(A) Regarding submission of plan by Govt. Department, the procedure shall be as follows:
(a) All building whether by Government or Private Architects shall in all its aspects confirm to the byelaws.
(b) The Central/State Govt. or A&N Administration shall designate an authority within its own department to issue a certificate specifying that the bye-laws have been followed in all its aspects. The plan then that the
Procedure for Construction By govt.Agencies
Fees
3.8
bye-laws have been followed in all its aspects. The plans then need not be submitted to the local authority for approval.
(c) The certificate mentioned in 3.7 (A) (b) above shall preferably be given by a person not directly connected with the preparation of plan and specification.
(d) All Plans and other details shall be submitted to the local authority for information and record.
(e) In the case of construction of defence departments, layout plan should be submitted and general indication given whether they are residential or not so that the local authority can estimate the requirements of water, electricity and sewerage disposal.
No notice as referred to in 3.1 shall be deemed valid unless and until the person giving notice has paid the fees prescribed by the authority and an attested copy or duplicate copy of the receipt of such payment is attached with the notice.
3.9 (i) The fees as mentioned in 3.1 shall be charged in terms of the floor area of the building. In the event of a “building permit” is not issued the fees so paid shall not be returned to the occupier by he shall be allowed to resubmit it with 10% of fee described under rule 3.8 after complying with all the objections raised by the authority within a period of 6 months from the date of rejection after which fresh fees shall have to be paid.
(ii) The building permit fees for all buildings shall be as under:
(a) All kind of residential building
Total covered - upto 150.00 sq.mtrs - Rs.04.00/M2
Area on all - upto 300.00 sq.mtrs - Rs.10.00/M2
Floors - above 300.00 sq.mtrs- Rs.20.00/M2.
(b) All Kinds of commercial building
Total covered - upto 150.00 sq.mtrs - Rs.40.00/M2
Area on all - upto 300.00 sq.mtrs - Rs.60.00/M2
Floors - above 300.00 sq.mtrs - Rs.120.00/M2.
Part IIProcedure for Obtaining Building Permit for the Erection of Buildings and Execution of Works.
Notice: 3.1 Every person, who intends to construct, reconstruct, alter or add to a building or demolish any building shall give notice to the authority for the approval of the site and for permission to execute the work in the forms specified in appendix ‘A’ with such variation as circumstances may require.
Site Plan: 3.2 It shall be accompanied by:
(i) Land Records- Revenue map and records entry pertaining to the plot on which building is to be constructed/ reconstructed altered or added, issued by the competent authority.
(ii) A Plan or Plans (in triplicate) of the building to be constructed, Reconstructed altered or added to draw or reproduced in a clear and legible manner of suitable or durable material and showing a ground floor plan, elevation or each floor and sections of the building and complying with the requirements specified in appendix ‘C’ and
(iii) A specification (in triplicate) complying with the requirements Specified in the Appendix ‘D’ as far as may be necessary.
(iv) An undertaking that coral shall not be used as a building material in any form.
3.3. All the plans shall be duly signed by the occupier/authorized agent and the registered architect, Regd. Or Licensed Supervisor and should indicate their names, address, qualifications and license number.
3.4 Every person who has given notice to the authority for the approval of the site and for permission for execution of work shall inform the authority in writing the date of commencement of the work and on completion of plinth level, roof level and report of completion to facilitate the authority for inspection.
Colouring the Plan 3.3 (A) The colours to be used in the plans shall be as in the following table.
Qualification of Regd.
Architect Regd.
Engineer Licenced Supervisor
Item
Site Plan
Building Plan
Amonia print white plan
Blue print
Amonia print white plan
Blue print
1.
Existing works
Black (out line)
White
Black
White
2.
Proposed works
Red (filled in)
Red
Red
Red
3.
Drainage & Sewerage work
Red dotted
Red dotted
Red dotted
Red dotted
4.
Water supply work
Black dotted thin
Black dotted thin
Black dotted thin
Black dotted thin
5.
Works proposed to be dismantled
Yellow hatched
Yellow hatched
Yellow hatched
Yellow hatched
6.
Open spaces
No colour
No colour
No colour
No colour
7.
Plot lines
Thick black
Thick black
Thick black
Thick black
8.
Permissible building line
Thick dotted black
Thick dotted black
--
--
9.
Existing street
Green
Green
--
--
10.
Future street if any
Green dotted
Green dotted
--
--
11.
Work to be regularized or diviation made
Red dotted
Red dotted
Red dotted
Red dotted
Drawing etc. 3.4 Every building work for which permission is sought under the Bye-Prepared by laws shall be designed and supervised by the Regd. Licenced Architect/Regd. Engineer/Licenced Supervisor. Qualification Architect etc. which a person shall have for registration as Reg-streed Architect/Regd. Engineer/Licenced Supervisor within the jurisdiction of the Port Blair Municipal Board shall be mentioned in 3.5(i) to 3.5(iii)
3.5 (i) The minimum qualification of a Regd. Architect Shall be a Regd. Architect with the COUNCIL of Architecture under the Architects Act, 1972 (20 of 1972).
