations along all main roads/public roads and take action to remove these.
(ii) The Enforcement authority shall summarily remove any violation or deviation in building construction in maintaining the road widths and building line.
B) Constitution of Town Planning and Building Tribunal:
The Government shall constitute a Town Planning and Building Tribunal for dealing with all town planning, enforcement and building issues by making necessary amendment to the AP Urban Areas (Development) Act, 1975.