(ii) The minimum qualification for a registered Engineer shall be the corporate membership (civil) of the institution of Engineer (India) of such degree or Diploma in civil, Municipal or Structural Engineering which makes him eligible for such membership.
(iii)The minimum qualification for Licenced Supervisor shall be: -
(a). 3 years Architectural Assistantship of Intermediate in Architecture or
(b). Diploma in Civil Engineer; or
(c). Certificate course in Draftsmanship in Civil Engineer form I.T.I. or equivalent with 5 (five) years experience.
3.5 (A) The Authority may decline to accept any plan, section or specification which does not bear the signature of a Reg. Architect, Regd. Engineer of Licensed Supervisor in token of its having been prepared by the Licensee or under his supervision.
Competence: 3.5 (b) (1) ARCHITECT/ ENGINEER
The licenced Architect is competent to carryout work related to building permit as give below and will be entitled to submit:
(a) All plans and related information connected with building permit.
(b) Structural detail and calculation for building on all plots.
(c) Certificate of supervision for all building.
(d) All Layout plans.
(ii)supervisor.
The Licenced Supervisor will be entitled to submit all plans and related Information connected with Building permit on plots up to 200 sq. Mtrs. And up to two storeys only. LICENCING 3.5 (c)
The qualified technical personnel or group as given in 3.5 shall be licensed with the authority as prescribed in appendix-k and the license shall be valid for one calendar year ending 31st December after which it shall be renewed annually.
Licence FEE 3.5(d)
A Registration/ Licence fee as prescribed in Appendix-‘K’ shall be charged for enlistment with the Municipal Council as Licensed Architect, Licenced Engineer, Licence Supervisor as the case may be.
3.6 Every Person, who intends to erect a building or execute any such work shall get its structural work designed by
(a) A registered Architect or Regd. Engineer in the case of RCC & STEEL structures for more then two storeyed residential buildings.
(b) A licenced supervisor in other cases.
3.7 No notice and building permit is necessary for the following alterations which do not otherwise violate any provisions regarding general building requirements structure stability and fire safety of the bye-laws:-
(a) Opening and closing of a window or door or ventilator;
(b) Providing intercommunication doors;
(c) Providing partition;
(d) Gardening;
(e) White Washing;
(f) Painting;
(g) Plastering and patchwork;
(h) Reflooring;
(i) Construction of sunshade; and
(j) Re-erection of portions of building damaged by earthquake or other natural calamities, to the same extent and specification as existed prior to such damage.
(c) Public Buildings
Total covered
Area on all - upto 150.00 sq.mtrs - Rs.10.00/M2
Floors - upto 150.00 sq.mtrs - Rs.50.00/M2
(d) Additions, - 50% of original permit Alterations & Fee. Revisi
Revisions
(e) Revalidation - 25% of the original permit fee per year after expiry of the original building permit.
Prevention of permit
- 10% in case the revalidation sort for before the expiry of the original building permit.
NOTE: In no case the building permit fee as specified above shall be less than Rs.100/-
3.10. notifications of stages :
(1) As work progresses under a building permit, the holder thereof shall cause the Authority to be notified at the following stages of constructions:
(a) Upon commencement of the work.
(b) Upon completion of the footings and before erection of the foundation walls; and
(c) Upon total completion of the work authorized by the building permit and before occupancy in the form prescribed in Appendix-‘E’.
(2) inspection at the stages referred to as (a) and (b) of sub-rules (1) shall be made by the Authority or any other Officer authorized by him within 7 days following the receipt of the Notice after which period the owner will be free to continue the construction according to the sanctioned plan. At the first inspection the Authority or the Authorised Officer shall determine to the best of his ability that the building has been located in accordance with the site plans and yard area complying with the requirement of these rules. The final inspection at the stage indicated in clause (c) of sub rule (1) shall be made within 21 days following the receipt of Notice for the grant of occupancy Certificate.
3.11. The sanction once accorded shall remain valid for 2 Years.
3.12. If during the construction of a building any departure of a substantial nature from the sanctioned plan in intended to be made, sanction of the authority shall be obtained before the change is made. The revised plan showing the deviation shall be submitted and procedure laid down for the original plan apply to such amended plan.
3.13 The authority may revoke any permit issued under the provisions of the Bye-Laws Wherever there has been any fake statement or misrepresentation of any material fact in the Application on which the permit was based.
3.14 The Authority may either sanction or refuse the plans and specifications or may sanctioned them with such modification and direction as it may deem necessary and there upon shall communicate its decision to the person giving the notice, in Appendix-‘E’ or ‘J’ as the case may be.
3.15 If within 60 days of the receipt of the notice under 3.1 of the bye-laws, the authority fails to intimate in writing to the person, who has given the notice of its refusal or sanction, the notice with its plans , statements shall be deemed to have been sanctioned, provided that the fact is immediately brought to notice of the Authority in writing by the person who has given notice and having not received any information from the authority within 30 days of giving such written notice subject to the conditions mentioned in this clause nothing shall be constructed to authorized any
Ground for refusal of Building plan of work
3.17
Temporary Occupancy
person to do anything in contravention of or against the terms or lease of titles of the land or any other regulations, bye-laws ordinance in operation, on the site of the works.
3.16 In the case of refusal, the authority shall quote the reason and relevant section of the bye-laws which the plan contravenes. The authority shall be as far as possible point out the objections to the plan and specifications in the first instance itself and ensure that no new objection are raised when they are resubmitted after compliance of earlier objections.
(A) The grounds on which the sanction of a building plan or work may be refused shall be the following namely:
(a)That the building or work or the use of the site for the building work or any of the particulars comprised in the site plan, ground plan elevation section or specification would contravene the provisions of any bye-laws made in this behalf or any other law or rule, bye-law of order made under such other law.
(b)That the notice of sanction does not contain the particulars or is not prepared in the manner required under the bye-laws made in this behalf.
(c)That any information or documents required by the Secretary/ an officer authorized by the Municipality under the Regulation or any bye-laws made there under has or have not been duly furnish ed.
(d) That in case falling under the section/layout plans have not been sanctioned in accordance with the bye-laws.
(e) That the building or work would be an encroachment on Govt. Land or land vested in the Municipality.
(f) That the site of the building or work does not abut on a street or projected on street and that there is no access to such building or work from any such street by a passage or pathway appertaining to such site.
The Secretary or any officer authorized by him with the approval of the Chairperson shall communicate the refusal along with the reason there of to the person who has given the notice.
3.18 Once the plan has been scrutinized and objection have been pointed out, the Occupier or owner giving notice shall modify the plan to comply with the objection raised any resubmit it, with the prescribed as mentioned as under 3.9
3.19 Upon the request of the holder of the permit, the authority may issue a temporary Occupancy certificate of occupancy for a building or part thereof before the entire work covered by the permit shall have been completed provided such portion may be, occupied safely prior to full completion of building without endangering life or Public Welfare.
Completion Certificate
Occupancy Certificate
Requirements Of Sites
Proximity Electric Lines
Proximity to Burial or Burning Grounds
Preservation of existing Trees
3.20 The Form of Notice of completion of the erection of a building or the execution of Any work required to be given shall be in the form set forth in appendix-E
3.21 With in a period of 30 days after receipt of the notice of completion referred to in by laws 3.18 the Authority shall communicate in the form set forth in appendix-F The requisite permission to occupied any such building or to use any building or a Part thereof effected by any such work.
4Health Sanitation and Other Requirments
4.1 Any land passage or any other area within the cartilage of a building shall if the Authority so requires be effectively drained by surface water drains or other means.
4.2 No verandah, Balcony or the like shall be allowed to be erected or re-erected or any additions or alteration made to building within a distance coated be below in accordance with the current Indian Electricity rules and its amendments from time to time between the building and any over head Electric supply lines.
VerticalClearanceFrom the highest point
HorizontalCleaaance fromthe nearest point
a)
Low & medium Voltage lines and Service lines
2.5
1.2
b)
High voltage line Up to and including33,000 volts
3.7
2.0
c)
Extra high voltage Lines beyond 33,000 Volts
3.7(+0.3for every additional33 KV)
2.0 (+0.3 for every additional 33KV)
(Plus 0.3m for every additional 33,000 volts or part thereof)
4.3 No building shall be constructed on any site, any part of which there is deposited refuse or other offensive matter objectionable to the Authority until such refuse has been prepared or left in manner suitable for building purposes to the satisfaction of the Authority.
4.4 No site which is situated with in a distance of 90 m from a place used as a burial or burning ground shall be used for the construction of any building without the previous approval of the Health Officer & no building intended for human habitation with in burning place or ground was closed or burning or burial place or ground shall be reconstructed or added to without the previous approval of the Health Officer.
4.5 No site shall be approve for construction of building unless provision of Suitable measures for checking the erosion of soil and sliding due to excavation are made to the satisfaction of Authority.
4.6 Every person who constructs, reconstructs, Alters or adds to a building shall carry out such measures as far as possible to conserve and protect all existing trees with a diameter of 30 cm
Preservation of Contamination to Fresh water source
4.7
Foundation
4.8
5.1
5.2
5.4
Requirements Of plinth
6.1
6.2
and more within his site provided That all dangerous trees which are likely to cause damage to his own all adjoining properties shall be caused to removed. The Municipal Board shall consult the town-planning branch of A.P.W.D/Directorate of town planning in giving permission for removal.
Every person who constructs, re-constructs, alters or adds to a building shall wherever the site is within 15m of any tank, reservoir, water course, river fresh water channel or well, carry out such measures as may be necessary or as the authority may direct for the purpose of preventing any contamination of any risk of the drainage of building passing into such tank reservoir, water-course, river, fresh water channel or well
Rain Water Harvesting
Every person who constructs, reconstructs, adds to a building or alters it, shall provide a proper spout /tank for collection of rain water which shall be utilized for various domestic purpose other than drinking.